You are on page 1of 24

ONE-PAGE SUMMARY OF CURRICULUM VITAE

Dr Noushad Ali Naseem Ameer Ali


PhD Civil Engr (Univ of Auckland), MSc Const Law & Arb (Kings College London), MSc Arch: Building Econs & Mgt (University College London), BSc (Hons)
QS (Reading), CDipAF, Cert Adj (RICS), Cert Adj (KLRCA)
PPRISM, FRISM, FCIOB, FCIArb, MNZIQS, MRICS, MAPM, AIQS (Affil), Reg QS (NZ), Reg QS (Msia)
Chartered Quantity Surveyor (UK), Registered Quantity Surveyor (NZ & M'sia), Chartered Construction Manager (UK), Accredited Mediator (CIDB, M'sia),
Panel Adjudicator (KLRCA & RICS)

Senior Lecturer
School of Engineering and Advanced Technology, Massey University,
Room 106.8, Building 106, Albany Highway, Auckland 0745, New Zealand
Phone: +64 9 414 0800 extn: 43562; Mobile and Whatsapp: +64 21 260 2520
E-mail: N.A.N.AmeerAli@massey.ac.nz; Private email: naseem6864@yahoo.com; Skype: naseem6864

Summary of experience
I have 30 years experience in both the construction industry and academia from the United Kingdom, Malaysia, and
New Zealand. My construction industry experience is in construction project management, construction contracts
consultancy, dispute resolution, quantity surveying, and commercial management. My academic experience
includes teaching and supervising students at both undergraduate and postgraduate levels.
Academic and professional qualifications
I have academic and professional qualifications from the UK, Malaysia, and New Zealand. I have a Bachelors
degree in Quantity Surveying, two Masters degrees one in Architecture majoring in Building Economics and
Management, and the other in Construction Law and Arbitration, and a PhD in Civil Engineering. The title of my
thesis was: Statutory Construction Adjudication Analysis of the New Zealand and Malaysian Legislations.
Current teaching at Massey University
I supervise students doing the Construction Research and Report paper at Bachelors and Masters levels and one
PhD student. I developed, as a team, and am now programme leader on New Zealands first Master of
Construction degree with a construction law specialization. I coordinate and teach the following papers:
Masters level: 218.763 Construction Law I, 218.764 Construction Law 2, 218.765 Construction Adjudication,
218.780 Construction Commercial Management
Bachelors level: 218.211 Construction Economics and Estimating, 218.311 Construction Contracts and
Financial Administration, 218.315 Construction Law
Research interests
My research and professional interests are in construction law, construction contracts, drafting contracts,
professional negligence, alternative dispute resolution including arbitration, adjudication, and mediation,
construction project management, procurement, and aspects of quantity surveying and commercial management.
Among the specific areas of research include studying various legislation in commonwealth jurisdictions governing
payment and adjudication in the construction industry including the New Zealand Construction Contracts Act 2002
and the Malaysian Construction Industry Payment and Adjudication Act 2012. I am also working on increasing
efficiency in adjudication by developing a web-based e-adjudication system.
I am also doing research on increasing efficiency by drafting construction contracts in modern plain language. I
authored the Model Terms of Construction Contract for Subcontract Work that was endorsed by 15 construction
related bodies in Malaysia. I also authored the Standard Terms of Construction Contract for Renovation and Small
Projects [STCC-RSP 2015] facilitated by the Construction Development Board Malaysia. It is the first construction
contract in the world to be accredited with the Clear English Standard by the Plain Language Commission, UK.
Continuing professional development
I keep up-to-date with new industry developments in my area and share my views on them. See for example my
submission to the New Zealand Commerce Select Committee on some of the proposals in the then Construction
Contracts Amendment Bill 2013 here:
http://www.parliament.nz/ennz/pb/sc/documents/evidence/50SCCO_EVI_00DBHOH_BILL11975_1_A348553/naseem-ameer-ali

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 1 OF 24

FULL CURRICULUM VITAE - CONTENTS


1
2
3
4

5
6

Academic Qualifications
Professional Qualifications
Career History
Industry And Academic Experience
4.1
Construction Industry
4.2
Academia - Teaching And Supervision
4.3
Academia - Course Development And Advisory
4.4
Academia - External Examiner
Professional, Industry, Government, Editorial and Other Appointments
Membership Of Other Professional Organisations

3
3
4
5

7
7

Appendix A - Publications And Presentations


8
A.1
Research Thesis and Dissertations
A.2
Publications Reports and Court Case Commentary
A.3
Publications - Book Chapter
A.4
Publications - Papers In Journals And Conference Proceedings
A.5
Presentations - A Representative Selection Of Presentations At Conferences And Seminars
Appendix B - Selection Of Dispute Resolution Experience Without Confidential Details

13

Appendix C - Details On Construction Project Experience Including Project Management,


Contract Management, And Cost Management Experience

14

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 2 OF 24

ACADEMIC QUALIFICATIONS

PhD Civil Engineering, University of Auckland. Thesis title: Statutory Construction Adjudication: Analysis
of the New Zealand and Malaysian Legislations. Supervisor: Professor Dr Suzanne Wilkinson. University
of Auckland, New Zealand [Part-time, completed 2015]

MSc Construction Law & Arbitration. Dissertation classification: Merit. Title: The Professional Liability of
the Project Manager, supervised by John Powell QC. Kings College London, University of London, UK.
[Part-time, completed 1992]

MSc Architecture Building Economics and Management. Dissertation classification: Distinction. Title:
Professional Responsibility in the Building Industry: A Critical Analysis in a Malaysian Context, supervised
by Professor John Andrews. University College London, University of London, UK. [Full-time, completed
1989]. Won British High Commissioners Award (Chevening Scholar)

Certificate in Adjudication, Royal Institution of Chartered Surveyors [2015]

Certificate in Adjudication, Kuala Lumpur Regional Centre for Arbitration [2012]

Certified Diploma in Accounting and Finance, Chartered Association of Certified Accountants [Part-time,
completed 1988]

BSc (Hons) Quantity Surveying, University of Reading, UK [Full-time, completed 1986]

PROFESSIONAL QUALIFICATIONS

Past President of the Royal Institution of Surveyors Malaysia [PPRISM]

Fellow of the Royal Institution of Surveyors Malaysia [FRISM]

Fellow of the Chartered Institute of Building, UK [FCIOB]

Fellow of the Chartered Institute of Arbitrators, UK [FCIArb]

Professional Member of the New Zealand Institute of Quantity Surveyors [MNZIQS]

Professional Member of the Royal Institution of Chartered Surveyors, UK [MRICS]

Registered Quantity Surveyor, Board of Quantity Surveyors Malaysia [Reg QS]

Registered Quantity Surveyor, New Zealand Institute of Quantity Surveyors [Reg QS]

Member of the Association for Project Management, UK [MAPM]

Affiliate, Australian Institute of Quantity Surveyors [Affil AIQS]

Accredited Mediator, Panel on Construction Industry Development Board, Malaysia

Panel Adjudicator, Kuala Lumpur Regional Centre for Arbitration

Panel Adjudicator, Royal Institution of Chartered Surveyors

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 3 OF 24

CAREER HISTORY

June 2010 -

Senior Lecturer
School of Engineering and Advanced Technology, Massey University, Albany, Auckland

2007 -

Director
CIC-QS Services, Kuala Lumpur, Malaysia (quantity surveying, project management
and construction contracts consultancy)

1995 - 2006
(Concurrent with below)

Managing Director
CIC-QS Services, Kuala Lumpur, Malaysia (quantity surveying, project management
and construction contracts consultancy)

1998 - 2006

Director
HPRC Consulting Group, Kuala Lumpur, Malaysia (off-shoot of the High-Point Rendel
International Group of British origin project management, cost management, and
construction contracts consultancy)

