You are on page 1of 4

M E T R A D O

PROYECTO : CONSTRUCCIN DE LA INFRAESTRUCTURA DE I.E. N 30907 PALMATAMBO"


PROPIETARIO : I.E. N 30907 - PALMATAMBO
SECTOR:PALMATAMBO DISTRITO:P PERENE PROVINCIA CHANCHAMAYO DEPARTAMENTO: JUNIN
E :
ITEMS 01.04.01.02 Acero fy=4200 kg/cm2 FECHA: AGOSTO DE 2013
R
:
E ACEROS ZAPATAS
N
E LONGITUD X
DESCRIPCIN DISEO DE FIERRO N ELEM. N PZAS LONG
IGUALES X ELEM. X PZA 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Z-1 Verticales 1.00 5/8" 2 5 1.00 10.00

Horizontales 0.85 5/8" 2 6 0.85 10.20

Z-2 Verticales 0.90 5/8" 2 4 0.90 7.20

Horizontales 0.75 5/8" 2 5 0.75 7.50

Z-3 Verticales 1.20 5/8" 3 6 1.20 21.60

Horizontales 1.05 5/8" 3 7 1.05 22.05

Z-4 Verticales 1.10 5/8" 3 5 1.10 16.50

Horizontales 0.95 5/8" 3 6 0.95 17.10

sub-total 112.15

LT=LONGITUD TALTA DE VARILLAS EN MT 112.15

PESO ESPECIFICO DE CADA VARILLA (KG/ML) 0.25 0.56 0.99 1.55 2.24 4.04

TOTAL KGS 173.83 173.83


M E T R A D O
PROYECTO : CONSTRUCCIN DE LA INFRAESTRUCTURA DE I.E. N 30907 PALMATAMBO"
PROPIETARIO : I.E. N 30907 - PALMATAMBO
SECTOR:PALMATAMBO DISTRITO:P PERENE PROVINCIA CHANCHAMAYO DEPARTAMENTO: JUNIN
E :
ITEMS 01.04.02.03 Acero fy=4200 kg/cm2 FECHA: AGOSTO DE 2013
R
:
E ACEROS EN VIGA EN CIMENTACION
N
E LONGITUD X
DESCRIPCIN DISEO DE FIERRO N ELEM. N PZAS LONG
IGUALES X ELEM. X PZA 1/4" 3/8" 1/2" 5/8" 3/4" 1"
EJE 1-1 18.8
8 5/8" 4 18.88 75.52
VC-03 (0.25X0.50)

1.50 3/8" 4 33 1.50 198.00

EJE 2-2 18.8


5/8" 4 18.88 75.52
VC-03 (0.25X0.50) 8

1.50 3/8" 4 32 1.50 192.00

EJE A-A, E-E 6.07


1/2" 2 4 6.07 48.56
VC-01 (0.25X0.50)

1.50 3/8" 2 38 1.50 114.00

EJE C-C 6.07


5/8" 1 4 6.07 24.28
VC-02 (0.25X0.50)

1.50 3/8" 1 38 1.50 57.00

3.25 1/2" 1 2 3.25 6.50

sub-total 561 55.06 175.32


LT=LONGITUD TALTA DE VARILLAS EN MT 561.00 55.06 175.32

PESO ESPECIFICO DE CADA VARILLA (KG/ML) 0.25 0.56 0.99 1.55 2.24 4.04

TOTAL KGS 640.42 314.16 54.51 271.75


M E T R A D O
PROYECTO : CONSTRUCCIN DE LA INFRAESTRUCTURA DE I.E. N 30907 PALMATAMBO"
PROPIETARIO : I.E. N 30907 - PALMATAMBO
SECTOR:PALMATAMBO DISTRITO:P PERENE PROVINCIA CHANCHAMAYO DEPARTAMENTO: JUNIN
E : FECHA: AGOSTO DE 2013
ITEMS 01.04.03.03 Acero fy=4200 kg/cm2
R
:
E ACEROS COLUMNAS
N
E LONGITUD X
DESCRIPCIN DISEO DE FIERRO N ELEM. N PZAS LONG
IGUALES X ELEM. X PZA 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Columna C-1 6.63 5/8" 4 8 6.63 212.16

1.30 3/8" 4 64 1.30 332.80

Columna C-2 5.80 5/8" 6 6 5.80 208.80

1.30 3/8" 4 32 1.30 166.40

columna C-3 5.80 3/8" 18 4 5.80 417.60

0.80 1/4" 18 29 0.80 417.60

sub-total 417.60 916.80 420.96

LT=LONGITUD TALTA DE VARILLAS EN MT 417.60 916.80 420.96

PESO ESPECIFICO DE CADA VARILLA (KG/ML) 0.25 0.56 0.99 1.55 2.24 4.04

TOTAL KGS 1270.30 104.40 513.41 652.49


M E T R A D O
PROYECTO : CONSTRUCCIN DE LA INFRAESTRUCTURA DE I.E. N 30907 PALMATAMBO"
PROPIETARIO : I.E. N 30907 - PALMATAMBO
SECTOR:PALMATAMBO DISTRITO:P PERENE PROVINCIA CHANCHAMAYO DEPARTAMENTO: JUNIN
E :
ITEMS 01.04.04.03 Acero fy=4200 kg/cm2 FECHA: AGOSTO DE 2013
R
:
E ACEROS VIGAS
N
E LONGITUD X
DESCRIPCIN DISEO DE FIERRO N ELEM. N PZAS LONG
IGUALES X ELEM. X PZA 1/4" 3/8" 1/2" 5/8" 3/4" 1"
EJE 1-1 18.5
0 5/8" 4 18.50 74.00
VA-101 (0.25X0.40)

1.30 3/8" 4 32 1.30 166.40

2.55 1/2" 2 2 2.55 10.20

2.85 1/2" 2 2 2.85 11.40

EJE 2-2 18.5


0 5/8" 4 18.50 74.00
VA-100 (0.25X0.40)

1.30 3/8" 4 32 1.30 166.40

2.55 1/2" 2 2 2.55 10.20

EJE B-B, C-C Y D-D 5.77


1/2" 3 4 5.77 69.24
VP-101 (0.25X0.40)

1.30 3/8" 3 38 1.30 148.20

3.25 5/8" 3 2 3.25 19.50

EN TIMPANO

EJE A-A Y E-E 5.77


1/2" 2 4 5.77 46.16
VP-100 (0.25X0.40)

1.30 3/8" 2 34 1.30 88.40

sub-total 569.40 147.20 167.50

LT=LONGITUD TALTA DE VARILLAS EN MT 569.40 147.20 167.50

PESO ESPECIFICO DE CADA VARILLA (KG/ML) 0.25 0.56 0.99 1.55 2.24 4.04

TOTAL KGS 724.22 318.86 145.73 259.63