You are on page 1of 757

__________

HIGHLIGHTS

REVISION NO. 09 Feb 01/07

Pages which have been revised are outlined below, together with the Highlights of the
Revision

--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------

CHAPTER 05
__________

L.E.P. 1- 6 REVISED TO REFLECT THIS REVISION INDICATING


NEW,REVISED, AND/OR DELETED PAGES
05-22-60 TITLE OF TASK(S) DATA UPDATED ALL
601, 603-
606

05-23-20 CONSUMABLE INGREDIENT DATA UPDATED ALL


605, 616

05-24-50 CORRECTION/ADDITION/AMPLIFICATION ALL


607- 609 REPLACED REMOVE THE PRESSURE RELIEF DOORS
WITH OPEN THE THRUST-REVERSER PRESSURE-
RELIEF DOORS.

05-51-11 TECHNICAL CORRECTIONS ALL


610- 611 CORRECTED SPELLING.

05-51-23 TECHNICAL CORRECTIONS ALL


602- 603, ADDED CROSS REF INSTALL STEERING ACTUATOR
605

05-51-25 CORRECTION/ADDITION/AMPLIFICATION ALL


601- 602, UPDATED CROSS REF.
605, 615, TITLE OF TASK(S) DATA UPDATED ALL
621- 623,
627

05-HIGHLIGHTS Page 1 of 1
REVISION NO. 09 Feb 01/07

JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

LIST OF EFFECTIVE PAGES


_______________________
N, R or D indicates pages which are New, Revised or Deleted respectively
Remove and insert the affected pages and complete the Record of Revisions and
the Record of Temporary Revisions as necessary

CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE

RECORD 05-21-20 614 May01/05 05-21-60 602 Nov01/04


OF TEMP. 05-21-20 615 Nov01/06 05-21-60 603 Aug01/06
REVISION 05-21-20 616 Nov01/06 05-21-60 604 Aug01/06
05-21-20 617 Nov01/04 05-21-60 605 Nov01/04
L.E.P. R 1- 6 Feb01/07 05-21-20 618 Nov01/04 05-21-60 606 Nov01/04
T. of C. 1 Feb01/06 05-21-20 619 Nov01/04 05-21-60 607 Nov01/04
T. of C. 2 May01/05 05-21-30 601 Nov01/04 05-21-60 608 Aug01/06
T. of C. 3 May01/05 05-21-30 602 Nov01/04 05-21-60 609 Nov01/04
T. of C. 4 Aug01/05 05-21-30 603 Nov01/04 05-21-60 610 Nov01/04
T. of C. 5 Aug01/05 05-21-30 604 Nov01/04 05-21-60 611 Nov01/04
T. of C. 6 Aug01/05 05-21-30 605 Nov01/04 05-21-70 601 Nov01/06
T. of C. 7 Aug01/05 05-21-30 606 Nov01/04 05-21-70 602 Nov01/06
T. of C. 8 Aug01/05 05-21-30 607 Nov01/04 05-21-70 603 Nov01/06
T. of C. 9 Aug01/05 05-21-30 608 Nov01/04 05-21-70 604 Nov01/06
T. of C. 10 Aug01/05 05-21-30 609 Nov01/04 05-21-70 605 Nov01/04
T. of C. 11 Nov01/06 05-21-30 610 Nov01/04 05-21-90 601 Nov01/04
T. of C. 12 Nov01/06 05-21-30 611 Nov01/04 05-21-90 602 Nov01/04
T. of C. 13 Nov01/06 05-21-30 612 Nov01/04 05-21-90 603 Nov01/04
T. of C. 14 Nov01/06 05-21-30 613 Nov01/04 05-21-90 604 Nov01/04
05-21-30 614 Nov01/04 05-21-90 605 May01/05
05-00-00 1 Nov01/04 05-21-40 601 Nov01/04 05-21-90 606 May01/05
05-00-00 2 Nov01/04 05-21-40 602 Nov01/04 05-21-90 607 May01/05
05-21-40 603 Nov01/04 05-21-90 608 May01/05
05-20-00 1 Nov01/04 05-21-40 604 Nov01/04 05-21-90 609 May01/05
05-21-40 605 Nov01/04 05-21-90 610 Nov01/04
05-21-00 601 Nov01/04 05-21-40 606 Nov01/04 05-21-90 611 Nov01/04
05-21-00 602 Nov01/04 05-21-40 607 Nov01/04
05-21-10 601 Nov01/04 05-21-40 608 Nov01/04 05-22-00 601 Nov01/04
05-21-10 602 Nov01/04 05-21-40 609 Nov01/04 05-22-00 602 Nov01/04
05-21-20 601 Feb01/06 05-21-40 610 Nov01/04 05-22-00 603 Nov01/04
05-21-20 602 May01/05 05-21-50 601 May01/05 05-22-10 601 May01/06
05-21-20 603 Nov01/04 05-21-50 602 May01/05 05-22-10 602 May01/06
05-21-20 604 Nov01/04 05-21-50 603 Feb01/05 05-22-10 603 May01/06
05-21-20 605 Nov01/06 05-21-50 604 May01/05 05-22-10 604 Nov01/04
05-21-20 606 Feb01/06 05-21-50 605 May01/06 05-22-10 605 Nov01/04
05-21-20 607 Feb01/06 05-21-50 606 May01/06 05-22-20 601 Aug01/05
05-21-20 608 Aug01/06 05-21-50 607 Nov01/04 05-22-20 602 Aug01/05
05-21-20 609 Feb01/06 05-21-50 608 Nov01/04 05-22-20 603 Aug01/05
05-21-20 610 Feb01/06 05-21-50 609 May01/06 05-22-20 604 Aug01/05
05-21-20 611 Feb01/06 05-21-50 610 May01/06 05-22-20 605 Aug01/05
05-21-20 612 Feb01/06 05-21-50 611 May01/06 05-22-20 606 Feb01/05
05-21-20 613 Aug01/06 05-21-60 601 Nov01/04 05-22-30 601 Nov01/04

05-L.E.P. Page 1
Feb 01/07

JSA
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE

05-22-30 602 Aug01/06 05-23-20 604 Nov01/04 05-24-50 603 Nov01/04


05-22-30 603 Aug01/06 05-23-20 R 605 Feb01/07 05-24-50 604 Nov01/04
05-22-30 604 Nov01/04 05-23-20 606 Nov01/04 05-24-50 605 Nov01/04
05-22-30 605 Aug01/06 05-23-20 607 Nov01/04 05-24-50 606 Nov01/04
05-22-30 606 Nov01/04 05-23-20 608 Nov01/04 05-24-50 R 607 Feb01/07
05-22-30 607 Aug01/06 05-23-20 609 Nov01/04 05-24-50 R 608 Feb01/07
05-22-30 608 Feb01/05 05-23-20 610 Nov01/04 05-24-50 N 609 Feb01/07
05-22-30 609 Feb01/05 05-23-20 611 Nov01/04 05-24-70 601 Nov01/04
05-22-40 601 Feb01/06 05-23-20 612 Nov01/04 05-24-70 602 Nov01/04
05-22-40 602 May01/05 05-23-20 613 May01/05 05-24-70 603 Nov01/04
05-22-40 603 Nov01/04 05-23-20 614 Nov01/04 05-24-70 604 Nov01/04
05-22-40 604 Feb01/06 05-23-20 615 Nov01/04 05-24-70 605 Nov01/04
05-22-40 605 May01/05 05-23-20 R 616 Feb01/07 05-24-70 606 Nov01/04
05-22-40 606 May01/05 05-23-20 617 Nov01/04 05-24-70 607 Nov01/04
05-22-40 607 Aug01/06 05-23-20 618 Nov01/04
05-22-40 608 Aug01/06 05-23-30 601 Nov01/04 05-25-00 601 Nov01/04
05-22-40 609 Feb01/05 05-23-30 602 Nov01/04 05-25-00 602 Nov01/04
05-22-40 610 Feb01/05 05-23-30 603 Nov01/04 05-25-00 603 Nov01/04
05-22-50 601 Nov01/04 05-23-30 604 Nov01/04 05-25-00 604 Nov01/04
05-22-50 602 Nov01/04 05-23-30 605 Feb01/05 05-25-00 605 Nov01/04
05-22-50 603 Nov01/04 05-23-30 606 Nov01/04 05-25-20 601 Nov01/04
05-22-50 604 Nov01/04 05-23-30 607 Feb01/05 05-25-20 602 Nov01/04
05-22-50 605 Nov01/04 05-23-30 608 Nov01/04 05-25-20 603 Nov01/04
05-22-50 606 May01/05 05-23-30 609 Nov01/04 05-25-20 604 Nov01/04
05-22-50 607 Aug01/06 05-23-30 610 Nov01/04 05-25-20 605 Nov01/04
05-22-50 608 May01/05 05-23-30 611 Nov01/04 05-25-20 606 Nov01/04
05-22-50 609 Feb01/05 05-23-30 612 Nov01/04 05-25-20 607 Nov01/04
05-22-50 610 Feb01/05 05-23-30 613 Nov01/04 05-25-20 608 Nov01/04
05-22-60 R 601 Feb01/07 05-25-30 601 May01/05
05-22-60 602 Aug01/06 05-24-00 601 Nov01/04 05-25-30 602 May01/05
05-22-60 R 603 Feb01/07 05-24-00 602 Nov01/04 05-25-30 603 Nov01/04
05-22-60 R 604 Feb01/07 05-24-10 601 Nov01/04 05-25-30 604 May01/05
05-22-60 R 605 Feb01/07 05-24-10 602 Nov01/04 05-25-30 605 May01/05
05-22-60 R 606 Feb01/07 05-24-10 603 Nov01/04 05-25-30 606 May01/05
05-22-60 D 607 05-24-10 604 Nov01/04 05-25-30 607 May01/05
05-24-10 605 Nov01/04 05-25-30 608 Nov01/04
05-23-00 601 Nov01/04 05-24-10 606 Nov01/04 05-25-30 609 Nov01/04
05-23-00 602 May01/05 05-24-10 607 Nov01/04 05-25-30 610 Nov01/04
05-23-00 603 Nov01/04 05-24-10 608 Nov01/04 05-25-30 611 May01/05
05-23-10 601 Nov01/04 05-24-30 601 Nov01/04 05-25-30 612 May01/05
05-23-10 602 Nov01/04 05-24-30 602 Nov01/04 05-25-30 613 May01/05
05-23-10 603 Nov01/04 05-24-30 603 Nov01/04 05-25-30 614 Nov01/04
05-23-10 604 Nov01/04 05-24-30 604 Nov01/04 05-25-30 615 May01/05
05-23-10 605 Nov01/04 05-24-30 605 Nov01/04 05-25-30 616 May01/05
05-23-10 606 Nov01/04 05-24-30 606 Nov01/04 05-25-30 617 Nov01/04
05-23-10 607 Nov01/04 05-24-30 607 Nov01/04 05-25-30 618 May01/05
05-23-10 608 Nov01/04 05-24-30 608 Nov01/04 05-25-30 619 Nov01/04
05-23-10 609 Nov01/04 05-24-30 609 Nov01/04 05-25-40 601 May01/05
05-23-20 601 Nov01/04 05-24-30 610 Nov01/04 05-25-40 602 May01/05
05-23-20 602 Nov01/04 05-24-50 601 Nov01/04 05-25-40 603 Aug01/06
05-23-20 603 Nov01/04 05-24-50 602 Nov01/04 05-25-40 604 Aug01/06

05-L.E.P. Page 2
Feb 01/07

JSA
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE

05-25-40 605 Aug01/06 05-28-20 605 Nov01/04 05-51-11 622 Aug01/06


05-25-50 601 Nov01/04 05-28-20 606 Nov01/04 05-51-11 623 Aug01/06
05-25-50 602 Nov01/04 05-28-20 607 May01/05 05-51-11 624 Aug01/06
05-25-50 603 Nov01/04 05-28-20 608 Nov01/04 05-51-11 625 Aug01/06
05-25-60 601 Nov01/04 05-28-20 609 May01/05 05-51-11 626 Aug01/06
05-25-60 602 Nov01/04 05-28-20 610 Nov01/04 05-51-11 627 Aug01/06
05-25-70 601 Nov01/04 05-28-20 611 Nov01/04 05-51-11 628 Aug01/06
05-25-70 602 Nov01/04 05-28-20 612 Nov01/04 05-51-11 629 Aug01/06
05-25-70 603 Nov01/04 05-28-20 613 Nov01/04 05-51-11 630 Aug01/06
05-25-70 604 Nov01/04 05-28-20 614 May01/05 05-51-11 631 Aug01/06
05-25-70 605 Nov01/04 05-28-20 615 May01/05 05-51-11 632 Aug01/06
05-25-70 606 Nov01/04 05-28-20 616 May01/05 05-51-11 633 Aug01/06
05-25-70 607 Nov01/04 05-28-20 617 May01/05 05-51-11 634 Aug01/06
05-25-70 608 Nov01/04 05-28-20 618 May01/05 05-51-11 635 Aug01/06
05-25-70 609 Aug01/06 05-28-30 601 Nov01/04 05-51-11 636 Aug01/06
05-25-70 610 Aug01/06 05-28-30 602 Nov01/04 05-51-11 637 Aug01/06
05-25-70 611 May01/06 05-28-30 603 Nov01/05 05-51-11 638 Aug01/06
05-25-70 612 May01/06 05-28-30 604 Nov01/05 05-51-11 639 Aug01/06
05-25-70 613 May01/06 05-28-30 605 Nov01/05 05-51-11 640 Aug01/06
05-25-70 614 May01/06 05-28-30 606 Nov01/05 05-51-11 641 Aug01/06
05-25-70 615 Nov01/04 05-28-30 607 Nov01/04 05-51-11 642 Aug01/06
05-25-70 616 Nov01/04 05-28-30 608 Nov01/04 05-51-12 601 Nov01/04
05-25-70 617 May01/06 05-51-12 602 Nov01/04
05-25-90 601 Nov01/04 05-50-00 1 Nov01/04 05-51-12 603 Nov01/04
05-25-90 602 Nov01/04 05-50-00 201 Nov01/04 05-51-12 604 Nov01/04
05-25-90 603 Nov01/04 05-50-00 202 Nov01/04 05-51-12 605 Nov01/04
05-51-12 606 Nov01/04
05-27-00 601 Nov01/04 05-51-00 1 Nov01/04 05-51-12 607 Nov01/04
05-27-10 601 Nov01/04 05-51-00 2 Nov01/04 05-51-12 608 Nov01/04
05-27-10 602 Nov01/04 05-51-00 3 Nov01/04 05-51-12 609 Nov01/04
05-27-30 601 Nov01/04 05-51-11 601 Nov01/04 05-51-12 610 Nov01/04
05-27-30 602 Nov01/04 05-51-11 602 Nov01/04 05-51-12 611 Nov01/04
05-27-30 603 Nov01/04 05-51-11 603 Nov01/04 05-51-12 612 Nov01/04
05-27-30 604 Nov01/04 05-51-11 604 Nov01/04 05-51-12 613 Nov01/04
05-27-30 605 Nov01/04 05-51-11 605 Nov01/04 05-51-12 614 Nov01/04
05-51-11 606 May01/06 05-51-12 615 Nov01/04
05-28-00 601 Nov01/04 05-51-11 607 Nov01/04 05-51-12 616 Nov01/04
05-28-10 601 Nov01/04 05-51-11 608 Aug01/06 05-51-12 617 Nov01/04
05-28-10 602 Nov01/04 05-51-11 609 Aug01/06 05-51-12 618 Nov01/04
05-28-10 603 Nov01/04 05-51-11 R 610 Feb01/07 05-51-12 619 Nov01/04
05-28-10 604 Nov01/04 05-51-11 R 611 Feb01/07 05-51-12 620 Nov01/04
05-28-10 605 Nov01/04 05-51-11 612 Aug01/06 05-51-13 601 Nov01/04
05-28-10 606 May01/05 05-51-11 613 Aug01/06 05-51-13 602 Nov01/04
05-28-10 607 Nov01/04 05-51-11 614 Aug01/06 05-51-13 603 Nov01/04
05-28-10 608 May01/05 05-51-11 615 Aug01/06 05-51-13 604 Nov01/04
05-28-10 609 May01/05 05-51-11 616 Aug01/06 05-51-13 605 Nov01/04
05-28-10 610 May01/05 05-51-11 617 Aug01/06 05-51-13 606 Nov01/04
05-28-20 601 Nov01/04 05-51-11 618 Aug01/06 05-51-13 607 Nov01/04
05-28-20 602 Nov01/04 05-51-11 619 Aug01/06 05-51-13 608 Nov01/04
05-28-20 603 Nov01/04 05-51-11 620 Aug01/06 05-51-13 609 Nov01/04
05-28-20 604 Nov01/04 05-51-11 621 Aug01/06 05-51-13 610 Nov01/04

05-L.E.P. Page 3
Feb 01/07

JSA
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE

05-51-13 611 Nov01/04 05-51-17 613 Nov01/04 05-51-23 R 602 Feb01/07


05-51-13 612 Nov01/04 05-51-17 614 Nov01/04 05-51-23 R 603 Feb01/07
05-51-13 613 Nov01/04 05-51-18 601 Nov01/04 05-51-23 604 Nov01/04
05-51-13 614 Nov01/04 05-51-18 602 Nov01/04 05-51-23 R 605 Feb01/07
05-51-13 615 Nov01/04 05-51-18 603 Nov01/06 05-51-23 606 Aug01/06
05-51-13 616 Nov01/04 05-51-18 604 Nov01/06 05-51-24 601 Feb01/06
05-51-14 601 Aug01/06 05-51-18 605 Nov01/04 05-51-24 602 May01/05
05-51-14 602 Aug01/06 05-51-18 606 Nov01/04 05-51-24 603 May01/05
05-51-14 603 Aug01/06 05-51-18 607 Nov01/04 05-51-24 604 May01/05
05-51-14 604 Aug01/06 05-51-18 608 Nov01/04 05-51-24 605 Feb01/06
05-51-14 605 Aug01/06 05-51-18 609 Nov01/04 05-51-24 606 Feb01/06
05-51-14 606 Aug01/06 05-51-18 610 Nov01/04 05-51-24 607 Feb01/06
05-51-14 607 Aug01/06 05-51-18 611 Nov01/04 05-51-24 608 Feb01/06
05-51-14 608 Aug01/06 05-51-18 612 Nov01/04 05-51-24 609 Nov01/04
05-51-14 609 Aug01/06 05-51-18 613 Nov01/04 05-51-24 610 Feb01/06
05-51-14 610 Aug01/06 05-51-18 614 Nov01/04 05-51-24 611 Nov01/04
05-51-14 611 Aug01/06 05-51-18 615 Nov01/04 05-51-24 612 Nov01/04
05-51-14 612 Aug01/06 05-51-18 616 May01/05 05-51-24 613 Nov01/04
05-51-14 613 Aug01/06 05-51-18 617 May01/05 05-51-24 614 Nov01/04
05-51-14 614 Aug01/06 05-51-18 618 May01/05 05-51-24 615 Nov01/04
05-51-14 615 Aug01/06 05-51-18 619 May01/05 05-51-24 616 Nov01/04
05-51-15 601 May01/05 05-51-18 620 May01/05 05-51-24 617 Nov01/04
05-51-15 602 May01/05 05-51-18 621 Nov01/06 05-51-24 618 Nov01/04
05-51-15 603 Feb01/06 05-51-18 622 Nov01/06 05-51-24 619 Nov01/04
05-51-15 604 Feb01/06 05-51-18 623 May01/05 05-51-24 620 Nov01/04
05-51-15 605 May01/05 05-51-18 624 May01/05 05-51-24 621 Nov01/04
05-51-15 606 May01/05 05-51-18 625 May01/05 05-51-24 622 Nov01/04
05-51-15 607 May01/05 05-51-18 626 May01/05 05-51-24 623 Nov01/04
05-51-15 608 May01/05 05-51-18 627 May01/05 05-51-24 624 Nov01/04
05-51-15 609 May01/05 05-51-18 628 May01/05 05-51-24 625 Nov01/04
05-51-15 610 May01/06 05-51-18 629 May01/05 05-51-24 626 Nov01/04
05-51-15 611 May01/06 05-51-18 630 May01/05 05-51-24 627 Nov01/04
05-51-16 601 Nov01/06 05-51-18 631 Feb01/06 05-51-25 R 601 Feb01/07
05-51-16 602 Nov01/06 05-51-18 632 Feb01/06 05-51-25 R 602 Feb01/07
05-51-16 603 Aug01/05 05-51-18 633 May01/05 05-51-25 603 May01/05
05-51-16 604 Aug01/05 05-51-18 634 May01/05 05-51-25 604 May01/05
05-51-16 605 Aug01/05 05-51-18 635 May01/05 05-51-25 R 605 Feb01/07
05-51-16 606 Aug01/05 05-51-19 601 Aug01/06 05-51-25 606 May01/05
05-51-16 607 Aug01/05 05-51-19 602 Aug01/06 05-51-25 607 May01/05
05-51-17 601 May01/06 05-51-21 601 Nov01/04 05-51-25 608 May01/05
05-51-17 602 May01/06 05-51-21 602 Nov01/04 05-51-25 609 May01/05
05-51-17 603 May01/06 05-51-21 603 Nov01/04 05-51-25 610 May01/05
05-51-17 604 May01/06 05-51-21 604 Nov01/04 05-51-25 611 May01/05
05-51-17 605 Aug01/05 05-51-21 605 Nov01/04 05-51-25 612 May01/05
05-51-17 606 Aug01/05 05-51-22 601 Nov01/04 05-51-25 613 May01/05
05-51-17 607 Aug01/05 05-51-22 602 Nov01/04 05-51-25 614 Nov01/04
05-51-17 608 Aug01/05 05-51-22 603 Nov01/04 05-51-25 R 615 Feb01/07
05-51-17 609 Aug01/05 05-51-22 604 Nov01/04 05-51-25 616 May01/05
05-51-17 610 Aug01/05 05-51-22 605 Nov01/04 05-51-25 617 May01/05
05-51-17 611 Nov01/04 05-51-22 606 Nov01/04 05-51-25 618 May01/05
05-51-17 612 Nov01/04 05-51-23 601 Nov01/06 05-51-25 619 May01/05

05-L.E.P. Page 4
Feb 01/07

JSA
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE

05-51-25 620 May01/05 05-51-31 607 Nov01/04 05-53-00 527 Feb01/06


05-51-25 R 621 Feb01/07 05-51-31 608 Nov01/04 05-53-00 528 Feb01/06
05-51-25 R 622 Feb01/07 05-51-31 609 Nov01/04 05-53-00 529 Feb01/06
05-51-25 R 623 Feb01/07 05-51-34 601 Nov01/04 05-53-00 530 Feb01/06
05-51-25 624 May01/05 05-51-41 601 Nov01/04 05-53-00 531 Feb01/06
05-51-25 625 May01/05 05-51-41 602 Nov01/04 05-53-00 532 Feb01/06
05-51-25 626 May01/05 05-51-41 603 Nov01/04 05-53-00 533 Feb01/06
05-51-25 R 627 Feb01/07 05-51-41 604 Nov01/04 05-53-00 534 Feb01/06
05-51-25 628 May01/05 05-51-41 605 Nov01/04 05-53-00 535 Feb01/06
05-51-25 629 May01/05 05-51-41 606 Nov01/04 05-53-00 536 Feb01/06
05-51-25 630 May01/05 05-51-41 607 Nov01/04 05-53-00 537 Feb01/06
05-51-25 631 May01/05 05-51-41 608 Nov01/04 05-53-00 538 Feb01/06
05-51-25 632 May01/05 05-51-42 601 Nov01/04 05-53-00 539 Feb01/06
05-51-25 633 May01/05 05-51-42 602 Nov01/04 05-53-00 540 Feb01/06
05-51-25 634 May01/05 05-51-42 603 Nov01/04 05-53-00 541 Feb01/06
05-51-25 635 May01/05 05-51-42 604 Nov01/04 05-53-00 542 Feb01/06
05-51-25 636 May01/05 05-51-42 605 Nov01/04 05-53-00 543 Feb01/06
05-51-25 637 May01/05 05-51-42 606 Nov01/04 05-53-00 544 Feb01/06
05-51-25 638 May01/05 05-51-42 607 Nov01/04 05-53-00 545 Feb01/06
05-51-25 639 May01/05 05-51-43 501 Nov01/04 05-53-00 546 Feb01/06
05-51-25 640 May01/05 05-51-43 502 Nov01/04 05-53-00 547 Feb01/06
05-51-25 641 May01/05 05-51-43 503 Nov01/04 05-53-00 548 Feb01/06
05-51-25 642 May01/05 05-51-43 504 Nov01/04 05-53-00 549 Feb01/06
05-51-25 643 May01/05 05-51-43 505 Nov01/04 05-53-00 550 Feb01/06
05-51-25 644 May01/05 05-53-00 551 Feb01/06
05-51-26 601 Nov01/06 05-53-00 501 Aug01/05 05-53-00 552 Feb01/06
05-51-26 602 Nov01/04 05-53-00 502 Nov01/04 05-53-00 553 Feb01/06
05-51-26 603 Nov01/04 05-53-00 503 Feb01/06 05-53-00 554 Feb01/06
05-51-26 604 Nov01/04 05-53-00 504 Feb01/06 05-53-00 555 Feb01/06
05-51-26 605 Nov01/04 05-53-00 505 Feb01/06 05-53-00 556 Feb01/06
05-51-26 606 Nov01/04 05-53-00 506 Feb01/06 05-53-00 557 Feb01/06
05-51-27 601 May01/05 05-53-00 507 Feb01/06 05-53-00 558 Feb01/06
05-51-27 602 May01/05 05-53-00 508 Feb01/06 05-53-00 559 Feb01/06
05-51-27 603 May01/05 05-53-00 509 Feb01/06 05-53-00 560 Feb01/06
05-51-27 604 Nov01/04 05-53-00 510 Feb01/06 05-53-00 561 Feb01/06
05-51-28 601 Nov01/04 05-53-00 511 Feb01/06 05-53-00 562 Feb01/06
05-51-29 601 Nov01/04 05-53-00 512 Feb01/06 05-53-00 563 Feb01/06
05-51-29 602 Nov01/06 05-53-00 513 Feb01/06 05-53-00 564 Feb01/06
05-51-29 603 Nov01/06 05-53-00 514 Feb01/06
05-51-29 604 Nov01/06 05-53-00 515 Feb01/06 05-54-00 201 Nov01/04
05-51-29 605 Nov01/04 05-53-00 516 Feb01/06 05-54-00 202 Nov01/04
05-51-29 606 Nov01/04 05-53-00 517 Feb01/06 05-54-00 203 Nov01/04
05-51-29 607 Nov01/04 05-53-00 518 Feb01/06
05-51-29 608 Nov01/04 05-53-00 519 Feb01/06 05-56-00 601 Nov01/04
05-51-29 609 Nov01/06 05-53-00 520 Feb01/06 05-56-00 602 Nov01/04
05-51-31 601 Nov01/04 05-53-00 521 Feb01/06 05-56-00 603 Nov01/04
05-51-31 602 Nov01/04 05-53-00 522 Feb01/06 05-56-00 604 Nov01/04
05-51-31 603 Nov01/04 05-53-00 523 Feb01/06 05-56-00 605 Nov01/04
05-51-31 604 Nov01/04 05-53-00 524 Feb01/06 05-56-00 606 Nov01/04
05-51-31 605 Nov01/04 05-53-00 525 Feb01/06 05-56-00 607 Nov01/04
05-51-31 606 Nov01/04 05-53-00 526 Feb01/06 05-56-00 608 Nov01/04

05-L.E.P. Page 5
Feb 01/07

JSA
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE

05-56-00 609 Nov01/04


05-56-00 610 Nov01/04
05-56-00 611 Nov01/04
05-56-00 612 Nov01/04
05-56-00 613 Nov01/04
05-56-00 614 Nov01/04
05-56-00 615 Nov01/04
05-56-00 616 Nov01/04
05-56-00 617 Nov01/04
05-56-00 618 Nov01/04
05-56-00 619 Nov01/04
05-56-00 620 Nov01/04
05-56-00 621 Nov01/04
05-56-00 622 Nov01/04
05-56-00 623 Nov01/04
05-56-00 624 Nov01/04
05-56-00 625 Nov01/04

05-57-00 201 Nov01/04


05-57-00 202 Nov01/04
05-57-00 203 Nov01/04
05-57-00 204 Nov01/04
05-57-00 205 Nov01/04
05-57-00 206 Nov01/04
05-57-00 207 Nov01/04
05-57-00 208 Nov01/04
05-57-00 209 Nov01/04
05-57-00 210 Nov01/04

05-59-00 1 Feb01/06
05-59-32 201 Nov01/06
05-59-32 202 Nov01/06
05-59-32 203 Nov01/06
05-59-32 204 Nov01/06

05-L.E.P. Page 6
Feb 01/07

JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
TIME LIMITS - MAINTENANCE CHECKS -
__________________________________ 05-00-00
_______
GENERAL
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Scheduled Maintenance Checks 1 ALL
(05-20-00)
Unscheduled Maintenance Checks 1 ALL
(05-50-00)
Time Limits and Maintenance Checks 1 ALL
Instructions for Continued 1 ALL
Airworthiness

____________________________
SCHEDULED MAINTENANCE CHECKS 05-20-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Task numbering 1 ALL
Procedure content 1 ALL