1997

Director
High-Point Rendel Consultants, Kuala Lumpur, Malaysia (part of the High-Point Rendel
International Group of British origin project management, cost management, and
construction contracts consultancy)

1996

Deputy Technical Director (Contracts & Commercial)


High-Point Rendel Consultants, Kuala Lumpur, Malaysia

1995

General Manager (Technical Services)


High-Point Rendel Consultants, Kuala Lumpur, Malaysia

1994 - 1995

Executive Director
Beard Dove (Malaysia) Kuala Lumpur, Malaysia (part of the Beard Dove International
Group, of British origin project management, cost management, and construction
contracts consultancy)

1993 - 1994

Project Manager
Beard Dove (Malaysia), Kuala Lumpur Malaysia

1991 - 1993

Senior Lecturer
Leeds Metropolitan University, Leeds, United Kingdom

1989 - 1991

Quantity Surveyor
Francis Graves Ltd, Quantity Surveyors and Project Managers, London, United Kingdom

1986 - 1988

Quantity Surveyor
Basar & Harun, Quantity Surveyors, Petaling Jaya, Malaysia

1985

Trainee Quantity Surveyor


Jurukur Bina, Kuala Lumpur, Malaysia

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 4 OF 24

INDUSTRY AND ACADEMIC EXPERIENCE

4.1

Construction Industry

I have 30 years of professional experience. My experience includes the areas of project management, quantity
surveying, construction contracts consultancy, and dispute resolution services including arbitration, adjudication,
and mediation. I have also acted as expert witness in arbitration and the courts. I have acted as consultant for
both client organizations and construction companies.
The range of types of projects I have been involved in include offices, hotels, banks, apartments and
condominiums, housing developments, mixed developments, university campuses, sports complexes (including
the National Sports Complex project for the 1998 Kuala Lumpur Commonwealth Games), factories, hospitals,
interior fitting out works, refurbishment works, infrastructure projects and some oil and gas sector work.
See Appendix B for a selection of dispute resolution experience without confidential details and Appendix C for
details on construction project experience including experience on project management, contract management,
and quantity surveying.
4.2

Academia - Teaching And Supervision

School of Engineering and Advanced Technology, Massey University, Auckland. Senior Lecturer in the
Bachelors of Construction (majors in Construction Management and Quantity Surveying) since June 2010.
Programme leader for Master of Construction degree with specialisations in Construction Law, Construction
Project Management, and Quantity Surveying. Currently teaching the following papers: Masters degree level:
218.763 Construction Law I, 218.764 Construction Law 2, 218.765 Construction Adjudication, and 218.780
Construction Commercial Management. Bachelors degree level: 218.211 Construction Economics and
Estimating, 218.311 Construction Contracts and Financial Administration, 218.315 Construction Law.
Supervising students on the Construction Research and Report paper and one PhD student.
Sydney Law School, The University of Sydney, guest lecturer on the LLM programme on the Plain English
in Legal Writing course delivered at Robinson College, University of Cambridge, United Kingdom.
Technology University Malaysia (part time) for one year as Adjunct Associate Professor on the MSc course
in Construction Contract Management.
Leeds Metropolitan University, UK (full time) for two years as Senior Lecturer on the Quantity Surveying
and Construction Management courses.
University Malaya, Malaysia (part time) over eight years lecturing on the undergraduate Quantity Surveying
degree, Masters in Law (LLM) degree, and MSc in Construction Management degree.
MARA Technology University, Malaysia (part time) for one year lecturing on the Architecture course.
Subjects taught and supervised are primarily in the areas of construction law and practice, construction
contracts, contract administration, construction dispute resolution, construction project management, construction
economics, feasibility studies, cost planning, procurement, tendering, and estimating. I have supervised over 40
students dissertations at: final year undergraduate degree and Masters degree levels. I have also been technical
adviser to a few PhD students and supervisor for one.
4.3

Academia - Course Development and Advisory

Member of the College Academic Board, College of Science, Massey University, New Zealand.
Member of the Construction degree programme committee reviewed the Bachelors in Construction
(Construction Management and Quantity Surveying majors) degree, enhanced and refined the Bachelors

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 5 OF 24

degree. Degree now accredited by the Pacific Association of Quantity Surveyors and the Royal Institution of
Chartered Surveyors.
Part of a team that developed a new Master of Construction degree with specialisations in Construction
Project Management, Construction Law, and Quantity Surveying. Developed four new papers in my areas
of specialization, which includes construction law, contract administration, dispute resolution including
construction adjudication, and construction commercial management. When the degree was approved, I
was appointed Programme Leader.
Initiated and developed (with two colleagues) the Masters degree in Construction Law and Arbitration for
Leeds Metropolitan University, UK in 1992.
Adviser on the MSc Construction Contract Management degree at Technology University Malaysia.
Adviser at the proposal stage of the MSc in Construction Procurement Management degree planned by
MARA Technology University, Malaysia.
Adviser during the formative stages of the BSc degree in Quantity Surveying at University Malaya,
Malaysia.
4.4

Academia External Examiner

Examiner thesis submitted for a Masters-by-research degree at Massey University. Research topic on
improving productivity through off-site manufacturing in the New Zealand construction industry.
External examiner for a Masters-by-research student at Technology University Malaysia. Research topic on
professional negligence.
External examiner for degree and diploma courses in Quantity Surveying at MARA Technology University,
Malaysia for several years.
Examiner and tutor, Chartered Institute of Arbitrators Arbitration Entry Level Courses held in Malaysia.
Panel of professional interview examiners for the Chartered Institute of Building, United Kingdom.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 6 OF 24

PROFESSIONAL, INDUSTRY, GOVERNMENT, EDITORIAL, AND OTHER APPOINTMENTS

Member of the New Zealand Institute of Quantity Surveyors Auckland branch board.

President, The Royal Institution of Surveyors Malaysia 2006. Also held several other positions earlier
including Deputy President, Secretary-General, Treasurer, Editorial Board member, Quantity Surveying
Division Chair (three sessions), and Divisional Committee Member between 1993 and 2005.

Vice-President, The Chartered Institute of Arbitrators (UK) Malaysia Branch 2000-2001. Held several
other positions including Honorary Secretary and Honorary Auditor prior to 2000.

Vice-President, The Chartered Institute of Building (UK) Malaysia Branch 1997-2001. Held several
other positions including Vice-President (Finance), and Honorary Auditor between 1997 and 2005.

Member of the Board of Quantity Surveyors Malaysia appointed by the Minister of Works 2003-2008.

Chair Malaysian Construction Industry Working Group on Payment and Adjudication (WG 10).

Author of the Construction Industry Contracts Committees subcontract CICC Model Terms of
Construction Contract for Subcontract Work. First published by the Construction Industry Development
Board, Malaysia in 2006 and reprinted with minor edit in 2007.

Author of the Construction Industry Contracts Committees Standard Terms of Construction Contract for
Renovation and Small Projects [STCC-RSP 2015]. Published by the Construction Industry Development
Board, Malaysia in December 2014.

Member of the drafting committee Standard Terms of Construction Contract for Design and Build
Work. Leader of team re-drafting traditional draft into modern plain English.

Member of the Master Builders Association Malaysias Contracts & Practice committee.

Member of the Malaysian Advocates and Solicitors Disciplinary Committee sat and judged as a threemember tribunal in more than a dozen cases with oral hearings.

Member of the Board of PLAIN Plain Language Association International

Editorial Board member, The Surveyor, Journal of the Institution of Surveyors Malaysia (1986 1999).

Reviewer for the Journal of International Real Estate and Construction Studies, Nova Science
Publishers Inc, USA.

Member of the organising committee Building Resilience Conference, Auckland, September 2016.

Member of the College Academic Board, College of Science, Massey University, New Zealand.

