Puente Caynarachi

RELACIN DE PRECIOS DE MATERIALES


PUENTE CAYNARACHI

LUGAR PRECIO FLETE ALM. MER.


ITEM DESCRIPCION UND
COMPRA 2% 5%

1 Acero Corrugado fy=4,200 Kg. Tarapoto 2.62 0.05 0.05 0.13


2 Acero Estructural ASTM A 36 Kg. Chimbote 3.10 0.27 0.06 0.16
4 Acetileno Kg. Tarapoto 6.00 0.05 0.30
6 Agua para concreto m 3
Obra Anlisi de cantera
7 Alambre Negro # 8 Kg Tarapoto 4.16 0.05 0.08 0.21
8 Alambre Negro + distaciadores Kg Lima 2.52 0.38 0.05 0.13
11 Arandelas,pernos y tuercas und. Tarapoto 3.91 0.005 0.08
12 Arena m3 Obra 100.64 Anlisi de cantera
13 Asfalto RC-250 (80%) Gln Lima 8.40 0.20 0.17 0.42
17 Cemento Portland Bls. Tarapoto 20.14 2.13 1.01 2.42
18 Clavos 4" Kg. Tarapoto 4.16 0.05 0.08 0.21
20 Desmoldante Gln Lima 92.21 1.79 1.84 4.61
21 Disolvente Thiner Gln Tarapoto 19.93 0.17 0.40 1.00
31 Material seleccionado m3 Obra 67.41 Anlisi de cantera
32 Kerosene Industrial (20%) Gln Tarapoto 5.63 0.18 0.11 0.28
34 Ladrillo KK und. Tarapoto 0.53 0.03 0.01 0.03
36 Madera Tornillo pie2 Tarapoto 2.26 0.08 0.05 0.11
37 Neopreno cm 3
Lima 0.24 0.001 0.01
38 Oxgeno m 3
Lima 9.45 3.33 0.47
39 Pernos 3/8"x 4" und. Tarapoto 0.55 0.01 0.01 0.03
42 Petrleo Gln Tarapoto 6.98 0.18 0.14 0.35
43 Pidra chancada m 3
Obra 151.83 Anlisi de cantera
46 Pintura Esmalte Gln Lima 29.69 3.24 0.59 1.48
47 Pintura Esmalte Epxica Gln Lima 118.59 3.24 2.37 5.93
48 Pintura Esmalte Sinttico Gln Lima 41.36 3.24 0.83 2.07
49 Pintura Metal Primer Gln Lima 31.33 3.24 0.63 1.57
50 Pintura Imprimante Gln Lima 13.79 3.24 0.28 0.69
54 Plastificante Acelerante kg Lima 12.00 0.38 0.24 0.60
56 Soldadura Cellocord 1/8'' Kg Lima 6.44 0.38 0.13 0.32
60 Tripley 19 mm. 4'x8'x19mm. und Tarapoto 83.23 0.95 1.66 4.16
65 Acero Pretensor Kg. Chimbote 19.35 0.27 0.39 0.97
66 Ducto corrugado kg Chimbote 30.19 0.27 0.60 1.51
67 Anclajes cable acero kg Chimbote 600.12 0.27 12.00 30.01
85 Piedra para obra de Proteccin m 3
Obra 174.99 Anlisi de cantera
87 Acero Estructural PG-24 Kg. Chimbote 3.43 0.27 0.07 0.17

UNI-FIC
Puente Caynarachi

CALCULO DE LA DISTANCIA VIRTUAL

PARA LA DETERMINACION DEL FLETE

RUTAS DIST FACTOR


DE A Km

LIMA - DSVO OLMOS 771.00 1.00


PACASMAYO-DSVO OLMOS 109.00 1.00
TALARA - DSVO OLMOS 322.00 1.00
CHIMBOTE - DSVO OLMOS 341.00 1.00
DSVO OLMOS - OBRA 718.00 1.00

RUTAS DISTANCIA VIRTUAL


DE A (Dv)

LIMA - OBRA 1489


PACASMAYO - OBRA 827
TALARA - OBRA 1040
CHIMBOTE - OBRA 1059
TARAPOTO - OBRA 104

INDICE CREPCO. F(32) = Noviemb 02 = 4.857


Junio 91

CARGA Slidos Liquidos


VALORES <500 >500 <500 >500
A 5.77 0 4.61 0
B 0.040557 0.052092 0.0631 0.074608

CLCULO DE FLETES

FLETE = (A+BxDv)xf/1000 0

CARGA SLIDA CARGA LQUIDA


DE A S. / Kg S. / Kg
1 Lima Obra 0.38 0.54
2 Pacasmayo Obra 0.21 0.30
3 Talara Obra 0.26 0.38
5 Chimbote Obra 0.27 0.38
6 Tarapoto Obra 0.05 0.05

UNI-FIC
Puente Caynarachi

PRECIO
EN OBRA

2.85
3.59
6.35
14.10
4.50
3.08
4.00
100.64
9.19
25.70
4.50
100.45
21.50
67.41
6.20
0.60
2.50
0.25
13.25
0.60
7.65
151.83
35.00
130.13
47.50
36.77
18.00
13.22
7.27
90.00
20.98
32.57
642.40
174.99
3.94