ZONAL INSPECTION : LOWER HALF OF 05-21-00


FUSELAGE
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as visible 601 ALL
from the Ground of the Lower Half
of the Fuselage
Zonal Inspection of the Lower Half 602 ALL
of the Fuselage
ZONAL INSPECTION : RADOME 05-21-10
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Radome 601 ALL
ZONAL INSPECTION : AVIONICS COMPARTMENT 05-21-20
INSPECTION/CHECK 601 ALL
Zonal Inspection of the FWD 601 ALL
Avionics Compartment (Zones 121
and 122)
Zonal Inspection as far as Visible 603 ALL
from the Ground of the Nose Gear
Well (Zones 123)
Zonal Inspection of the Lateral 605 ALL
Avionics Compartment
Zonal Inspection of the AFT 609 ALL
Avionics Compartment (Zones 127
and 128)
Zonal Inspection of the FWD 611 ALL
Avionics Compartment (Zones 121
and 122)
Zonal Inspection of the Lateral 613 ALL

05-CONTENTS Page 1
Feb 01/06
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Avionic Compartment
Zonal Inspection of the Rear 615 ALL
Avionic Compartment
Zonal Inspection of Nose Gear 618 ALL
Well, Including Zone 124
ZONAL INSPECTION : FORWARD CARGO 05-21-30
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the FWD Cargo 601 ALL
Compartment (Zones 131 and 132)
Zonal Inspection of Underfloor Bay 603 ALL
of FWD Cargo Compartment
Zonal Inspection of the Bay behind 606 ALL
the FWD Cargo Compartment (Zones
137 and 138)
Zonal Inspection of Forward Cargo 608 ALL
Compartment
Zonal Inspection of the FWD Cargo 612 ALL
Compartment
ZONAL INSPECTION : CENTER WING 05-21-40
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wing 601 ALL
Center Box (Zones 141 and 142)
Zonal Inspection of the 603 ALL
Pressurized Zone Under the Cabin
Floor
Zonal Inspection as far as visible 605 ALL
from the Ground of the Main Gear
Well and the Hydraulics
Compartment (Zones 147 and 148)
Zonal Inspection of the Main Gear 607 ALL
Well and the Hydraulics
Compartment (Zones 147 and 148)
Zonal Inspection of the Main Gear 609 ALL
Well and the Hydraulics
Compartment (Zones 147 and 148)
ZONAL INSPECTION : AFT CARGO COMPARTMENT 05-21-50
INSPECTION/CHECK 601 ALL
Zonal Inspection of Aft Cargo 601 ALL
Compartment (As Far As Visible -
If A/CT(s) is Installed)
Zonal Inspection of Underfloor Bay 603 ALL
of Aft Cargo Compartment
Zonal Inspection of Aft Cargo 605 ALL
Compartment
Zonal Inspection of the Aft Cargo 609 ALL

05-CONTENTS Page 2
May 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Compartment (Zones 151 and 152)
ZONAL INSPECTION : BULK CARGO 05-21-60
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Bulk 601 ALL
Cargo-Compartment (Zones 161 and
162)
Zonal Inspection of the Underfloor 603 ALL
Bay of the Bulk Cargo-Compartment
(Zones 163 and 164)
Zonal Inspection of Bulk 605 ALL
Cargo-Compartment
Zonal Inspection of the Bulk 607 ALL
Cargo-Compartment (Zones 161 and
162)
ZONAL INSPECTION : AFT CABIN UNDERFLOOR 05-21-70
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Aft-Cabin 601 ALL
Underfloor Compartment (Zones 171
and 172)
Zonal Inspection of the Aft-Cabin 604 ALL
Underfloor Compartment (Zones 171
and 172)
ZONAL INSPECTION : BELLY FAIRING, AIR 05-21-90
CONDITIONING AND HYDRAULICS COMPARTMENTS
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Air 601 ALL
Conditioning Compartment and
Fairings
Zonal Inspection of the Offwing 603 ALL
escape-slide Stowage Area
Zonal Inspection of the Hydraulic 605 ALL
Compartment and Fairings
Zonal Inspection of Rear Fairing 608 ALL
Zonal Inspection of the Air 610 ALL
Conditioning Compartment and
Fairings

ZONAL INSPECTION : UPPER HALF OF 05-22-00


FUSELAGE
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as Visible 601 ALL
from the Ground of the Upper Half
of the Fuselage
Zonal Inspection of the Upper Half 602 ALL

05-CONTENTS Page 3
May 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
of the Fuselage up to the Stringer
8LH and the Stringer 8RH including
the Doors Surrounds
Zonal Inspection of the Upper Half 603 ALL
of the Fuselage from the Stringer
8LH to the Stringer 8RH (Fuselage
Crown Area)
ZONAL INSPECTION : COCKPIT 05-22-10
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Cockpit 601 ALL
(Zones 211 and 212)
Zonal Inspection of the Cockpit 604 ALL
(Zones 211 and 212)
ZONAL INSPECTION : FORWARD CABIN UTILITY 05-22-20
AREAS
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Forward 601 ALL
Cabin Utility Area (Zone 221 and
222)
Zonal Inspection of the FWD Cabin 605 ALL
Utility Area Overhead Compartment
ZONAL INSPECTION : FORWARD PASSENGER 05-22-30
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Forward 601 ALL
Passenger Compartment (Zones 231
and 232)
Zonal Inspection of the Overhead 606 ALL
Compartment of the Forward
Passenger Compartment (Zones 233
and 234)
Zonal Inspection of the Floor 608 ALL
Structure of the Forward Passenger
Compartment (Zones 231 and 232)
ZONAL INSPECTION : MID PASSENGER 05-22-40
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Center 601 ALL
Passenger Compartment
Zonal Inspection of Center 606 ALL
Passenger Overhead Compartment
Zonal Inspection of the Floor 609 ALL
Structure of the Center Passenger
Compartment (Zones 241 and 242)
ZONAL INSPECTION : AFT PASSENGER 05-22-50
COMPARTMENT

05-CONTENTS Page 4
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
INSPECTION/CHECK 601 ALL
Zonal Inspection of Aft Passenger 601 ALL
Compartment
Zonal Inspection of Aft Passenger 606 ALL
Overhead Compartment
Zonal Inspection of Aft Passenger 609 ALL
Compartment Including Floor
Structure
ZONAL INSPECTION : AFT CABIN UTILITY 05-22-60
AREA
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Overhead 601 ALL
Compartment of the Aft Cabin
(Zones 263 and 264)
Zonal Inspection of the Aft Cabin 603 ALL
Utility Area (zones 261 and 262)

ZONAL INSPECTION : STABILIZERS AND 05-23-00


CONE/REAR FUSELAGE
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as visible 601 ALL
from the ground of the Stabilizers
and the Cone/Rear Fuselage
Zonal Inspection of Stabilizers 602 ALL
and Cone/Rear Fuselage
ZONAL INSPECTION : FUSELAGE TAIL SECTION 05-23-10
AFT OF AFT PRESSURE BULKHEAD
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Tail 601 ALL
Section of the Aft Fuselage (Zones
311 and 312)
Zonal Inspection of the Air Intake 604 ALL
Area of the APU on the Tail Cone
(Zones 313 and 314)
Zonal Inspection of Tail Cone APU 606 ALL
and Accessory Compartment
Zonal Inspection of the APU 608 ALL
Exhaust Area on the Tail Cone
ZONAL INSPECTION : VERTICAL STABILIZER 05-23-20
AND RUDDER
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Dorsal Fin 601 ALL
Zonal Inspection of Vertical 603 ALL
Stabilizer Leading Edge
Zonal Inspection of the Spar Box 605 ALL
of the Vertical Stabilizer

05-CONTENTS Page 5
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of Vertical 608 ALL
Stabilizer Tip
Zonal Inspection of the Trailing 610 ALL
Edge of the Vertical Stabilizer
Zonal Inspection of Rudder 612 ALL
Zonal Inspection of Vertical 614 ALL
Stabilizer Trailing Edge
Zonal Inspection of Rudder 616 ALL
ZONAL INSPECTION : TRIMMABLE HORIZONTAL 05-23-30
STABILIZER LEFT SIDE AND LEFT ELEVATOR
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Leading 601 ALL
Edge of the Trimmable Horizontal
Stabilizer
Zonal Inspection of the Tip of the 603 ALL
Trimmable Horizontal Stabilizer
Zonal Inspection of the Spar Box 605 ALL
of the Trimmable Horizontal
Stabilizer
Zonal Inspection of the Trailing 608 ALL
Edge of the Trimmable Horizontal
Stabilizer
Zonal Inspection of the Elevator 610 ALL
Zonal Inspection of the Trailing 612 ALL
Edge of the Trimmable Horizontal
Stabilizer

ZONAL INSPECTION : POWER PLANT, NACELLES 05-24-00


AND PYLONS
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as Visible 601 ALL
from the Ground of the Power
Plant, the Nacelles and the Pylons
Zonal Inspection of the Power 602 ALL
Plant, the Nacelles and the Pylons
ZONAL INSPECTION : ENGINE PYLON BOX AND 05-24-10
FORWARD FAIRING
INSPECTION/CHECK 601 ALL
Zonal Inspection of Upper Forward 601 ALL
Pylon
Zonal Inspection of Lower Pylon 607 ALL
ZONAL INSPECTION : ENGINE AIR INTAKE, 05-24-30
FAN AND ACCESSORY GEARBOX
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Air Intake 601 ALL
Lip and the Inlet Cowl

05-CONTENTS Page 6
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of the Area of 607 ALL
the Fan and the Accessory Gearbox
Zonal Inspection of the Fan and 609 ALL
the Engine Cowling
ZONAL INSPECTION : ENGINE THRUST 05-24-50
REVERSER AND EXHAUST SECTION
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Thrust 601 ALL
Reverser Cowling
Zonal Inspection of the Hot 607 ALL
Section
ZONAL INSPECTION : ENGINE AFT PYLON 05-24-70
INSPECTION/CHECK 601 ALL
Zonal Inspection of Pylon Leading 601 ALL
Edge and Lower Fairing

ZONAL INSPECTION : WING 05-25-00


INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wings as 601 ALL
far as visible from the ground
Zonal Inspection of the Wing Lower 602 ALL
Surface including the Upper and
Lower Surfaces of the Flaps and
the Slats
Zonal Inspection of the Wing Upper 604 ALL
Surface including the Slats, the
Flaps and the Spoilers
ZONAL INSPECTION : WING FIXED LEADING 05-25-20
EDGE
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Structure 601 ALL
of the Inboard Fixed Leading Edge
Zonal Inspection of Outboard Fixed 606 ALL
L.E. Structure
ZONAL INSPECTION : WING FLAP TRACK 05-25-30
FAIRINGS AND WING TIP
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Flap Track 601 ALL
No. 2 and Fairing
Zonal Inspection of the Flap Track 604 ALL
No. 3 and Fairing
Zonal Inspection of the Flap Track 606 ALL
No. 4 and Fairing
Zonal Inspection of the Wing Tip 608 ALL
Zonal Inspection of the Flap Track 611 ALL
No. 2 and Fairing

05-CONTENTS Page 7
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of the Flap Track 614 ALL
No. 3 and Fairing
Zonal Inspection of the Flap Track 617 ALL
No. 4 and Fairing
ZONAL INSPECTION : WING FUEL TANK 05-25-40
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wing Fuel 601 ALL
Tank
Zonal Inspection of the Wing Fuel 603 ALL
Tank
ZONAL INSPECTION : WING VENT SURGE TANK 05-25-50
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Vent Surge 601 ALL
Tank
ZONAL INSPECTION : WING DRY BAY 05-25-60
(OUTBOARD)
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Dry Bay 601 ALL
(Outboard)
ZONAL INSPECTION : AFT SECTION OF WING 05-25-70
AND TRAILING EDGE FIXED STRUCTURE
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as visible 601 ALL
of the Main Landing Gear Bay
Zonal Inspection of the Shroud Box 603 ALL
Zonal Inspection of the Inboard 607 ALL
Fixed Trailing Edge Structure from
the Shroud Box to the Rib 9
Zonal Inspection of the False Spar 609 ALL
Box
Zonal Inspection of the Outboard 611 ALL
Fixed Trailing Edge Structure from
the Rib 9 to the Rib 27
Zonal Inspection of the Main 615 ALL
Landing Gear Bay
ZONAL INSPECTION : WING AILERON 05-25-90
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wing 601 ALL
Aileron

ZONAL INSPECTION : LANDING GEAR AND 05-27-00


LANDING GEAR DOORS
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as Visible 601 ALL
from the Ground of the Landing
Gear and the Landing Gear Doors

05-CONTENTS Page 8
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
ZONAL INSPECTION : NOSE GEAR AND DOORS 05-27-10
INSPECTION/CHECK 601 ALL
Zonal Inspection of Nose Gear and 601 ALL
Nose Gear Doors
ZONAL INSPECTION : MAIN LANDING GEAR AND 05-27-30
DOORS
INSPECTION/CHECK 601 ALL
Zonal Inspection of LH/RH Main 601 ALL
Landing Gear
Zonal Inspection of Main Landing 602 ALL
Gear Cylinder Door
Zonal Inspection of Main Landing 603 ALL
Gear Secondary Door
Zonal Inspection of Main Landing 604 ALL
Gear Main Doors

ZONAL INSPECTION : DOORS 05-28-00


INSPECTION/CHECK 601 ALL
Zonal Inspection of the Doors as 601 ALL
far as Visible from the Ground
ZONAL INSPECTION : AVIONICS COMPARTMENT 05-28-10
DOORS (FORWARD AND LATERAL)
INSPECTION/CHECK 601 ALL
Zonal Inspection of Forward 601 ALL
Avionics Compartment Door
Zonal Inspection of Forward 604 ALL
Avionics Compartment Door
Zonal Inspection of Lateral 606 ALL
Avionics Compartment Doors
Zonal Inspection of Lateral 609 ALL
Avionics Compartment Doors
ZONAL INSPECTION : AVIONICS COMPARTMENT 05-28-20
DOORS, CARGO COMPARTMENT DOORS (RIGHT
SIDE)
INSPECTION/CHECK 601 ALL
Zonal Inspection of FWD 601 ALL
Cargo-Compartment Door Including
Fuselage Door Sill, Door Seal and
Lock Fittings
Zonal Inspection of AFT 603 ALL
Cargo-Compartment Door Including
Fuselage Door Sill, Door Seal and
Lock Fittings
Zonal Inspection of the Bulk 605 ALL
Cargo-Compartment Door and the
Stop Fittings on the Door Frame

05-CONTENTS Page 9
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of FWD 607 ALL
Cargo-Compartment Door
Zonal Inspection of AFT 610 ALL
Cargo-Compartment Door
Zonal Inspection of the Bulk 612 ALL
Cargo-Compartment Door and the
Stop Fittings on the Fuselage Door
Frame
Zonal Inspection of Rear Avionic 614 ALL
Compartment Door
Zonal Inspection of Rear Avionic 617 ALL
Compartment Door
ZONAL INSPECTION : PASSENGER/CREW DOORS 05-28-30
AND EMERGENCY EXITS
INSPECTION/CHECK 601 ALL
Zonal Inspection of FWD and AFT 601 ALL
Passenger/Crew Doors including
Door Stops on Fuselage Door Frames
and Door Seals
Zonal Inspection of FWD and AFT 603 ALL
Emergency Exits including Door
Surround on Fuselage Door Frames
and Door Seals
Zonal Inspection of FWD and AFT 605 ALL
Passenger/Crew Doors
Zonal Inspection of FWD and AFT 607 ALL
Emergency Exits

______________________________
UNSCHEDULED MAINTENANCE CHECKS 05-50-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL

_______________________________
UNSCHEDULED MAINTENANCE CHECKS 05-50-00
MAINTENANCE PRACTICES 201 ALL
Fluid Leak Measurement - 201 ALL
Maintenance Practices

INSPECTIONS 05-51-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Inspection Coverage 1 ALL
Inspection Sequence 1 ALL
Inspection Form 2 ALL
INSPECTIONS AFTER HARD/OVERWEIGHT 05-51-11
LANDING

05-CONTENTS Page 10
Aug 01/05
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
INSPECTION/CHECK 601 ALL
Inspection After Hard/Overweight 601 ALL
Landing
INSPECTION AFTER LANDING GEAR DOWN 05-51-12
LIMITING SPEED EXCEEDED
INSPECTION/CHECK 601 ALL
Inspection after Landing Gear 601 ALL
Extension at more than the
Geardown Limiting Speed
INSPECTION AFTER FLAP/SLAT LIMITING 05-51-13
SPEED EXCEEDED
INSPECTION/CHECK 601 ALL
Inspection after Flap/Slat 601 ALL
Extension at more than the
Flap/Slat Limiting Speed
INSPECTION OF AIRFRAME AFTER BIRD OR 05-51-14
HAIL STRIKE
INSPECTION/CHECK 601 ALL
Inspection of the Airframe after a 601 ALL
Bird or Hail Strike
INSPECTION AFTER A TIRE BURST OR TREAD 05-51-15
THROW OR WHEEL FAILURE
INSPECTION/CHECK 601 ALL
Inspection after a Tire Burst or 601 ALL
Tread Throw or Wheel Failure
INSPECTION AFTER BRAKE EMERGENCY 05-51-16
APPLICATION OR OVERHEAT
INSPECTION/CHECK 601 ALL
Inspection After Brake Emergency 601 ALL
Application or Overheat
INSPECTION AFTER FLIGHT IN EXCESSIVE 05-51-17
TURBULENCE OR IN EXCESS OF VMO/MMO
INSPECTION/CHECK 601 ALL
Inspection after in Flight 601 ALL
Excessive Load Factor due to
Turbulence or Maneuver or in
Excess of VMO/MMO
INSPECTION AFTER LIGHTNING STRIKE 05-51-18
INSPECTION/CHECK 601 ALL
Inspection after Lightning Strike 601 ALL
INSPECTION AFTER ENGINE BIRD STRIKE OR 05-51-19
SLUSH INGESTION
INSPECTION/CHECK 601 ALL
Inspection of the Engine after a 601 ALL
Bird Strike or Slush Ingestion
INSPECTION AFTER TAIL RUNWAY IMPACT 05-51-21

05-CONTENTS Page 11
Nov 01/06
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
INSPECTION/CHECK 601 ALL
Inspection after a Tail Runway 601 ALL
Impact
INSPECTION AFTER NLG TOWING OVERLOAD 05-51-22
OR OVERRUN
INSPECTION/CHECK 601 ALL
Inspection After a NLG Towing 601 ALL
Overload or Overrun
INSPECTION AFTER NLG STEERING ANGLE 05-51-23
EXCEEDED
INSPECTION/CHECK 601 ALL
Inspection after NLG Steering 601 ALL
Angle of more than 95 deg.
INSPECTION AFTER LEAVING RUNWAY OR 05-51-24
TAXIWAY
INSPECTION/CHECK 601 ALL
Inspection after Leaving Runway or 601 ALL
Taxiway
INSPECTION AFTER FLIGHT THROUGH DUST 05-51-25
STORM/VOLCANIC ASH OR SEVERE
CONDITIONS ON GROUND
INSPECTION/CHECK 601 ALL
Inspection after Flight through 601 ALL
Dust Storm or Dust Contamination
on Ground
Inspection after Flight through 620 ALL
Volcanic Ash or Volcanic Ash
Contamination on Ground
INSPECTION AFTER ENGINE FAILURE 05-51-26
INSPECTION/CHECK 601 ALL
INSPECTION AFTER ENGINE FAILURE 601 ALL
INSPECTION AFTER IMPACT ON ENGINE 05-51-27
COWLS
INSPECTION/CHECK 601 ALL
Inspection after Impact on Engine 601 ALL
Cowls
PROCEDURE AFTER FLUID SPILLAGE 05-51-28
INSPECTION/CHECK 601 ALL
Procedure after Fluid Spillage 601 ALL
INSPECTION AFTER ABNORMAL PAX/CREW 05-51-29
DOOR MOVEMENT
INSPECTION/CHECK 601 ALL
Inspection after Abnormal Movement 601 ALL
of the Pax/Crew Door
INSPECTION AFTER SIGNIFICANT MLG 05-51-31
VIBRATION AT TOUCH-DOWN

05-CONTENTS Page 12
Nov 01/06
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
INSPECTION/CHECK 601 ALL
Inspection after Significant MLG 601 ALL
Vibration at Touch-Down
INSPECTION AFTER ENGINE WINDMILLING 05-51-34
(AFTER ENGINE IN-FLIGHT SHUT-DOWN)
INSPECTION/CHECK 601 ALL
Inspection after Engine 601 ALL
Windmilling (After Engine
In-Flight Shut-Down)
INSPECTION AFTER OVERWEIGHT TAXIING 05-51-41
INSPECTION/CHECK 601 ALL
Inspection after Overweight 601 ALL
Taxiing
INSPECTION AFTER VERY HIGH WINDS ON 05-51-42
GROUND
INSPECTION/CHECK 601 ALL
Inspection after Very High Winds 601 ALL
on Ground
INSPECTIONS AFTER WORK ON SYSTEM 05-51-43
ELECTRICAL INSTALLATION
ADJUSTMENT/TEST 501 ALL
Inspection after Work on System 501 ALL
Electrical Installation

PRESSURIZATION TEST OF FUSELAGE (LEAKAGE 05-53-00


CHECKS) AFTER A/C ABNORMAL OPERATION OR
REPAIR
ADJUSTMENT/TEST 501 ALL
Test for Leakage in the Repair 501 ALL
Area at a Differential Pressure of
280 mbar (4.06 psi)
Test for Leakage in the Repair 511 ALL
Area at a Differential Pressure of
280 mbar (4.06 psi) (with AIDS)
Test for Leakage in the Repair 521 ALL
Area at a Differential Pressure of
550 mbar (7.97 psi)
Test for Leakage in the Repair 532 ALL
Area at a Differential Pressure of
550 mbar (7.97 psi) (with AIDS)
Test to Measure the Structural 543 ALL
Leakage
Test to Measure the Structural 554 ALL
Leakage (with AIDS)

DEMAGNETIZATION 05-54-00

05-CONTENTS Page 13
Nov 01/06
R
JSA
CHAPTER 05
__________

TIME LIMITS/MAINTENANCE CHECKS

TABLE OF CONTENTS
_________________

_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
MAINTENANCE PRACTICES 201 ALL
Demagnetization of the External 201 ALL
Parts of the Frames of the
Windshield and Sliding Windows

LEVELING AND MEASUREMENT AFTER A/C 05-56-00


ABNORMAL OPERATION
INSPECTION/CHECK 601 ALL
Inspection/Check of the Leveling 601 ALL
and Measurement after Abnormal
Operation of the Aircraft

AIRCRAFT STABILITY 05-57-00


MAINTENANCE PRACTICES 201 ALL
Aircraft Stability 201 ALL

NON-REVENUE FLIGHT - REQUIREMENTS 05-59-00


FOLLOWING MAINTENANCE ACTIONS
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Engine Replacement 1 ALL
FERRY FLIGHT WITH GEAR DOWN 05-59-32
MAINTENANCE PRACTICES 201 ALL
Preparation for Ferry Flight with 201 ALL
Gear Down
Return to Normal Operation after a 203 ALL
Ferry Flight with Gear Down

05-CONTENTS Page 14
Nov 01/06
R
JSA
TIME LIMITS - MAINTENANCE CHECKS - GENERAL - DESCRIPTION AND OPERATION
______________________________________________________________________

1. _______
General
This chapter includes the following sections:
- 05-20-00: SCHEDULED MAINTENANCE CHECKS
- 05-50-00: UNSCHEDULED MAINTENANCE CHECKS

A. Scheduled Maintenance Checks (05-20-00)


This section includes all the zonal inspections that you must do on the
aircraft.

B. Unscheduled Maintenance Checks (05-50-00)


This section includes maintenance checks to be performed whenever a
flight in abnormal conditions is reported by the Flight Crew.
This section is divided into two categories of information:
- inspections,
- checks.

2. Time
__________________________________
Limits and Maintenance Checks
The part of the Aircraft Maintenance Manual (AMM) was previously issued in a
separate Manual to this AMM with the title:
-------------------------------------------------------------------------------
Aircraft Maintenance Manual
CHAPTER 05
Time Limits and Maintenance Checks
-------------------------------------------------------------------------------
The content of this manual, since revision 20 approved on JUL07, 1999, is
into the Maintenance Planning Manual (MPD) - Section 9.1: Life
Limits/Monitored Parts.

A. Instructions for Continued Airworthiness

(1) Maintenance scheduling


The V2500 is designed as an On-Condition engine whereby the
scheduled inspection tasks are determined through the use of the MSG3
procedure and documented in the Maintenance Review Board document
(MRB). The MRB Document is the basis from which the Approved
Maintenance Program, for each operator, will be developed. The
Maintenance Planning Document should cover all of the procedures
included in the appropriate MRB Document, such as:

(a) External engine/powerplant inspections.

(b) Boroscope inspections.

(c) Magnetic chip detector inspections.



EFF :

ALL  05-00-00

Page 1
Nov 01/04
 
JSA 
(d) Filter inspections and replacements.

(e) Assessment and correction of class III Centralised Fault Display


System (CFDS) faults.

(f) When a defect is detected which requires engine removal, the


Operator will be expected to rectify the identified defect and to
review the total engine for any appropriate preventive
maintenance action that will ensure its continued airworthiness.

(2) Trend Monitoring


It is recommended that operators have a trend monitoring program in
addition to the above activity. The program should be set up to
provide information split into scheduled tasks to ensure the
airworthiness of the engine. Elements of this program should include
the monitoring of the following parameters or other data acceptable
to the relevant Authority:

(a) Exhaust Gas Temperature (EGT).

(b) Shaft rotational speeds (N1 and N2).

(c) Fuel flow.

(d) Vibration.



EFF :

ALL  05-00-00

Page 2
Nov 01/04
 
JSA 
SCHEDULED MAINTENANCE CHECKS - DESCRIPTION AND OPERATION
________________________________________________________

1. General
_______

A. Task numbering
This section gives the accomplishment instructions for zonal inspection
tasks
- related to the requirements of the Maintenance Planning Document (MPD)
a specific AMTOSS zonal task number which combines the ATA 05-20 and
the concerned A/C zone is used as follows :

Task Numbering System for Zonal Inspection Tasks.

ATA Reference Number


II
TASK N 0 5 - 2 2 - 6 0 - 2 0 0 - 0 0 1
I__I I I______I I_____I I_____I
1 2 3 4 5

1 : ATA
2 : Relates to ATA section 20
scheduled maintenance checks
3 : Zone
4 : Function code, E.G. 200 : INSPECTION CHECK
5 : Unique identification of discrete tasks

B. Procedure content

(1) It is thought that people which perform the zonal tasks have an
adequate knowledge of the aircraft construction and systems
installations thus a list of all the items contained in the zones to
be inspected is not given.

(2) If you find damage, corrosion, leaks, it is recommended to refer to


the related structure/system inspection ata-chapter for detailed
inspection and corrective action

(3) Any Fairing, access panel, access door, etc removed or opened to gain
access to zones should also be examined during the zonal inspection.
This requirement is not specially quoted within each individual
procedure because it is a standard maintenance practice.



EFF :

ALL  05-20-00

Page 1
Nov 01/04
 
JSA 
ZONAL INSPECTION : LOWER HALF OF FUSELAGE - INSPECTION/CHECK
____________________________________________________________

TASK 05-21-00-200-001

Zonal Inspection as far as visible from the Ground of the Lower Half of the
Fuselage

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-35-00-200-002 Inspection of the Wing to Fuselage Fairings and Belly


Fairing Access Panels for Missing Fasteners

3. __________
Job Set-up

Subtask 05-21-00-869-050

A. Not Applicable

4. Procedure
_________

Subtask 05-21-00-210-050

A. Inspection

(1) Make a general visual inspection of the lower half of the fuselage
from the ground during the aircraft walkaround.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Inspect the belly fairing access panels for missing fasteners
(Ref. TASK 53-35-00-200-002)



EFF :

ALL  05-21-00

Page 601
Nov 01/04
 
JSA 
TASK 05-21-00-200-002

Zonal Inspection of the Lower Half of the Fuselage

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-100-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.0 m (6 ft. 7 in.)

3. __________
Job Set-up

Subtask 05-21-00-010-050

A. Get Access

(1) Put an access platform in position near the lower half of the
fuselage.

4. Procedure
_________

Subtask 05-21-00-210-051

A. Inspection

(1) Make a general visual inspection of the lower half of the fuselage up
to the Stringer 19 LH and RH and the doors surrounds.

(2) Make sure that there is no damage, corrosion, leaks or cracks on all
the parts of the components and the structure you can see.

5. Close-up
________

Subtask 05-21-00-410-050

A. Close Access

(1) Remove the access platform(s).



EFF :

ALL  05-21-00

Page 602
Nov 01/04
 
JSA 
ZONAL INSPECTION : RADOME - INSPECTION/CHECK
____________________________________________

TASK 05-21-10-200-001

Zonal Inspection of the Radome

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-110-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-15-11-010-001 Opening of the Radome 110AL


53-15-11-410-001 Closing of the Radome 110AL

3. __________
Job Set-up

Subtask 05-21-10-010-050

A. Get Access

(1) Put an access platform in position at the zone 110.

(2) Open the radome 110AL, (Ref. TASK 53-15-11-010-001).

NOTE : Two persons are necessary to open the radome.


____



EFF :

ALL  05-21-10

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-10-210-050

A. Inspection

(1) Do a general visual inspection of the structure of the radome.

(2) Make sure that there are no signs of corrosions, craks or damage .

(3) Make sure that all the installations (wiring, equipment) are attached
correctly.

5. Close-up
________

Subtask 05-21-10-410-050

A. Close Access

(1) Close the radome 110AL, (Ref. TASK 53-15-11-410-001).

NOTE : Two persons are necessary to close the radome.


____

(2) Remove the access platform(s).