Member of the Rangitoto College Board of Trustees, Auckland, New Zealand

Member of the North Shore Swimming Club, Auckland, New Zealand

MEMBERSHIP OF OTHER PROFESSIONAL ORGANISATIONS

Member of the Society of Construction Law, United Kingdom


Member of the Society of Construction Law, New Zealand
Member of the Society of Construction Law, Malaysia
Member of the Adjudication Society, United Kingdom
Associate member of the Commonwealth Association of Legislative Counsel

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 7 OF 24

APPENDIX A - PUBLICATIONS AND PRESENTATIONS


I have over 25 publications as journal articles, conference proceedings, or industry reports. See below for a
selection of some of my publications and presentations. I have also presented at over 100 conferences and
seminars primarily in the areas of construction law, construction contracts, construction contracts drafting,
dispute resolution, project management, and cost management in the United Kingdom, Malaysia, Singapore,
Brunei, Indonesia, Hong Kong, Japan, Australia, and New Zealand for various organizations and professional
bodies including:

The Pacific Association of Quantity Surveyors


The New Zealand Institute of Quantity Surveyors
The Institution of Professional Engineers New Zealand
The Arbitrators and Mediators Institute of New Zealand
The Adjudication Society UK
The Commonwealth Association of Legislative Counsel
Plain Language Association InterNational
The Chartered Institute of Arbitrators (UK) Malaysia Branch
The Malaysian Institute of Arbitrators
The Bar Council States of Malaya
The Chartered Institute of Building (UK) Malaysia branch
The Royal Institution of Surveyors Malaysia
The Malaysian Institute of Architects
The Institution of Engineers Malaysia
The Master Builders Association Malaysia
The Construction Industry Development Board Malaysia
Projacs International
The Promis-Group, and
Various other private organizations including companies listed on Stock Exchanges.

A.1

Research Thesis and Dissertations

1.

N A N Ameer Ali (2015) Statutory Construction Adjudication: Analysis of the New Zealand and
Malaysian Legislations, PhD Thesis, University of Auckland, 2015, Auckland.

2.

N A N Ameer Ali (1992) The Professional Liability of the Project Manager, MSc Dissertation (classified
merit), Kings College London, University of London, 1992, London.

3.

N A N Ameer Ali (1989) Professional Responsibility in the Building Industry: A Critical Analysis in a
Malaysian Context, MSc Dissertation (classified distinction), University College London, University of
London, 1989, London.

A.2

Publications Reports and Court Case Commentary

1.

N A N Ameer Ali (2016) Commentary on the case of WRP Asia Pacific Sdn Bhd v NS Bluescope
Lysaght Malaysia Sdn Bhd 2015. Commentary for the Construction Industry Development Boards
Construction Law Report 2016. Construction Industry Development Board Malaysia, 2016, Kuala
Lumpur.

2.

N A N Ameer Ali and C F Lim (2007, 2008) A Report on the Proposal for a Malaysian Construction
Industry Payment and Adjudication Act. A report for industry and government. Editors: S A Karib, N
Shaffii, and N Muhamad Nor, Construction Industry Development Board Malaysia. November 2007,
revised August 2008, revised December 2008, Kuala Lumpur.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 8 OF 24

A.3

Publications Book Chapter

1.

N A N Ameer Ali. Mediation in the Malaysia Construction Industry. Chapter in a book on Mediation in the
Construction Industry: An International Review (Editors: P Brooker and S Wilkinson). Taylor & Francis
Ltd. July 2010.

A.4

Publications Papers in Journals and Conference Proceedings

1.

D Finnie and N A N Ameer Ali (2015) The New Zealand construction contracts amendment Act 2015
for better or worse? Construction Economics and Building, 15(4), 95-105. DOI:
http://dx.doi.org/10.5130/AJCEB.v15i4.4544

2.

N A N Ameer Ali and S Wilkinson (2010) Modern Legal Drafting of Construction Contracts A Plea for
Good Sense. Proceedings of the CIB World Congress 2010, 11 13 May 2010, Salford.

3.

N A N Ameer Ali and S Wilkinson (2009) The Ideal Construction Dispute Resolver. Proceedings of the
Pacific Association of Quantity Surveyors 13th Annual Congress, 17 18 August 2009, Kuala Lumpur.

4.

N A N Ameer Ali and S Wilkinson (2009) Rethinking Or Tinkering Contract Management? Proceedings
of the Pacific Association of Quantity Surveyors 13th Annual Congress, 17 18 August 2009, Kuala
Lumpur.

5.

N A N Ameer Ali (2009) Adjudication Competition or Complementary to Arbitration? Proceedings of


the Bar Council of Malaysia Conference on Transforming Construction Justice, 7 August 2009, Kuala
Lumpur.

6.

N A N Ameer Ali and S Wilkinson (2009) Statutory Adjudication Under Nine Commonwealth
Jurisdictions A Users Perspective on Legislative Drafting Style. In: Proceedings of the
Commonwealth Association of Legislative Counsel Conference, 1-4 April 2009, Hong Kong.

7.

N A N Ameer Ali (2008) Modernising Construction Contracts, Incorporating A Case Study - The CICC
Model Terms Of Construction Contract For Subcontract Work 2007 - Master Builders Journal, 3rd
Quarter 2008, Master Builders Association Malaysia.

8.

N A N Ameer Ali (2008) Applying Modern Drafting Guidelines in Construction Contracts Incorporating A
Case Study - The CICC Model Terms Of Construction Contract For Subcontract Work 2007. In:
Proceedings of the International Conference on Modern Legal Drafting, July 2008, Kuala Lumpur.

9.

N A N Ameer Ali (2008) Unique Plain Language Contract A Success, New Zealand Building
Subcontractors Federation UPDATE, May 2008, Wellington.

10.

N A N Ameer Ali (2008) Modern Plain English Drafting And Construction: The Malaysian Subcontract
Model Terms. Society of Construction Law, April 2008, London.

11.

N A N Ameer Ali (2007, 2008) One Step at a Time - An Overview of Alternative Dispute Resolution in
Malaysia Including Proposals for a Construction Industry Payment and Adjudication Act. RICS
Construction Journal, Nov/Dec 2007, London; and The Australian ADR Reporter The Quarterly
Bulletin of The Chartered Institute of Arbitrators (Australia) Limited - Issue No 6 - March 2008, Sydney.

12.

N A N Ameer Ali (2007) The Proposed Malaysian Construction Industry Payment and Adjudication Act.
In: Proceedings of the Adjudication Societys Sixth Annual Conference on International Adjudication and
Dispute Resolution, November 2007, London.

13.

N A N Ameer Ali (2007) Accessibility Of Legal Documents In The Construction Industry A Plea For
Sanity. In: Proceedings of the Pacific Association of Quantity Surveyors International Conference, June
2007, Auckland.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 9 OF 24

14.

N A N Ameer Ali (2007) The Arbitration Act 2005 The Relationship Between Arbitration and Statutory
Adjudication. In: Proceedings of the Lexis-Nexis Conference, January 2007, Kuala Lumpur.

15.

N A N Ameer Ali (2006) A Construction Industry Payment And Adjudication Act: Reducing PaymentDefault And Increasing Dispute Resolution Efficiency In Construction, Master Builders Journal, Part One
in 3rd Quarter 2006, Part Two in 4th Quarter 2006, Kuala Lumpur.

16.

N A N Ameer Ali (2006, 2007) Model Terms of Construction Contract for Subcontract Work. Author of
industry standard form of construction contract for subcontract work. Contract endorsed by 15
construction industry organisations led and published by the Construction Industry Development Board,
Malaysia. September 2006. Revised reprint May 2007, Kuala Lumpur.

17.

N A N Ameer Ali (2006) Model Terms of Construction Contract. In: Proceedings of the Construction
Industry Development Boards Annual International Construction Conference, 13 15 September 2006,
Kuala Lumpur.

18.

