Contact: SUPPLIERS ABNORMALITY REPORT


COLOCAR LOS DATOS DEL
Supplier: KASAI MEXICANA S.A. DE C.V.
PROVEEDOR ENE-
Address: Address: Blvd. Miguel de Cervantes Saavedra Sur 7502
Esq. Calle Poliducto
Report #: ENE 1201
Col. Ciudad Industrial De Len.
Issue Date:
Phone: C.P. 37490 Len Gto., Mxico
Fax No. : Phone: 01 (477) 763 55 50 ext. 135
Responsible:
E-mail: Fax No. : 01 (477) 763 55 54
E-mail: Department:

PART INFORMATION
OCCURRENCE:
PART NAME: NG QUATITY: CANTIDAD QUE SE DETECT EN
New Recurrent
PRODCUCCION CON ESTE DEFECTO .
DEFECT TYPE:
PART NUMBER: COLOR:
B
LA CANTIDAD TOTAL DETECTADA SE A
LOTE EN EL CUAL SE ENCONTR EL COLOCA EN EL REJECTED MATERIAL
LOT NUMBER: MATERIAL DEFECTUOSO REPORTED BY:
REPORT. CREDIT NOTE REINSTATEMENT
DATE: NEXT SHIMPENT DATE:

1a. PROBLEM DESCRIPTION


Please it does involve these questions in the writing of the problem, what?, who?, when?, how? and why?

DESCRIBIR CLARAMENTE CUAL ES EL DEFECTO Y EN QUE NOS AFECTA .


INCLUIR CUNTO MATERIAL HAY EN ALMACN CON ESTA CONDICION ?

TRATAR DE SER LO MS ESPECIFICOS DE TAL MANERA QUE NO TENGA DUDAS EL


PROVEEDOR.

1b. IMAGES PROBLEM DESCRIPTION

BCQ07-75E1
CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO
EXCLUSIVO DE KASAI
SUPPLIERS ABNORMALITY REPORT
ENE-- MES EN QUE SE REALIZA EL REPORTE
ENE 1201 12-- CORRESPONDE AL AO
01-- NUMERO CONSECUTIVO

PART INFORMATION

DATE:

1a. PROBLEM DESCRIPTION


estions in the writing of the problem, what?, who?, when?, how? and why?

MAGES PROBLEM DESCRIPTION

BCQ07-75E1
CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO
LLENADO EXCLUSIVO DE PROVEEDOR
2. CONTAINMENT ACTIONS (What will be the immediate fix? Provide short term action to KASAI within 24 hours)
ACCIONES DE CONTENCIN (Cul ser el arreglo inmediato? Proporcione las acciones de contencin dentro de 24 horas)
No. Action Responsible Due Date

3. ROOT CAUSE ANALYSIS (Supplier must use problem solving tools on page 3)
ANALISIS DE CAUSA RAZ (El proveedor deber usar las herramientas de solucin de problemas de la pgina 3)

4. CORRECTIVE ACTION (Permanent Counterme asure. Provide short term action to KASAI within 5 workdays)
4. ACCIN CORRECTIVA (Contramedida permanente. Prporcionarne las acciones corr
permanentes dentro de 5 das hbiles)

No. Action Responsible Due Date

No. Action Responsible Due Date

5. FMEA, CONTROL PLAN, OTHER THAT NEED TO BE CHANGED


5. AMEF, PLAN DE CONTROL U OTRO DOCUMENTO CAMBIADO
No. Action Responsible Due Date

6. CORRECTIVE ACTION VERIFICATION (For KASAI use only)


VERIFICACIN DE LA ACCIN CORRECTIVA (Uso solo para Kasai)
No. Action Responsible Due Date

CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO. BCQ07-75E1


CLUSIVO DE PROVEEDOR
mmediate fix? Provide short term action to KASAI within 24 hours) 2.
glo inmediato? Proporcione las acciones de contencin dentro de 24 horas) DESCRIBIR LAS ACTIVIDADES QUE SE REALIZARON PARA CONTENER EL
Completed Advance
DEFECTO. POR LO GENERAL PROVEEDOR TIENE QUE VENIR A
CERTIFICAR EL MATERIAL SOSPECHOSO O CONTRATAR SERVICIOS DE
SORTEADORA PARA QUE LO HAGA.