EFF :

ALL  05-21-10

Page 602
Nov 01/04
 
JSA 
ZONAL INSPECTION : AVIONICS COMPARTMENT - INSPECTION/CHECK
__________________________________________________________

TASK 05-21-20-200-001

R Zonal Inspection of the FWD Avionics Compartment (Zones 121 and 122)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-121-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

3. __________
Job Set-up

Subtask 05-21-20-010-050

A. Get Access

(1) Put an access platform in position at zones 121 and 122.

(2) Open the avionic-compartment access door 811.

4. Procedure
_________

Subtask 05-21-20-210-050

A. Inspection

(1) Do a general visual inspection of the forward avionic compartment


(Zones 121 and 122).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-21-20

Page 601
Feb 01/06
 
JSA 
5. Close-up
________

Subtask 05-21-20-410-050

A. Close Access

R (1) Close the avionic-compartment access door 811.

(2) Remove the access platform(s).



EFF :

ALL  05-21-20

Page 602
May 01/05
 
JSA 
TASK 05-21-20-200-002

Zonal Inspection as far as Visible from the Ground of the Nose Gear Well (Zones
123)

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-22-00-010-001 Nose Gear Doors - Ground Doors Opening


32-22-00-410-001 Nose Gear Doors - Ground Doors Closing

3. __________
Job Set-up

Subtask 05-21-20-010-051

A. Get Access

(1) Open the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
010-001)

4. Procedure
_________

Subtask 05-21-20-210-051

A. Inspection

(1) Do a general visual inspection of the nose gear well (Zones 123 and
124).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-21-20

Page 603
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-21-20-410-051

A. Close Access

(1) Close the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
410-001)



EFF :

ALL  05-21-20

Page 604
Nov 01/04
 
JSA 
TASK 05-21-20-200-003

Zonal Inspection of the Lateral Avionics Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-125-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-21-20-991-002-A Fig. 601


05-21-20-991-007 Fig. 602

3. __________
Job Set-up

Subtask 05-21-20-010-052-A

A. Get Access

(1) Put an access platform in position at zones 125 and 126.

(2) Open the access doors 822 and 812.


R (Ref. Fig. 601/TASK 05-21-20-991-002-A)
R (Ref. Fig. 602/TASK 05-21-20-991-007)

4. Procedure
_________

Subtask 05-21-20-210-052

A. Inspection

(1) Do a general visual inspection of the lateral avionics compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-21-20

Page 605
Nov 01/06
 
JSA 
R Access Doors of the Avionics Compartment (Left Side)
R Figure 601/TASK 05-21-20-991-002-A



EFF :

ALL  05-21-20

Page 606
Feb 01/06
 
JSA 
R Access Doors of the Avionics Compartment (Right Side)
Figure 602/TASK 05-21-20-991-007



EFF :

ALL  05-21-20

Page 607
Feb 01/06
 
JSA 
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-20-410-052-A

A. Close Access

(1) Close the access doors 822 and 812.

(2) Remove the access platform(s).



EFF :

ALL  05-21-20

Page 608
Aug 01/06
R  
JSA 
TASK 05-21-20-200-005

R Zonal Inspection of the AFT Avionics Compartment (Zones 127 and 128)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-127-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access

3. __________
Job Set-up

Subtask 05-21-20-010-054

A. Get Access

(1) Put an access platform in position at zone 127.

(2) Open the access door 824 (Ref. TASK 52-41-00-010-002).

4. Procedure
_________

Subtask 05-21-20-210-054

A. Inspection

(1) Do a general visual inspection of the AFT avionic compartment (Zones


127 and 128).

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-21-20

Page 609
Feb 01/06
 
JSA 
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-20-410-054

A. Close Access

(1) Close the access door 824 (Ref. TASK 52-41-00-410-002).

(2) Remove the access platform(s).



EFF :

ALL  05-21-20

Page 610
Feb 01/06
R  
JSA 
TASK 05-21-20-200-007

R Zonal Inspection of the FWD Avionics Compartment (Zones 121 and 122)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-121-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-12-13-000-001 Removal of the avionics compartment floor panels


53-12-13-400-001 Installation of the avionics compartment floor panels

3. __________
Job Set-up

Subtask 05-21-20-010-056

A. Get Access

(1) Put an access platform in position at zone 811.

(2) Open the avionic-compartment access door 811 and the access door
121AL.

(3) Remove the floor panels 121AF, 121BF, 121CF and 122BF from the
forward cabin utility-area (Ref. TASK 53-12-13-000-001).



EFF :

ALL  05-21-20

Page 611
Feb 01/06
 
JSA 
4. Procedure
_________

Subtask 05-21-20-210-056

A. Inspection

(1) Do a general visual inspection of the forward avionic compartment


(Zones 121 and 122).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-20-410-056

A. Close Access

(1) Install the floor panels 121AF, 121BF, 121CF, 122BF (Ref. TASK 53-12-
13-400-001).

(2) Close the access door 121AL and the avionic-compartment access door
811.

(3) Remove the access platform(s).



EFF :

ALL  05-21-20

Page 612
Feb 01/06
R  
JSA 
TASK 05-21-20-200-008

Zonal Inspection of the Lateral Avionic Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-125-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-21-20-991-002-A Fig. 601

3. __________
Job Set-up

Subtask 05-21-20-010-057

A. Get Access

(1) For zones 125 and 126

R (a) Put an access platform in position at zones 125 and 126.

(b) Open the access doors 812, 822 and 824.


(Ref. Fig. 601/TASK 05-21-20-991-002-A)



EFF :

ALL  05-21-20

Page 613
Aug 01/06
 
JSA 
4. Procedure
_________

Subtask 05-21-20-210-057

A. Inspection

R (1) Do a general visual inspection of the lateral avionic compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-20-410-057

A. Close Access

(1) For zones 125 and 126

R (a) Close the access doors 812, 822 and 824.



EFF :

ALL  05-21-20

Page 614
May 01/05
 
JSA 
TASK 05-21-20-200-010

Zonal Inspection of the Rear Avionic Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-127-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-41-00-010-002 Open the Avionics Compartment Doors for Access
52-41-00-410-002 Close the Avionics Compartment Doors after Access
53-12-13-000-001 Removal of the avionics compartment floor panels
53-12-13-400-001 Installation of the avionics compartment floor panels
05-21-20-991-007 Fig. 602
05-21-20-991-006 Fig. 603

3. __________
Job Set-up

R Subtask 05-21-20-010-059-A

R A. Get Access

R (1) Put an access platform in position at zones 127 and 128.


R (Ref. Fig. 602/TASK 05-21-20-991-007)

R (2) Open the access door 824 (Ref. TASK 52-41-00-010-002).

R (3) Open the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-001).



EFF :

ALL  05-21-20

Page 615
Nov 01/06
 
JSA 
R (4) Remove the sidewall panels 131AW, 131BW, 131CW, 131DW, 132BW, 132EW.
R (Ref. Fig. 603/TASK 05-21-20-991-006)

R (5) Remove the floor panels 127BF, 127BG, 127CF, 127DF, 128CF, 128EG.
R (Ref. TASK 53-12-13-000-001)

4. Procedure
_________

Subtask 05-21-20-210-059

A. Inspection

(1) Do a general visual inspection of the rear avionics compartment


(Zones 127 and 128).

(2) Make sure that there are no signs of corrosion, leaks, cracks or
damage.

(3) Make sure that all the installations (wiring) are attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

R Subtask 05-21-20-410-059-A

R A. Close Access

R (1) Install the floor panels 127BF, 127BG, 127CF, 127DF, 128CF, 128EG
R (Ref. TASK 53-12-13-400-001).

R (2) Install the sidewall panels 131AW, 131BW, 131CW, 131DW, 132BW, 132EW.

R (3) Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-
R 002).

R (4) Close the access door 824 (Ref. TASK 52-41-00-410-002).

R (5) Remove the access platform(s).



EFF :

ALL  05-21-20

Page 616
Nov 01/06
 
JSA 
Sidewall Panels of the Forward Cargo Compartment
Figure 603/TASK 05-21-20-991-006



EFF :

ALL  05-21-20

Page 617
Nov 01/04
 
JSA 
TASK 05-21-20-200-012

Zonal Inspection of Nose Gear Well, Including Zone 124

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-123-02

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-22-00-010-001 Nose Gear Doors - Ground Doors Opening


32-22-00-410-001 Nose Gear Doors - Ground Doors Closing

3. __________
Job Set-up

Subtask 05-21-20-010-062

A. Get Access

(1) Open the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
010-001)

4. Procedure
_________

Subtask 05-21-20-210-061

A. Inspection

(1) Do a general visual inspection of the nose gear well (Zones 123 and
124).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-21-20

Page 618
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-21-20-410-062

A. Close Access

(1) Close the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
410-001)



EFF :

ALL  05-21-20

Page 619
Nov 01/04
 
JSA 
ZONAL INSPECTION : FORWARD CARGO COMPARTMENT - INSPECTION/CHECK
_______________________________________________________________

TASK 05-21-30-200-001

Zonal Inspection of the FWD Cargo Compartment (Zones 131 and 132)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-131-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-21-30-010-050

A. Get Access

(1) Put an access platform in position at the zones 131 and 132.

(2) Open the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-001)



EFF :

ALL  05-21-30

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-30-210-050

A. Inspection

(1) Do a general visual inspection of the forward cargo compartment


(Zones 131 and 132).

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-21-30-410-050

A. Close Access

(1) Close the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-
002)

(2) Remove the access platform(s).



EFF :

ALL  05-21-30

Page 602
Nov 01/04
 
JSA 
TASK 05-21-30-200-002

Zonal Inspection of Underfloor Bay of FWD Cargo Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-133-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-22-14-000-001 Removal of the FWD Cargo-Compartment Floor-Panels
53-22-14-400-001 Installation of the FWD Cargo-Compartment
Floor-Panels
05-21-30-991-003 Fig. 601

3. __________
Job Set-up

Subtask 05-21-30-010-051

A. Get Access

(1) Put an access platform in position at zones 133 and 134.

(2) Open the forward cargo door 825 (Ref. TASK 52-30-00-860-001).

(3) Open the access doors:


133AL, 134AR.
(Ref. Fig. 601/TASK 05-21-30-991-003)



EFF :

ALL  05-21-30

Page 603
Nov 01/04
 
JSA 
Access Doors of the Lower Section of the Fuselage (Zone 130)
Figure 601/TASK 05-21-30-991-003



EFF :

ALL  05-21-30

Page 604
Nov 01/04
 
JSA 
(4) Remove the floor panels:
131AF, 131EF, 131HF,
132DF
(Ref. TASK 53-22-14-000-001).

4. Procedure
_________

Subtask 05-21-30-210-051

A. Inspection

(1) Do a general visual inspection of the underfloor bay of the forward


cargo compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-30-410-051

A. Close Access

(1) Install the floor panels:


131AF, 131EF, 131HF,
132DF.
(Ref. TASK 53-22-14-400-001)

(2) Close the access doors:


133AL, 134AR.

(3) Close the forward cargo door 825 (Ref. TASK 52-30-00-860-002).

(4) Remove the access platform(s).



EFF :

ALL  05-21-30

Page 605
Nov 01/04
 
JSA 
TASK 05-21-30-200-003

Zonal Inspection of the Bay behind the FWD Cargo Compartment (Zones 137 and
138)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-137-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-54-12-000-001 Removal of the FWD Cargo Compartment Partition FR34


52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-21-30-010-052

A. Get Access

(1) Put an access platform in position at the zones 137 and 138.

(2) Open the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-001).

(3) Remove the partitions:


131NW, 131PW, 132PW.
(Ref. TASK 25-54-12-000-001)



EFF :

ALL  05-21-30

Page 606
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-30-210-052

A. Inspection

(1) Do a general visual inspection of the bay behind the forward cargo
compartment (Zones 137 and 138).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-30-410-052

A. Close Access

(1) Install the partitions:


131NW, 131PW, 132PW.

(2) Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-
002).

(3) Remove the access platform(s).



EFF :

ALL  05-21-30

Page 607
Nov 01/04
 
JSA 
TASK 05-21-30-200-004

Zonal Inspection of Forward Cargo Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-131-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-22-14-000-001 Removal of the FWD Cargo-Compartment Floor-Panels
53-22-14-400-001 Installation of the FWD Cargo-Compartment
Floor-Panels
05-21-30-991-002 Fig. 602
05-21-30-991-001 Fig. 603

3. __________
Job Set-up

Subtask 05-21-30-010-053

A. Get Access

(1) Put an access platform in position at the zones 131 and 132.

(2) Open the forward cargo door 825 (Ref. TASK 52-30-00-860-001).

(3) Remove the ceiling panels:


131AC, 131BC.
(Ref. Fig. 602/TASK 05-21-30-991-002)



EFF :

ALL  05-21-30

Page 608
Nov 01/04
 
JSA 
Floor and Ceiling Panels of the Forward Cargo Compartment
Figure 602/TASK 05-21-30-991-002



EFF :

ALL  05-21-30

Page 609
Nov 01/04
 
JSA 
(4) Remove the sidewall panels:
131GW, 131HW, 131MW, 132MW.
(Ref. Fig. 603/TASK 05-21-30-991-001)

(5) Remove the floor panels:


131FF, 131GF, 131JF, 131KF, 132FF, 132GF, 132JF. (Ref. TASK 53-22-14-
000-001)

4. Procedure
_________

Subtask 05-21-30-210-053

A. Inspection

(1) Do a general visual inspection of the forward cargo compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-30-410-053

A. Close Access

(1) Install the floor panels:


131FF, 131GF, 131JF, 131KF, 132FF, 132GF, 132JF. (Ref. TASK 53-22-14-
400-001)

(2) Install the sidewall panels: 131GW, 131HW, 131MW, 132MW.

(3) Install the ceiling panels: 131AC, 131BC.

(4) Close the forward cargo door 825 (Ref. TASK 52-30-00-860-002).

(5) Remove the access platform(s).



EFF :

ALL  05-21-30

Page 610
Nov 01/04
 
JSA 
Sidewall Panels of the Forward Cargo Compartment
Figure 603/TASK 05-21-30-991-001



EFF :

ALL  05-21-30

Page 611
Nov 01/04
 
JSA 
TASK 05-21-30-200-006

Zonal Inspection of the FWD Cargo Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-131-03

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-22-14-000-001 Removal of the FWD Cargo-Compartment Floor-Panels
53-22-14-400-001 Installation of the FWD Cargo-Compartment
Floor-Panels
05-21-30-991-002 Fig. 602
05-21-30-991-001 Fig. 603

3. __________
Job Set-up

Subtask 05-21-30-010-055

A. Get Access

(1) Put an access platform in position at the zones 131 and 132.

(2) Open the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-001)

(3) Remove the ceiling panels: 131AC, 131BC, 131CC.


(Ref. Fig. 602/TASK 05-21-30-991-002)



EFF :

ALL  05-21-30

Page 612
Nov 01/04
 
JSA 
(4) Remove the sidewall panels: 131GW, 131HW, 131MW, 132KW, 132MW.
(Ref. Fig. 603/TASK 05-21-30-991-001)

(5) Remove the floor panels:


131BF, 131CF, 131FF,
131GF, 131JF, 131KF,
132FF, 132GF, 132JF, 132KF.
(Ref. TASK 53-22-14-000-001)

4. Procedure
_________

Subtask 05-21-30-210-055

A. Inspection

(1) Do a general visual inspection of the forward cargo compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-30-410-055

A. Close Access

(1) Install the floor panels:


131BF, 131CF, 131FF,
131GF, 131JF, 131KF,
132FF, 132GF, 132JF,
132KF.
(Ref. TASK 53-22-14-400-001)

(2) Install the sidewall panel:


131GW, 131HW, 131MW,
132KW, 132MW.

(3) Install the ceiling panels:


131AC, 131BC, 131CC.

(4) Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-
002).



EFF :

ALL  05-21-30

Page 613
Nov 01/04
 
JSA 
(5) Remove the access platform(s).



EFF :

ALL  05-21-30

Page 614
Nov 01/04
 
JSA 
ZONAL INSPECTION : CENTER WING - INSPECTION/CHECK
_________________________________________________

TASK 05-21-40-200-001

Zonal Inspection of the Wing Center Box (Zones 141 and 142)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-141-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

57-17-11-000-001 Removal of the Covers 147AZ (148AZ)


57-17-11-400-001 Installation of the Covers 147AZ (148AZ)

3. __________
Job Set-up

Subtask 05-21-40-010-050

A. Get Access

(1) Put an access platform in position at the zones 141 and 142.

(2) Remove the cover panels:


147AZ, 148AZ, (Ref. TASK 57-17-11-000-001).



EFF :

ALL  05-21-40

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-40-210-050

A. Inspection

(1) Do a general visual inspection of the wing center box (Zones 141 and
142).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-40-410-050

A. Close Access

(1) Install the cover panels:


147AZ, 148AZ, (Ref. TASK 57-17-11-400-001).

(2) Remove the access platform(s).



EFF :

ALL  05-21-40

Page 602
Nov 01/04
 
JSA 
TASK 05-21-40-200-002

Zonal Inspection of the Pressurized Zone Under the Cabin Floor

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-145-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-32-12-000-002 Removal of the Cabin Floor Panels


53-32-12-400-002 Installation of the Cabin Floor Panels

3. __________
Job Set-up

Subtask 05-21-40-010-051

A. Get Access

(1) Remove the floor panels:


241EF, 241FF, 241GF,
241HF, 241JF, 241KF,
241LF, 241MF, 242FF,
242GF, 242HF, 242KF,
242LF, 242MF, from the passenger compartment.
(Ref. TASK 53-32-12-000-002)

4. Procedure
_________

Subtask 05-21-40-210-051

A. Inspection

(1) Do a general visual inspection of the pressurized zone under the


cabin floor.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-21-40

Page 603
Nov 01/04
 
JSA 
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-40-410-051

A. Close Access

(1) Install the floor panels:


241EF, 241FF, 241GF,
241HF, 241JF, 241KF,
241LF, 241MF, 242FF,
242GF, 242HF, 242KF,
242LF, 242MF, in the passenger compartment. (Ref. TASK 53-32-12-400-
002)



EFF :

ALL  05-21-40

Page 604
Nov 01/04
 
JSA 
TASK 05-21-40-200-003

Zonal Inspection as far as visible from the Ground of the Main Gear Well and
the Hydraulics Compartment (Zones 147 and 148)

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-010-001 Open the Main Gear Doors for Access


32-12-00-410-001 Close the Main Gear Doors after Access

3. __________
Job Set-up

Subtask 05-21-40-010-052

A. Get Access

(1) Open the main landing gear doors


734, 744, (Ref. TASK 32-12-00-010-001).

4. Procedure
_________

Subtask 05-21-40-210-052

A. Inspection

(1) Do a general visual inspection of the main gear well and the
hydraulics compartment from the ground (Zones 147 and 148).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-21-40

Page 605
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-21-40-410-052

A. Close Access

(1) Close the main landing gear doors


734, 744 , (Ref. TASK 32-12-00-410-001).



EFF :

ALL  05-21-40

Page 606
Nov 01/04
 
JSA 
TASK 05-21-40-200-004

Zonal Inspection of the Main Gear Well and the Hydraulics Compartment (Zones
147 and 148)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-147-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-010-001 Open the Main Gear Doors for Access


32-12-00-410-001 Close the Main Gear Doors after Access

3. __________
Job Set-up

Subtask 05-21-40-010-053

A. Get Access

(1) Put an access platform in position at the zones 147 and 148.

(2) Open the main landing gear doors


734, 744 , (Ref. TASK 32-12-00-010-001).



EFF :

ALL  05-21-40

Page 607
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-40-210-053

A. Inspection

(1) Do a general visual inspection of the main gear well and the
hydraulics compartment (Zones 147 and 148).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-40-410-053

A. Close Access

(1) Close the main landing gear doors


734, 744 , (Ref. TASK 32-12-00-410-001).

(2) Remove the access platform(s).



EFF :

ALL  05-21-40

Page 608
Nov 01/04
 
JSA 
TASK 05-21-40-200-005

Zonal Inspection of the Main Gear Well and the Hydraulics Compartment (Zones
147 and 148)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-147-03

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-35-13-000-001 Removal of the Belly Fairing Access Panels


53-35-13-400-001 Installation of the Belly Fairing Access Panels

3. __________
Job Set-up

Subtask 05-21-40-010-054

A. Get Access

(1) Put an access platform in position at the zones 147 and 148.

(2) Remove the access panels:


147AB, 147EB.
(Ref. TASK 53-35-13-000-001)



EFF :

ALL  05-21-40

Page 609
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-40-210-054

A. Inspection

(1) Do a general visual inspection of the main gear well and the
hydraulics compartment (Zone 147 and 148).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-40-410-054

A. Close Access

(1) Install the access panels:


147AB, 147EB.
(Ref. TASK 53-35-13-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-21-40

Page 610
Nov 01/04
 
JSA 
ZONAL INSPECTION : AFT CARGO COMPARTMENT - INSPECTION/CHECK
___________________________________________________________

TASK 05-21-50-200-001

R Zonal Inspection of Aft Cargo Compartment (As Far As Visible - If A/CT(s) is


R Installed)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-151-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-21-50-010-050

A. Get Access

(1) Put an access platform in position at zone 152.

(2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).



EFF :

ALL  05-21-50

Page 601
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-21-50-210-050

A. Inspection

R (1) Do a general visual inspection of the aft cargo compartment (as far
R as you can see - if A/CT(S) is installed).

(2) Make sure that there are no signs of corrosion, cracks or damage.
R

5. Close-up
________

Subtask 05-21-50-410-050

A. Close Access

(1) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).

(2) Remove the access platform(s).



EFF :

ALL  05-21-50

Page 602
May 01/05
 
JSA 
TASK 05-21-50-200-002

Zonal Inspection of Underfloor Bay of Aft Cargo Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-153-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

28-11-27-000-001 Removal of the Additional Center Tank (ACT)


28-11-27-400-001 Installation of the Additional Center Tank (ACT)
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-42-14-000-001 Removal of the AFT Cargo-Compartment Floor-Panels
Zone 150
53-42-14-400-001 Installation of the AFT Cargo-Compartment
Floor-Panels Zone 150

3. __________
Job Set-up

R Subtask 05-21-50-010-051-A

R A. Get Access

R (1) Put an access platform in position at zones 153 and 154.

R (2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).

R (3) Remove the floor panels between FR46 and FR59


R (Ref. TASK 53-42-14-000-001).



EFF :

ALL  05-21-50

Page 603
Feb 01/05
 
JSA 
Subtask 05-21-50-020-052

B. Removal of Components

R (1) Remove the Additional Center Tank (ACT), if installed (Ref. TASK 28-
11-27-000-001).

4. Procedure
_________

Subtask 05-21-50-210-051

A. Inspection

(1) Do a general visual inspection of the underfloor bay of the aft cargo
compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-50-420-052

A. Installation of Components

R (1) Install the ACT, if removed (Ref. TASK 28-11-27-400-001).

Subtask 05-21-50-410-051-A

B. Close Access

(1) Install the floor panels between FR46 and FR59


(Ref. TASK 53-42-14-400-001).

(2) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).

(3) Remove the access platform(s).



EFF :

ALL  05-21-50

Page 604
May 01/05
 
JSA 
TASK 05-21-50-200-003

Zonal Inspection of Aft Cargo Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-151-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-55-11-000-001 Removal of the AFT Cargo-Compartment Partition FR47


25-55-11-400-001 Installation of the AFT Cargo-Compartment Partition
FR47
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
R 05-21-50-991-002-A Fig. 601
05-21-50-991-001 Fig. 602

3. __________
Job Set-up

Subtask 05-21-50-010-052

A. Get Access

(1) Put an access platform in position at the zones 151 and 152.

(2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).

(3) Remove the ceiling panels:


151AC.
R (Ref. Fig. 601/TASK 05-21-50-991-002-A)



EFF :

ALL  05-21-50

Page 605
May 01/06
 
JSA 
R Floor and Ceiling Panels of the Aft Cargo Compartment
R Figure 601/TASK 05-21-50-991-002-A



EFF :

ALL  05-21-50

Page 606
May 01/06
 
JSA 
(4) Remove the partition panels: 151AW, 151BW, 152BW.
(Ref. TASK 25-55-11-000-001)

(5) Remove the sidewall panels:


151CW, 151DW, 151EW,
151HW, 151JW, 151GC,
152DW, 152HW, 152JW,
152CW, 152FW, 152GW,
(Ref. Fig. 602/TASK 05-21-50-991-001)

4. Procedure
_________

Subtask 05-21-50-210-052

A. Inspection

(1) Do a general visual inspection of the aft cargo compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-50-410-052

A. Close Access

(1) Install the ceiling panels:


151AC.

(2) Install the partition panels: 151AW, 151BW, 152BW.


(Ref. TASK 25-55-11-400-001)

(3) Install the sidewall panels:


151CW, 151DW, 151EW,
151HW, 151JW, 151GC,
152DW, 152HW, 152JW,
152CW, 152FW, 152GW,

(4) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).

(5) Remove the access platform(s).



EFF :

ALL  05-21-50

Page 607
Nov 01/04
 
JSA 
Sidewall Panels of the Aft Cargo Compartment
Figure 602/TASK 05-21-50-991-001



EFF :

ALL  05-21-50

Page 608
Nov 01/04
 
JSA 
TASK 05-21-50-200-004

Zonal Inspection of the Aft Cargo Compartment (Zones 151 and 152)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-151-03

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-55-11-000-001 Removal of the AFT Cargo-Compartment Partition FR47


25-55-11-400-001 Installation of the AFT Cargo-Compartment Partition
FR47
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-42-14-000-001 Removal of the AFT Cargo-Compartment Floor-Panels
Zone 150
53-42-14-400-001 Installation of the AFT Cargo-Compartment
Floor-Panels Zone 150
R 05-21-50-991-002-A Fig. 601
05-21-50-991-001 Fig. 602

3. __________
Job Set-up

Subtask 05-21-50-010-053

A. Get Access

(1) Put an access platform in position at zones 151 and 152.

(2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).



EFF :

ALL  05-21-50

Page 609
May 01/06
 
JSA 
(3) Remove the ceiling panels:
151AC, 151BC, 151DC, 151GC, 151HC, 151JC.
R (Ref. Fig. 601/TASK 05-21-50-991-002-A)

(4) Remove the partition panels:


152BW, 151AW, 151BW (Ref. TASK 25-55-11-000-001).

(5) Remove the sidewall panels:


151CW, 151DW, 151EW, 151HW, 151JW,
152CW, 152DW, 152FW, 152GW, 152HW, 152JW.
(Ref. Fig. 602/TASK 05-21-50-991-001)

(6) Remove the floor panels:


R 151SF, 151BF, 151CF,
R 151TF, 151EF, 151FF,
R 151UF, 151HF, 151JF,
R 151AG, 151MF, 151NF,
R 151BG, 151QF, 151RF,
R 152BF, 152CF, 152SF,
R 152FF, 152EF, 152TF,
R 152XF, 152YF, 152ZF,
R 152VF, 152WF,
R 152NF, 152MF, 152AG,
R 152RF, 152QF, 152BG,
(Ref. TASK 53-42-14-000-001).

Subtask 05-21-50-020-053

B. Not Applicable

4. Procedure
_________

Subtask 05-21-50-210-053

A. Inspection

(1) Do a general visual inspection of the aft cargo compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.



EFF :

ALL  05-21-50

Page 610
May 01/06
 
JSA 
5. Close-up
________

Subtask 05-21-50-420-053

A. Not Applicable

Subtask 05-21-50-410-053

B. Close Access

(1) Install the ceiling panels:


151AC, 151BC, 151DC, 151GC, 151HC, 151JC.

(2) Install the partition panels:


152BW, 151AW, 151BW (Ref. TASK 25-55-11-400-001).

(3) Install the sidewall panels:


151CW, 151DW, 151EW, 151HW, 151JW,
152CW, 152DW, 152FW, 152GW, 152HW, 152JW.

(4) Install the floor panels:


R 151SF, 151BF, 151CF,
R 151TF, 151EF, 151FF,
R 151UF, 151HF, 151JF,
R 151AG, 151MF, 151NF,
R 151BG, 151QF, 151RF,
R 152BF, 152CF, 152SF,
R 152FF, 152EF, 152TF,
R 152XF, 152YF, 152ZF
R 152VF, 152WF,
R 152NF, 152MF, 152AG,
R 152RF, 152QF, 152BG,
(Ref. TASK 53-42-14-400-001).

(5) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).

(6) Remove the access platform(s).



EFF :

ALL  05-21-50

Page 611
May 01/06
 
JSA 
ZONAL INSPECTION : BULK CARGO COMPARTMENT - INSPECTION/CHECK
____________________________________________________________

TASK 05-21-60-200-001

Zonal Inspection of the Bulk Cargo-Compartment (Zones 161 and 162)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-161-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-21-60-010-050

A. Get Access

(1) Open the aft cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)

4. Procedure
_________

Subtask 05-21-60-210-050

A. Inspection

(1) Do a general visual inspection of the bulk cargo compartment (Zones


161 and 162).

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-21-60

Page 601
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-21-60-410-050

A. Close Access

(1) Close the aft cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)



EFF :

ALL  05-21-60

Page 602
Nov 01/04
 
JSA 
TASK 05-21-60-200-002

Zonal Inspection of the Underfloor Bay of the Bulk Cargo-Compartment (Zones 163
and 164)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-163-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-42-17-000-001 Removal of the BULK Cargo-Compartment Floor-Panels
53-42-17-400-001 Installation of the BULK Cargo-Compartment
Floor-Panels

3. __________
Job Set-up

Subtask 05-21-60-010-051

A. Get Access

R (1) Put an access platform in position at zones 163 and 164.

R (2) Open the aft cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).