N A N Ameer Ali (2006) Adjudication, An End to Cash Flow Problems in the Construction Industry. In:
Proceedings of the Kuala Lumpur Regional Centre for Arbitration Construction Industry Development
Board Conference on Adjudication, 26 April 2006, Kuala Lumpur.

19.

N A N Ameer Ali (2005) A Construction Industry Payment and Adjudication Act Reducing Payment
Default and Increasing Dispute Resolution Efficiency. In: Proceedings of the International Conference
and Forum on Construction Industry Payment and Adjudication Acts. September 2005. Kuala Lumpur.

A.5

Presentations A Representative Selection of Presentations at Conferences and Seminars

1.

N A N Ameer Ali (2014) The Malaysian Standard Terms of Construction Contract for Renovation and
Small Projects, presented in the Malay Language, 14 December 2014, Kuala Lumpur via Skype from
Auckland.

2.

N A N Ameer Ali (2014) Statutory Adjudication - the Need for a Legislation Framework. Presentation at
the 4th New Zealand Built Environment Symposium, 14 November 2014, Auckland.

3.

N A N Ameer Ali (2014) Drafting Modern Lean Construction Contracts. Presentation at the 4th New
Zealand Built Environment Symposium, 14 November 2014, Auckland.

4.

N A N Ameer Ali (2014) The Malaysian Construction Industry Payment and Adjudication Act 2012
(CIPAA) and Construction Contracts - Strategies for Moving Forward, 13-14 August 2014, Kuala Lumpur
via Skype from Auckland.

5.

N A N Ameer Ali (2014) Construction Contracts and Dispute Resolution 2020. Presentation at the New
Zealand Institute of Quantity Surveyors Auckland Branch Annual General Meeting, 30 April 2014.

6.

N A N Ameer Ali (2013) The Benefits of Lean Documents in the Construction Industry. Presentation at the
Adjudicators Association of New Zealand Annual General Meeting, 15 June 2013, Auckland.

7.

N A N Ameer Ali (2012) Modernising Construction Contracts. Presentation at the New Zealand Institute of
Professional Engineers Massey University CPD Evening Talk, November 2012, Auckland.

8.

N A N Ameer Ali and S Wilkinson (2009) Case Studies On Plain Language Construction Contracts
Greenfield Drafting v Re-Drafting. Presentation at the Plain Language Association InterNationals
Seventh International Biennial Conference on Raising the Standard, 15 17 October 2009, Sydney.

9.

N A N Ameer Ali (2009) The Different Ways Commonwealth Countries Have Dealt With Dispute
Resolution In The Construction Industry. Presentation at the Arbitrators and Mediators Institute of New
Zealands monthly luncheon talk, 21 April 2009, Dunedin.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 10 OF 24

10.

N A N Ameer Ali (2006) Model Terms Of Construction Contract For Sub-Contract Work 2006.
Presentation at the Construction Industry Development Board and the Institution of Surveyors Malaysia
Roadshow Seminar, December 2006, Johor Baharu.

11.

N A N Ameer Ali (2006) Communication in Project Management. Presentation at the Institution of


Engineers Malaysia Seminar, August 2006, Kuala Lumpur.

12.

N A N Ameer Ali (2006) Contemporary Issues In Construction Contracts. Presentation at The Institution
Of Surveyors Malaysia Sarawak Branch Seminar, Feb 2006, Kuching.

13.

N A N Ameer Ali (2005) Mediating Construction Disputes. Presentation at the 13th Malaysian Bar
Councils Malaysian Law Conference, November 2005, Kuala Lumpur.

14.

N A N Ameer Ali (2005) Effectively Developing and Managing the Outsourcing Contract for Facilities
Management. Presentation at The Asia Business Forum Facilities & Maintenance Management
Conference, September 2005, Kuala Lumpur.

15.

N A N Ameer Ali (2003) Marketing Quantity Surveying Services - Opportunities & Challenges: Extracting
the USP (Unique Selling Proposition) from Quantity Surveyors Through Effective Presentation Selling
Refrigerators to Eskimos. Presentation at the Institution of Surveyors Malaysias Annual Convention,
August 2003, Subang Jaya, Selangor.

16.

N A N Ameer Ali (2003) X-Files in the Construction and Property Industries Unraveled. In: Proceedings of
the Institution of Surveyors Malaysias 5th Malaysian Surveyors Congress, June 2003, Kuala Lumpur.

17.

N A N Ameer Ali (2002) Construction Contracts. Presentation at the Centre for Management Technologys
Seminar on Business Contracts - Latest Legal & Commercial Issues, July 2002, Kuala Lumpur.

18.

N A N Ameer Ali (2002) Completion, Non-Completion And Extension Of Time. Presentation at the
Chartered Institute Of Building Malaysias Seminar on 48 Common Contractual Problems & Their
Solutions, May 2002, Petaling Jaya.

19.

N A N Ameer Ali (2002) Construction Project Management- Principles And Methodologies. Presentation
at the Malaysian Institute of Architects course on Project Management, April 2002, Kuala Lumpur.

20.

N A N Ameer Ali (2001) Construction Contracts Claims Including Provisions Under The PAM, CIDB 2000
And JKR Contracts. Presentation at the Centre for Management Technologys Seminar, September
2001, Kuala Lumpur.

21.

N A N Ameer Ali (2000) Reengineering Turnkey Projects - Improving Cost, Quality & Speed. Presentation
at the Centre for Management Technologys Seminar, July 2000, Kuala Lumpur.

22.

N A N Ameer Ali (2000) Project & Contract Management. Presentation at the EMC Management Centres
Seminar, June 2000, Kuala Lumpur.

23.

N A N Ameer Ali (2000) Construction Project Management: Effective On Time And Within Budget
Techniques. Presentation at the Centre for Management Technologys 4th Annual Conference on
Construction Project Management, March 2000, Kuala Lumpur.

24.

N A N Ameer Ali (1999) Turnkey Construction Projects. Presentation at the Centre for Management
Technologys Seminar, September 1999, Kuala Lumpur.

25.

N A N Ameer Ali (1999) Effective Project Feasibility Studies. Presentation at the IPA Trainings Seminar,
September 1999, Kuala Lumpur.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 11 OF 24

26.

N A N Ameer Ali (1999) Construction Procurement And Contract Strategies For The New Millennium.
Presentation at the Board Of Quantity Surveyors Malaysia & Institution of Surveyors Malaysias
Convention, August 1999, Petaling Jaya, Selangor.

27.

N A N Ameer Ali (1999) Challenges Of The New Millennium. Presentation at the Annual Malaysian
Surveyors Congress, June 1999, Kuala Lumpur.

28.

N A N Ameer Ali (1998) Construction Contracts. Presentation at the Centre for Management
Technologys 3rd Annual Program on Turnkey Construction Projects, September 1998, Kuala Lumpur.

29.

N A N Ameer Ali (1998) A Comparison Of The PAM (JCT 63), JKR & IEM Forms of Construction
Contracts. Two-day presentation at the Power Mind Consultancy Seminar On Construction Contracts,
March 1998, Kuala Lumpur.

30.

N A N Ameer Ali (1998) Variations in Construction Contracts. Presentation at the Centre for Management
Technologys Seminar, March 1998, Kuala Lumpur.

31.

N A N Ameer Ali (1997) Contractual Claims And Settlement. Presentations at the Chartered Institute Of
Building Malaysias Seminar Series on Construction Management, Nov 1997 - May 1998, Kuala Lumpur.

32.

N A N Ameer Ali (1997) A Critical Comparison of the PAM, JKR & IEM Forms of Construction Contracts.
Presentation at the Institution Of Surveyors Malaysias Seminar, December 1997, Kota Kinabalu, Sabah.

33.

N A N Ameer Ali (1997) Claims & Counterclaims Within the Construction Industry. Presentation at the
Asia Pacific Diligences Seminar, December 1997, Kuala Lumpur.

34.

