Procedure, Requirements and Timescale for assessing requests for Full and Partial Nakheel Compliance Certification (NCC)

Application Documentation NCC Assessment Procedure

The following documentation must


be submitted as part of any
application for either a Full or As-built drawings compared
Partial Nakheel Compliance with Nakheel stamp
Certificate (NCC): approved drawings; or if
applicable, the Trakhees
1. 1. Letter from Application Building Permit stamp
Consultant/Contractor requesting formally approved drawings
a Full or Partial NCC submitted

2. Plan clearly illustrating the Plot and building coordinates


building(s) to which the checked
application relates Application Application
checked for deemed
3. A copy of the Nakheel Detailed completenes complete
Design stamp approved s Schedule of Alterations (if
drawings; or if these are not applicable) checked for
available, copy of the Trakhees Application Consultant DCR compliance
Building permit stamp approved deemed notified and
drawings incomplete NCC
advised of
timescale declined and
DCR DCR
4. A copy of the as-built drawings rectification
Breaches Compliant
works
Consultant Identified
5. A survey report confirming both requested
building and plot coordinates notified with
DRB
deficiencies
Assessment
6. A letter of undertaking and highlighted
indemnity on approved format
template, and signed and Accompanied Site Full or
stamped by the developer; or Inspection and survey Partial
signed and stamped by the carried out conditional
Consultant/Contractor if NCC issued
accompanied by signed and 30 working
stamped letter from the days
developer confirming power of
attorney to 15 working days (excluding additional time for DRB cycle)
Consultant/Contractor.