SETA » 2 3) 4) 5) 6 ‘A and B can do a piece of work in 40 days while C&A can do It in 60 days. If B is twice as good as C then C alone will do the work in how many days? 1, 120 days 3. 80 days 2, 100 days: 4,24 days As thrice as good a workman as B and B is twice as good a workman as C. If they all finish 2 piece of work in 12 days, then C alone will finish it in how many days? 1. 18 days 2. 108 days 3. 3 days 4, 154 days ‘A can do a work in 15 days and B the same ‘work in 12 days. B started the work and was Joined by A, 5 days before the end of work. The work lasted for how many days? 1. 8 days 2.12 days 3.13 days 4.24 days ‘Accan do a plece of work in 40 days and B can do the same in 30 days. A started alone but left the work after 10 days, then B worked at it for 10 days. C finished the remaining work in 10 days. How long will C alone take to complete the work? 1. 24 days 3.44 days 2. 30 days 4.17 Y days 5 men or 6 women or 10 boys can do a work in 15 days. How long will it take to complete the work by a group of 5 men, 6 women and 10 boys? 1.5 days 3. 10 days 2. 6 days 4.45 days A can do @ piece of work in 90 days, B in 40 days and C in 12 days. They work for a day each in turn, Le. first day A does it alone, second day B does it alone and third day C does it alone. After that the cycle is repeated til work |s completed. They get Rs: 240 for this job. If ‘the wages are divided in proportion to the work ‘each had done. Find the amount A will get? 114 2.24 3.34 4.36 ‘Three men with 5 boys can do a piece of work in 2 days and 4 men and 16 boys can complete the job in one day. How much time will i take 8) 9) 10) 41) 12) 13) STER for one boy together with a woman who can work twice as fast as the boy to complete a job that is three times as time consuming? 1.24 days 2, 28 days 3.32 days 4.36 days A and B together can do a piece of work in twelve days which B and C together can do in 16 days. After & has been working at it for five days and B for seven days, C finishes it in 13 days. In how many days C alone will do the work? 41. 16 days 3. 36 days 2.24 days 4. 48 days Twelve men complete @ work in 9 days. After they have worked for 6 days, 6 more men join them, How many days will they take to ‘complete the remaining work? 1. 2 days 2.3 days 3.4 days 4.5 days A tank, which could be filed in 5 hs, takes 1 hour mare to be filed owing to a leak in its bottom. If the tank is full, the leakage will ‘empty the tank in. 1. the 2.11 brs 3.13 hrs 4,30 hrs Pipe A can fil a tank in 16 min and pipe 8 can empty it in 24 min. If both are opened, after how many minutes should pipe B be closed, so that tank is filled in 30 min? 1.20 2.21 3.23 4.22 “Two pipes can fila tank in 18 min and 27 min, A third pipe can empty full tank in 6 min. All three are opened when tank was 2/3 full. In how many min, will tank become empty? Lit 2.9 3.13 4.7 A,B &C can fill a tank in 12, 24, 48 hrs. They ‘are opened together, but 8 is closed 3 hrs before and C closed 2 hrs before filing of tank. In how many hours, was tank filed? 1.6 2.8 37 4.9 CDC, SRM University 14) Three pipes A, B and C can fila tank in 8 hrs. ‘Al the three plpes are opened for 2 hrs and then C Is closed. If A & 8 fll the remaining tank in 9 brs, find the time taken by C alone to fil the tank? 1.12 2.18 3.24 4.36 15) A, Band C can do a piece of work in 24, 30 & 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days the work was ‘completed? 1.12 2.14 3.AlL 4.15 16) A can do 2 piece of work in 12 days. After he had worked for 2 days B joins him. If they ‘complete the remaining work in 8 days, in how many days B alone can finish the work? 1, 18 days 2. 12 days 3. 24 days 4,10 days 17) Two workers A & B working together completed a job in 5 days. If A worked twice as efficent as, actually did and B worked 1/3" as efficient as he actually did, the work would have completed In 3 days, Find the time for A to complete the job alone? 1.10 2.25/4 3.2/4 4.19/4 18) If 1 man or 2 women or 3 boys can do a piece of work in 44 days. Then in how many days the same piece of work will be done by 1 man, 1 woman and 1 boy? 1.20 2.22 3.24 4.26 19) A can do a work in 16 days, B in 24 days, they take the help of C and the three together finish the work in 6days. Ifthe total remuneration for the work is Rs.40, find the amount that each will receive In proportion to the work. 1, Rs.60 2. Rs.50 3. Rs.15 4,Rs.20 20) 2 men and 1 women can complete a piece of work in 14 days wile 4 women and 2 men can do the same work in 8 days. If men get Rs.60 per day, what should be the wage per day of women? 2a) 2) 23) 24) 25) 1.30 per day 2.40 3.50 4.60 ‘Two taps A & B can separately fil a cistern in 48min & 60min respectively. Both the taps are kept open for 20mins and then the tap B is turned off. How much time wil it take to fil the cistern? 1. 24mins 2. 28mins 3. 32mins 4, 36mins Two pipes can separately fl a cistern in 12mins & 24mins respectively and a waste pipe can drain off 20 gallons per minute. If all the three pipes are opened the cistern fils in 24mins. What is the capacty of the cistern? 1.360 gallons. 2. 380 gallons 3.240

You might also like