N A N Ameer Ali (1997) A Critical Comparison of the PAM, JKR & IEM Forms of Construction Contracts.
Althea Consultancys two-day seminar on Construction Contracts, November 1997, Kuala Lumpur.

35.

N A N Ameer Ali (1997) Legal Aspects Of Design & Build contracts. Centre for Management Technologys
Conference on Turnkey Construction Projects, November 1997, Kuala Lumpur.

36.

N A N Ameer Ali (1997) Pitfalls To Avoid In The PAM 69 Construction Contract. Presentation at the Asia
Pacific Diligences Seminar on Construction Claims And Standard Forms of Construction Contracts,
September 1997, Kuala Lumpur.

37.

N A N Ameer Ali (1997) The Rights And Obligations Of Employers, Consultants And Contractors.
Presentation at Althea Consultancys two-day seminar on Construction Contract Management &
Administration, August 1997, Kuala Lumpur.

38.

N A N Ameer Ali (1996) Managing Time, Quality & Monetary Claim To Avoid Disputes. Presentation at the
Power Mind Consultancys Seminar on Construction Contract And Project Management, October 1996,
Kota Kinabalu, Sabah.

39.

N A N Ameer Ali (1996) Claims for Variations From Contract And Extension Of Time. Presentation at the
Centre For Management Technologys Seminar on Contract Management, March 1996, Kuala Lumpur.

40.

N A N Ameer Ali (1995) Effective Contract Administration. Presentation at Power Mind Consultancys
Seminar on Construction Claims Management, October 1995, Kuala Lumpur.

41.

N A N Ameer Ali (1995) Construction Contracts: Current Development in Construction Claims, Monetary
Claims, Payments, and Certificates And Disputes Settlement. Presentation at the Legend Communiques
Seminar, October 1995, Kuala Lumpur.

42.

N A N Ameer Ali (1995) The Legal Liability Of The Project Manager. Presentation at the Centre for
Management Technologys Conference on Construction Project Management, August 1995, Kuala
Lumpur.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 12 OF 24

APPENDIX B SELECTION OF DISPUTE RESOLUTION EXPERIENCE WITHOUT CONFIDENTIAL DETAILS


1.

Disputes between a manufacturing company and a contractor on a factory project on issues relating to alleged
non-payment and termination.

2.

Disputes between a developer and main contractor on a high-rise apartment project on issues relating to payment,
liquidated damages, alleged improper certification and some issues on quality of construction.

3.

Disputes between a factory owner and contractor on a factory extension on issues relating to payment, liquidated
damages and challenges to the liquidated damages amount.

4.

Disputes and differences between a main contractor and a sub-contractor on a golf course project on issues
relating to variations, alleged double handling, loss and expense claims and challenges on certificates.

5.

Disputes between a main contractor and a USA based sub-contractor on a gas compressor plant project on issues
relating to alleged delays, liquidated damages and performance bonds.

6.

Disputes between a housing developer and main contractor on a housing project on issues relating to payment,
setting-off, alleged defective works, liquidated damages, challenges on extension of time issued and alleged
negligence.

7.

Disputes between a developer and contractor on a housing project on issues relating to extensions of time and
challenging of the liquidated damages amount.

8.

Disputes between a subsidiary of a quasi-government body and contractor on payment and set-off issues.

9.

Disputes between a quasi-government body and a main contractor on an office complex development on issues
relating to delayed payment, delayed completion, loss and expense claims and issues pertaining to alleged delays
by sub-contractors.

10.

Disputes between a funding organization and professional accounting firm acting as developer cum administrator
on a housing project on issues relating to significant cost overruns, variations, delays and alleged negligence.

11.

Disputes between a funding organization and a developer on a housing project on issues relating to claims on
alleged variations.

12.

Differences between a developer and an insurance loss adjusting company on a shopping complex project on
issues pertaining to quantum of rectification works incurred following a fire.

13.

Disputes between an academic institution and a main contractor on a hostel project on issues relating to delays,
extension of time and possible termination.

14.

Disputes between a developer and a contractor on an office and residential complex on issues pertaining to
entitlement and quantum of variations.

15.

Disputes between a developer and contractor on a land reclamation project on issues relating to monetary claims.

16.

Disputes between a developer and a contractor on a road project on issues relating to variations.

17.

Disputes between a main contractor and a sub-contractor on plumbing works contract on issues relating to claims
for loss and expense, variations and general damages.

18.

Disputes between developer and contractor on an apartment project on issues relating to rates and profit margins.

19.

Disputes between a quasi-government body and a contractor on an earthworks project on issues relating to claims
for variations, loss and expense, and royalties.

20.

Disputes between a developer and an architect on a condominium project on issues relating to construction costs
and professional fees.

21.

Acted in a three-person tribunal in over a dozen cases dealing with disciplinary issues relating to the conduct of
practicing advocates and solicitors admitted to the Malaysian Bar.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 13 OF 24

APPENDIX C DETAILS ON CONSTRUCTION PROJECT EXPERIENCE INCLUDING PROJECT


MANAGEMENT, CONTRACT MANAGEMENT, AND COST MANAGEMENT EXPERIENCE
PROJECT TITLE

CLIENT

Police Complex at Shah


Alam, Malaysia

Eastern Access Sdn Bhd 20 Million

Ad hoc advisory project & construction


management and commercial & contracts
consultancy services during post contract stage.

Pearl Palace Residential


Development, Kuala
Lumpur, Malaysia

Seri Damai Residence


Sdn Bhd

100 Million

Development & Project Management and Contracts


& Commercial services starting from land issues,
market study, feasibility study and appointment of
consultants.

Seberang Prai Local


Authority Office Complex,
Malaysia

Seberang Perai Local


Authority

35 Million

Full project management and commercial &


contracts consultancy services.

Integrated Residential
Ministry of Education
School, Hulu Terengganu, Malaysia
Malaysia

20 Million

Project management and commercial & contracts


consultancy services starting from negotiation of
prices.

Integrated Residential
School, Jempol, Negeri
Sembilan, Malaysia

20 Million

Project management and commercial & contracts


consultancy services starting from negotiation of
prices.

Ministry of Education
Malaysia

APPROXIMATE PROFESSIONAL SERVICES PROVIDED


VALUE (NZD)

Bukit Larut Mixed


Development, Taiping,
Malaysia

Teachers Cooperative
Holdings Sdn Bhd

135 Million

Development & project management services


commencing from market study, feasibility study
and appointment of other consultants.

Office Tower and


Complex, Bandar Meru
Raya, Ipoh, Malaysia

Perak State Economic


Development
Corporation

35 Million

Full project management including value


engineering studies and commercial & contracts
consultancy services.

Mixed Development,
Bandar Meru Raya
Township, Ipoh, Malaysia

Perak State Economic


Development
Corporation

800 Million

Development management including coordinating


preparation of masterplan.

Masterplanning Medical
Campus and conversion
of Kuantan General
Hospital into a Teaching
Hospital, Malaysia

International Islamic
University

400 Million

Partial project management involvement during


early stages of Masterplanning.

Mixed redevelopment of
80 acre Brickfields site
including new Kuala
Lumpur Railway Station,
railway requirements,
relocation, commercial,
offices
and residential
development, Kuala
Lumpur, Malaysia

Malayan Railways

1.25 Billion

Full pre-contract project management services


including preparing brief for development and
railway requirements, strategic requirement on
relocation, review of existing tenancies, preparing
evaluation criteria, evaluation of developers
proposals including commercial viability, technical
railway requirements, company financial and
technical background, joint venture proposals,
time and quality parameters and technical backup team.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 14 OF 24

Office Fitting Out,


Menara IMC, Kuala
Lumpur, Malaysia

British Telecom

Undisclosed

Full inception to completion project management


services including establishing Singapore-based
end-user requirements, establishing the brief and
preparing agreements for Kuala Lumpur-based
consultants, establishing cost plan in conjunction
with the London-based Client, preparing
coordinated drawings, call for tender, evaluation
of
tenders,
recommendation,
award,
implementation at site, coordinating purchase of
loose furniture and equipment and producing
close-out report.