(3) Remove the floor panels:


R 161AF, 161DF and 162JF (Ref. TASK 53-42-17-000-001).



EFF :

ALL  05-21-60

Page 603
Aug 01/06
 
JSA 
4. Procedure
_________

Subtask 05-21-60-210-051

A. Inspection

(1) Do a general visual inspection of the underfloor bay of the bulk


cargo compartment (Zones 163 and 164).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-60-410-051

A. Close Access

(1) Install the floor panels:


R 161AF, 161DF and 162JF (Ref. TASK 53-42-17-400-001).

R (2) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).

(3) Remove the access platform(s).



EFF :

ALL  05-21-60

Page 604
Aug 01/06
 
JSA 
TASK 05-21-60-200-003

Zonal Inspection of Bulk Cargo-Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-161-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-55-12-000-002 Removal of the Ceiling Panels in the AFT Cargo


Compartment - FR59/FR65
25-55-12-000-003 Removal of the Sidewall Panels in the AFT Cargo
Compartment - FR59/FR65
25-55-12-400-002 Installation of the Ceiling Panels in the AFT Cargo
Compartment - FR59/FR65
25-55-12-400-003 Installation of the Sidewall Panels in the AFT Cargo
Compartment - FR59/FR65
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-21-60-010-052

A. Get Access

(1) Put an access platform in position at the zones 161 and 162.

(2) Open the AFT cargo compartment door 826. (Ref. TASK 52-30-00-860-001)



EFF :

ALL  05-21-60

Page 605
Nov 01/04
 
JSA 
(3) Remove the sidewall panels:
161AW, 161BW, 161CW.
(Ref. TASK 25-55-12-000-003)

(4) Remove the ceiling panel 161AC:


(Ref. TASK 25-55-12-000-002)

4. Procedure
_________

Subtask 05-21-60-210-052

A. Inspection

(1) Do a general visual inspection of the bulk cargo compartment (Zones


161 and 162).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-60-410-052

A. Close Access

(1) Install the ceiling panel 161AC.


(Ref. TASK 25-55-12-400-002)

(2) Install the sidewall panels:


161AW, 161BW, 161CW.
(Ref. TASK 25-55-12-400-003)

(3) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)

(4) Remove the access platform(s).



EFF :

ALL  05-21-60

Page 606
Nov 01/04
 
JSA 
TASK 05-21-60-200-004

Zonal Inspection of the Bulk Cargo-Compartment (Zones 161 and 162)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-161-03

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65


25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
FR65
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
53-42-17-000-001 Removal of the BULK Cargo-Compartment Floor-Panels
53-42-17-400-001 Installation of the BULK Cargo-Compartment
Floor-Panels
05-21-60-991-001 Fig. 601
05-21-60-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-21-60-010-053

A. Get Access

(1) Put an access platform in position at the zones 161 and 162.

(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)



EFF :

ALL  05-21-60

Page 607
Nov 01/04
 
JSA 
(3) Remove the ceiling panels: 161AC, 161BC, 162CC.
(Ref. Fig. 601/TASK 05-21-60-991-001)

(4) Remove the sidewall panels: 161AW, 161BW, 161CW, 162BW, 162CW, 162EW,
162FW, 162GW.
(Ref. Fig. 602/TASK 05-21-60-991-002)

(5) Remove the partition panels: 161DW, 162DW. (Ref. TASK 25-55-12-000-
001)

(6) Remove the floor panels: 161BF, 161CF, 161EF, 161FF, 162EF, 162FF,
162GF, 162HF, 162JF, 162KF, 162LF. (Ref. TASK 53-42-17-000-001)

4. Procedure
_________

Subtask 05-21-60-210-053

A. Inspection

(1) Do a general visual inspection of the bulk cargo compartment.

R (2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-60-410-053

A. Close Access

(1) Install the floor panels:


161BF, 161CF, 161EF,
161FF, 162EF, 162FF,
162GF, 162HF, 162JF,
162KF, 162LF. (Ref. TASK 53-42-17-400-001)

(2) Install the ceiling panels: 161AC, 161BC, 162CC.

(3) Install the partition panels: 161DW, 162DW. (Ref. TASK 25-55-12-400-
001)



EFF :

ALL  05-21-60

Page 608
Aug 01/06
 
JSA 
Floor and Ceiling Panels of the Bulk Cargo Compartment
Figure 601/TASK 05-21-60-991-001



EFF :

ALL  05-21-60

Page 609
Nov 01/04
 
JSA 
Sidewall Panels and Partition of the Bulk Cargo Compartment
Figure 602/TASK 05-21-60-991-002



EFF :

ALL  05-21-60

Page 610
Nov 01/04
 
JSA 
(4) Install the sidewall panels: 161AW, 161BW, 161CW, 162BW, 162CW,
162EW, 162FW, 162GW.

(5) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)

(6) Remove the access platform(s).



EFF :

ALL  05-21-60

Page 611
Nov 01/04
 
JSA 
ZONAL INSPECTION : AFT CABIN UNDERFLOOR COMPARTMENT - INSPECTION/CHECK
______________________________________________________________________

TASK 05-21-70-200-001

Zonal Inspection of the Aft-Cabin Underfloor Compartment (Zones 171 and 172)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-171-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65


25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
FR65
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
R 05-21-70-991-001-A Fig. 601

3. __________
Job Set-up

Subtask 05-21-70-010-050

A. Get Access
R (Ref. Fig. 601/TASK 05-21-70-991-001-A)

(1) Put an access platform in position at the zones 171 and 172.

R (2) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).



EFF :

ALL  05-21-70

Page 601
Nov 01/06
 
JSA 
R Access Doors of the Aft Fuselage
R Figure 601/TASK 05-21-70-991-001-A



EFF :

ALL  05-21-70

Page 602
Nov 01/06
 
JSA 
(3) Open the access doors 171AL and 172AR.
R

R (4) Remove the partition panels 161DW and 162DW (Ref. TASK 25-55-12-000-
001).

4. Procedure
_________

Subtask 05-21-70-210-050

A. Inspection

(1) Do a general visual inspection of the aft-cabin underfloor


compartment (Zones 171 and 172).

R (2) Make sure that there are no signs of corrosion, cracks and damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-70-410-050

A. Close Access

R (1) Install the partition panels 161DW and 162DW (Ref. TASK 25-55-12-400-
001).

(2) Close the access doors 171AL and 172AR.

R (3) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).

(4) Remove the access platform(s).



EFF :

ALL  05-21-70

Page 603
Nov 01/06
 
JSA 
TASK 05-21-70-200-002

Zonal Inspection of the Aft-Cabin Underfloor Compartment (Zones 171 and 172)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-171-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-55-12-000-001 Removal of the AFT Cargo Compartment Partition FR65


25-55-12-400-001 Installation of the AFT Cargo Compartment Partition
FR65
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
R 05-21-70-991-001-A Fig. 601

3. __________
Job Set-up

Subtask 05-21-70-010-051

A. Get Access

(1) Put an access platform in position at the zones 171 and 172.

(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)

(3) Open the access doors 171AL and 172AR.


R (Ref. Fig. 601/TASK 05-21-70-991-001-A)



EFF :

ALL  05-21-70

Page 604
Nov 01/06
 
JSA 
(4) Remove the partition panels 161DW, 162DW. (Ref. TASK 25-55-12-000-
001)

4. Procedure
_________

Subtask 05-21-70-210-051

A. Inspection

(1) Do a general visual inspection of the aft-cabin underfloor


compartment (Zones 171 and 172).

(2) Make sure that there are no signs of corrosions, craks or damages.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-21-70-410-051

A. Close Access

(1) Install the partition panels 161DW, 162DW. (Ref. TASK 25-55-12-400-
001)

(2) Close the access doors 171AL and 172AR.

(3) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)

(4) Remove the access platform(s).



EFF :

ALL  05-21-70

Page 605
Nov 01/04
 
JSA 
______________________________________________________________________________
ZONAL INSPECTION : BELLY FAIRING, AIR CONDITIONING AND HYDRAULICS COMPARTMENTS
________________
INSPECTION/CHECK

TASK 05-21-90-200-001

Zonal Inspection of the Air Conditioning Compartment and Fairings

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-191-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-35-13-000-002 Removal of the Quick-Release Access Panels from the


Belly Fairing Structure
53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure

3. __________
Job Set-up

Subtask 05-21-90-010-050

A. Get Access

(1) Put an access platform in position at the zones 191 and 192.

(2) Remove the access panels 191BB, 191KB, 192KB. (Ref. TASK 53-35-13-
000-002)



EFF :

ALL  05-21-90

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-90-210-050

A. Inspection

(1) Do a general visual inspection of the air conditioning compartment


and fairings.

(2) Make sure that there are no signs of corrosions, cracks or damages.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-90-410-050

A. Close Access

(1) Install the access panels 191KB, 191BB, 192KB. (Ref. TASK 53-35-13-
400-002)

(2) Remove the access platform(s).



EFF :

ALL  05-21-90

Page 602
Nov 01/04
 
JSA 
TASK 05-21-90-200-003

Zonal Inspection of the Offwing escape-slide Stowage Area

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-193-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-62-42-000-001 Offwing Escape-Slide - Removal


25-62-42-400-001 Offwing Escape-Slide - Installation

3. __________
Job Set-up

Subtask 05-21-90-010-052

A. Get Access

WARNING : MAKE SURE THAT THE SAFETY/LOCK PIN IS CORRECTLY INSTALLED IN


_______
THE REGULATOR VALVE ASSEMBLY OF THE INFLATION RESERVOIR.
THIS PREVENTS ACCIDENTAL:
- DISCHARGE OF THE INFLATION RESERVOIR
- DEPLOYMENT OF THE ESCAPE-SLIDE
WHICH CAN CAUSE INJURY AND/OR DAMAGE.

(1) Put an access platform in position at the zones 193 and 194.

(2) Remove the offwing escape-slide enclosure (Ref. TASK 25-62-42-000-


001)



EFF :

ALL  05-21-90

Page 603
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-21-90-210-052

A. Inspection

(1) Do a general visual inspection of the stowage for the upper-wing


fairing slide.

(2) Make sure that there are no signs of corrosions, craks or damages.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-90-410-052

A. Close Access

(1) Install the offwing escape slide enclosure (Ref. TASK 25-62-42-400-
001)

(2) Remove the access platform(s).



EFF :

ALL  05-21-90

Page 604
Nov 01/04
 
JSA 
TASK 05-21-90-200-005

R Zonal Inspection of the Hydraulic Compartment and Fairings

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-195-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific 1 ACCESS PLATFORM 2M (6 FT)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-21-90-991-004 Fig. 601

3. __________
Job Set-up

Subtask 05-21-90-010-054

A. Get Access

R (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 195 and 196.

R (2) Open the hydraulic reservoir pressurization access-door 195BB and the
R Yellow hydraulic compartment access-door 196BB.
(Ref. Fig. 601/TASK 05-21-90-991-004)



EFF :

ALL  05-21-90

Page 605
May 01/05
 
JSA 
R Hydraulic Compartment Access Doors (195BB and 196BB)
Figure 601/TASK 05-21-90-991-004



EFF :

ALL  05-21-90

Page 606
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-21-90-210-054

A. Inspection

R (1) Do a general visual inspection of the hydraulic compartment and the


R fairings.

(2) Make sure that there are no signs of corrosion damage, cracks or
other damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
correctly attached.

5. Close-up
________

Subtask 05-21-90-410-054

A. Close Access

R (1) Close the hydraulic reservoir pressurization access-door 195BB and


R the Yellow hydraulic compartment access-door 196BB.

(2) Remove the access platform(s).



EFF :

ALL  05-21-90

Page 607
May 01/05
 
JSA 
TASK 05-21-90-200-007

Zonal Inspection of Rear Fairing

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-197-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-35-13-000-001 Removal of the Belly Fairing Access Panels


53-35-13-000-002 Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
53-35-13-400-001 Installation of the Belly Fairing Access Panels
53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure

3. __________
Job Set-up

Subtask 05-21-90-010-056

A. Get Access

R (1) Put an access platform in position at zones 197 and 198.

(2) Remove the access panels:


R 197AB, 197GB, 198GB (Ref. TASK 53-35-13-000-001) and 826GR,
197BB, 198BB (Ref. TASK 53-35-13-000-002).



EFF :

ALL  05-21-90

Page 608
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-21-90-210-056

A. Inspection

(1) Do a general visual inspection of the rear fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-90-410-056

A. Close Access

(1) Install the access panels:


R 197AB, 197GB, 198GB (Ref. TASK 53-35-13-400-001), 826GR,
198BB, 197BB. (Ref. TASK 53-35-13-400-002)

(2) Remove the access platform(s).



EFF :

ALL  05-21-90

Page 609
May 01/05
 
JSA 
TASK 05-21-90-200-009

Zonal Inspection of the Air Conditioning Compartment and Fairings

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-191-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-35-11-000-001 Removal of the Wing-to-Fuselage Fairings


53-35-11-400-001 Installation of the Wing-to-Fuselage Fairings
53-35-13-000-001 Removal of the Belly Fairing Access Panels
53-35-13-000-002 Removal of the Quick-Release Access Panels from the
Belly Fairing Structure
53-35-13-400-001 Installation of the Belly Fairing Access Panels
53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure

3. __________
Job Set-up

Subtask 05-21-90-010-058

A. Get Access

(1) Put an access platform in position at the zones 191 and 192.

(2) Remove the wing-to-fuselage fairings:


191BT, 191CT, 191DT, 191ET, 191LB, 192BT, 192CT, 192DT, 192ET, 192LB,
192MB .
(Ref. TASK 53-35-11-000-001)



EFF :

ALL  05-21-90

Page 610
Nov 01/04
 
JSA 
(3) Remove the access panels:
- 191AB, 191AT, 191GB, 191JB, 192AB, 192AT.
(Ref. TASK 53-35-13-000-001)
- 191EB, 191HB, 191KB, 192EB, 192FB, 192KB.
(Ref. TASK 53-35-13-000-002)

4. Procedure
_________

Subtask 05-21-90-210-058

A. Inspection

(1) Do a general visual inspection of the air conditioning compartment


and fairings.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-21-90-410-058

A. Close Access

(1) Install the access panels:


- 191EB, 191HB, 191KB, 192EB, 192FB, 192KB.
(Ref. TASK 53-35-13-400-002)
- 191AB, 191AT, 191GB, 191JB, 192AB, 192AT.
(Ref. TASK 53-35-13-400-001)

(2) Install the wing-to-fuselage fairings:


191BT, 191CT, 191DT, 191ET, 191LB, 192BT, 192CT, 192DT, 192ET, 192LB,
192MB .
(Ref. TASK 53-35-11-400-001)

(3) Remove the access platform(s).



EFF :

ALL  05-21-90

Page 611
Nov 01/04
 
JSA 
ZONAL INSPECTION : UPPER HALF OF FUSELAGE - INSPECTION/CHECK
____________________________________________________________

TASK 05-22-00-200-001

Zonal Inspection as far as Visible from the Ground of the Upper Half of the
Fuselage

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-22-00-869-050

A. Not Applicable

4. Procedure
_________

Subtask 05-22-00-210-050

A. Inspection

(1) Do a general visual inspection of the upper half of the fuselage from
the ground.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-22-00

Page 601
Nov 01/04
 
JSA 
TASK 05-22-00-200-002

Zonal Inspection of the Upper Half of the Fuselage up to the Stringer 8LH and
the Stringer 8RH including the Doors Surrounds

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-200-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

3. __________
Job Set-up

Subtask 05-22-00-010-053

A. Get Access

(1) Put an access platform in position at the zone 200.

4. Procedure
_________

Subtask 05-22-00-210-051

A. Inspection

(1) Do a general visual inspection of the upper half of the fuselage up


to the stringers 8 LH and 8 RH and the door surrounds.

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-22-00-410-053

A. Close Access

(1) Remove the access platform(s).



EFF :

ALL  05-22-00

Page 602
Nov 01/04
 
JSA 
TASK 05-22-00-200-003

Zonal Inspection of the Upper Half of the Fuselage from the Stringer 8LH to the
Stringer 8RH (Fuselage Crown Area)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-200-03

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

3. __________
Job Set-up

Subtask 05-22-00-010-054

A. Get Access

(1) Put an access platform in position at the zone 200.

4. Procedure
_________

Subtask 05-22-00-210-052

A. Inspection

(1) Do a general visual inspection of the upper half of the fuselage from
the stringer 8 LH to the stringer 8 RH (fuselage crown area).

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-22-00-410-054

A. Close Access

(1) Remove the access platform(s).



EFF :

ALL  05-22-00

Page 603
Nov 01/04
 
JSA 
ZONAL INSPECTION : COCKPIT - INSPECTION/CHECK
_____________________________________________

TASK 05-22-10-200-001

Zonal Inspection of the Cockpit (Zones 211 and 212)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-211-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-22-10-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-22-10-010-050

A. Get Access
(Ref. Fig. 601/TASK 05-22-10-991-001)

(1) Remove the sidewall panels:


211AW, 211BW, 211EW,
212AW, 212BW, 212EW,
R 212JW,
R 211AZ, 212AZ.

NOTE : You can remove the sidewall panels 211FW, 212FW and 212HW as
____
an alternative for the panels 211EW, 212EW and 212JW.

4. Procedure
_________

Subtask 05-22-10-210-050

A. Inspection

(1) Do a general visual inspection of the cockpit.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring) are attached correctly.



EFF :

ALL  05-22-10

Page 601
May 01/06
 
JSA 
R Access Panels of the Cockpit
Figure 601/TASK 05-22-10-991-001



EFF :

ALL  05-22-10

Page 602
May 01/06
 
JSA 
5. Close-up
________

Subtask 05-22-10-410-050

A. Close Access

(1) Install the sidewall panels:


211AW, 211BW, 211EW,
212AW, 212BW, 212EW,
R 212JW,
R 211AZ, 212AZ.

NOTE : Install the sidewall access panels 211FW, 212FW and 212HW if
____
you removed them.



EFF :

ALL  05-22-10

Page 603
May 01/06
 
JSA 
TASK 05-22-10-200-002

Zonal Inspection of the Cockpit (Zones 211 and 212)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-211-02

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-13-41-000-001 Removal of the Ceiling Panels


25-13-41-400-001 Installation of the Ceiling Panels
05-22-10-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-22-10-010-051

A. Get Access

(1) Remove the ceiling panels:


211BC, 211FC, 211HC,
212BC, 212FC.
(Ref. TASK 25-13-41-000-001).

(2) Remove the sidewall panel 212KW,


(Ref. Fig. 601/TASK 05-22-10-991-001)

4. Procedure
_________

Subtask 05-22-10-210-051

A. Inspection

(1) Do a general visual inspection of the cockpit.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-22-10

Page 604
Nov 01/04
 
JSA 
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-22-10-410-051

A. Close Access

(1) Install the ceiling panels:


211BC, 211FC, 211HC,
212BC, 212FC.
(Ref. TASK 25-13-41-400-001).

(2) Install the sidewall panel 212KW.



EFF :

ALL  05-22-10

Page 605
Nov 01/04
 
JSA 
ZONAL INSPECTION : FORWARD CABIN UTILITY AREAS - INSPECTION/CHECK
_________________________________________________________________

TASK 05-22-20-200-006

Zonal Inspection of the Forward Cabin Utility Area (Zone 221 and 222)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-221-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-22-41-000-001 Removal of the Wall-Mounted Cabin-Attendant Seats


25-22-41-400-001 Installation of the Wall-Mounted Cabin-Attendant
Seats
25-23-45-000-002 Removal of the Door Frame Linings at the Right FWD
Passenger/Crew Door
25-23-45-000-005 Removal of the Door Frame Linings at the Left FWD
Passenger/Crew Door
25-23-45-400-006 Installation of the Door Frame Linings at the Left
FWD Passenger/Crew Door
25-23-45-400-007 Installation of the Door Frame Linings at the Right
FWD Passenger/Crew Door
25-26-41-000-001 Removal of the Forward Curtain Rail
25-26-41-400-001 Installation of the Forward Curtain Rail
25-31-41-000-001 Removal of the FWD Galley Unit (6475MM)
25-31-41-000-002 Removal of the FWD Galley Unit (6478MM or 6479MM)
25-31-41-400-001 Installation of the FWD Galley Unit (6475MM)
25-31-41-400-002 Installation of the FWD Galley Unit (6478MM or
6479MM)
25-41-41-000-001 Removal of the Lavatory A
25-41-41-400-001 Installation of the Lavatory A
25-41-42-000-001 Removal of the Lavatory B



EFF :

ALL  05-22-20

Page 601
Aug 01/05
R  
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-41-42-400-001 Installation of the Lavatory B


25-41-44-000-001 Removal of the Lavatory H
25-41-44-400-001 Installation of the Lavatory H
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
53-12-12-000-001 Removal of the Cabin Floor Panels from FR12 thru FR24
53-12-12-400-001 Installation of the Cabin Floor Panels from FR12 thru
FR24

3. __________
Job Set-up

R Subtask 05-22-20-010-055-A

R A. Get Access

R (1) Put an access platform in position at zones 221 and 222.

R (2) Open the FWD passenger/crew doors 831 and 841 (Ref. TASK 52-10-00-
R 010-001).

R (3) Remove the toilets (Ref. TASK 25-41-41-000-001), (Ref. TASK 25-41-42-
R 000-001) and (Ref. TASK 25-41-44-000-001).

R (4) Remove the galleys (Ref. TASK 25-31-41-000-001) and (Ref. TASK 25-31-
R 41-000-002).

R (5) Remove the wall-mounted cabin-attendant seat (Ref. TASK 25-22-41-000-


R 001).

R (6) Remove the curtain (Ref. TASK 25-26-41-000-001).

R (7) Remove the floor panels (Ref. TASK 53-12-12-000-001).

R (8) Remove the door frame linings:


R 221AW, 221BW, 221CW,
R 221EW, 221FW, 221RW,
R 221SW, 221VW.
R (Ref. TASK 25-23-45-000-005)

R (9) Remove the door frame linings:


R 222RW, 222SW, 222VW,
R 222UW, 222TW.
R (Ref. TASK 25-23-45-000-002)



EFF :

ALL  05-22-20

Page 602
Aug 01/05
 
JSA 
4. Procedure
_________

Subtask 05-22-20-210-055

A. Inspection

(1) Do a general visual inspection of the forward-cabin utility area.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

R Subtask 05-22-20-410-055-A

R A. Close Access

R (1) Install the door frame linings:


R 221AW, 221BW, 221CW,
R 221EW, 221FW, 221RW,
R 221SW, 221VW.
R (Ref. TASK 25-23-45-400-006).

R (2) Install the door frame linings:


R 222RW, 222SW, 222VW,
R 222UW, 222TW.
R (Ref. TASK 25-23-45-400-007).

R (3) Install the floor panels (Ref. TASK 53-12-12-400-001).

R (4) Install the curtain (Ref. TASK 25-26-41-400-001).

R (5) Install the wall-mounted cabin-attendant seat (Ref. TASK 25-22-41-


R 400-001).

R (6) Install the galleys (Ref. TASK 25-31-41-400-001) and (Ref. TASK 25-
R 31-41-400-002).

R (7) Install the toilet (Ref. TASK 25-41-41-400-001), (Ref. TASK 25-41-42-
R 400-001) and (Ref. TASK 25-41-44-400-001).



EFF :

ALL  05-22-20

Page 603
Aug 01/05
 
JSA 
R (8) Close the FWD passenger-crew doors 831 and 841 (Ref. TASK 52-10-00-
R 410-001).

R (9) Remove the access platform(s).



EFF :

ALL  05-22-20

Page 604
Aug 01/05
 
JSA 
TASK 05-22-20-200-003

R Zonal Inspection of the FWD Cabin Utility Area Overhead Compartment


R

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-223-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-42-000-001 Removal of the Ceiling Panels - Forward Utility Area


25-23-42-400-001 Installation of the Ceiling Panels - Forward Utility
Area
25-24-41-000-001 Removal of the Overhead Stowage Compartments
25-27-44-400-002 Installation of a Stowage FWD LH (Zone 231)
25-31-41-000-001 Removal of the FWD Galley Unit (6475MM)
25-31-41-000-002 Removal of the FWD Galley Unit (6478MM or 6479MM)
25-31-41-400-001 Installation of the FWD Galley Unit (6475MM)
25-31-41-400-002 Installation of the FWD Galley Unit (6478MM or
6479MM)
25-41-41-000-001 Removal of the Lavatory A
25-41-41-400-001 Installation of the Lavatory A
25-41-42-000-001 Removal of the Lavatory B
25-41-42-400-001 Installation of the Lavatory B
25-41-44-000-001 Removal of the Lavatory H
25-41-44-400-001 Installation of the Lavatory H

3. __________
Job Set-up

Subtask 05-22-20-010-052

A. Get Access

(1) Remove the toilet


(Ref. TASK 25-41-41-000-001),
(Ref. TASK 25-41-42-000-001),
(Ref. TASK 25-41-44-000-001).

(2) Remove the galleys


(Ref. TASK 25-31-41-000-001), (Ref. TASK 25-31-41-000-002).



EFF :

ALL  05-22-20

Page 605
Aug 01/05
 
JSA 
(3) Remove the overhead stowage compartment, if installed in zone 220
(Ref. TASK 25-24-41-000-001).

(4) Remove the ceiling panels:


221AC, 221BC, 222BC (Ref. TASK 25-23-42-000-001).

4. Procedure
_________

Subtask 05-22-20-210-052

A. Inspection

(1) Do a general visual inspection of the forward-cabin overhead


compartment (Zones 223 and 224).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-22-20-410-052

A. Close Access

(1) Install the ceiling panels:


221AC, 221BC, 222BC (Ref. TASK 25-23-42-400-001).

(2) Install the overhead stowage compartment, if installed in zone 220.


(Ref. TASK 25-27-44-400-002)

(3) Install the galleys (Ref. TASK 25-31-41-400-001) and (Ref. TASK 25-
31-41-400-002).

(4) Install the toilets, if removed:


(Ref. TASK 25-41-41-400-001),
(Ref. TASK 25-41-42-400-001),
(Ref. TASK 25-41-44-400-001).



EFF :

ALL  05-22-20

Page 606
Feb 01/05
R  
JSA 
ZONAL INSPECTION : FORWARD PASSENGER COMPARTMENT - INSPECTION/CHECK
___________________________________________________________________

TASK 05-22-30-200-001

Zonal Inspection of the Forward Passenger Compartment (Zones 231 and 232)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-231-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.5 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-43-000-001 Removal of the Upper Sidewall Panel(s)


25-23-43-400-001 Installation of the Upper Sidewall Panel(s)
25-23-44-000-001 Removal of the Lower Sidewall-Panels (Dado Panels)
25-23-44-400-001 Installation of the Lower Sidewall-Panels (Dado
Panels)
25-23-45-000-002 Removal of the Door Frame Linings at the Right FWD
Passenger/Crew Door
25-23-45-000-005 Removal of the Door Frame Linings at the Left FWD
Passenger/Crew Door
25-23-45-400-006 Installation of the Door Frame Linings at the Left
FWD Passenger/Crew Door
25-23-45-400-007 Installation of the Door Frame Linings at the Right
FWD Passenger/Crew Door
25-23-48-000-001 Removal of the Cove Light Panels
25-23-48-400-001 Installation of the Cove Light Panels
05-22-30-991-001 Fig. 601
05-22-30-991-002 Fig. 602



EFF :

ALL  05-22-30

Page 601
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-22-30-010-050

A. Get Access

(1) Put an access platform in position at the zones 231 and 232.

R (2) Remove the sidewall panels:


R 231AW, 231BW, 231CW, (Ref. TASK 25-23-45-000-005), 232AW, 232BW,
R 232CW, (Ref. TASK 25-23-45-000-002),
R 231DW, 231GW, 231KW, 231NW, 231RW, 231UW, 231XW, 232DW, 232GW, 232KW,
R 232NW, 232RW, 232UW, 232XW, (Ref. TASK 25-23-44-000-001),
R 231EW, 231HW, 231LW, 231PW, 231SW, 231VW, 231YW, 232EW, 232HW, 232LW,
R 232PW, 232SW, 232VW, 232YW, (Ref. TASK 25-23-43-000-001),
R 231FW, 231JW, 231MW, 231QW, 231TW, 231WW, 231ZW, 232FW, 232JW, 232MW,
R 232QW, 232TW, 232WW, 232ZW, (Ref. TASK 25-23-48-000-001).
(Ref. Fig. 601/TASK 05-22-30-991-001, 602/TASK 05-22-30-991-002)

4. Procedure
_________

Subtask 05-22-30-210-050

A. Inspection

(1) Do a general visual inspection of the forward passenger compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
R correct general visual inspection as necessary without removal
R of the wiring and ducting.



EFF :

ALL  05-22-30

Page 602
Aug 01/06
 
JSA 
R Sidewall and Ceiling Panels of the Passenger Compartment (Zones 231-232)
Figure 601/TASK 05-22-30-991-001



EFF :

ALL  05-22-30

Page 603
Aug 01/06
 
JSA 
Sidewall Panels of the Passenger Compartment (Zone 232)
Figure 602/TASK 05-22-30-991-002



EFF :

ALL  05-22-30

Page 604
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-22-30-410-050

A. Close Access

(1) Install the sidewall panels:


R 231FW, 231JW, 231MW, 231QW, 231TW, 231WW, 231ZW, 232DW, 232GW, 232KW,
R 232NW, 232RW, 232UW, 232PX, 232SX, 232VX, (Ref. TASK 25-23-48-400-
001),
R 231EW, 231HW, 231LW, 231PW, 231SW, 231VW, 231YW, 232EW, 232HW, 232LW,
R 232PW, 232SW, 232VW, 232YW, (Ref. TASK 25-23-43-400-001),
R 231DW, 231GW, 231KW, 231NW, 231RW, 231UW, 231XW, 232DW, 232GW, 232KW,
R 232NW, 232RW, 232UW, 232XW, (Ref. TASK 25-23-44-400-001),
R 231AW, 231BW, 231CW, (Ref. TASK 25-23-45-400-006), 232AW, 232BW,
R 232CW, (Ref. TASK 25-23-45-400-007).
(Ref. Fig. 601/TASK 05-22-30-991-001, 602/TASK 05-22-30-991-002)

(2) Remove the access platform(s).