INCLUYE CERTIFICAR TODO MATERIAL SOSPECHOSO QUE SE


ENCUENTRA EN SUS INSTALACIONES.

SE DESCIBEN LAS ACTIVIDADES QUE SE REALIZARON EN EL PROCESO


MIENTRAS ENCUENTRAN CAUSA RAZ Y ESTABLECEN LA CONTRAMEDIDA
DEFINITIVA.

oblem solving tools on page 3) 3.


roveedor deber usar las herramientas de solucin de problemas de la pgina 3)

SE DESCRIBE LA CAUSA RAZ DEL PROBLEMA, ESTA SE OBTIENE POR


MEDIO DE UN ANLISIS.

PARA OBTENER CAUSA RAZ SE DEBE DE USAR LAS HERRAMIENTAS


PARA LA SOLUCION DE PROBLEMAS DE LA PAGINA 3 O ALGUNA OTRA
HERRAMIENTA.

sure. Provide short term action to KASAI within 5 workdays)


CIN CORRECTIVA (Contramedida permanente. Prporcionarne las acciones correctivas
permanentes dentro de 5 das hbiles)

Completed Advance

UNA VEZ TENIENDO LA CAUSA RAZ, SE DEBEN ESTABLECER LAS


ACCIONES CORRECTIVAS DEFINITIVAS.

PUEDEN SER UNA O MS.

Completed Advance

EED TO BE CHANGED
DE CONTROL U OTRO DOCUMENTO CAMBIADO
Completed Advance
SI HAY CAMBIOS EN ALGUNOS DE ESTOS DOCUMENTOS SE DEBE
MENCIONAR EN ESTE APARTADO.

ESTOS DOCUMENTOS PUEDEN SER INSTRUCCIONES DE TRABAJO, AMEF,


PLAN DE CONTROL, ETC.

KASAI use only) 6.


E LA ACCIN CORRECTIVA (Uso solo para Kasai)
Completed Advance

EL RESPONSABLE DEASEGURAMIENTO DE CALIDAD A PROVEEDORES


DEBE VERIFICAR LAS ACCIONES CORRECTIVAS HASTA QUE SE CIERREN
POR COMPLETO.

CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO. BCQ07-75E1


LLENADO EXCLUSIVO DE PROVEEDOR
7. ROOT CAUSE ANALYSIS TOOLS /HERRAMIENTAS PARA EL ANALISIS DE LA CAUSA RAZ
Use the problem solving tools below to perform root cause analysis or other solving tool/Use las herramientas para resolver problemas siguie
otra herramienta.

5 WHY'S / 5 PORQUE
A) ISSUE ORIGIN /ORIGEN DEL PROBLEMA

WHY MADE THE


DEFECT? / POR
QUE FUE
HECHO EL
DEFECTO?

WHY WHY WHY WHY

B) DEFECT ESCAPE / FUGA DEL DEFECTO

WHY WAS
SHIPPED THE
MATERIAL WITH
DEFECT? / POR
QU SE ENVIO
MATERIAL CON
DEFECTO?

WHY WHY WHY WHY

CAUSE AND EFFECT DIAGRAMA/ DIAGRAMA DE CAUSA EFECTO

hin / MANO DE OBRA


MAN METHOD / METODO

MATERIAL / MATERIAL MACHINE / MAQUINARIA

CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO. BCQ07-75E1


CLUSIVO DE PROVEEDOR
OLS /HERRAMIENTAS PARA EL ANALISIS DE LA CAUSA RAZ
analysis or other solving tool/Use las herramientas para resolver problemas siguientes o alguna
otra herramienta.

PROBLEM /
PROBLEMA

CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO. BCQ07-75E1


LLENADO EXCLUSIVO DE KASAI
8. KASAI ANSWER

CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO. BCQ07-75E1


O EXCLUSIVO DE KASAI
8. KASAI ANSWER

CANCELACION DE LA PRODUCCION MAS UN AO CALENDARIO. BCQ07-75E1