Kuala Selangor Floating


Hotel, Malaysia

BGH Leisure Sdn Bhd

Undisclosed

Project management services up to pre-contract


stage including liaison with international
consultants.

Bertam Sports Complex,


Sebarang Prai, Malaysia

Seberang Perai Local


Authority

7.5 Million

Full project management and contracts &


commercial consultancy services.

Various Venues for South


East Asian games XXI,
Malaysia

Ministry of Youth &


Sports Malaysia

10 Million

Project management support and contracts &


commercial consultancy.

100 units of teachers


accommodation quarters
at Bandar Baru Serting,
Jempol, Negeri
Sembilan, Malaysia

Ministry of Education
Malaysia

6 Million

Full project management and contracts &


commercial consultancy services.

University
campus
development
for
International
Islamic
University (Phase 1),
Malaysia

International
University

Islamic

175 Million

Full project management and contracts &


commercial management services starting August
1995 including trouble shooting significantly
delayed project with cost overrun. Role included
preparing project brief, coordinating end users,
preparing monthly management report, cash flow
projections, cost reports, managing consultants
fees, ensuring valuations and certificates are
properly issued in accordance with construction
contracts, evaluation of extensions of time,
setting up and implementing change control, cost,
quality and time control systems.

University
campus
development
International
Islamic
University (Phase 2),
Malaysia

International
University

Islamic

325 Million

Full project management and contracts &


commercial management services starting March
1995. Role includes preparing project brief,
coordinating end users, preparing monthly
management report, cash flow projections, cost
reports, managing consultants fees, ensuring
valuations and certificates are properly issued in
accordance with the contract, evaluation of
extensions of time, setting up & implementing
change control, cost, quality and time control
systems.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 15 OF 24

University campus for


Asian Institute of Medicine,
Science & Technology,
Kedah, Malaysia

MIED

300 Million

Project management support and ad hoc


contracts advisory services.

National Sports Complex Ministry of Youth &


for
the
1998 Sports Malaysia
Commonwealth
Games,
Bukit Jalil, Malaysia

500 Million

Project management support and contracts &


commercial consultancy services including cost
monitoring and reviewing of rates and ad hoc
contracts advisory service.

Additional Facilities at Ministry of Youth &


National Sports Complex Sports Malaysia
for
the
1998
Commonwealth
Games,
Bukit Jalil, Malaysia

1.5 Million

Project management support and contracts &


commercial consultancy.

Infrastructure
development
and
computerisation of 500
schools, Malaysia

Comtrac Sdn Bhd

Confidential

Contracts consultancy including preparing


preliminary review and report, extension of time
claims, loss and expense claims and on-going
contract advisory services including advising on
issues relating to completion, partial occupation,
extension of time, loss and expense and deductions
for liquidated damages.

Infrastructure
development
and
computerisation of 200
schools, Malaysia

TimeCom
Sdn Bhd

Confidential

Contracts consultancy including preparing


preliminary review and report, extension of time
claims, loss and expense claims and on-going
contract advisory services including advising on
issues relating to completion, partial occupation,
extension of time, loss and expense and deductions
for liquidated damages.

Aerotrain
and
aerobridges at Kuala
Lumpur
International
Airport, Malaysia

Ara Consortium

Undisclosed

Advising on contractual risks and assisting in the


drafting of main concession agreement and subcontract agreements including operations and
maintenance and construction obligations - at
proposal stage.

Electrified Double Track Emrail Sdn Bhd


Project Rawang Ipoh,
Malaysia

125 Million

Contract management consultancy services


including drafting and negotiating main and
subcontracts and contracts advisory services.

Selayang General Hospital, Obayashi Corporation


Malaysia

265 Million

Ad hoc contract advisory services

NSC Hockey Stadium, Ministry of Youth &


Bukit Jalil, Malaysia
Sports Malaysia

44 Million

Ad hoc contract advisory services

Holdings

KLIA project Western


Access and Salak Tinggi
Link, Malaysia

Sungei Way Builders


Sdn Bhd

60 Million

Contracts consultancy services including


preparation of preliminary review and report.

PVC

Industrial Resin Sdn

125 Million

Partial contracts & commercial review and report

Plant,

Kertih

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 16 OF 24

Malaysia

Bhd (Subsidiary
Land & General)

of

Marine
Village
Development,
Pulau
Besar, Melaka, Malaysia

Comtrac Sdn Bhd

22.5 Million

Contracts consultancy services including


preparation of preliminary review and report,
preparation of extension of time claims, loss and
expense claims and contract administration.

Mixed Building and


Infrastructure
Development, Bukit Katil,
Melaka, Malaysia

Intria Bina Sdn Bhd

23 Million

Contracts consultancy services including


preparation of preliminary review and report,
preparation of extension of time claims, loss and
expense claims and contract administration
services including advising on issues relating to
issuance of CPC, deductions for LAD, nonpayment by Employer and set-offs between
contracts.

Renovation
and
Refurbishment Works of
Offices for UMBC Harta
Sdn Bhd, Malaysia

Atlanta
Sdn Bhd

Resources

2.5 Million

Preparation of variations & final accounts and


claims consultancy services including preliminary
assessment of extension of time claims, loss and
expense claims and contract administration
services.

Construction
and
Completion of piping
work Area A of PSR-2
Melaka Refinery Project
Stage 1, Malaysia

Tepat Teknik Sdn Bhd

23 Million

Contracts consultancy services including


preparation of preliminary review and report,
preparation of extension of time claims, loss and
expense claims and contract administration
services.

Earthworks, demolition,
retaining walls, drainage
and building works for
Fettes Villa Development,
Penang, Malaysia

S & P Project
Management Sdn Bhd

9 Million

Contracts consultancy services including


preparation of preliminary review and report,
preparation of extension of time claims, loss and
expense claims and contract administration
services.

Condominium Blocks at
Jalan Jelatek, Kuala
Lumpur, Malaysia

Ambangan Puri Sdn


Bhd (Subsidiary of E &
O Berhad)

24 Million

Preliminary review and report and contracts


advisory services on extension of time issues,
completion certificate and defective works.

Mixed
Development,
Seremban, Malaysia

Tempo Rekaan Sdn


Bhd

Undisclosed

Contractual risk analysis


modifications to main contract.

Investigation,
Design
Construction, Completion
and Maintenance of land
reclamation
works,
coastal protection and
other marine works,
Tanjong
Tokong,
Penang, Malaysia

Tidalmarine - Seri
Meraga Joint Venture

60 million

Contract risk analysis

374 Room Evergreen


Laurel 5 Star Hotel,
Gurney Drive, Penang,

Kajima (Malaysia) Sdn


Bhd

44.5 Million

Ad hoc contracts & commercial consultancy


advisory service.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

on tender bid documents submitted by tenderer


and risk analysis of contract.

and

drafting

PAGE 17 OF 24

Malaysia
Piling
Works
for
Distribution Warehouse
at Shah Alam, Malaysia

Comtrac Sdn Bhd

1 Million

Director providing partial input in claims


consultancy services including preparation of
preliminary review and report, preparation of
extension of time claims, loss and expense claims
and contract administration services.

Central Complex Building


at
Universiti
Islam
Antarabangsa, Gombak,
Selangor, Malaysia

Asaztera Sdn Bhd

12.5 Million

Director in charge of lost and expense claims


submission.

Several
throughout
Malaysia

Industrialised Housing
Management Sdn Bhd

Undisclosed

Claims consultancy services.

Luxury
3-storey
Bungalow, Shah Alam,
Malaysia

Phoenix AZ Design

1.5 Million

Independent review and assessment of value of


works.