EFF :

ALL  05-22-30

Page 605
Aug 01/06
 
JSA 
TASK 05-22-30-200-003

Zonal Inspection of the Overhead Compartment of the Forward Passenger


Compartment (Zones 233 and 234)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-233-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-41-000-001 Removal of the Ceiling Panels


25-23-41-400-001 Installation of the Ceiling Panels
25-24-41-000-001 Removal of the Overhead Stowage Compartments
25-24-41-400-001 Installation of the Overhead Stowage Compartments
25-32-41-000-001 Removal of the MID RH Galley Unit (7000MM)
25-32-41-400-001 Installation of the MID RH Galley Unit (7000MM)
25-42-41-000-001 Removal of the Lavatory H
25-42-41-400-001 Installation of the Lavatory H
05-22-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-22-30-010-052

A. Get Access

(1) Remove the toilet, if installed (Ref. TASK 25-42-41-000-001).

(2) Remove the galley, if installed (Ref. TASK 25-32-41-000-001).

(3) Remove the overhead stowage compartments (Ref. TASK 25-24-41-000-


001).

(4) Remove the ceiling panels


231AC, 231BC, 231CC,
231DC, 231EC, 231FC,
231GC, 231HC, 232AC.
(Ref. TASK 25-23-41-000-001) and
(Ref. Fig. 601/TASK 05-22-30-991-001)



EFF :

ALL  05-22-30

Page 606
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-22-30-210-052

A. Inspection

(1) Do a general visual inspection of the overhead stowage compartments


of the forward passenger compartment (Zones 233 and 234).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
R correct general visual inspection as necessary without removal
R of the wiring and ducting.

5. Close-up
________

Subtask 05-22-30-410-052

A. Close Access

(1) Install the ceiling panels


231AC, 231BC, 231CC,
231DC, 231EC, 231FC,
231GC, 231HC, 232AC.
(Ref. TASK 25-23-41-400-001)

(2) Install the overhead stowage compartments (Ref. TASK 25-24-41-400-


001).

(3) Install the galley, if removed (Ref. TASK 25-32-41-400-001).

(4) Install the toilet, if removed (Ref. TASK 25-42-41-400-001).



EFF :

ALL  05-22-30

Page 607
Aug 01/06
 
JSA 
TASK 05-22-30-200-008

Zonal Inspection of the Floor Structure of the Forward Passenger Compartment


(Zones 231 and 232)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-231-04

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-21-41-000-001 Removal of the Passenger Seats


25-21-41-400-001 Installation of the Passenger Seats
25-26-41-000-012 Removal of the MID Curtain Rail
25-26-41-400-012 Installation of the MID Curtain Rail
25-27-44-000-002 Removal of a Stowage FWD LH (Zone 231)
25-27-44-000-003 Removal of a Stowage FWD RH (Zone 232)
25-27-44-400-002 Installation of a Stowage FWD LH (Zone 231)
25-27-44-400-003 Installation of a Stowage FWD RH (Zone 232)
25-27-46-000-001 Removal of a Doghouse
25-27-46-400-001 Installation of a Doghouse
53-22-12-000-001 Removal of the Cabin Floor Panels
53-22-12-400-001 Installation of the Cabin Floor Panels

3. __________
Job Set-up

Subtask 05-22-30-010-056

A. Get Access

(1) Remove the seats from FR20 to FR35


(Ref. TASK 25-21-41-000-001).

(2) Remove the curtains


(Ref. TASK 25-26-41-000-012).

(3) Remove the stowages 6575MM and 6576MM


(Ref. TASK 25-27-44-000-002) and (Ref. TASK 25-27-44-000-003).

(4) Remove the dog house, if installed (Ref. TASK 25-27-46-000-001)



EFF :

ALL  05-22-30

Page 608
Feb 01/05
R  
JSA 
(5) Remove the floor panels from FR20 to FR35
(Ref. TASK 53-22-12-000-001).

4. Procedure
_________

Subtask 05-22-30-210-056

A. Inspection

(1) Do a general visual inspection of the floor structure of the forward


passenger compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-22-30-410-056

A. Close Access

(1) Install the floor panels from FR20 to FR35


(Ref. TASK 53-22-12-400-001).

(2) Install the dog house, if removed


(Ref. TASK 25-27-46-400-001).

(3) Install the stowages 6575MM and 6576MM


(Ref. TASK 25-27-44-400-002), (Ref. TASK 25-27-44-400-003).

(4) Install the curtain


(Ref. TASK 25-26-41-400-012).

(5) Install the seats from FR20 TO FR35


(Ref. TASK 25-21-41-400-001).



EFF :

ALL  05-22-30

Page 609
Feb 01/05
R  
JSA 
ZONAL INSPECTION : MID PASSENGER COMPARTMENT - INSPECTION/CHECK
_______________________________________________________________

TASK 05-22-40-200-001

Zonal Inspection of the Center Passenger Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-241-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

R 25-23-43-000-001 Removal of the Upper Sidewall Panel(s)


25-23-43-400-001 Installation of the Upper Sidewall Panel(s)
25-23-44-000-001 Removal of the Lower Sidewall-Panels (Dado Panels)
25-23-44-400-001 Installation of the Lower Sidewall-Panels (Dado
Panels)
25-23-47-000-002 Removal of the Upper Sidewall Panel Assy 241LW,
(242LW), 241CW, (242CW) and 241FW, (242FW)
25-23-47-400-002 Installation of the Upper Sidewall Panel Assy 241LW,
(242LW), 241CW, (242CW) and 241FW, (242FW)
25-23-48-000-001 Removal of the Cove Light Panels
25-23-48-400-001 Installation of the Cove Light Panels
05-22-40-991-001 Fig. 601
05-22-40-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-22-40-010-050

A. Get Access

(1) Remove the sidewall panels:


(Ref. Fig. 601/TASK 05-22-40-991-001, 602/TASK 05-22-40-991-002)
241CW,
242CW (Ref. TASK 25-23-47-000-002),
241LW,
242LW (Ref. TASK 25-23-47-000-002),
241AW, 241EW, 241JW,
241NW, 241RW, 241UW,
242AW, 242EW, 242JW,



EFF :

ALL  05-22-40

Page 601
Feb 01/06
 
JSA 
R Sidewall and Ceiling Panels of the Center Passenger Compartment
Figure 601/TASK 05-22-40-991-001



EFF :

ALL  05-22-40

Page 602
May 01/05
 
JSA 
Sidewall Panels of the Passenger Compartment (Zone 242)
Figure 602/TASK 05-22-40-991-002



EFF :

ALL  05-22-40

Page 603
Nov 01/04
 
JSA 
242NW, 242RW, 242UW
(Ref. TASK 25-23-44-000-001),
241PW, 241SW, 241VW,
242PW, 242SW, 242VW
R (Ref. TASK 25-23-43-000-001),
241DW, 241HW, 241MW,
241QW, 241TW, 241WW,
242DW, 242HW, 242MW,
242QW, 242TW, 242WW
(Ref. TASK 25-23-48-000-001).

4. Procedure
_________

Subtask 05-22-40-210-050

A. Inspection

(1) Do a general visual inspection of the center passenger compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-22-40-410-050

A. Close Access

(1) Install the sidewall panels:


241DW, 241HW, 241MW,
241QW, 241TW, 241WW,
242DW, 242HW, 242MW,
242QW, 242TW, 242WW
(Ref. TASK 25-23-48-400-001),
241PW, 241SW, 241VW,
242PW, 242SW, 242VW
(Ref. TASK 25-23-43-400-001),
241AW, 241EW, 241JW,
241NW, 241RW, 241UW,
242AW, 242EW, 242JW,
242NW, 242RW, 242UW
(Ref. TASK 25-23-44-400-001),
241PW, 241SW, 241VW,
242PW, 242SW, 242VW
(Ref. TASK 25-23-43-400-001),



EFF :

ALL  05-22-40

Page 604
Feb 01/06
 
JSA 
R 241CW,
R 242CW
R (Ref. TASK 25-23-47-400-002),
R 241LW,
R 242LW
R (Ref. TASK 25-23-47-400-002).



EFF :

ALL  05-22-40

Page 605
May 01/05
 
JSA 
TASK 05-22-40-200-003

Zonal Inspection of Center Passenger Overhead Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-243-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.50 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-41-000-001 Removal of the Ceiling Panels


25-23-41-400-001 Installation of the Ceiling Panels
25-24-41-000-001 Removal of the Overhead Stowage Compartments
25-24-41-400-001 Installation of the Overhead Stowage Compartments
25-32-41-000-001 Removal of the MID RH Galley Unit (7000MM)
25-32-41-400-001 Installation of the MID RH Galley Unit (7000MM)
25-42-41-000-001 Removal of the Lavatory H
25-42-41-400-001 Installation of the Lavatory H
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
05-22-40-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-22-40-010-052

A. Get Access

R (1) Put an access platform in position at zone 832 (842).

(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).



EFF :

ALL  05-22-40

Page 606
May 01/05
 
JSA 
(3) Remove the toilet, if installed
(Ref. TASK 25-42-41-000-001).

(4) Remove the galley, if installed


(Ref. TASK 25-32-41-000-001).

(5) Remove the overhead stowage compartments, if installed in zone 240


(Ref. TASK 25-24-41-000-001).

(6) Remove the ceiling panels 241AC, 241BC, 241CC, 241DC, 241EC, 241FC
(Ref. TASK 25-23-41-000-001).
(Ref. Fig. 601/TASK 05-22-40-991-001)

4. Procedure
_________

Subtask 05-22-40-210-052

A. Inspection

(1) Do a general visual inspection of the center passenger overhead


compartment (zones 243 and 244).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
R correct general visual inspection as necessary without removal
R of the wiring and ducting.

5. Close-up
________

Subtask 05-22-40-410-052

A. Close Access

(1) Install the ceiling panels:


241AC, 241BC, 241CC, 241DC, 241EC, 241FC
(Ref. TASK 25-23-41-400-001).

(2) Install the overhead stowage compartments, if removed


(Ref. TASK 25-24-41-400-001).

(3) Install the galley, if removed


(Ref. TASK 25-32-41-400-001).



EFF :

ALL  05-22-40

Page 607
Aug 01/06
 
JSA 
(4) Install the toilet, if removed
(Ref. TASK 25-42-41-400-001).

(5) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).

(6) Remove the access platform(s).


R

EFF :

ALL  05-22-40

Page 608
Aug 01/06
 
JSA 
TASK 05-22-40-200-008

Zonal Inspection of the Floor Structure of the Center Passenger Compartment


(Zones 241 and 242)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-241-04

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-21-41-000-001 Removal of the Passenger Seats


25-21-41-400-001 Installation of the Passenger Seats
53-32-12-000-002 Removal of the Cabin Floor Panels
53-32-12-400-002 Installation of the Cabin Floor Panels

3. __________
Job Set-up

Subtask 05-22-40-010-057

A. Get Access

(1) Remove the seats from FR35 to FR47


(Ref. TASK 25-21-41-000-001).

(2) Remove the floor panels from FR35 to FR47


(Ref. TASK 53-32-12-000-002).

4. Procedure
_________

Subtask 05-22-40-210-057

A. Inspection

(1) Do a general visual inspection of the floor structure of the center


passenger compartment.

(2) Make sure that there are no signs of corrosion, cracks of damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-22-40

Page 609
Feb 01/05
R  
JSA 
5. Close-up
________

Subtask 05-22-40-410-057

A. Close Access

(1) Install the floor panels from FR35 to FR47


(Ref. TASK 53-32-12-400-002).

(2) Install the seats from FR35 to FR47


(Ref. TASK 25-21-41-400-001).



EFF :

ALL  05-22-40

Page 610
Feb 01/05
R  
JSA 
ZONAL INSPECTION : AFT PASSENGER COMPARTMENT - INSPECTION/CHECK
_______________________________________________________________

TASK 05-22-50-200-001

Zonal Inspection of Aft Passenger Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-251-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.50 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-43-000-001 Removal of the Upper Sidewall Panel(s)


25-23-43-400-001 Installation of the Upper Sidewall Panel(s)
25-23-44-000-001 Removal of the Lower Sidewall-Panels (Dado Panels)
25-23-44-400-001 Installation of the Lower Sidewall-Panels (Dado
Panels)
25-23-48-000-001 Removal of the Cove Light Panels
25-23-48-400-001 Installation of the Cove Light Panels
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
05-22-50-991-001 Fig. 601
05-22-50-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-22-50-010-050

A. Get Access

(1) Put an access platform in position at the zone 832 (842).

(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).



EFF :

ALL  05-22-50

Page 601
Nov 01/04
 
JSA 
(3) Remove the sidewall panels:
251AW, 251DW, 251GW,
251KW, 251NW, 251RW
251UW, 251XW, 251AX
252AW, 252DW, 252GW
252KW, 252NW, 252RW
252UW, 252XW, 252AX.
(Ref. TASK 25-23-44-000-001)
251BW, 251EW, 251HW,
251LW, 251PW, 251SW,
251BX, 251VW, 251YW,
252BW, 252EW, 252HW,
252LW, 252PW, 252SW,
252BX, 252VW, 252YW,
(Ref. TASK 25-23-43-000-001)
251CW, 251FW, 251JW,
251MW, 251QW, 251TW,
251WW, 251ZW, 251CX
252CW, 252FW, 252JW,
252MW, 252QW, 252TW,
252WW, 252ZW, 252CX
(Ref. TASK 25-23-48-000-001).
(Ref. Fig. 601/TASK 05-22-50-991-001, 602/TASK 05-22-50-991-002)

4. Procedure
_________

Subtask 05-22-50-210-050

A. Inspection

(1) Do a general visual inspection of the aft passenger compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.



EFF :

ALL  05-22-50

Page 602
Nov 01/04
 
JSA 
Sidewall and Ceiling Panels of the Aft Passenger Compartment (Zone 251)
Figure 601/TASK 05-22-50-991-001



EFF :

ALL  05-22-50

Page 603
Nov 01/04
 
JSA 
Sidewall Panels of the Passenger Compartment (Zone 252)
Figure 602/TASK 05-22-50-991-002



EFF :

ALL  05-22-50

Page 604
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-22-50-410-050

A. Close Access

(1) Install the sidewall panels:


251CW, 251FW, 251JW,
251MW, 251QW, 251TW,
251WW, 251ZW, 251CX
252CW, 252FW, 252JW,
252MW, 252QW, 252TW,
252WW, 252ZW, 252CX,
(Ref. TASK 25-23-48-400-001).
251BW, 251EW, 251HW,
251LW, 251PW, 251SW,
251SW, 251VW, 251YW,
251BX,
252BW, 252EW, 252HW,
252LW, 252PW, 252SW,
252SW, 252VW, 252YW,
252BX.
(Ref. TASK 25-23-43-400-001)
251AW, 251DW, 251GW
251KW, 251NW, 251RW
251UW, 251XW, 251AX
252AW, 252DW, 252GW
252KW, 252NW, 252RW
252UW, 252XW, 252AX
(Ref. TASK 25-23-44-400-001)

(2) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).

(3) Remove the access platform(s).



EFF :

ALL  05-22-50

Page 605
Nov 01/04
 
JSA 
TASK 05-22-50-200-003

Zonal Inspection of Aft Passenger Overhead Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-253-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.50 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-41-000-001 Removal of the Ceiling Panels


25-23-41-400-001 Installation of the Ceiling Panels
25-24-41-000-001 Removal of the Overhead Stowage Compartments
25-24-41-400-001 Installation of the Overhead Stowage Compartments
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
05-22-50-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-22-50-010-052

A. Get Access

R (1) Put an access platform in position at zone 832 (842).

(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).

(3) Remove the lavatories, if installed.

(4) Remove the galleys, if installed.



EFF :

ALL  05-22-50

Page 606
May 01/05
 
JSA 
(5) Remove the overhead stowage compartments (Ref. TASK 25-24-41-000-
001).

(6) Remove the ceiling panels:


(Ref. Fig. 601/TASK 05-22-50-991-001)
251AC, 251BC, 251CC,
251DC, 251EC, 251FC,
251GC, 251HC, 251JC
(Ref. TASK 25-23-41-000-001).

4. Procedure
_________

Subtask 05-22-50-210-052

A. Inspection

(1) Do a general visual inspection of the aft passenger overhead


compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
R correct general visual inspection as necessary without removal
R of the wiring and ducting.

5. Close-up
________

Subtask 05-22-50-410-052

A. Close Access

(1) Install the ceiling panels:


251AC, 251BC, 251CC,
251DC, 251EC, 251FC,
251GC, 251HC, 251JC
(Ref. TASK 25-23-41-400-001).

(2) Install the overhead stowage compartments (Ref. TASK 25-24-41-400-


001).

(3) Install the galleys, if removed.

(4) Install the lavatories, if removed.

(5) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).

(6) Remove the access platform(s).



EFF :

ALL  05-22-50

Page 607
Aug 01/06
 
JSA 
INTENTIONALLY BLANK


R



 05-22-50

Page 608
May 01/05
 
JSA 
TASK 05-22-50-200-008

Zonal Inspection of Aft Passenger Compartment Including Floor Structure

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-251-04

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.50 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-10-00-010-001 Opening of the Passenger/Crew Door


52-10-00-410-001 Closing of the Passenger/Crew Door
53-42-12-000-001 Removal of the Cabin Floor Panels at FR47 thru FR64
53-42-12-400-001 Installation of the Cabin Floor Panels at FR47 thru
FR64

3. __________
Job Set-up

Subtask 05-22-50-010-057

A. Get Access

(1) Put an access platform in position at the zone 832 (842).

(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).

(3) Remove the toilets, if installed in zone 250.

(4) Remove the galleys, if installed in zone 250.

(5) Remove the floor panels between FR47 and FR64 (Ref. TASK 53-42-12-
000-001).



EFF :

ALL  05-22-50

Page 609
Feb 01/05
R  
JSA 
4. Procedure
_________

Subtask 05-22-50-210-057

A. Inspection

(1) Do a general visual inspection of the aft passenger compartment. This


inspection includes the floor structure.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-22-50-410-057

A. Close Access

(1) Install the floor panels between FR47 and FR64 (Ref. TASK 53-42-12-
400-001).

(2) Install the galleys, if removed.

(3) Install the toilets, if removed.

(4) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).

(5) Remove the access platform(s).



EFF :

ALL  05-22-50

Page 610
Feb 01/05
R  
JSA 
ZONAL INSPECTION : AFT CABIN UTILITY AREA - INSPECTION/CHECK
____________________________________________________________

TASK 05-22-60-200-003

Zonal Inspection of the Overhead Compartment of the Aft Cabin (Zones 263 and
264)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-263-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-42-000-002 Removal of the Ceiling Panels - Aft Utility Area


25-23-42-400-002 Installation of the Ceiling Panels - Aft Utility Area
25-24-41-000-001 Removal of the Overhead Stowage Compartments
25-24-41-400-001 Installation of the Overhead Stowage Compartments
R 25-33-41-000-001 Removal of the Aft Galley Unit (6480MM)
R 25-33-41-000-002 Removal of the Aft Galley Unit (6481MM or 6483MM)
R 25-33-41-400-001 Installation of the Aft Galley Unit (6480MM)
R 25-33-41-400-002 Installation of the Aft Galley Unit (6481MM or
6483MM)
25-43-41-000-001 Removal of the Lavatory D
25-43-41-400-001 Installation of the Lavatory D
25-43-42-000-001 Removal of the Lavatory E
25-43-42-400-001 Installation of the Lavatory E
25-43-43-000-001 Removal of the Lavatory F
25-43-43-400-001 Installation of the Lavatory F
25-43-44-000-001 Removal of the Lavatory H
25-43-44-400-001 Installation of the Lavatory H

3. __________
Job Set-up

Subtask 05-22-60-010-052

A. Get Access

(1) Remove the toilets, if installed


(Ref. TASK 25-43-41-000-001) or (Ref. TASK 25-43-42-000-001),
(Ref. TASK 25-43-43-000-001) or (Ref. TASK 25-43-44-000-001).



EFF :

ALL  05-22-60

Page 601
Feb 01/07
 
JSA 
(2) Remove the galleys, if installed (Ref. TASK 25-33-41-000-001) or
(Ref. TASK 25-33-41-000-002).

(3) Remove the overhead stowage compartments, if installed (Ref. TASK 25-
24-41-000-001).

(4) Remove the ceiling panels:


261CC, 261BC, 262BC,
262CC. (Ref. TASK 25-23-42-000-002)

4. Procedure
_________

Subtask 05-22-60-210-052

A. Inspection

(1) Do a general visual inspection of the overhead compartment of the aft


cabin (Zones 263 and 264).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
R correct general visual inspection as necessary without removal
R of the wiring and ducting.

5. Close-up
________

Subtask 05-22-60-410-052

A. Close Access

(1) Install the ceiling panels:


261CC, 261BC, 262BC,
262CC (Ref. TASK 25-23-42-400-002).

(2) Install the overhead stowage compartments, if removed (Ref. TASK 25-
24-41-400-001).

(3) Install the toilets, if removed


(Ref. TASK 25-43-41-400-001) or (Ref. TASK 25-43-42-400-001),
(Ref. TASK 25-43-43-400-001) or (Ref. TASK 25-43-44-400-001).

(4) Install the galleys, if removed (Ref. TASK 25-33-41-400-001) or


(Ref. TASK 25-33-41-400-002).



EFF :

ALL  05-22-60

Page 602
Aug 01/06
 
JSA 
TASK 05-22-60-200-004

Zonal Inspection of the Aft Cabin Utility Area (zones 261 and 262)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-261-02

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-22-41-000-001 Removal of the Wall-Mounted Cabin-Attendant Seats


25-22-41-400-001 Installation of the Wall-Mounted Cabin-Attendant
Seats
25-22-42-000-001 Removal of the Free-Standing Cabin-Attendant Seat(s)
25-22-42-400-001 Installation of the Free-Standing Cabin-Attendant
Seat(s)
25-22-43-000-001 Removal of the Cabin Attendant Swivel-Seat
25-22-43-400-001 Installation of the Cabin Attendant Swivel-Seat
25-23-45-000-003 Removal of the Door Frame Linings at the Left AFT
Passenger/Crew Door
25-23-45-000-004 Removal of the Door Frame Linings at the Right AFT
Passenger/Crew Door
25-23-45-400-005 Installation of the Door Frame Linings at the Right
AFT Passenger/Crew Door
25-23-45-400-006 Installation of the Door Frame Linings at the Left
FWD Passenger/Crew Door
25-26-41-000-003 Removal of the Aft Curtain Rail
25-26-41-400-003 Installation of the Aft Curtain Rail
25-27-15-000-001 Removal of an Emergency Equipment Stowage
25-27-15-400-001 Installation of an Emergency Equipment Stowage
25-27-44-000-005 Removal of a Stowage MID RH (Zone 231/241)
25-27-44-400-005 Installation of a Stowage MID RH (Zone 231/241)
25-27-46-000-001 Removal of a Doghouse
25-27-46-400-001 Installation of a Doghouse
R 25-33-41-000-001 Removal of the Aft Galley Unit (6480MM)
R 25-33-41-000-002 Removal of the Aft Galley Unit (6481MM or 6483MM)
R 25-33-41-400-001 Installation of the Aft Galley Unit (6480MM)
R 25-33-41-400-002 Installation of the Aft Galley Unit (6481MM or
6483MM)
25-43-41-000-001 Removal of the Lavatory D
25-43-41-400-001 Installation of the Lavatory D



EFF :

ALL  05-22-60

Page 603
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-43-42-000-001 Removal of the Lavatory E


25-43-42-400-001 Installation of the Lavatory E
25-43-43-000-001 Removal of the Lavatory F
25-43-43-400-001 Installation of the Lavatory F
25-43-44-000-001 Removal of the Lavatory H
25-43-44-400-001 Installation of the Lavatory H
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
53-42-12-000-002 Removal of the Cabin Floor Panels at FR64 thru FR70
53-42-12-400-002 Installation of the Cabin Floor Panels at FR64 thru
FR70

3. __________
Job Set-up

R Subtask 05-22-60-010-053-A

R A. Get Access

R (1) Open the aft passenger/crew doors 832 and 842


R (Ref. TASK 52-10-00-010-001).

R (2) Remove the wall-mounted cabin-attendant seat, if installed


R (Ref. TASK 25-22-41-000-001).

R (3) Remove the cabin-attendant free-standing seat, if installed


R (Ref. TASK 25-22-42-000-001).

R (4) Remove the cabin-attendant swivel seat, if installed


R (Ref. TASK 25-22-43-000-001).

R (5) Remove the curtain


R (Ref. TASK 25-26-41-000-003).

R (6) Remove the left and right emergency equipment stowages


R (Ref. TASK 25-27-15-000-001).

R (7) Remove the stowage, if installed


R (Ref. TASK 25-27-44-000-005).

R (8) Remove the dog house, if installed


R (Ref. TASK 25-27-46-000-001).



EFF :

ALL  05-22-60

Page 604
Feb 01/07
 
JSA 
R (9) Remove the toilets, if installed
R (Ref. TASK 25-43-41-000-001) or (Ref. TASK 25-43-42-000-001)
R (Ref. TASK 25-43-43-000-001) or (Ref. TASK 25-43-44-000-001).

R (10) Remove the galley, if installed


R (Ref. TASK 25-33-41-000-001) or (Ref. TASK 25-33-41-000-002).

R (11) Remove the floor panels


R (Ref. TASK 53-42-12-000-002).

R (12) Remove the access panels


R 261VW, 261UW,
R 261TW, 261WW,
R (Ref. TASK 25-23-45-000-003).
R 262VW, 262UW,
R 262TW, 262WW,
R (Ref. TASK 25-23-45-000-004).

4. Procedure
_________

Subtask 05-22-60-210-053

A. Inspection

(1) Do a general visual inspection of the aft-cabin utility areas (Zones


261 and 262).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring) are attached correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

R Subtask 05-22-60-410-053-A

R A. Close Access

R (1) Close the access panels:


R 261VW, 261UW,
R 261TW, 261WW,
R (Ref. TASK 25-23-45-400-006).
R 262VW, 262UW,
R 262TW, 262WW,
R (Ref. TASK 25-23-45-400-005).



EFF :

ALL  05-22-60

Page 605
Feb 01/07
 
JSA 
R (2) Install the floor panels
R (Ref. TASK 53-42-12-400-002).

R (3) Install the galley, if removed


R (Ref. TASK 25-33-41-400-001) or (Ref. TASK 25-33-41-400-002).

R (4) Install the toilets, if removed


R (Ref. TASK 25-43-41-400-001) or (Ref. TASK 25-43-42-400-001)
R (Ref. TASK 25-43-43-400-001) or (Ref. TASK 25-43-44-400-001).

R (5) Install the dog house, if removed


R (Ref. TASK 25-27-46-400-001).

R (6) Install the stowage, if removed


R (Ref. TASK 25-27-44-400-005).

R (7) Install the left and right emergency equipment stowages


R (Ref. TASK 25-27-15-400-001).

R (8) Install the curtain


R (Ref. TASK 25-26-41-400-003).

R (9) Install the cabin-attendant swivel seat, if removed


R (Ref. TASK 25-22-43-400-001).

R (10) Install the cabin-attendant free-standing seat, if removed


R (Ref. TASK 25-22-42-400-001).

R (11) Install the wall-mounted cabin-attendant seat, if removed


R (Ref. TASK 25-22-41-400-001).

R (12) Close the aft passenger/crew doors 832 and 842


R (Ref. TASK 52-10-00-410-001).



EFF :

ALL  05-22-60

Page 606
Feb 01/07
 
JSA 
ZONAL INSPECTION : STABILIZERS AND CONE/REAR FUSELAGE - INSPECTION/CHECK
________________________________________________________________________

TASK 05-23-00-200-001

Zonal Inspection as far as visible from the ground of the Stabilizers and the
Cone/Rear Fuselage

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-23-00-869-050

A. Not Applicable

4. Procedure
_________

Subtask 05-23-00-210-050

A. Inspection

(1) Do a general visual inspection of the stabilizers and the tail unit
from ground.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-23-00

Page 601
Nov 01/04
 
JSA 
TASK 05-23-00-200-002

R Zonal Inspection of Stabilizers and Cone/Rear Fuselage

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-300-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 4 m (13 ft. 1 in.)

3. __________
Job Set-up

Subtask 05-23-00-010-050

A. Get Access

R (1) Put an access platform in position at zone 300.

4. Procedure
_________

Subtask 05-23-00-210-051

A. Inspection

R (1) Do a general visual inspection of the stabilizers and cone.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Do a visual inspection of the drain holes at the inner side of the
R lower surface of the THS.

R (4) Make sure that the drain holes are not blocked.



EFF :

ALL  05-23-00

Page 602
May 01/05
 
JSA 
5. Close-up
________

Subtask 05-23-00-410-050

A. Close Access

(1) Remove the access platform(s).



EFF :

ALL  05-23-00

Page 603
Nov 01/04
 
JSA 
_____________________________________________________________________
ZONAL INSPECTION : FUSELAGE TAIL SECTION AFT OF AFT PRESSURE BULKHEAD
________________
INSPECTION/CHECK

TASK 05-23-10-200-001

Zonal Inspection of the Tail Section of the Aft Fuselage (Zones 311 and 312)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-311-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.50 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-23-10-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-23-10-010-050

A. Get Access

(1) Put an access platform in position at the zone 310.

