Professional Documents
Culture Documents
A 110T8069 1 -
DATE
REV ZONE DESCRIPTION APPROVED
(YYYY-MM-DD)
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIGNATURES & DATES
A 110T8069 2 -
1. GENERAL
This specification defines the installation procedure used for the 9FA.03 Inlet Ducting, MLI A041.
The installer shall have the following equipment (as a minimum) to install the 9FA.03 Inlet
Ducting, MLI A041
2.1 Hand tools (for ISO bolting hardware)
Winch
Jacks
Hydraulic jacks
Slings & shackles
Scaffolding
Crane
2.3 Adjustment
Thickness wedges
Theodolyte target glasses
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO
A 110T8069 3 -
An assembly area of 10 meters by 20 meters is recommended to assemble the ducts and for the
positioning of cranes.
4. REFERENCE DOCUMENTS
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO
A 110T8069 4 -
5. INSTALLATION SEQUENCE
Spreader bars must be used for the handling of each of the ducts.
Refer to Ducting Lifting Arrangement Drawing, 109T4314, for lifting of individual duct
piece.
WARNING: The assembly will need to be supported appropriately during and after the
installation of the sloped duct on to the vertical duct assembly due to change in the
location of the center of gravity.
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO
A 110T8069 5 -
10. Make sure that gasket is not damaged during removal of shipping braces and lifting
lugs.
WARNING: Do not support the duct assembly off of the inlet plenum transition duct. The
inlet plenum transition duct cannot support the weight of the vertical duct assembly
WARNING: The assembly will need to be supported appropriately during and after the
installation of the sloped duct on to the vertical duct assembly due to change in the
location of the center of gravity.
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO
A 110T8069 6 -
WARNING: The assembly will need to be supported appropriately during and after the
installation of the sloped duct on to the vertical duct assembly due to change in the
location of the center of gravity.
6. Remove the caps from the open ends of the IBH pipes.
7. Install MLI A341 at the piping / supporting interface of the duct (drawing 108T8702 & MLI
A341 Installation drawing).
8. After bolting the Silencer duct (105T3148) to the Elbow Silencer Duct (105T3149) and IBH
duct (105T3150) Assembly, lift it and remove the formed angle channel shipping blocks.
9. Place this assembly on the A041 support steel and align the bolt hole patterns of the
downstream end of the IBH holes and the upstream flange of the sloped duct 105T3151.
Alternatively steps 6 & 7 can be done after steps 8 and 9. Where, MLI A341 will be installed after
placing the duct on to the support structure.
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO
A 110T8069 7 -
1. Bond the self adhesive rubber band REP 35 (105T5622) to the structural sheets, profiles
and angle bars according to 105T5622.
2. Pull out the support pins (sheet 4 of 105T5622) from the duct shell plate. Push the
acoustic cushion REP 34 (105T5622) such that it pierces the support pin.
3. Install the square washer REP 32 (105T5622) and bend the support pin to lock the
acoustic cushion in place.
4. Install the cladding sheets as outlined in 105T5622 and fix in place using self-tapping
screws REP33. The self-tapping screws shall have a pitch no greater than 8 inches [203
mm].
5. Caulk the overlapping areas of the field installed cladding seams with Sikaflex 221 and
ensure that the assembly is water tight.
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO
A 110T8069 8 -
6. PAINT INSPECTION
1. Inspect the inlet duct for any damage to the paint system. Stainless steel components are not
to be painted.
2. Repair any damaged areas as per GEK111332, section V, paragraph C (Page 20). The paint
system is International Protective Coatings Co.
7. CLEANLINESS/FINAL INSPECTION
Prior to the operation of the gas turbine, the inlet ducting and inlet plenum must be checked to
ensure that they are 100% free of dirt, debris, tools, cleaning equipment, and other foreign
objects. All sections of the inlet ducting must be completely installed. All instrumentation must
be in place. All access hatches shall be closed and sealed prior to start.
COPYRIGHT 2014 GE POWER & WATER (USA), LLC AND/OR ITS AFFILIATES. All rights reserved. The information contained herein is GE Power & Water Gas Turbine Proprietary
Technical Information that belongs to the General Electric Company, GE Power & Water (USA), LLC and/or their affiliates, which has been provided solely for the express reason of restricted
private use. All persons, firms, or corporations who receive such information shall be deemed by the act of their receiving the same to have agreed to make no duplication, or other disclosure, or
use whatsoever for any, or all such information except as expressly authorized in writing by the General Electric Company, GE Power & Water (USA), LLC and/or its affiliates.
GE CLASS II (INTERNAL NON-CRITICAL)
SIZE CAGE CODE DWG NO