The Ascott Serviced


Apartments and Kirana
Condominium
Block,
Kuala Lumpur, Malaysia

Kajima (M) Sdn Bhd

1.5 Million

Contracts advisory service as and when required

Construction
of
submarine
water
pipelines, watermains at
Road R2 and other
contingency waterworks
for Pusat Pentadbiran
Kerajaan
Persekutuan
Putrajaya (Package WS6A), Malaysia

Contrail Sdn Bhd

Confidential

Independent opinion & report and negotiation on


contractual issues.

Segamat
Compressor
Plant, Gas Utilisation
Pipeline, Malaysia

MMC Oil & Gas Sdn


Bhd

50 Million

Contract administration services including acting


as mediator between Malaysian main contractor
and sub-contractor from the USA.

Mixed
Development
including
Commercial
Development
at
Seberang Perai Utara,
Pulau Pinang, Malaysia

Motif Era Sdn Bhd

17.5 Million

Post contract commercial & contracts advisory


service including acting as mediator.

Final Account Claims for


18-holes Golf Course in
Bandar
Kinrara,
Puchong, Malaysia

I & P Landscaping Sdn


Bhd

Confidential

Independent review and assessment and acting


as mediator.

Miri
Resort
City
Reclamation, Malaysia

MMCE/UDL
Venture

Confidential

Arbitration support services.

schools
Malaysia,

Joint

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 18 OF 24

40 Storey Hotel /
Apartments,
Kuala
Lumpur, Malaysia

Martego Sdn Bhd

59 Million

Arbitration technical support services for


respondents counsel including preparation of
technical points of defence, attending meetings,
providing technical support to Counsel acting on
behalf of respondent up to hearing.

Apartment
Development at Sungei
Besi, Selangor, Malaysia

Seloga Jaya Sdn Bhd

Confidential

Expert witness services for plaintiff in court case


on claims for loss of profit and providing expert
opinion on procurement systems. Subsequently,
by consent, role continued in arbitration.

Condominium
Development,
Kuala
Lumpur, Malaysia

CS Chew Chartered
Architect & Town
Planners

Confidential

Expert witness services for plaintiff in court case


on claims for default on professional fees.

Earthworks, Ipoh, Perak,


Malaysia

Perbadanan
Kemajuan
Perak

Confidential

Full range of arbitration services as


representative
for
respondent
including
preparation of points of defence, attending all
meetings and making all non-financial decisions
on behalf of the respondent.

Mechanical and Electrical


Works for Traditional
Herbal
Factory
at
Kawasan Perindustrian
Darul
Aman,
Jitra,
Kedah, Malaysia

Sukitronics
Sdn Bhd

(Penang)

Confidential

Arbitration technical support services for


claimants Counsel including preparation of
technical points of defence, attending meetings,
providing technical support to Counsel acting on
behalf of Claimant up to award.

Arbitration
between
contractor
and
government of Malaysia

Contractor
Government
Malaysia

and
of

Confidential

Arbitrator on disputes on variations, work done


and other issues.

Arbitration between main


contractor and developer

Intria Bina Bhd

Disputed
amount: RM 5
million

Arbitration support services

Arbitration
between
Silveron Builders Sdn
Bhd and Sin Soon Lee
Realty (M) Sdn Bhd

Silveron Builders Sdn


Bhd

Confidential

Expert witness services appointed by claimant in


arbitration.

Two major packages in


Putrajaya, Malaysia

Putrajaya
Sdn Bhd

Disputed
amount: RM 20
million

Independent opinion and expert evaluation to


settle major disputes on variations. Subsequently
represented the respondent in adjudication.

Renovation of Petronas
Laboratory, Hulu Klang
(Phases 1,2, & 3) ,
Malaysia

Petronas

2 Million

Full range of commercial & contracts and quantity


surveying services including preparation of cost
plans, budgets, preliminary estimates, complete
tender and contract documents, evaluation of
tenders, recommendations, post contract
administration including preparing monthly
financial
statements,
interim
valuations,
negotiating and agreeing variations and final

Negeri

Holdings

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 19 OF 24

accounts.
Low Cost Apartments in
Tirana, Albania

Penang Shipbuilding
Corporation
(Subconsultant to project
Consultant QS)

25 Million

Pre-contract commercial & contracts advise to


appointed project consultant QS including
advising on drafting of design and build contracts
and cost planning.

Major refurbishment of St
Thomas
Hospital,
London, UK

South East Thames


Regional
Health
Authority

30 Million

Contracts & commercial management services.


Project let out on a management contracting
procurement route.

Extension works to
existing
Hospital,
Ashford, Kent including
addition
of
new
Psychiatric
and
Rehabilitation
departments, UK

South East Thames


Regional
Health
Authority

12.5 Million

Contracts & commercial management and


quantity surveying services.

Proposed
Restoration
Works
to
Sunway
Pyramid
Shopping
Complex, Malaysia

Maphilindo
International / The
Peoples Insurance Co
(M) Sdn Bhd

Confidential

Independent evaluation and report on value of


restoration work following fire.

Redevelopment of Lloyds
Bank, London, UK

Lloyds Bank

20 Million

Full range of quantity surveying and contracts &


commercial services and project management
support services.

Petronas Management
Training Centre Package
2 comprising Teaching
Block, Library, Lecture
Theatre, Hostel units,
Package 3 comprising
multi
purpose
hall,
gymnasium,
squash
courts, tennis centre,
rugby and hockey fields
and
Package
4
comprising
running
tracks, spectators stand,
ancillary works and
swimming pool, Bangi,
Selangor, Malaysia

Petronas

10 Million

Full range of commercial & contracts and quantity


surveying services including preparation of cost
plans, budgets, preliminary estimates, tender and
contract documents, evaluation of tenders,
recommendations, post contract administration
including preparing monthly financial statements,
interim valuations, negotiating and agreeing
variations and final accounts.

Mixed Development and


Resettlement
of
Squatters
at
Bukit
Antarabangsa,
Hulu
Klang,
Selangor,
Malaysia

Abrar
Berhad

Corporation

200 Million

Director in charge of preparation of financial


feasibility studies including generating cash flow
projections and undertaking sensitivity analysis
and other pre contract quantity surveying and
contracts & commercial services.

28 units Double Storey


Semi-detached Housing
at Bandar Kinrara, Kuala

Perumahan
Kinrara
Berhad (Associated
with
Island
&

2.5 Million

Director in charge providing the full range of pre


and post contract quantity surveying services.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 20 OF 24

Lumpur, Malaysia

Peninsular Berhad)

Emerald Coast Marina


Resort
and
Mixed
Development
Lukut,
Negeri
Sembilan,
Malaysia

Goldbridge
Engineering
&
Construction Berhad

400 Million

Director in charge of preparation of financial


feasibility studies including generating cash flow
projections and undertaking sensitivity analysis
and other pre contract quantity surveying
services.

Hotel Development in
Mid Valley City, Kuala
Lumpur, Malaysia

Dwi Koleksi Sdn Bhd

60 Million

Director in charge preparing preliminary estimates


and providing other pre contract quantity
surveying services.

2 Office Towers in Mid


Valley
City,
Kuala
Lumpur, Malaysia

Acespear (M) Sdn Bhd

40 Million

Director in charge preparing preliminary estimates


and providing other pre contract quantity
surveying services

Office Tower Block, Jalan


Mahkamah,
Kuala
Lumpur, Malaysia

G-Two
Berhad

30 Million

Director in charge providing full range of pre


contract quantity surveying services.

Projek Pintu Ke Asia,


Malaysia

Symonds
Travers
Morgan (Malaysia)

650 Million

Director in charge of preparation of preliminary


estimates.

Business Hotel, Kuala


Lumpur, Malaysia

Janaf Sdn Bhd

10 Million

Director in charge providing pre contract quantity


surveying services.