(2) Open the access doors:


312AR, 314AR.
(Ref. Fig. 601/TASK 05-23-10-991-001)



EFF :

ALL  05-23-10

Page 601
Nov 01/04
 
JSA 
Access Provision of the Aft Fuselage Tail Section
Figure 601/TASK 05-23-10-991-001



EFF :

ALL  05-23-10

Page 602
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-10-210-050

A. Inspection

(1) Do a general visual inspection of the tail section of the aft


fuselage (Zones 311 and 312).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-10-410-050

A. Close Access

(1) Close the access doors:


312AR, 314AR.

(2) Remove the access platform(s).



EFF :

ALL  05-23-10

Page 603
Nov 01/04
 
JSA 
TASK 05-23-10-200-002

Zonal Inspection of the Air Intake Area of the APU on the Tail Cone (Zones 313
and 314)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-313-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.50 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-23-10-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-23-10-010-051

A. Get Access

(1) Put an access platform in position at the zone 310.

(2) Open the access door 314AR.


(Ref. Fig. 601/TASK 05-23-10-991-001)



EFF :

ALL  05-23-10

Page 604
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-10-210-051

A. Inspection

(1) Do a general visual inspection of the air intake area of the APU on
the tail cone (Zones 313 and 314).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-10-410-051

A. Close Access

(1) Close the access door 314AR.

(2) Remove the access platform(s).



EFF :

ALL  05-23-10

Page 605
Nov 01/04
 
JSA 
TASK 05-23-10-200-003

Zonal Inspection of Tail Cone APU and Accessory Compartment

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-315-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.50 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-001 Open the APU Doors for Access


52-41-00-410-001 Close the APU Doors after Access

3. __________
Job Set-up

Subtask 05-23-10-010-052

A. Get Access

(1) Put an access platform in position at the zone 310.

(2) Open the access doors:


315AL, 316AR.
(Ref. TASK 52-41-00-010-001)



EFF :

ALL  05-23-10

Page 606
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-10-210-052

A. Inspection

(1) Do a general visual inspection of the tail cone APU and accessory
compartment.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-10-410-052

A. Close Access

(1) Close the access doors:


315AL, 316AR.
(Ref. TASK 52-41-00-410-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-10

Page 607
Nov 01/04
 
JSA 
TASK 05-23-10-200-004

Zonal Inspection of the APU Exhaust Area on the Tail Cone

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-317-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 5 m (16 ft. 5 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-18-000-001 Removal of the APU Exhaust Access-Fairing 317AL


52-41-18-400-001 Installation of the APU Exhaust Access-Fairing 317AL

3. __________
Job Set-up

Subtask 05-23-10-010-053

A. Get Access

(1) Put an access platform in position at the zone 310.

(2) Remove the access fairing 317AL.


(Ref. TASK 52-41-18-000-001)



EFF :

ALL  05-23-10

Page 608
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-10-210-053

A. Inspection

(1) Do a general visual inspection of the APU exhaust area on the tail
cone.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-10-410-053

A. Close Access

(1) Install the access fairing 317AL.


(Ref. TASK 52-41-18-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-10

Page 609
Nov 01/04
 
JSA 
ZONAL INSPECTION : VERTICAL STABILIZER AND RUDDER - INSPECTION/CHECK
____________________________________________________________________

TASK 05-23-20-200-001

Zonal Inspection of the Dorsal Fin

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-321-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 6 m (19 ft. 8 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-45-11-000-001 Removal of the Dorsal Fin 321AL


53-45-11-400-001 Installation of the Dorsal Fin 321AL

3. __________
Job Set-up

Subtask 05-23-20-010-050

A. Get Access

(1) Put an access platform in position at the zone 320.

(2) Remove the access panel 321AL.


(Ref. TASK 53-45-11-000-001)



EFF :

ALL  05-23-20

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-20-210-050

A. Inspection

(1) Do a general visual inspection of the dorsal fin.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-050

A. Close Access

(1) Install the access panel 321AL.


(Ref. TASK 53-45-11-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 602
Nov 01/04
 
JSA 
TASK 05-23-20-200-002

Zonal Inspection of Vertical Stabilizer Leading Edge

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-322-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 6 m (19 ft. 8 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-32-11-000-001 Removal of the Vertical Stabilizer Leading-Edge


55-32-11-400-001 Installation of the Vertical Stabilizer Leading-Edge

3. __________
Job Set-up

Subtask 05-23-20-010-051

A. Get Access

(1) Put an access platform in position at the zone 320.

(2) Remove the access panels:


322AL, 322BL, 322CL.
(Ref. TASK 55-32-11-000-001)



EFF :

ALL  05-23-20

Page 603
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-20-210-051

A. Inspection

(1) Do a general visual inspection of the leading edge of the vertical


stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-051

A. Close Access

(1) Install the access panels:


322AL, 322BL, 322CL.
(Ref. TASK 55-32-11-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 604
Nov 01/04
 
JSA 
TASK 05-23-20-200-003

Zonal Inspection of the Spar Box of the Vertical Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-323-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 6 m (19 ft. 8 in.)

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

R Material No. 08-061 D DAN 328AS


TAPE SOUND DAMPENINGALUMINIUM FOIL (Ref. 20-31-00)

C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-45-11-000-001 Removal of the Dorsal Fin 321AL


53-45-11-400-001 Installation of the Dorsal Fin 321AL
53-55-11-000-001 Removal of the Fairings 323AL/323AR
53-55-11-400-001 Installation of the Fairings 323AL/323AR
53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR
53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR
55-32-11-000-001 Removal of the Vertical Stabilizer Leading-Edge
55-32-11-400-001 Installation of the Vertical Stabilizer Leading-Edge



EFF :

ALL  05-23-20

Page 605
Feb 01/07
 
JSA 
3. __________
Job Set-up

Subtask 05-23-20-010-052

A. Get Access

(1) Put an access platform in position at the zone 320.

(2) Remove the access panels:


321AL, (Ref. TASK 53-45-11-000-001)
323AL, 323AR, (Ref. TASK 53-55-11-000-001)
325AR, 325AL, (Ref. TASK 53-55-12-000-001)
322BL. (Ref. TASK 55-32-11-000-001)

(3) Remove and discard the aluminium tape from the lightening holes in
the front spar.

4. Procedure
_________

Subtask 05-23-20-210-052

A. Inspection

(1) Do a general visual inspection of the spar box of the vertical


stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-052

A. Close Access

(1) Cut and install the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-
061) over the lightening holes on the front spar.

(2) Install the access panels:


322BL, (Ref. TASK 55-32-11-400-001)
325AR, 325AL, (Ref. TASK 53-55-12-400-001)
323AR, 323AL, (Ref. TASK 53-55-11-400-001)
321AL
(Ref. TASK 53-45-11-400-001)



EFF :

ALL  05-23-20

Page 606
Nov 01/04
 
JSA 
(3) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 607
Nov 01/04
 
JSA 
TASK 05-23-20-200-004

Zonal Inspection of Vertical Stabilizer Tip

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-324-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 11 m (36 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-34-11-000-001 Removal of the Vertical Stabilizer Tip


55-34-11-400-001 Installation of the Vertical Stabilizer Tip

3. __________
Job Set-up

Subtask 05-23-20-010-053

A. Get Access

(1) Put an access platform in position at the vertical stabilizer tip


level.

(2) Remove the vertical stabilizer tip 324AT.


(Ref. TASK 55-34-11-000-001)



EFF :

ALL  05-23-20

Page 608
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-20-210-053

A. Inspection

(1) Do a general visual inspection of the vertical stabilizer tip.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring) are attached correctly.

5. Close-up
________

Subtask 05-23-20-410-053

A. Close Access

(1) Install the vertical stabilizer tip 324AT.


(Ref. TASK 55-34-11-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 609
Nov 01/04
 
JSA 
TASK 05-23-20-200-005

Zonal Inspection of the Trailing Edge of the Vertical Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-325-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 10 m (32 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL,


325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
55-33-13-410-001 Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-002 Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR

3. __________
Job Set-up

Subtask 05-23-20-010-054

A. Get Access

(1) Put an access platform in position at the zone 320.

(2) Remove the access panels:


325BL, 325CL, 325DL,
325BR.
(Ref. TASK 55-33-13-010-001) or (Ref. TASK 55-33-13-010-002).



EFF :

ALL  05-23-20

Page 610
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-20-210-054

A. Inspection

(1) Do a general visual inspection of the trailing edge of the vertical


stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-054

A. Close Access

(1) Install the access panels:


325BL, 325CL, 325DL,
325BR.
(Ref. TASK 55-33-13-410-001) or (Ref. TASK 55-33-13-410-002)

(2) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 611
Nov 01/04
 
JSA 
TASK 05-23-20-200-006

Zonal Inspection of Rudder

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-326-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 10 m (32 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR


53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR
55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
55-33-13-410-001 Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-002 Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
55-44-11-000-001 Removal of the Rudder Tip
55-44-11-400-001 Installation of the Rudder Tip



EFF :

ALL  05-23-20

Page 612
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-23-20-010-055

A. Get Access

(1) Put an access platform in position at zone 320.

(2) Remove the access panels:


R 325AL, 325AR
R (Ref. TASK 53-55-12-000-001),
R 325BL, 325BR, 325CL, 325CR, 325DL, 325DR, 325EL, 325ER (Ref. TASK 55-
R 33-13-010-001) or (Ref. TASK 55-33-13-010-002),
R 326AT
R (Ref. TASK 55-44-11-000-001).

4. Procedure
_________

Subtask 05-23-20-210-055

A. Inspection

(1) Do a general visual inspection of the rudder.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-055

A. Close Access

(1) Install the access panels:


326AT
R (Ref. TASK 55-44-11-400-001),
R 325BL, 325BR, 325CL, 325CR, 325DL, 325DR, 325EL, 325ER (Ref. TASK 55-
R 33-13-410-001) or (Ref. TASK 55-33-13-410-002),
R 325AL, 325AR
R (Ref. TASK 53-55-12-400-001).

(2) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 613
May 01/05
 
JSA 
TASK 05-23-20-200-007

Zonal Inspection of Vertical Stabilizer Trailing Edge

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-325-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 10 m (32 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR


53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR
55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
55-33-13-410-001 Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-002 Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR



EFF :

ALL  05-23-20

Page 614
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-23-20-010-056

A. Get Access

(1) Put an access platform in position at the zone 320.

(2) Remove the access panels:


325BL, 325CL, 325DL, 325EL,
325BR, 325CR, 325DR, 325ER,
(Ref. TASK 55-33-13-010-001) or (Ref. TASK 55-33-13-010-002)
325AL, 325AR.
(Ref. TASK 53-55-12-000-001)

4. Procedure
_________

Subtask 05-23-20-210-056

A. Inspection

(1) Do a general visual inspection of the trailing edge of the vertical


stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-056

A. Close Access

(1) Install the access panels:


325AL, 325AR,
(Ref. TASK 53-55-12-400-001)
325BL, 325CL, 325DL, 325EL,
325BR, 325CR, 325DR, 325ER,
(Ref. TASK 55-33-13-410-001) or (Ref. TASK 55-33-13-410-002)

(2) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 615
Nov 01/04
 
JSA 
TASK 05-23-20-200-008

Zonal Inspection of Rudder

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-326-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 10 m (32 ft. 10 in.)

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

R Material No. 08-061 D DAN 328AS


TAPE SOUND DAMPENINGALUMINIUM FOIL (Ref. 20-31-00)

C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR


53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR
55-33-13-010-001 Opening of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
55-33-13-410-001 Closing of the Trailing Edge Access-Panels 325EL,
325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR
55-33-13-410-002 Closing/Installation of the Trailing Edge
Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL,
325CR, 325BL and 325BR
55-44-11-000-001 Removal of the Rudder Tip
55-44-11-400-001 Installation of the Rudder Tip



EFF :

ALL  05-23-20

Page 616
Feb 01/07
 
JSA 
3. __________
Job Set-up

Subtask 05-23-20-010-057

A. Get Access

(1) Put an access platform in position at the zone 320.

(2) Remove the access panels:


325BL, 325CL, 325DL, 325EL, (Ref. TASK 55-33-13-010-001) or
(Ref. TASK 55-33-13-010-002)
325AL,
(Ref. TASK 53-55-12-000-001)
326AT.
(Ref. TASK 55-44-11-000-001)

(3) Remove and discard the aluminium foil from the lightening holes in
the front spar.

4. Procedure
_________

Subtask 05-23-20-210-057

A. Inspection

(1) Do a general visual inspection of the rudder.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-20-410-057

A. Close Access

(1) Cut and install the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-
061) over the lightening holes on the front spar.

(2) Install the access panels:


326AT,
(Ref. TASK 55-44-11-400-001)
325AL,
(Ref. TASK 53-55-12-400-001)
325BL, 325CL, 325DL, 325EL.



EFF :

ALL  05-23-20

Page 617
Nov 01/04
 
JSA 
(Ref. TASK 55-33-13-410-001) or (Ref. TASK 55-33-13-410-002).

(3) Remove the access platform(s).



EFF :

ALL  05-23-20

Page 618
Nov 01/04
 
JSA 
______________________________________________________________________________
ZONAL INSPECTION : TRIMMABLE HORIZONTAL STABILIZER LEFT SIDE AND LEFT ELEVATOR
________________
INSPECTION/CHECK

TASK 05-23-30-200-001

Zonal Inspection of the Leading Edge of the Trimmable Horizontal Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-331-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-12-11-000-001 Removal of the Horizontal Stabilizer Leading Edge


55-12-11-400-001 Installation of the Horizontal Stabilizer Leading
Edge

3. __________
Job Set-up

Subtask 05-23-30-010-050

A. Get Access

(1) Put an access platform in position.

(2) Remove the leading edges:


331AB, 331BB, 331CB. (Ref. TASK 55-12-11-000-001)

(3) Remove the access panels:


341AB, 341BB, 341CB. (Ref. TASK 55-12-11-000-001)



EFF :

ALL  05-23-30

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-30-210-050

A. Inspection

(1) Do a general visual inspection of the leading edge of the trimmable


horizontal stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (ducting, piping) are attached
correctly.

5. Close-up
________

Subtask 05-23-30-410-050

A. Close Access

(1) Install the leading edges:


331AB, 331BB, 331CB. (Ref. TASK 55-12-11-400-001)

(2) Install the leading edges:


341AB, 341BB, 341CB. (Ref. TASK 55-12-11-400-001)

(3) Remove the access platform(s).



EFF :

ALL  05-23-30

Page 602
Nov 01/04
 
JSA 
TASK 05-23-30-200-002

Zonal Inspection of the Tip of the Trimmable Horizontal Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-332-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 4 m (13 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-14-11-000-001 Removal of the Tips 332AB/342AB


55-14-11-400-001 Installation of the Tips 332AB/342AB

3. __________
Job Set-up

Subtask 05-23-30-010-051

A. Get Access

(1) Put an access platform in position.

(2) Remove the tip 332AB / 342AB . (Ref. TASK 55-14-11-000-001)

4. Procedure
_________

Subtask 05-23-30-210-051

A. Inspection

(1) Do a general visual inspection of the tip of the trimmable horizontal


stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-23-30

Page 603
Nov 01/04
 
JSA 
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-30-410-051

A. Close Access

(1) Install the tip 332AB / 342AB. (Ref. TASK 55-14-11-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-30

Page 604
Nov 01/04
 
JSA 
TASK 05-23-30-200-003

Zonal Inspection of the Spar Box of the Trimmable Horizontal Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-333-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 5 m (16 ft. 5 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

R 55-15-11-000-001 Removal of the Apron 333AT/333AB/343AT/343AB


R 55-15-11-400-001 Installation of the Apron 333AT/333AB/343AT/343AB
05-23-30-991-007 Fig. 601

3. __________
Job Set-up

Subtask 05-23-30-010-052

A. Get Access

(1) Put an access platform in position.

(2) Open the access doors 312AR, 314AR.


(Ref. Fig. 601/TASK 05-23-30-991-007)

R (3) Remove the aprons 333AT, 333AB, 343AT and 343AB (Ref. TASK 55-15-11-
R 000-001).



EFF :

ALL  05-23-30

Page 605
Feb 01/05
 
JSA 
Access provision of the Aft Fuselage Tail Section
Figure 601/TASK 05-23-30-991-007



EFF :

ALL  05-23-30

Page 606
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-30-210-052

A. Inspection

(1) Do a general visual inspection of the spar box of the trimmable


horizontal stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-30-410-052

A. Close Access

R (1) Install the aprons 333AT, 333AB, 343AT and 343AB (Ref. TASK 55-15-11-
R 400-001).

R (2) Close the access doors 312AR, 314AR.

R (3) Remove the access platform(s).



EFF :

ALL  05-23-30

Page 607
Feb 01/05
 
JSA 
TASK 05-23-30-200-004

Zonal Inspection of the Trailing Edge of the Trimmable Horizontal Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-334-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 4 m (13 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-13-11-000-001 Removal of the THS Trailing Edge Access Panels


55-13-11-400-001 Installation of the THS Trailing Edge Access Panels

3. __________
Job Set-up

Subtask 05-23-30-010-053

A. Get Access

(1) Put an access platform in position.

(2) Remove the trailing edge access panels:


334BB, 334DB, 334FB, 334HB.
344BB, 344DB, 344FB, 344HB. (Ref. TASK 55-13-11-000-001)



EFF :

ALL  05-23-30

Page 608
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-30-210-053

A. Inspection

(1) Do a general visual inspection of the trailing edge of the trimmable


horizontal stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-30-410-053

A. Close Access

(1) Install the trailing edge access panels:


334BB, 334DB, 334FB, 334HB
344BB, 344DB, 344FB, 344HB. (Ref. TASK 55-13-11-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-30

Page 609
Nov 01/04
 
JSA 
TASK 05-23-30-200-005

Zonal Inspection of the Elevator

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-335-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-13-11-000-001 Removal of the THS Trailing Edge Access Panels


55-13-11-400-001 Installation of the THS Trailing Edge Access Panels
55-22-11-000-001 Removal of the Elevator Leading Edge Access Panels
335AB (345AB), 335BB (345BB), 335CB (345CB), 335DB
(345DB).
55-22-11-400-001 Installation of the Elevator Leading Edge Access
Panels 335AB (345AB), 335BB (345BB), 335CB (345CB),
335DB (345DB).

3. __________
Job Set-up

Subtask 05-23-30-010-054

A. Get Access

(1) Put an access platform in position.

(2) Remove the trailing edge access panels:


334BB, 334DB, 334FB, 334HB.
344BB, 344DB, 344FB, 344HB.
(Ref. TASK 55-13-11-000-001)



EFF :

ALL  05-23-30

Page 610
Nov 01/04
 
JSA 
(3) Remove the elevator leading edge access panels
335AB, 335BB, 335CB, 335DB.
345AB, 345BB, 345CB, 345DB.
(Ref. TASK 55-22-11-000-001)

4. Procedure
_________

Subtask 05-23-30-210-054

A. Inspection

(1) Do a general visual inspection of the elevator.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-30-410-054

A. Close Access

(1) Install the trailing edge access panels


334BB, 334DB, 334FB, 334HB.
344BB, 344DB, 344FB, 344HB.
(Ref. TASK 55-13-11-400-001)

(2) Install the elevator leading edge access panels


335AB, 335BB, 335CB, 335DB.
345AB, 345BB, 345CB, 345DB.
(Ref. TASK 55-22-11-400-001)

(3) Remove the access platform(s).



EFF :

ALL  05-23-30

Page 611
Nov 01/04
 
JSA 
TASK 05-23-30-200-007

Zonal Inspection of the Trailing Edge of the Trimmable Horizontal Stabilizer

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-334-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 4 m (13 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-13-11-000-001 Removal of the THS Trailing Edge Access Panels


55-13-11-400-001 Installation of the THS Trailing Edge Access Panels

3. __________
Job Set-up

Subtask 05-23-30-010-056

A. Get Access

(1) Put an access platform in position.

(2) Remove the trailing edge access panels


334AT, 334BT, 334CT,
334DT, 334AB, 334BB,
334CB, 334DB, 334EB,
334FB, 334GB, 334HB,
344AT, 344BT, 344CT,
344DT, 344AB, 344BB,
344CB, 344DB, 344EB,
344FB, 344GB, 344HB,
(Ref. TASK 55-13-11-000-001)



EFF :

ALL  05-23-30

Page 612
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-23-30-210-056

A. Inspection

(1) Do a general visual inspection of the trailing edge of the trimmable


horizontal stabilizer.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-23-30-410-056

A. Close Access

(1) Install the trailing edge access panels:


334AT, 334BT, 334CT,
334DT, 334AB, 334BB,
334CB, 334DB, 334EB,
334FB, 334GB, 334HB.
344AT, 344BT, 344CT,
344DT, 344AB, 344BB,
344CB, 344DB, 344EB,
344FB, 344GB, 344HB,
(Ref. TASK 55-13-11-400-001)

(2) Remove the access platform(s).



EFF :

ALL  05-23-30

Page 613
Nov 01/04
 
JSA 
ZONAL INSPECTION : POWER PLANT, NACELLES AND PYLONS - INSPECTION/CHECK
______________________________________________________________________

TASK 05-24-00-200-001

Zonal Inspection as far as Visible from the Ground of the Power Plant, the
Nacelles and the Pylons

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-24-00-869-050

A. Not Applicable

4. Procedure
_________

Subtask 05-24-00-210-050

A. Inspection

(1) Do a general visual inspection of the power plant, the nacelles and
the pylons from the ground during the aircraft walkaround.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-24-00

Page 601
Nov 01/04
 
JSA 
TASK 05-24-00-200-002

Zonal Inspection of the Power Plant, the Nacelles and the Pylons

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-400-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

3. __________
Job Set-up

Subtask 05-24-00-010-051

A. Get Access

(1) Put an access platform in position.

4. Procedure
_________

Subtask 05-24-00-210-051

A. Inspection

(1) Do a general visual inspection of the power plant, the nacelles and
the pylons.

(2) Make sure that there are no signs of corrosion, craks or damage.

5. Close-up
________

Subtask 05-24-00-410-051

A. Close Access

(1) Remove the access platform(s).



EFF :

ALL  05-24-00

Page 602
Nov 01/04
 
JSA 
ZONAL INSPECTION : ENGINE PYLON BOX AND FORWARD FAIRING - INSPECTION/CHECK
__________________________________________________________________________

TASK 05-24-10-200-001

Zonal Inspection of Upper Forward Pylon

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-411-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-24-10-991-001 Fig. 601


05-24-10-991-002 Fig. 602
05-24-10-991-003 Fig. 603
05-24-10-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-10-010-050

A. Get Access

(1) Put an access platform in position.

(2) Remove the access panels:


- For the left pylon:

(Ref. Fig. 601/TASK 05-24-10-991-001)


413AL, 413BL, 413CL,
413DL, 413EL.

(Ref. Fig. 602/TASK 05-24-10-991-002)



EFF :

ALL  05-24-10

Page 601
Nov 01/04
 
JSA 
Access Panels and Doors of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-10-991-001



EFF :

ALL  05-24-10

Page 602
Nov 01/04
 
JSA 
Access Panels and Doors of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-10-991-002



EFF :

ALL  05-24-10

Page 603
Nov 01/04
 
JSA 
414AR, 414AZ, 414BR,
414CR, 414FR.
- For the right pylon:

(Ref. Fig. 603/TASK 05-24-10-991-003)


423AL, 423AZ, 423BL,
423CL, 423DL, 423FL.

(Ref. Fig. 604/TASK 05-24-10-991-004)


424AR, 424BR,
424CR, 424ER.

4. Procedure
_________

Subtask 05-24-10-210-050

A. Inspection

(1) Do a general visual inspection of the upper forward pylon (Zones 411,
413, 414, 421, 423 and 424).

(2) Make sure that there are no signs of corrosion, craks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-10-410-050

A. Close Access

(1) Install the access panels:


- For the left pylon:
413AL, 413BL, 413CL,
413DL, 413EL,
414AR, 414AZ, 414BR,
414CR, 414FR.
- For the right pylon:
423AL, 423AZ, 423BL,
423CL, 423DL, 423FL,
424AR, 424BR,
424CR, 424ER.

(2) Remove the access platform(s).



EFF :

ALL  05-24-10

Page 604
Nov 01/04
 
JSA 
Access Panels and Doors of the Right Nacelle (Left Side)
Figure 603/TASK 05-24-10-991-003



EFF :

ALL  05-24-10

Page 605
Nov 01/04
 
JSA 
Access Panels and Doors of the Right Nacelle (Right Side)
Figure 604/TASK 05-24-10-991-004



EFF :

ALL  05-24-10

Page 606
Nov 01/04
 
JSA 
TASK 05-24-10-200-002

Zonal Inspection of Lower Pylon

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-415-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

54-51-21-000-001 Removal of the Pylon Lateral Access-Doors


54-51-21-400-001 Installation of the Pylon Lateral Access-Doors
05-24-10-991-001 Fig. 601
05-24-10-991-002 Fig. 602
05-24-10-991-003 Fig. 603
05-24-10-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-10-010-051

A. Get Access

(1) Put an access platform in position at zone 415 (425).


(Ref. Fig. 601/TASK 05-24-10-991-001, 602/TASK 05-24-10-991-002)

(2) Remove the pylon lateral access-doors (Ref. TASK 54-51-21-000-001):


(Ref. Fig. 603/TASK 05-24-10-991-003, 604/TASK 05-24-10-991-004)
415AL, 415AR, 415BL, 415BR,
425AL, 425AR, 425BL, 425BR.



EFF :

ALL  05-24-10

Page 607
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-24-10-210-051

A. Inspection

(1) Do a general visual inspection of the lower section of the pylon.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-10-410-051

A. Close Access

(1) Install the pylon lateral access-doors (Ref. TASK 54-51-21-400-001):


(Ref. Fig. 601/TASK 05-24-10-991-001, 602/TASK 05-24-10-991-002)
415AL, 415AR, 415BL, 415BR,
(Ref. Fig. 603/TASK 05-24-10-991-003, 604/TASK 05-24-10-991-004)
425AL, 425AR, 425BL, 425BR.

(2) Remove the access platform(s).



EFF :

ALL  05-24-10

Page 608
Nov 01/04
 
JSA 
_______________________________________________________________
ZONAL INSPECTION : ENGINE AIR INTAKE, FAN AND ACCESSORY GEARBOX
________________
INSPECTION/CHECK

TASK 05-24-30-200-001

Zonal Inspection of the Air Intake Lip and the Inlet Cowl

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-433-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-24-30-991-001 Fig. 601


05-24-30-991-002 Fig. 602
05-24-30-991-003 Fig. 603
05-24-30-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-30-010-050

A. Get Access

(1) Put an access platform in position at zones 433 and 443.

(2) Remove the access panels:


(Ref. Fig. 601/TASK 05-24-30-991-001, 602/TASK 05-24-30-991-002)
434AR, 434BR,
437AL, 438AR,
(Ref. Fig. 603/TASK 05-24-30-991-003, 604/TASK 05-24-30-991-004)
444AR, 444BR,
447AL, 448AR.



EFF :

ALL  05-24-30

Page 601
Nov 01/04
 
JSA 
Access Doors of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-30-991-001



EFF :

ALL  05-24-30

Page 602
Nov 01/04
 
JSA 
Access Doors of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-30-991-002



EFF :

ALL  05-24-30

Page 603
Nov 01/04
 
JSA 
Access Doors of the Right Nacelle (Right Side)
Figure 603/TASK 05-24-30-991-003



EFF :

ALL  05-24-30

Page 604
Nov 01/04
 
JSA 
Access Doors of the Right Nacelle (Left Side)
Figure 604/TASK 05-24-30-991-004



EFF :

ALL  05-24-30

Page 605
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-24-30-210-050

A. Inspection

(1) Do a general visual inspection of the air intake lip and the inlet
cowl.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-30-410-050

A. Close Access

(1) Install the access panels:


434AR, 434BR,
437AL, 438AR,
444AR, 444BR,
447AL, 448AR.

(2) Remove the access platform(s).



EFF :

ALL  05-24-30

Page 606
Nov 01/04
 
JSA 
TASK 05-24-30-200-002

Zonal Inspection of the Area of the Fan and the Accessory Gearbox

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-435-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)


71-13-00-410-010 Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
05-24-30-991-001 Fig. 601
05-24-30-991-002 Fig. 602
05-24-30-991-003 Fig. 603
05-24-30-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-30-010-051

A. Get Access

(1) Put an access platform in position at zones 435 and 445.

(2) Open the fan cowl doors. (Ref. TASK 71-13-00-010-010)


(Ref. Fig. 601/TASK 05-24-30-991-001, 602/TASK 05-24-30-991-002)
437AL, 438AR
(Ref. Fig. 603/TASK 05-24-30-991-003, 604/TASK 05-24-30-991-004)
447AL, 448AR



EFF :

ALL  05-24-30

Page 607
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-24-30-210-051

A. Inspection

(1) Do a general visual inspection of the area of the fan case and the
accessory gearbox.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-30-410-051

A. Close Access

(1) Close the fan cowl doors. (Ref. TASK 71-13-00-410-010)


437AL, 438AR
447AL, 448AR

(2) Remove the access platform(s).



EFF :

ALL  05-24-30

Page 608
Nov 01/04
 
JSA 
TASK 05-24-30-200-003

Zonal Inspection of the Fan and the Engine Cowling

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-437-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)


71-13-00-410-010 Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
05-24-30-991-001 Fig. 601
05-24-30-991-002 Fig. 602
05-24-30-991-003 Fig. 603
05-24-30-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-30-010-052

A. Get Access

(1) Put an access platform in position at the zones 437 and 447.