UNI-FIC
Puente Caynarachi

ARA LA DETERMINACION DEL FLETE

UNI-FIC
GASTOS GENERALES
PUENTE CAYNARACHI
(EJECUCIN POR CONTRATA)

TIEMPO DE EJECUCIN DE TRABAJOS: 8.00 MESES

1.00 GASTOS GENERALES FIJOS

1.01 CAMPAMENTO Incluido en los Anlisis de Costos Unitarios


1.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Incluido en los Anlisis de Costos Unitarios
1.03 MANTENIMIENTO DE OFICINA CENTRAL

ITEM Costo S/. Mes Parcial


Mantenimiento, alquiler de oficina 4,500.00 8.00 36,000.00
Comunicaciones 2,134.80 8.00 17,078.40
Sub total S/. 53,078.40

1.04 SEGUROS

ITEM Costo S/. Estimado Parcial


Seguro de Accidentes del Personal, Equipo y Enseres 20,086.97 20,086.97
Seguro de Estructuras metlica 2,800.00 2,800.00
Sub total S/. 22,886.97

1.05 IMPRESOS, TILES DE ESCRITORIO Y OFICINA

ITEM Costo S/. Cantidad Meses Parcial


Impresiones y copias 500.00 1.00 8.00 4,000.00
Utiles de escritorio y oficina 1,500.00 1.00 8.00 12,000.00
Sub total S/. 16,000.00

1.06 GASTOS DIVERSOS

ITEM Costo S/. Cantidad Meses Parcial


Gastos de licitacin 2,500.00 1.00 1.00 2,500.00
Gastos legales notariales 2,500.00 1.00 1.00 2,500.00
Sub total S/. 5,000.00
1.07 CARTELES DE OBRA Incluido en los Anlisis de Costos Unitarios

1.08 MEDICAMENTOS Y VESTUARIO

ITEM Costo S/. Cantidad Meses Parcial


Vestuario 200.00 1.00 8.00 1,600.00
Medicinas 100.00 1.00 8.00 800.00
Sub total S/. 2,400.00

SUB TOTAL GASTOS GENERALES FIJOS 99,365.37


PORCENTAJE CON RESPECTO AL COSTO DIRECTO

99,365.37 X100%= 2.65%


3,743,192.98

TOTAL GASTOS GENERALES FIJOS 99,365.37


2.00 GASTOS GENERALES VARIABLES
2.01 SUELDO DE PERSONAL
OFICINA CENTRAL
Personal Directivo
Gerente del Proyecto 1.00 8.00 10,000.00 80,000.00
Ing. Coordinador 1.00 8.00 7,000.00 56,000.00
136,000.00

Sub total S/. 136,000.00

Personal Administrativo
Administrador 1.00 8.00 3,200.00 25,600.00
Asistente Administrativo 1.00 8.00 1,500.00 12,000.00
Contador 1.00 8.00 2,500.00 20,000.00
Logstico 1.00 8.00 1,400.00 11,200.00
Secretaria 1.00 8.00 1,500.00 12,000.00
Radio operador 1.00 8.00 900.00 7,200.00
Chofer 1.00 8.00 1,000.00 8,000.00
96,000.00

Sub total S/. 96,000.00

DIRECCION TCNICA ADMINISTRATIVA

PERSONAL Cantidad Meses Sueldo Parcial


Ing. Residente 1.00 8.00 6,000.00 48,000.00
Ing. Asistente 1.00 8.00 4,000.00 32,000.00
Ing. Montaje 1.00 1.00 4,000.00 4,000.00
Ing.Costos y Valorizacin 1.00 8.00 4,000.00 32,000.00
Ing. Impacto Ambiental 1.00 1.50 4,000.00 6,000.00
Jefe Maestro de Obra 1.00 8.00 3,550.00 28,400.00
Almacenero 1.00 8.00 1,500.00 12,000.00
Administrador 1.00 8.00 3,050.00 24,400.00
Asistente Adiministrativo 1.00 8.00 1,500.00 12,000.00
Secretaria 1.00 8.00 1,200.00 9,600.00
Mecnico 1.00 8.00 1,200.00 9,600.00
Chofer 1.00 8.00 1,200.00 9,600.00
Comprador 1.00 8.00 1,000.00 8,000.00
Guardin 2.00 8.00 900.00 14,400.00
Subtotal : Sub total S/. 250,000.00

Total sueldos 482,000.00


2.02 GASTOS DE ALIMENTACION
PERSONAL Cantidad Meses Costo mes Parcial
Personal Profesional 5.00 8.00 500.00 20,000.00
Personal Tcnico Administrativo 5.00 8.00 450.00 18,000.00

Subtotal : Sub total S/. 38,000.00

2.03 MOVILIZACIN Y DESMOVILIZACIN DE PERSONAL

Cantidad N viajes Vitico Parcial


Personal profesional
Personas 10.00 4.00 180.00 7,200.00
Personal tcnico administrativo
Personas 5.00 4.00 170.00 3,400.00