TNB headquarters and


Administration Building,
Malaysia

Tenaga
Nasional
Properties Sdn Bhd

7.5 Million

Director in charge providing the full range of pre


and post contract quantity surveying services.

Factory Construction at
Senawang
Industrial
Park,
Seremban,
Malaysia

Fizwah
Sdn Bhd

9 Million

Director in charge of post contract quantity


surveying services.

Mixed Low and Medium


Cost
Housing
Development in Gombak,
Selangor, Malaysia

Mardzi Properties Sdn


Bhd

12.5 Million

Director in charge of pre contract quantity


surveying services.

Shopping
Complex
development
Lumut,
Perak, Malaysia

Perbadanan Perwira
Harta Malaysia

2 Million

Preparation of cost analysis and tender price


index.

Negeri
Sembilan
Technology
Corridor
(Phase
1),
Negeri
Sembilan, Malaysia

TH-NSTC Sdn Bhd

250 Million

Director in charge of preparation of feasibility


study and value engineering studies.

Kajima Oil and Gas Petro


Chemical Plant Pasir
Gudang, Malaysia

Kajima (M) Sdn Bhd

7.25 Million

Director in charge of post contract quantity


surveying services.

Holdings

Pembinaan

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 21 OF 24

Construction
and
Renovation of Mawar Art
Gallery in Johor Bahru,
Malaysia

Majlis Wanita Johor

0.5 Million

Director in charge of pre and post contract


quantity surveying services.

Detailed Engineering and


Costing
for
Taman
Beringin
Optimization
Work at Mukim Batu,
Kuala Lumpur, Malaysia

Alam Flora Sdn Bhd

0.75 Million

Director in charge of pre and post contract


quantity surveying services.

Privatisation scheme of
720 units in 3 Blocks of
16 storey apartments at
Mukim
Batu, Kuala
Lumpur, Malaysia

Fadason Holdings Sdn


Bhd

20 Million

Director in charge of pre contract quantity


surveying services.

Putrajaya Workers Camp


1 at Putrajaya, Malaysia

Firama
Berhad

12.5 Million

Director in charge of post contract quantity


surveying services.

Mixed Residential and


Commercial development
in
Mukim
Rawang,
Selangor, Malaysia

Auzplex Sdn Bhd

150 Million

Director in charge of preliminary estimates.

Construction of one unit


VIP Resort at P.T
Multigambut Industries,
Riau, Indonesia

TH-Plantation
Bhd

Sdn

0.5 Million

Director in charge of pre contract quantity


surveying services.

Low Cost Houses at


Bandar Sultan Sulaiman
Daerah Klang, Selangor,
Malaysia

Superscope
Development Sdn Bhd

15 Million

Director in charge of post contract quantity


surveying services.

Mixed Housing and


Commercial
Development at Padang
Besar, Perlis, Malaysia

Sonati Development
Corporation Sdn Bhd

4 Million

Director in charge of pre and post contract


quantity surveying services.

Top Down Construction


of Substructure Contract
for Telekom Exchange
Building at Jalan Tun
Razak, Kuala Lumpur,
Malaysia

Langkah Harta Sdn


Bhd

4 Million

Director in charge of post contract quantity


surveying services

Warehouse
Complex,
Petaling Jaya, Malaysia

Cosway (M) Sdn Bhd


(via Project QS)

5 Million

Director in charge of production of full bills of


quantities.

158 Room Budget Hotel,


Klang, Malaysia

Value Inn Sdn Bhd


(via Project Consultant

6 Million

Director in charge of production of full bills of


quantities.

Engineering

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

PAGE 22 OF 24

QS)
Hotel and Restaurant
development,
Birmingham, UK

Private Client

15 Million

Pre contract quantity surveying services including


preparing bills of quantities.

Renovation
Home, UK

Private Client

Undisclosed

Post contract quantity surveying services


including finalisation of variations and final
accounts.

Accommodation Units for


the USAF, England

USAF

Undisclosed

Post contract quantity surveying services


including preparation and negotiation of variations
and final accounts.

Community
accommodation
London, UK

Local Authority

Undisclosed

Post contract quantity surveying services


including preparation and negotiation of variations
and final accounts.

6 Million

Preparation of evaluation criteria and evaluation


of tenders based on financial, technical and cost
criteria.

of

State

Centre
Units,

Redevelopment of MAS
flight kitchen, Subang,
Kuala Lumpur, Malaysia

Malaysian
System

Airlines

National
Insemination
Centre, Jerantut Pahang,
Malaysia

Jabatan Perkhidmatan
Haiwan

2.5 Million

Cost planning, preparation of


estimates and bills of quantities.

Earthworks
and
substructure works for
petrol stations, Malaysia

Shell Malaysia

2.5 Million

Director responsible for resource management in


preparing estimates for substructure works.

Administration Building
for Second Refinery,
Tanjong Kling, Malacca,
Malaysia

Petronas

25 Million

Preparation of preliminary estimates.

Mixed
Residential
Development,
Desa
Bakti,
Selayang,
Malaysia

Pandan Maju Sdn Bhd

6 Million

Full range of pre-contract quantity surveying


services including preparation of preliminary
estimates, cash flow projections, preparation of
bills of quantities, tender documents and
evaluation of tenders.

Mixed
development
comprising
high-rise
condominium, offices &
shopping complex, Kuala
Lumpur, Malaysia

Private Developer

Undisclosed

Preparation of feasibility studies including cash


flow projections.

Factory, Malaysia

Private Client

Undisclosed

Post contract quantity surveying services


including finalisation of variations and final
account.

Housing Development,
Batu
Berendam,
Malacca, Malaysia

Masa Merdeka Sdn


Bhd

7.5 Million

Preparation of monthly interim valuations and


financial statements.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016

preliminary

PAGE 23 OF 24

High Quality Bungalow,


Ampang, Kuala Lumpur,
Malaysia

Dato Abdullah Ahmad

Undisclosed

Post contract quantity surveying services


including preparation of variation orders and
negotiation of rates.

6-Storey
flatted
shop/office, Section 13,
Petaling Jaya, Malaysia

Domar Dunia Sdn Bhd

7 Million

Preparation of cost analysis and tender price


index.

Residential Development,
Saujana
Impian,
Malaysia

Sungai
Kantan
Development Sdn Bhd
(Associate of Negara
Properties Sdn Bhd)

Undisclosed

Contracts consultancy services including


preliminary review & report and arbitration
support services

Residential Colleges at
International
Islamic
University,
Gombak,
Malaysia

Goldbridge
Engineering
&
Construction Berhad

12.5 Million

Preparation of variations & final accounts and


claims consultancy services including preliminary
assessment of extension of time claims, loss and
expense claims and on-going contract
administration services.

Low Cost Apartments in


Tirana, Albania

Penang Shipbuilding
Corporation
(Subconsultant to project
consultant QS)

25 Million

Pre-contract commercial & contracts advise to


appointed project consultant QS including
advising on drafting of design and build contracts
and cost planning

Rehabilitation
of
abandoned project for
Tabung
Projek
Perumahan
Terbengkalai,
Taman
Jayamas,
Seremban,
Malaysia

TPPT Sdn Bhd

Confidential

Independent review, audit and assessment of


value of work including complete review of
financial & contractual status of project and
assessment of performance of all consultants.

Rehabilitation
of
abandoned project for
Tabung
Pusingan
Perumahan Kos Rendah,
Kg Ketiau, Penampang,
Kota Kinabalu, Sabah,
Malaysia

TPPT Sdn Bhd

Confidential

Independent opinion & assessment on variation


disputes

Road Rehabilitation and


Slope Stabilisation Works
at Bukit Dabei Microwave
Hill Station, Marudi,
Sarawak, Malaysia

TM Facilities Sdn Bhd

Confidential

Independent opinion and report on contractual


issues.

Dr Noushad Ali Naseem Ameer Ali CV - May 2016