(2) Open the fan cowl doors. (Ref. TASK 71-13-00-010-010)


(Ref. Fig. 601/TASK 05-24-30-991-001, 602/TASK 05-24-30-991-002)
437AL, 438AR
(Ref. Fig. 603/TASK 05-24-30-991-003, 604/TASK 05-24-30-991-004)
447AL, 448AR



EFF :

ALL  05-24-30

Page 609
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-24-30-210-052

A. Inspection

(1) Do a general visual inspection of the fan and the engine cowling.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-30-410-052

A. Close Access

(1) Close the fan cowl doors. (Ref. TASK 71-13-00-410-010)


437AL, 438AR
447AL, 448AR

(2) Remove the access platform(s).



EFF :

ALL  05-24-30

Page 610
Nov 01/04
 
JSA 
_____________________________________________________________
ZONAL INSPECTION : ENGINE THRUST REVERSER AND EXHAUST SECTION
________________
INSPECTION/CHECK

TASK 05-24-50-200-001

Zonal Inspection of the Thrust Reverser Cowling

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-451-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)


71-13-00-410-010 Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
78-32-00-010-010 Opening of the Thrust Reverser Halves
78-32-00-410-010 Closing of the Thrust Reverser Halves
05-24-50-991-001 Fig. 601
05-24-50-991-002 Fig. 602
05-24-50-991-003 Fig. 603
05-24-50-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-50-010-050

A. Get Access

(1) Put an access platform in position at the zones 451 and 461.
(Ref. Fig. 601/TASK 05-24-50-991-001, 602/TASK 05-24-50-991-002,
603/TASK 05-24-50-991-003, 604/TASK 05-24-50-991-004)



EFF :

ALL  05-24-50

Page 601
Nov 01/04
 
JSA 
Access Doors of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-50-991-001



EFF :

ALL  05-24-50

Page 602
Nov 01/04
 
JSA 
Access Doors of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-50-991-002



EFF :

ALL  05-24-50

Page 603
Nov 01/04
 
JSA 
Access Doors of the Right Nacelle (Left Side)
Figure 603/TASK 05-24-50-991-003



EFF :

ALL  05-24-50

Page 604
Nov 01/04
 
JSA 
Access Doors of the Right Nacelle (Right Side)
Figure 604/TASK 05-24-50-991-004



EFF :

ALL  05-24-50

Page 605
Nov 01/04
 
JSA 
(2) Open the fan cowl doors. (Ref. TASK 71-13-00-010-010)
437AL, 438AR
447AR, 448AR

(3) Open the thrust reverser doors. (Ref. TASK 78-32-00-010-010)


451AL, 452AR
461AL, 462AR

4. Procedure
_________

Subtask 05-24-50-210-050

A. Inspection

(1) Do a general visual inspection of the thrust reverser and the zone
below the thrust reverser.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-50-410-050

A. Close Access

(1) Close the fan cowl doors. (Ref. TASK 71-13-00-410-010)


437AL, 438AR
447AL, 448AR

(2) Close the thrust reverser doors. (Ref. TASK 78-32-00-410-010)


451AL, 452AR
461AL, 462AR

(3) Remove the access platform(s).



EFF :

ALL  05-24-50

Page 606
Nov 01/04
 
JSA 
TASK 05-24-50-200-002

Zonal Inspection of the Hot Section

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-453-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)


71-13-00-410-010 Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
78-32-00-010-010 Opening of the Thrust Reverser Halves
78-32-00-410-010 Closing of the Thrust Reverser Halves
R 78-36-00-010-040 Opening of the Thrust Reverser Doors
R 78-36-00-410-040 Closing of the Thrust Reverser Doors
R AMM 72-40-00 PB 001
R AMM 72-50-00 PB 001
05-24-50-991-001 Fig. 601
05-24-50-991-002 Fig. 602
05-24-50-991-003 Fig. 603
05-24-50-991-004 Fig. 604

3. __________
Job Set-up

Subtask 05-24-50-010-051

A. Get Access

(1) Put an access platform in position at the zones 453 and 463.
(Ref. Fig. 601/TASK 05-24-50-991-001, 602/TASK 05-24-50-991-002,
603/TASK 05-24-50-991-003, 604/TASK 05-24-50-991-004)



EFF :

ALL  05-24-50

Page 607
Feb 01/07
 
JSA 
R (2) Open the fan cowl doors: (Ref. TASK 71-13-00-010-010)
437AL, 438AR
R 447AL, 448AR.
R

R (3) Open the thrust-reverser pressure-relief doors 452DR and 462DR


R (Ref. TASK 78-32-00-010-010).

R (4) Open the thrust reverser doors: (Ref. TASK 78-36-00-010-040)


R 451AL, 452AR
R 461AL, 462AR.

4. Procedure
_________

R Subtask 05-24-50-210-051-A

R A. Inspection

R (1) Do a general visual inspection of the hot section.

R (2) Make sure that there are no signs of corrosion, cracks or damage.

R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.

R (4) Fuel wetness at the rear diffuser case flange/front HPT case flange
R interface is permitted provided no continuous steady drip leakage is
R seen (Ref. AMM 72-40-00 PB 001) and (Ref. AMM 72-50-00 PB 001) for
R flange location.

5. Close-up
________

Subtask 05-24-50-410-051

A. Close Access
R

R (1) Close the fan cowl doors: (Ref. TASK 71-13-00-410-010)


437AL, 438AR
R 447AL, 448AR.

R (2) Close the thrust reverser doors: (Ref. TASK 78-36-00-410-040)


451AL, 452AR
R 461AL, 462AR.

R (3) Close the thrust-reverser pressure-relief doors 452DR and 462DR


R (Ref. TASK 78-32-00-410-010).



EFF :

ALL  05-24-50

Page 608
Feb 01/07
 
JSA 
(4) Remove the access platform(s).



EFF :

ALL  05-24-50

Page 609
Feb 01/07
 
JSA 
ZONAL INSPECTION : ENGINE AFT PYLON - INSPECTION/CHECK
______________________________________________________

TASK 05-24-70-200-001

Zonal Inspection of Pylon Leading Edge and Lower Fairing

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-471-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-24-70-991-001 Fig. 601


05-24-70-991-002 Fig. 602
05-24-70-991-005 Fig. 603
05-24-70-991-006 Fig. 604

3. __________
Job Set-up

Subtask 05-24-70-010-050

A. Get Access

(1) Put an access platform in position at zone 470(480).

(2) Remove the access panels


- For the left pylon:

(Ref. Fig. 601/TASK 05-24-70-991-001)


471AL, 471BL, 471CL,
473AL, 475AL, 475BL,
475CL, 477AL.



EFF :

ALL  05-24-70

Page 601
Nov 01/04
 
JSA 
Location of the Access Panels of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-70-991-001



EFF :

ALL  05-24-70

Page 602
Nov 01/04
 
JSA 
(Ref. Fig. 602/TASK 05-24-70-991-002)
472AR, 472BR,
476AR, 476BR, 476CR.
- For the right pylon:
(Ref. Fig. 603/TASK 05-24-70-991-005)
481AL, 481BL, 483AL,
485AL, 485BL, 485CL,
(Ref. Fig. 604/TASK 05-24-70-991-006)
482AR, 482BR, 482CR,
486AR, 486BR, 486CR,
487AR.

4. Procedure
_________

Subtask 05-24-70-210-050

A. Inspection

(1) Do a general visual inspection of the leading edge of the pylon and
the lower fairing (Zones 471, 472, 473, 475, 476, 477, 481, 482, 483,
485, 486 and 487).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-24-70-410-050

A. Close Access

(1) Install the access panels


- For the left pylon:
471AL, 471BL, 471CL,
473AL, 475AL, 475BL,
475CL, 477AL,
472AR, 472BR,
476AR, 476BR, 476CR.
- For the right pylon:
481AL, 481BL, 483AL,
485AL, 485BL, 485CL,
482AR, 482BR, 482CR,
486AR, 486BR, 486CR,
487AR.



EFF :

ALL  05-24-70

Page 603
Nov 01/04
 
JSA 
Location of the Access Panels of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-70-991-002



EFF :

ALL  05-24-70

Page 604
Nov 01/04
 
JSA 
Location of the Access Panels of the Right Nacelle (Left Side)
Figure 603/TASK 05-24-70-991-005



EFF :

ALL  05-24-70

Page 605
Nov 01/04
 
JSA 
Location of the Access Panels of the Right Nacelle (Right Side)
Figure 604/TASK 05-24-70-991-006



EFF :

ALL  05-24-70

Page 606
Nov 01/04
 
JSA 
(2) Remove the access platform(s).



EFF :

ALL  05-24-70

Page 607
Nov 01/04
 
JSA 
ZONAL INSPECTION : WING - INSPECTION/CHECK
__________________________________________

TASK 05-25-00-200-001

Zonal Inspection of the Wings as far as visible from the ground

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-25-00-869-050

A. Not Applicable

4. Procedure
_________

Subtask 05-25-00-210-050

A. Inspection

(1) Do a general visual inspection of the wing (zone 500 and zone 600)
from the ground.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-25-00

Page 601
Nov 01/04
 
JSA 
TASK 05-25-00-200-002

Zonal Inspection of the Wing Lower Surface including the Upper and Lower
Surfaces of the Flaps and the Slats

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-500-02

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground

3. __________
Job Set-up

Subtask 05-25-00-866-050

A. Aircraft Maintenance Configuration

(1) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-80-00-866-004).

4. Procedure
_________

Subtask 05-25-00-210-051

A. Inspection

(1) Do a general visual inspection of the wing lower surface (zones 500
and 600).

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-25-00

Page 602
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-25-00-866-051

A. Aircraft Maintenance Configuration

(1) Retract the flaps and the slats (Ref. TASK 27-50-00-866-009),
(Ref. TASK 27-80-00-866-005).



EFF :

ALL  05-25-00

Page 603
Nov 01/04
 
JSA 
TASK 05-25-00-200-003

Zonal Inspection of the Wing Upper Surface including the Slats, the Flaps and
the Spoilers

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-500-03

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.50 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground

3. __________
Job Set-up

Subtask 05-25-00-866-052

A. Aircraft Maintenance Configuration

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER
_______
COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.

(1) Extend the spoilers (Ref. TASK 27-60-00-866-002).

(2) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-80-00-866-004)



EFF :

ALL  05-25-00

Page 604
Nov 01/04
 
JSA 
Subtask 05-25-00-941-050

B. Get Access

(1) Put an access platform in position at zone 500 and 600.

4. Procedure
_________

Subtask 05-25-00-210-052

A. Inspection

(1) Do a general visual inspection of the wing upper surface (zones 500
and 600).

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-25-00-942-050

A. Close Access

(1) Remove the access platform(s).

Subtask 05-25-00-866-053

B. Aircraft Maintenance Configuration

(1) Retract the spoilers (Ref. TASK 27-60-00-866-002).

(2) Retract the flaps and the slats (Ref. TASK 27-50-00-866-009),
(Ref. TASK 27-80-00-866-005).



EFF :

ALL  05-25-00

Page 605
Nov 01/04
 
JSA 
ZONAL INSPECTION : WING FIXED LEADING EDGE - INSPECTION/CHECK
_____________________________________________________________

TASK 05-25-20-200-001

Zonal Inspection of the Structure of the Inboard Fixed Leading Edge

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-521-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-80-00-866-004 Extending the Slats on the Ground


27-80-00-866-005 Retracting the Slats on the Ground
05-25-20-991-001 Fig. 601
05-25-20-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-25-20-866-050

A. Aircraft Maintenance Configuration

(1) Extend the slats (Ref. TASK 27-80-00-866-004).



EFF :

ALL  05-25-20

Page 601
Nov 01/04
 
JSA 
Subtask 05-25-20-010-050

B. Get Access

(1) Put an access platform in position at the zone 522 (622).

(2) Remove the access panels:


(Ref. Fig. 601/TASK 05-25-20-991-001, 602/TASK 05-25-20-991-002)
521AB, 521AT, 521BT,
521CB, 521EB, 521GB,
521HB.
621AB, 621AT, 621BT,
621CB, 621EB, 621GB,
621HB.

4. Procedure
_________

Subtask 05-25-20-210-050

A. Inspection

(1) Do a general visual inspection of the structure of the inboard fixed


leading edge.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-25-20-410-050

A. Close Access

(1) Install the access panels:


521AB, 521AT, 521BT,
521CB, 521EB, 521GB,
521HB.
621AB, 621AT, 621BT,
621CB, 621EB, 621GB,
621HB.

(2) Remove the access platform(s).



EFF :

ALL  05-25-20

Page 602
Nov 01/04
 
JSA 
Access Panels of the Upper Leading Edge of the Wing
Figure 601/TASK 05-25-20-991-001



EFF :

ALL  05-25-20

Page 603
Nov 01/04
 
JSA 
Access Panels of the Lower Surface of the Wing
Figure 602/TASK 05-25-20-991-002



EFF :

ALL  05-25-20

Page 604
Nov 01/04
 
JSA 
Subtask 05-25-20-866-051

B. Aircraft Maintenance Configuration

(1) Fully retract the slats (Ref. TASK 27-80-00-866-005).



EFF :

ALL  05-25-20

Page 605
Nov 01/04
 
JSA 
TASK 05-25-20-200-002

Zonal Inspection of Outboard Fixed L.E. Structure

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-522-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-80-00-866-004 Extending the Slats on the Ground


27-80-00-866-005 Retracting the Slats on the Ground
05-25-20-991-001 Fig. 601
05-25-20-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-25-20-866-052

A. Aircraft Maintenance Configuration

(1) Extend the slats (Ref. TASK 27-80-00-866-004)



EFF :

ALL  05-25-20

Page 606
Nov 01/04
 
JSA 
Subtask 05-25-20-010-051

B. Get Access

(1) Put an access platform in position.

(2) Remove the access panels


(Ref. Fig. 601/TASK 05-25-20-991-001, 602/TASK 05-25-20-991-002)
522AB, 522AT, 522BT,
522CB, 522EB, 522FB,
522HB, 522JB, 522KB,
522LB, 522NB, 522QB,
522SB, 522UB.
622AB, 622AT, 622BT,
622CB, 622EB, 622FB,
622HB, 622JB, 622KB,
622LB, 622NB, 622QB,
622SB, 622UB.

4. Procedure
_________

Subtask 05-25-20-210-051

A. Inspection

(1) Do a general visual inspection of the structure of the outboard fixed


leading edge.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-25-20-410-051

A. Close Access

(1) Install the access panels


522AB, 522AT, 522BT,
522CB, 522EB, 522FB,
522HB, 522JB, 522KB,
522LB, 522NB, 522QB,
522SB, 522UB.
622AB, 622AT, 622BT,
622CB, 622EB, 622FB,



EFF :

ALL  05-25-20

Page 607
Nov 01/04
 
JSA 
622HB, 622JB, 622KB,
622LB, 622NB, 622QB,
622SB, 622UB.

(2) Remove the access platform(s).

Subtask 05-25-20-866-053

B. Aircraft Maintenance Configuration

(1) Fully retract the slats (Ref. TASK 27-80-00-866-005)



EFF :

ALL  05-25-20

Page 608
Nov 01/04
 
JSA 
ZONAL INSPECTION : WING FLAP TRACK FAIRINGS AND WING TIP - INSPECTION/CHECK
___________________________________________________________________________

TASK 05-25-30-200-001

R Zonal Inspection of the Flap Track No. 2 and Fairing

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-531-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
05-25-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-30-866-050

A. Aircraft Maintenance Configuration

R (1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).



EFF :

ALL  05-25-30

Page 601
May 01/05
 
JSA 
Subtask 05-25-30-010-050

B. Get Access

(1) Put an access platform in position.

R (2) Remove the access panels:


(Ref. Fig. 601/TASK 05-25-30-991-001)
R 531AT,
(Ref. Fig. 601/TASK 05-25-30-991-001)
631AT.

4. Procedure
_________

Subtask 05-25-30-210-050

R A. Inspection

(1) Do a general visual inspection of the flap track No. 2 and the
related fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-050

A. Close Access

R (1) Install the access panels:


R 531AT,
631AT.

(2) Remove the access platform(s).

Subtask 05-25-30-866-051

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009)



EFF :

ALL  05-25-30

Page 602
May 01/05
 
JSA 
Access Panels of the Flap Track Fairings
Figure 601/TASK 05-25-30-991-001



EFF :

ALL  05-25-30

Page 603
Nov 01/04
 
JSA 
TASK 05-25-30-200-002

Zonal Inspection of the Flap Track No. 3 and Fairing

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-532-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
05-25-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-30-866-052

A. Aircraft Maintenance Configuration

R (1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

Subtask 05-25-30-010-051

B. Get Access

(1) Put an access platform in position.

R (2) Remove the access panels 532AT and 632AT.


(Ref. Fig. 601/TASK 05-25-30-991-001)



EFF :

ALL  05-25-30

Page 604
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-25-30-210-051

R A. Inspection

(1) Do a general visual inspection of the flap track No. 3 and the
related fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-051

A. Close Access

R (1) Install the access panels 532AT and 632AT.

(2) Remove the access platform(s).

Subtask 05-25-30-866-053

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :

ALL  05-25-30

Page 605
May 01/05
 
JSA 
TASK 05-25-30-200-003

Zonal Inspection of the Flap Track No. 4 and Fairing

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-533-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
05-25-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-30-866-054

A. Aircraft Maintenance Configuration

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

Subtask 05-25-30-010-052

B. Get Access

(1) Put an access platform in position.

R (2) Remove the access panels 533AT and 633AT.


(Ref. Fig. 601/TASK 05-25-30-991-001)



EFF :

ALL  05-25-30

Page 606
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-25-30-210-052

R A. Inspection

R (1) Do a general visual inspection of the flap track No. 4 and the
R related fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-052

A. Close Access

R (1) Install the access panels 533AT and 633AT.

(2) Remove the access platform(s).

Subtask 05-25-30-866-055

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :

ALL  05-25-30

Page 607
May 01/05
 
JSA 
TASK 05-25-30-200-004

Zonal Inspection of the Wing Tip

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-534-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 4 m (13 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-25-30-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-25-30-010-053

A. Get Access

(1) Put an access platform in position.

(2) Remove the access panels 534AB, 534AL, 534BL 634AB, 634AR, 634BR.
(Ref. Fig. 602/TASK 05-25-30-991-002)

4. Procedure
_________

Subtask 05-25-30-210-053

A. Inspection

(1) Do a general visual inspection of the wing tip.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-25-30

Page 608
Nov 01/04
 
JSA 
Access Panels of the Wing Tip
Figure 602/TASK 05-25-30-991-002



EFF :

ALL  05-25-30

Page 609
Nov 01/04
 
JSA 
(3) Make sure that all the installations (wiring) are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-053

A. Close Access

(1) Install the access panels 534AB, 534AL, 534BL, 634AB, 634AR, 634BR.

(2) Remove the access platform(s).



EFF :

ALL  05-25-30

Page 610
Nov 01/04
 
JSA 
TASK 05-25-30-200-005

Zonal Inspection of the Flap Track No. 2 and Fairing

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-531-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
57-55-11-000-001 Removal of the Flap Track Fairings Nos. 2, 3 and 4
57-55-11-400-001 Installation of the Flap Track Fairings Nos. 2, 3 and
4
05-25-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-30-866-056

A. Aircraft Maintenance Configuration

R (1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).



EFF :

ALL  05-25-30

Page 611
May 01/05
 
JSA 
Subtask 05-25-30-010-054

B. Get Access

(1) Put an access platform in position.

R (2) Remove the access panels (Ref. TASK 57-55-11-000-001):


R
(Ref. Fig. 601/TASK 05-25-30-991-001)
531AB, 531AL, 531AR,
531AT, 531BB, 531CB,
R 531DB,
631AB, 631AL, 631AR,
631AT, 631BB, 631CB,
631DB.

4. Procedure
_________

Subtask 05-25-30-210-054

R A. Inspection

(1) Do a general visual inspection of the flap track No. 2 and the
related fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-054

A. Close Access

R (1) Install the access panels (Ref. TASK 57-55-11-400-001):


531AB, 531AL, 531AR,
531AT, 531BB, 531CB,
R 531DB,
631AB, 631AL, 631AR,
631AT, 631BB, 631CB,
631DB.

(2) Remove the access platform(s).



EFF :

ALL  05-25-30

Page 612
May 01/05
 
JSA 
Subtask 05-25-30-866-057

B. Aircraft Maintenance Configuration

R (1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :

ALL  05-25-30

Page 613
May 01/05
 
JSA 
TASK 05-25-30-200-006

Zonal Inspection of the Flap Track No. 3 and Fairing

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-532-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
57-55-11-000-001 Removal of the Flap Track Fairings Nos. 2, 3 and 4
57-55-11-400-001 Installation of the Flap Track Fairings Nos. 2, 3 and
4
05-25-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-30-866-058

A. Aircraft Maintenance Configuration

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).



EFF :

ALL  05-25-30

Page 614
Nov 01/04
 
JSA 
Subtask 05-25-30-010-055

B. Get Access

(1) Put an access platform in position.

R (2) Remove the covers:


R
(Ref. Fig. 601/TASK 05-25-30-991-001)
R 532AL, 532AR, 532AT, 532DB,
632AL, 632AR, 632AT, 632DB
(Ref. TASK 57-55-11-000-001).

R (3) Remove the flap track fairings:


R 532AB, 532BB, 532CB,
632AB, 632BB, 632CB
(Ref. TASK 57-55-11-000-001).

4. Procedure
_________

Subtask 05-25-30-210-055

R A. Inspection

R (1) Do a general visual inspection of the flap track No. 3 and the
R related fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-055

A. Close Access

R (1) Install the flap track fairings:


R 532AB, 532BB, 532CB,
632AB, 632BB, 632CB
(Ref. TASK 57-55-11-400-001).

R (2) Install the covers:


R 532AL, 532AR, 532AT, 532DB,
632AL, 632AR, 632AT, 632DB
(Ref. TASK 57-55-11-400-001).



EFF :

ALL  05-25-30

Page 615
May 01/05
 
JSA 
(3) Remove the access platform(s).

Subtask 05-25-30-866-059

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :

ALL  05-25-30

Page 616
May 01/05
R  
JSA 
TASK 05-25-30-200-007

Zonal Inspection of the Flap Track No. 4 and Fairing

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-533-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
57-55-11-000-001 Removal of the Flap Track Fairings Nos. 2, 3 and 4
57-55-11-400-001 Installation of the Flap Track Fairings Nos. 2, 3 and
4
05-25-30-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-30-866-060

A. Aircraft Maintenance Configuration

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).



EFF :

ALL  05-25-30

Page 617
Nov 01/04
 
JSA 
Subtask 05-25-30-010-056

B. Get Access

(1) Put an access platform in position.

R (2) Remove the covers:


R
(Ref. Fig. 601/TASK 05-25-30-991-001)
R 533AL, 533AR, 533AT, 533DB,
633AL, 633AR, 633AT, 633DB
(Ref. TASK 57-55-11-000-001).

R (3) Remove the flap track fairings:


R 533AB, 533BB, 533CB,
633AB, 633BB, 633CB
(Ref. TASK 57-55-11-000-001).

4. Procedure
_________

Subtask 05-25-30-210-056

A. Inspection

(1) Do a general visual inspection of the flap track No. 4 and the
related fairing.

(2) Make sure that there are no signs of corrosion, cracks or damage.

R (3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-30-410-056

A. Close Access

R (1) Install the flap track fairings:


R 533AB, 533BB, 533CB,
633AB, 633BB, 633CB
(Ref. TASK 57-55-11-400-001).

R (2) Install the covers:


R 533AL, 533AR, 533AT, 533DB,
633AL, 633AR, 633AT, 633DB
(Ref. TASK 57-55-11-400-001).

(3) Remove the access platform(s).



EFF :

ALL  05-25-30

Page 618
May 01/05
 
JSA 
Subtask 05-25-30-866-061

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :

ALL  05-25-30

Page 619
Nov 01/04
 
JSA 
ZONAL INSPECTION : WING FUEL TANK - INSPECTION/CHECK
____________________________________________________

R TASK 05-25-40-200-005

R Zonal Inspection of the Wing Fuel Tank

R 1. __________________
Reason for the Job

R Refer to the MPD TASK: ZL-540-01

R 2. ______________________
Job Set-up Information

R A. Fixtures, Tools, Test and Support Equipment

R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------

R No specific access platform 2 m (6 ft. 7 in.)

R B. Referenced Information

R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------

R 57-27-11-000-001 Removal of the Access Panel (540AB, 540BB, 540CB,


R 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB,
R 640DB, 640EB, 640FB, 640GB)
R 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
R 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
R 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
R ....)
R 57-27-11-400-001 Installation of the Access Panel (540AB, 540BB,
R 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
R 640CB, 640DB, 640EB, 640FB, 640GB)
R 57-27-11-400-002 Installation of the Access Panel (540HB, 540JB,
R 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
R 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
R ....)
R 57-27-12-000-001 Removal of the Fuel-Surge Access Panel
R 57-27-12-400-001 Installation of the Fuel-Surge Access Panel



EFF :

ALL  05-25-40

Page 601
May 01/05
 
JSA 
R 3. __________
Job Set-up

R Subtask 05-25-40-010-054

R A. Get Access

R (1) Put an access platform in position.

R (2) Remove the access panels


R 540AB,
R 640AB (Ref. TASK 57-27-11-000-001),
R 540AZ, 540BZ,
R 640AZ, 640BZ (Ref. TASK 57-27-12-000-001),
R 540JB, 540KB,
R 640JB, 640KB (Ref. TASK 57-27-11-000-002).

R 4. Procedure
_________

R Subtask 05-25-40-210-054

R A. Inspection

R (1) Do a general visual inspection of the wing fuel tank.

R (2) Make sure that there are no signs of corrosion, cracks or damage.

R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.

R 5. Close-up
________

R Subtask 05-25-40-410-054

R A. Close Access

R (1) Install the access panels


R 540AB,
R 640AB (Ref. TASK 57-27-11-400-001),
R 540AZ, 540BZ,
R 640AZ, 640BZ (Ref. TASK 57-27-12-400-001),
R 540JB, 540KB,
R 640JB, 640KB (Ref. TASK 57-27-11-400-002).



EFF :

ALL  05-25-40

Page 602
May 01/05
 
JSA 
TASK 05-25-40-200-004

Zonal Inspection of the Wing Fuel Tank

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-540-02

R NOTE : Do this procedure at the same time as MPD Task 572004-03 (Ref Task
____
R 57-20-00-220-08), MDP Task 572027-03 (Ref Task 57-20-00-220-010), MPD
R Task 572060-02 (Ref Task 57-20-00-220-006) and MPD Task 572061-02
R (Ref Task 57-20-00-220-007).
R It is not then necessary to remove the access panels 540CZ, 540DZ,
R 640CZ and 640DZ.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

57-27-11-000-001 Removal of the Access Panel (540AB, 540BB, 540CB,


540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB,
640DB, 640EB, 640FB, 640GB)
57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
....)
57-27-11-000-003 Removal of the Closing Panel 540CZ
57-27-11-000-005 Removal of the Access Panel 521AZ(621AZ),
521BZ(621BZ), 521CZ(621CZ)
57-27-11-000-007 Removal of the Closing Panel
540CZ(640CZ),540DZ(640DZ)
57-27-11-400-001 Installation of the Access Panel (540AB, 540BB,
540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
640CB, 640DB, 640EB, 640FB, 640GB)



EFF :

ALL  05-25-40

Page 603
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

57-27-11-400-002 Installation of the Access Panel (540HB, 540JB,


540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
....)
57-27-11-400-003 Installation of the Closing Panel 540CZ
57-27-11-400-005 Installation of the Access Panel 521AZ(621AZ),
521BZ(621BZ), 521CZ(621CZ)
57-27-11-400-007 Installation of the Closing Panel 540CZ(640CZ),
540DZ(640DZ)
57-27-12-000-001 Removal of the Fuel-Surge Access Panel
57-27-12-400-001 Installation of the Fuel-Surge Access Panel

3. __________
Job Set-up

Subtask 05-25-40-010-053

A. Get Access

(1) Put an access platform in position.

R (2) Remove the access panels:


521AZ, 521BZ,
621AZ, 621BZ, (Ref. TASK 57-27-11-000-005)
540AZ, 540BZ,
640AZ, 640BZ, (Ref. TASK 57-27-12-000-001)
540AB, 540BB, 540CB,
540DB, 540EB, 540FB,
540GB,
640AB, 640BB, 640CB,
640DB, 640EB, 640FB,
R 640GB, (Ref. TASK 57-27-11-000-001)
540HB, 540JB, 540KB,
540LB, 540MB, 540NB,
R 540PB, 540QB, 540RB,
640HB, 640JB, 640KB,
640LB, 640MB, 640NB,
640PB, 640QB, 640RB. (Ref. TASK 57-27-11-000-002)

R (3) Remove the access panels:


R 540CZ, 640CZ,
R 540DZ, 640DZ.
R (Ref. TASK 57-27-11-000-003) (Ref. TASK 57-27-11-000-007)



EFF :

ALL  05-25-40

Page 604
Aug 01/06
 
JSA 
4. Procedure
_________

Subtask 05-25-40-210-053

A. Inspection

(1) Do a general visual inspection of the wing fuel tank.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-25-40-410-053

A. Close Access

R (1) Install the access panels:


R 540CZ, 640CZ,
R 540DZ, 640DZ.
R (Ref. TASK 57-27-11-400-003) (Ref. TASK 57-27-11-400-007)

R (2) Install the access panels:


R 521AZ, 521BZ,
621AZ, 621BZ, (Ref. TASK 57-27-11-400-005)
R 540AZ, 540BZ,
640AZ, 640BZ, (Ref. TASK 57-27-12-400-001)
540AB, 540BB, 540CB,
540DB, 540EB, 540FB,
540GB
640AB, 640BB, 640CB,
640DB, 640EB, 640FB,
R 640GB, (Ref. TASK 57-27-11-400-001)
540HB, 540JB, 540KB,
540LB, 540MB, 540NB,
R 540PB, 540QB, 540RB,
640HB, 640JB, 640KB,
640LB, 640MB, 640NB,
640PB, 640QB, 640RB. (Ref. TASK 57-27-11-400-002)

(3) Remove the access platform(s).