Total movilizacin de personal Sub total S/. 10,600.00

2.04 EQUIPOS NO INCLUIDOS EN LOS COSTOS DIRECTOS

Cantidad Costo Meses Parcial


Camioneta 1.00 2,900.00 8.00 23,200.00
Equipo de oficina 1.00 369.15 8.00 2,953.20
Equipo de radio y comunicaciones 1.00 374.86 8.00 2,998.88
Ensayos 1.00 697.15 3.00 2,091.45
Total equipos Sub total S/. 31,243.53
COMBUSTIBLES
Cantidad Costo diario meses Parcial
Camioneta y generador 1.00 60.00 8.00 14,400.00

Sub total S/. 14,400.00

SUB TOTAL GG-V1 576,243.53

576,243.53 X100%= 15.39%


3,743,192.98

TOTAL GG - V1 576,243.53

TIEMPO DE EJECUCIN 6 MESES

2.05 GASTOS FINANCIEROS

2.05.0 FONDO DE GARANTIA

DEL CAPITAL RETENIDO N


Primera retencin : 0.05 x N/ TR 0.05 1.00 = 0.006250 (1)
Ultima retencin : 0.05 x N 0.05 1.00 = 0.050000 (2)
Retencin promedio (RP) (1) + (2) / 2 = 0.028125
Tiempo de retencin (TR): 8.00

INTERS DE RETENCIN
1) Tasa efectiva mercado anual TAMN a Ago 2001 (x) 22.45%
2) Tasa efectiva de ahorro a Ago 2001 (y) 8.38%

x / TR x RP x 12 = 0.009471

y / TR x RP x 12 = 0.003535
TOTAL 0.013006 (3)

PORCENTAJE : (3) x 100 = 1.301% (a)

2.05.0 ADELANTO EN EFECTIVO

GASTOS POR CONCEPTO DE ADELANTO

Adelanto 20 %
Monto de Adelanto 20 %xN
Renovavin de Carta Fianza cada 3 meses
Tiempo de Retencin 8 meses
Nmero de trimestres 2.7 trimentre

PRIMER TRIMESTRE
2/2 (0.040 x 0.20 N x 3/12) = 0.002000
SEGUNDO TRIMESTRE
2/1 (0.040 x 0.20 N x 3/12) = 0.004000
0.006000 (4)

PORCENTAJE : (4) x 100 % = 0.600% (b)

2.05.0 CAPITAL RETENIDO POR CARTA FIANZA (25%)


0.25 x 0.0086 x N x (36.07% - 9.0%) /12 x 3 meses = 0.05% (c)
TOTAL ITEM 2.07 = (a) + (b) + ( c) = 1.951%

PORCENTAJE CON RESPECTO AL COSTO DIRECTO 1.951%

TOTAL GG-V2 73,029.70

GASTOS GENERALES VARIABLES


TOTAL GG-V1 + TOTAL GG - V2 649,273.225

1.00 TOTAL GASTOS GENERALES FIJOS S/. 99,365.37


2.00 TOTAL GASTOS GENERALES VARIABLES S/. 649,273.23

TOTAL DE GASTOS GENERALES EN S/. S/. 748,638.60

COSTO DIRECTO DE OBRA S/. 3,743,192.98

% DE GASTOS GENERALES 20.000%

NOTA:SEASUMI20%
ESTRUCTURA DE COSTOS DE MANO DE OBRA
(VIGENTE DEL 01.06.04 AL 31.05.05)
PROYECTO : CARRETERA PONGO DE CAYNARACHI - BARRANQUITA - PELEJO
OBRA : CONSTRUCCIN PUENTE CAYNARACHI
FECHA : ABRIL 2005

DESCRIPCION OPERARIO OFICIAL


1.00 Remuneracin bsica vigente (RB) (vigente del 01.06.04 al 31.05.05) 32.09 28.76
2.00 Bonificacin unificada de construccin (BUC) (vigente del 01.06.04 al 31.05.05)
Operario 32.00% 10.27
Oficial 30.00% 8.63
Pen 30.00%
3.00 Leyes y Beneficios Sociales sobre la RB 114.04% 36.60 32.80
4.00 Leyes y Beneficios Sociales sobre el BUC 12.00% 1.23 1.04
5.00 Bonificacin Movilidad Acumulada 7.20 7.20
6.00 Overol (02 Und.anuales) 0.40 0.40

JORNAL DIARIO 87.79 78.82


JORNAL HORARIO 10.97 9.85

TOPOGRAFO (130% OPERARIO)


TECNICO MONTAJISTA
OPERARIO SOLDADOR
OPERARIO CORTADOR
FUENTE : PUBLICACIN MENSUAL DEL GRUPO S10/COSTOS/EDICION 129/DICIEMBRE 2004/PAG. 100
TRUCTURA DE COSTOS DE MANO DE OBRA
(VIGENTE DEL 01.06.04 AL 31.05.05)
NGO DE CAYNARACHI - BARRANQUITA - PELEJO

PEON
25.63

7.69
29.23
0.92
7.20
0.40

71.07
8.88

14.26
14.26
10.97
10.97