EFF :

ALL  05-25-40

Page 605
Aug 01/06
 
JSA 
ZONAL INSPECTION : WING VENT SURGE TANK - INSPECTION/CHECK
__________________________________________________________

TASK 05-25-50-200-001

Zonal Inspection of the Vent Surge Tank

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-550-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,


540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
....)
57-27-11-400-002 Installation of the Access Panel (540HB, 540JB,
540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
....)
05-25-50-991-001 Fig. 601



EFF :

ALL  05-25-50

Page 601
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-25-50-010-050

A. Get Access

(1) Put an access platform in position.

(2) Remove the access panels


550BB, 550DB,
650BB, 650DB,
550AB, 550CB
650AB, 650CB, (Ref. TASK 57-27-11-000-002)
(Ref. Fig. 601/TASK 05-25-50-991-001)

4. Procedure
_________

Subtask 05-25-50-210-050

A. Inspection

(1) Do a general visual inspection of the vent surge tank.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (ducting, piping) are attached
correctly.

5. Close-up
________

Subtask 05-25-50-410-050

A. Close Access

(1) Install the access panels


550CB, 550DB,
650CB, 650DB,
550AB, 550BB,
650AB, 650BB, (Ref. TASK 57-27-11-400-002)

(2) Remove the access platform(s).



EFF :

ALL  05-25-50

Page 602
Nov 01/04
 
JSA 
Access Panels of the Vent Surge Tank of the Wing
Figure 601/TASK 05-25-50-991-001



EFF :

ALL  05-25-50

Page 603
Nov 01/04
 
JSA 
ZONAL INSPECTION : WING DRY BAY (OUTBOARD) - INSPECTION/CHECK
_____________________________________________________________

TASK 05-25-60-200-001

Zonal Inspection of the Dry Bay (Outboard)

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-560-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,


540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
....)
57-27-11-400-002 Installation of the Access Panel (540HB, 540JB,
540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
....)

3. __________
Job Set-up

Subtask 05-25-60-010-050

A. Get Access

(1) Put an access platform in position.

(2) Remove the access panel 560AB, (Ref. TASK 57-27-11-000-002). 660AB



EFF :

ALL  05-25-60

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-25-60-210-050

A. Inspection

(1) Do a general visual inspection of the dry bay (outboard).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (ducting, piping) are attached
correctly.

5. Close-up
________

Subtask 05-25-60-410-050

A. Close Access

(1) Install the access panel 560AB, 660AB. (Ref. TASK 57-27-11-400-002)

(2) Remove the access platform(s).



EFF :

ALL  05-25-60

Page 602
Nov 01/04
 
JSA 
________________________________________________________________________
ZONAL INSPECTION : AFT SECTION OF WING AND TRAILING EDGE FIXED STRUCTURE
________________
INSPECTION/CHECK

TASK 05-25-70-200-001

Zonal Inspection as far as visible of the Main Landing Gear Bay

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-010-001 Open the Main Gear Doors for Access


32-12-00-410-001 Close the Main Gear Doors after Access

3. __________
Job Set-up

Subtask 05-25-70-010-050

A. Get Access

(1) Open the main gear doors (Ref. TASK 32-12-00-010-001).

4. Procedure
_________

Subtask 05-25-70-210-050

A. Inspection

(1) Do a general visual inspection of the main landing-gear bay from the
ground.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-25-70

Page 601
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-25-70-410-050

A. Close Access

(1) Close the main gear doors (Ref. TASK 32-12-00-410-001).



EFF :

ALL  05-25-70

Page 602
Nov 01/04
 
JSA 
TASK 05-25-70-200-002

Zonal Inspection of the Shroud Box

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-572-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
05-25-70-991-001 Fig. 601
05-25-70-991-003 Fig. 602

3. __________
Job Set-up

Subtask 05-25-70-866-050

A. Aircraft Maintenance Configuration

(1) Fully extend the flaps. (Ref. TASK 27-50-00-866-008).



EFF :

ALL  05-25-70

Page 603
Nov 01/04
 
JSA 
Subtask 05-25-70-010-051

B. Get Access

(1) Put an access platform in position.

(2) Remove the access panels


571AB.
(Ref. Fig. 601/TASK 05-25-70-991-001)
671AB.
(Ref. Fig. 602/TASK 05-25-70-991-003)

4. Procedure
_________

Subtask 05-25-70-210-051

A. Inspection

(1) Do a visual inspection of the shroud box.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-70-410-051

A. Close Access

(1) Install the access panels


571AB.
671AB.

(2) Remove the access platform(s).

Subtask 05-25-70-866-051

B. Aircraft Maintenance Configuration

(1) Retract the flaps. (Ref. TASK 27-50-00-866-009)



EFF :

ALL  05-25-70

Page 604
Nov 01/04
 
JSA 
Access Panels of the Left Wing Lower Trailing Edge
Figure 601/TASK 05-25-70-991-001



EFF :

ALL  05-25-70

Page 605
Nov 01/04
 
JSA 
Access Panels of the Right Wing Lower Trailing Edge
Figure 602/TASK 05-25-70-991-003



EFF :

ALL  05-25-70

Page 606
Nov 01/04
 
JSA 
TASK 05-25-70-200-003

Zonal Inspection of the Inboard Fixed Trailing Edge Structure from the Shroud
Box to the Rib 9

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-573-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.50 m (8 ft. 2 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance

3. __________
Job Set-up

Subtask 05-25-70-866-052

A. Aircraft Maintenance Configuration

(1) Extend the spoilers (Ref. TASK 27-60-00-866-002)

(2) Fully extend the flaps. (Ref. TASK 27-50-00-866-008)

Subtask 05-25-70-941-051

B. Get Access

(1) Put an access platform in position.



EFF :

ALL  05-25-70

Page 607
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-25-70-210-052

A. Inspection

(1) Do a general visual inspection of the fixed structure.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-25-70-942-051

A. Close Access

(1) Remove the access platform(s).

Subtask 05-25-70-866-053

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).

(2) Retract the spoilers (Ref. TASK 27-60-00-866-002).



EFF :

ALL  05-25-70

Page 608
Nov 01/04
 
JSA 
TASK 05-25-70-200-004

Zonal Inspection of the False Spar Box

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-574-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-25-70-991-001 Fig. 601


05-25-70-991-003 Fig. 602

3. __________
Job Set-up

Subtask 05-25-70-010-053

A. Get Access

(1) Put an access platform in position.

(2) Remove the access panels


R 573AB, 573BB, 573CB,
R
R 573EB, 574AB, 574BB,
(Ref. Fig. 601/TASK 05-25-70-991-001)
R 673AB, 673BB, 673CB,
R
R 673EB, 674AB, 674BB
(Ref. Fig. 602/TASK 05-25-70-991-003)



EFF :

ALL  05-25-70

Page 609
Aug 01/06
 
JSA 
4. Procedure
_________

Subtask 05-25-70-210-053

A. Inspection

(1) Do a general visual inspection of the false spar box.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-25-70-410-053

A. Close Access

(1) Install the access panels


R 573AB, 573BB, 573CB,
R
R 573EB, 574AB, 574BB,
R 673AB, 673BB, 673CB,
R
R 673EB, 674AB, 674BB.

(2) Remove the access platform(s).



EFF :

ALL  05-25-70

Page 610
Aug 01/06
 
JSA 
TASK 05-25-70-200-005

Zonal Inspection of the Outboard Fixed Trailing Edge Structure from the Rib 9
to the Rib 27

WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-575-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-50-00-866-008 Extension of the Flaps on the Ground


27-50-00-866-009 Retraction of the Flaps on the Ground
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
R 57-51-37-000-005 Removal of the Access Panels 575KB(675KB),
R 575LB(675LB), 575MB(675MB)
R 57-51-37-000-007 Removal of the Access Panel 575AT(675AT)
R 57-51-37-400-005 Installation of the Access Panels 575KB(675KB),
R 575LB(675LB), 575MB(675MB)
R 57-51-37-400-007 Installation of the Access Panel 575AT(675AT)
R



EFF :

ALL  05-25-70

Page 611
May 01/06
 
JSA 
3. __________
Job Set-up

Subtask 05-25-70-866-054

A. Aircraft Maintenance Configuration

(1) Extend the spoilers (Ref. TASK 27-60-00-866-002).

(2) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

Subtask 05-25-70-010-054

B. Get Access

(1) Put an access platform in position.

(2) Remove the access panels


R 575AT, 675AT (Ref. TASK 57-51-37-000-007),
R 575KB, 575LB,
R
R 575MB, 675KB, 675LB,
R 675MB (Ref. TASK 57-51-37-000-005).
R

4. Procedure
_________

Subtask 05-25-70-210-054

A. Inspection

(1) Do a general visual inspection of the fixed structure (Outboard).

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-25-70

Page 612
May 01/06
 
JSA 
5. Close-up
________

Subtask 05-25-70-410-054

A. Close Access

(1) Install the access panels


R 575AT, 675AT (Ref. TASK 57-51-37-400-007),
R 575KB, 575LB,
R 575MB, 675KB, 675LB,
R 675MB (Ref. TASK 57-51-37-400-005).

(2) Remove the access platform(s).

Subtask 05-25-70-866-055

B. Aircraft Maintenance Configuration

(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).

(2) Fully retract the spoilers (Ref. TASK 27-60-00-866-002).



EFF :

ALL  05-25-70

Page 613
May 01/06
 
JSA 
INTENTIONALLY BLANK


R



 05-25-70

Page 614
May 01/06
 
JSA 
TASK 05-25-70-200-006

Zonal Inspection of the Main Landing Gear Bay

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-571-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-010-001 Open the Main Gear Doors for Access


32-12-00-410-001 Close the Main Gear Doors after Access

3. __________
Job Set-up

Subtask 05-25-70-010-055

A. Get Access

(1) Put an access platform in position at the zones 571 and 671.

(2) Open the main landing-gear doors (Ref. TASK 32-12-00-010-001).

4. Procedure
_________

Subtask 05-25-70-210-055

A. Inspection

(1) Do a general visual inspection of the main landing-gear bay.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-25-70

Page 615
Nov 01/04
 
JSA 
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.

5. Close-up
________

Subtask 05-25-70-410-055

A. Close Access

(1) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(2) Remove the access platform(s).



EFF :

ALL  05-25-70

Page 616
Nov 01/04
 
JSA 
Access Panel of the Upper Surface of the Wing
Figure 603/TASK 05-25-70-991-002



EFF :

ALL  05-25-70

Page 617
May 01/06
 
JSA 
ZONAL INSPECTION : WING AILERON - INSPECTION/CHECK
__________________________________________________

TASK 05-25-90-200-001

Zonal Inspection of the Wing Aileron

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-590-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-25-90-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-25-90-010-050

A. Get Access

(1) Put an access platform in position.

(2) Remove the access panels


590AB, 590BB.
690AB, 690BB.
(Ref. Fig. 601/TASK 05-25-90-991-001)



EFF :

ALL  05-25-90

Page 601
Nov 01/04
 
JSA 
Access Panels of the Wing Aileron
Figure 601/TASK 05-25-90-991-001



EFF :

ALL  05-25-90

Page 602
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-25-90-210-050

A. Inspection

(1) Do a general visual inspection of the aileron.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-25-90-410-050

A. Close Access

(1) Install the access panels


590AB, 590BB.
690AB, 690BB.

(2) Remove the access platform(s).



EFF :

ALL  05-25-90

Page 603
Nov 01/04
 
JSA 
ZONAL INSPECTION : LANDING GEAR AND LANDING GEAR DOORS - INSPECTION/CHECK
_________________________________________________________________________

TASK 05-27-00-200-001

Zonal Inspection as far as Visible from the Ground of the Landing Gear and the
Landing Gear Doors

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-27-00-869-050

A. Not applicable

4. Procedure
_________

Subtask 05-27-00-210-050

A. Inspection

(1) Do a general visual inspection of the landing-gear and the


landing-gear doors from the ground during the aircraft walkaround.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-27-00

Page 601
Nov 01/04
 
JSA 
ZONAL INSPECTION : NOSE GEAR AND DOORS - INSPECTION/CHECK
_________________________________________________________

TASK 05-27-10-200-001

Zonal Inspection of Nose Gear and Nose Gear Doors

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-711-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-22-00-010-001 Nose Gear Doors - Ground Doors Opening


32-22-00-410-001 Nose Gear Doors - Ground Doors Closing

3. __________
Job Set-up

Subtask 05-27-10-010-050

A. Get Access

(1) Open the nose gear doors 713 and 714. (Ref. TASK 32-22-00-010-001)

4. Procedure
_________

Subtask 05-27-10-210-050

A. Inspection

(1) Do a general visual inspection of the nose gear, the nose gear doors
and the leg door attached to the nose gear. This inspection includes
the zones 711, 712, 713, 714, 715 and 716.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-27-10

Page 601
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-27-10-410-050

A. Close Access

(1) Close the nose gear doors 713 and 714. (Ref. TASK 32-22-00-410-001)



EFF :

ALL  05-27-10

Page 602
Nov 01/04
 
JSA 
ZONAL INSPECTION : MAIN LANDING GEAR AND DOORS - INSPECTION/CHECK
_________________________________________________________________

TASK 05-27-30-200-001

Zonal Inspection of LH/RH Main Landing Gear

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-731-01

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-27-30-010-050

A. Not Applicable

4. Procedure
_________

Subtask 05-27-30-210-050

A. Inspection

(1) Do a general visual inspection of the main landing gear, left and
right sides. This inspection includes the zones 731 and 741.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-27-30

Page 601
Nov 01/04
 
JSA 
TASK 05-27-30-200-002

Zonal Inspection of Main Landing Gear Cylinder Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-732-01

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-27-30-010-051

A. Not Applicable

4. Procedure
_________

Subtask 05-27-30-210-051

A. Inspection

(1) Do a general visual inspection of the main landing gear cylinder


door. This inspection includes the zones 732 and 742.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-27-30

Page 602
Nov 01/04
 
JSA 
TASK 05-27-30-200-003

Zonal Inspection of Main Landing Gear Secondary Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-733-01

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-27-30-010-052

A. Not Applicable

4. Procedure
_________

Subtask 05-27-30-210-052

A. Inspection

(1) Do a general visual inspection of the main landing gear secondary


door. This inspection includes the zones 733 and 743.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-27-30

Page 603
Nov 01/04
 
JSA 
TASK 05-27-30-200-004

Zonal Inspection of Main Landing Gear Main Doors

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-734-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-010-001 Open the Main Gear Doors for Access


32-12-00-410-001 Close the Main Gear Doors after Access

3. __________
Job Set-up

Subtask 05-27-30-010-053

A. Get Access

(1) Open the main gear doors 734, 744. (Ref. TASK 32-12-00-010-001)

4. Procedure
_________

Subtask 05-27-30-210-053

A. Inspection

(1) Do a general visual inspection of the main landing gear main doors.
This inspection includes the zones 734 and 744.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.



EFF :

ALL  05-27-30

Page 604
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-27-30-410-053

A. Close Access

(1) Close the main gear doors 734, 744. (Ref. TASK 32-12-00-410-001)



EFF :

ALL  05-27-30

Page 605
Nov 01/04
 
JSA 
ZONAL INSPECTION : DOORS - INSPECTION/CHECK
___________________________________________

TASK 05-28-00-200-001

Zonal Inspection of the Doors as far as Visible from the Ground

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

Not Applicable

3. __________
Job Set-up

Subtask 05-28-00-869-050

A. Not Applicable.

4. Procedure
_________

Subtask 05-28-00-210-050

A. Inspection

(1) Do a general visual inspection of the doors from the ground during
the aircraft walkaround.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-28-00

Page 601
Nov 01/04
 
JSA 
___________________________________________________________________
ZONAL INSPECTION : AVIONICS COMPARTMENT DOORS (FORWARD AND LATERAL)
________________
INSPECTION/CHECK

TASK 05-28-10-200-001

Zonal Inspection of Forward Avionics Compartment Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-811-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.80 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access
05-28-10-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-28-10-010-050

A. Get Access

(1) Put an access platform in position at the zone 811.

(2) Open the forward avionics compartment door 811, (Ref. TASK 52-41-00-
010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001)



EFF :

ALL  05-28-10

Page 601
Nov 01/04
 
JSA 
Avionics Compartment Left Side Door and Forward Door
Figure 601/TASK 05-28-10-991-001



EFF :

ALL  05-28-10

Page 602
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-10-210-050

A. Inspection

(1) Do a general visual inspection of the forward avionics compartment


door.

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-28-10-410-050

A. Close Access

(1) Close the forward avionics compartment door 811, (Ref. TASK 52-41-00-
410-002).

(2) Remove the access platform(s).



EFF :

ALL  05-28-10

Page 603
Nov 01/04
 
JSA 
TASK 05-28-10-200-002

Zonal Inspection of Forward Avionics Compartment Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-811-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.80 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access
05-28-10-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-28-10-010-051

A. Get Access

(1) Put an access platform in position at the zone 811.

(2) Open the forward avionics compartment door 811, (Ref. TASK 52-41-00-
010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001)

(3) Remove the door panel and the insulation blanket.



EFF :

ALL  05-28-10

Page 604
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-10-210-051

A. Inspection

(1) Do a general visual inspection of the forward avionics compartment


door.

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-28-10-410-051

A. Close Access

(1) Install the door panel and the insulation blanket.

(2) Close the forward avionics compartment door 811, (Ref. TASK 52-41-00-
410-002).

(3) Remove the access platform(s).



EFF :

ALL  05-28-10

Page 605
Nov 01/04
 
JSA 
TASK 05-28-10-200-003

R Zonal Inspection of Lateral Avionics Compartment Doors

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-812-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.80 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access
05-28-10-991-001 Fig. 601
05-28-10-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-28-10-010-052

A. Get Access

R (1) Put an access platform in position at zones 812 and 822.

R (2) Open the forward avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001, 602/TASK 05-28-10-991-002)



EFF :

ALL  05-28-10

Page 606
May 01/05
 
JSA 
Avionics Compartment Right Side Door
Figure 602/TASK 05-28-10-991-002



EFF :

ALL  05-28-10

Page 607
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-10-210-052

A. Inspection

(1) Do a general visual inspection of the lateral avionics compartment


doors 812 and 822.

R (2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-28-10-410-052

A. Close Access

R (1) Close the lateral avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-410-002).

(2) Remove the access platform(s).



EFF :

ALL  05-28-10

Page 608
May 01/05
 
JSA 
TASK 05-28-10-200-004

R Zonal Inspection of Lateral Avionics Compartment Doors

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-812-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.80 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access
05-28-10-991-001 Fig. 601
05-28-10-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-28-10-010-053

A. Get Access

R (1) Put an access platform in position at zones 812 and 822.

R (2) Open the forward avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001, 602/TASK 05-28-10-991-002)

R (3) Remove the door panels and the insulation blankets.



EFF :

ALL  05-28-10

Page 609
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-28-10-210-053

R A. Inspection

(1) Do a general visual inspection of the lateral avionics compartment


doors 812 and 822.

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-28-10-410-053

A. Close Access

R (1) Install the door panels and the insulation blankets.

R (2) Close the lateral avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-410-002).

(3) Remove the access platform(s).



EFF :

ALL  05-28-10

Page 610
May 01/05
 
JSA 
_____________________________________________________________________________
ZONAL INSPECTION : AVIONICS COMPARTMENT DOORS, CARGO COMPARTMENT DOORS (RIGHT
SIDE) - INSPECTION/CHECK
________________________

TASK 05-28-20-200-001

Zonal Inspection of FWD Cargo-Compartment Door Including Fuselage Door Sill,


Door Seal and Lock Fittings

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-825-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.00 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-28-20-010-050

A. Get Access

(1) Put an access platform in position at the zone 825.

(2) Open the forward cargo-compartment door 825. (Ref. TASK 52-30-00-860-
001)



EFF :

ALL  05-28-20

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-20-210-050

A. Inspection

(1) Do a general visual inspection of the forward cargo-compartment door.


This inspection includes the fuselage door sill, door seal and lock
fittings.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring,piping) are attached
correctly.

5. Close-up
________

Subtask 05-28-20-410-050

A. Close Access

(1) Close the forward cargo-compartment door 825. (Ref. TASK 52-30-00-
860-002)

(2) Remove the access platform(s).



EFF :

ALL  05-28-20

Page 602
Nov 01/04
 
JSA 
TASK 05-28-20-200-002

Zonal Inspection of AFT Cargo-Compartment Door Including Fuselage Door Sill,


Door Seal and Lock Fittings

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-826-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.00 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

3. __________
Job Set-up

Subtask 05-28-20-010-051

A. Get Access

(1) Put an access platform in position at the zone 826.

(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)



EFF :

ALL  05-28-20

Page 603
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-20-210-051

A. Inspection

(1) Do a general visual inspection of the AFT cargo-compartment door.


This inspection includes the fuselage door sill, door seal and lock
fittings.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, piping) are attached
correctly.

5. Close-up
________

Subtask 05-28-20-410-051

A. Close Access

(1) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).

(2) Remove the access platform(s).



EFF :

ALL  05-28-20

Page 604
Nov 01/04
 
JSA 
TASK 05-28-20-200-003

Zonal Inspection of the Bulk Cargo-Compartment Door and the Stop Fittings on
the Door Frame

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-827-01

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-006 Open the Bulk Cargo-Compartment Door


52-30-00-860-008 Close the Bulk Cargo-Compartment Door

3. __________
Job Set-up

Subtask 05-28-20-010-052

A. Get Access

(1) Open the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
006)

4. Procedure
_________

Subtask 05-28-20-210-052

A. Inspection

(1) Do a general visual inspection of the bulk cargo-compartment door and


the stop fittings on the door frame.

(2) Make sure that there are no signs of corrosion, cracks or damage.



EFF :

ALL  05-28-20

Page 605
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-28-20-410-052

A. Close Access

(1) Close the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
008)



EFF :

ALL  05-28-20

Page 606
Nov 01/04
 
JSA 
TASK 05-28-20-200-004

Zonal Inspection of FWD Cargo-Compartment Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-825-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.00 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
05-28-20-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-28-20-010-053

A. Get Access

R (1) Put an access platform in position at zone 825.

R (2) Open the forward cargo-compartment door 825 (Ref. TASK 52-30-00-860-
001).

(3) Remove the access panel 825AR and the insulation.


(Ref. Fig. 601/TASK 05-28-20-991-001)



EFF :

ALL  05-28-20

Page 607
May 01/05
 
JSA 
Access Panels of the Cargo Compartment Doors
Figure 601/TASK 05-28-20-991-001



EFF :

ALL  05-28-20

Page 608
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-20-210-053

A. Inspection

(1) Do a general visual inspection of the forward cargo-compartment door.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, piping) are attached
correctly.

5. Close-up
________

Subtask 05-28-20-410-053

A. Close Access

(1) Install the insulation and the access panel 825AR.

R (2) Close the forward cargo-compartment door 825 (Ref. TASK 52-30-00-860-
002).

(3) Remove the access platform(s).



EFF :

ALL  05-28-20

Page 609
May 01/05
 
JSA 
TASK 05-28-20-200-005

Zonal Inspection of AFT Cargo-Compartment Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-826-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 2.00 m (6 ft. 7 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the


Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
05-28-20-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-28-20-010-054

A. Get Access

(1) Put an access platform in position at the zone 826.

(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)

(3) Remove the access panel 826AR and the insulation blanket.
(Ref. Fig. 601/TASK 05-28-20-991-001)



EFF :

ALL  05-28-20

Page 610
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-20-210-054

A. Inspection

(1) Do a general visual inspection of the AFT cargo-compartment door.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring,piping) are attached
correctly.

5. Close-up
________

Subtask 05-28-20-410-054

A. Close Access

(1) Install the insulation blanket and the access panel 826AR.

(2) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)

(3) Remove the access platform(s).



EFF :

ALL  05-28-20

Page 611
Nov 01/04
 
JSA 
TASK 05-28-20-200-006

Zonal Inspection of the Bulk Cargo-Compartment Door and the Stop Fittings on
the Fuselage Door Frame

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-827-02

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-30-00-860-006 Open the Bulk Cargo-Compartment Door


52-30-00-860-008 Close the Bulk Cargo-Compartment Door

3. __________
Job Set-up

Subtask 05-28-20-010-055

A. Get Access

(1) Open the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
006)

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

4. Procedure
_________

Subtask 05-28-20-210-055

A. Inspection

(1) Do a general visual inspection of the bulk cargo-compartment door and


the stop fittings on the fuselage door frame.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.



EFF :

ALL  05-28-20

Page 612
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-28-20-410-055

A. Close Access

(1) Close the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
008)



EFF :

ALL  05-28-20

Page 613
Nov 01/04
 
JSA 
TASK 05-28-20-200-007

R Zonal Inspection of Rear Avionic Compartment Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-824-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.80 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access
05-28-20-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-28-20-010-056

A. Get Access

R (1) Put an access platform in position at zone 824.

R (2) Open the rear avionic compartment door 824 (Ref. TASK 52-41-00-010-
002).
(Ref. Fig. 602/TASK 05-28-20-991-002)



EFF :

ALL  05-28-20

Page 614
May 01/05
 
JSA 
R Rear Avionic Compartment Door
Figure 602/TASK 05-28-20-991-002



EFF :

ALL  05-28-20

Page 615
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-28-20-210-056

A. Inspection

R (1) Do a general visual inspection of the rear avionic compartment door.

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-28-20-410-056

A. Close Access

R (1) Close the rear avionic compartment door 824 (Ref. TASK 52-41-00-410-
002).

(2) Remove the access platform(s).



EFF :

ALL  05-28-20

Page 616
May 01/05
 
JSA 
TASK 05-28-20-200-008

R Zonal Inspection of Rear Avionic Compartment Door

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-824-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.80 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-41-00-010-002 Open the Avionics Compartment Doors for Access


52-41-00-410-002 Close the Avionics Compartment Doors after Access
05-28-20-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-28-20-010-057

A. Get Access

R (1) Put an access platform in position at zone 824.

R (2) Open the rear avionic compartment door 824 (Ref. TASK 52-41-00-010-
002).
(Ref. Fig. 602/TASK 05-28-20-991-002)

R (3) Remove the door panels and the insulation blankets.



EFF :

ALL  05-28-20

Page 617
May 01/05
 
JSA 
4. Procedure
_________

Subtask 05-28-20-210-057

A. Inspection

R (1) Do a general visual inspection of the rear avionic compartment door.

(2) Make sure that there are no signs of corrosion, cracks or damage.

5. Close-up
________

Subtask 05-28-20-410-057

A. Close Access

R (1) Install the insulation blankets and the door panels.

R (2) Close the rear avionic compartment door 824 (Ref. TASK 52-41-00-410-
002).

(3) Remove the access platform(s).



EFF :

ALL  05-28-20

Page 618
May 01/05
 
JSA 
ZONAL INSPECTION : PASSENGER/CREW DOORS AND EMERGENCY EXITS - INSPECTION/CHECK
______________________________________________________________________________

TASK 05-28-30-200-001

Zonal Inspection of FWD and AFT Passenger/Crew Doors including Door Stops on
Fuselage Door Frames and Door Seals

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-831-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-10-00-010-001 Opening of the Passenger/Crew Door


52-10-00-410-001 Closing of the Passenger/Crew Door

3. __________
Job Set-up

Subtask 05-28-30-010-060

A. Get Access

(1) Put an access platform in position at zone 831(841) or 832(842).

(2) Open the passenger/crew doors 831(841) or 832(842) (Ref. TASK 52-10-
00-010-001).



EFF :

ALL  05-28-30

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-28-30-210-050

A. Inspection

(1) Do a general visual inspection of the FWD and AFT passenger/crew


doors. This inspection includes the door stops on the fuselage door
frames and the door seals.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, piping) are attached
correctly.

5. Close-up
________

Subtask 05-28-30-410-060

A. Close Access

(1) Close the passenger/crew doors 831(841) or 832(842) (Ref. TASK 52-10-
00-410-001).

(2) Remove the access platform(s).



EFF :

ALL  05-28-30

Page 602
Nov 01/04
 
JSA 
TASK 05-28-30-200-003

Zonal Inspection of FWD and AFT Emergency Exits including Door Surround on
Fuselage Door Frames and Door Seals

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-833-01

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.5 m (11 ft. 6 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-10-00-010-001 Opening of the Passenger/Crew Door


52-10-00-410-001 Closing of the Passenger/Crew Door
52-21-11-000-001 Removal of the Emergency Exit Hatch
52-21-11-400-001 Installation of the Emergency Exit Hatch

3. __________
Job Set-up

Subtask 05-28-30-010-050

A. Get Access

(1) Put an access platform in position at zone 831(841) or 832(842).

(2) Open the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
00-010-001).

R (3) Open the emergency exit doors 833(843), 834(844) (Ref. TASK 52-21-11-
000-001).



EFF :

ALL  05-28-30

Page 603
Nov 01/05
 
JSA 
4. Procedure
_________

Subtask 05-28-30-210-052

A. Inspection

(1) Do a general visual inspection of the forward and aft emergency


exits. This inspection includes the door surround on the fuselage
door frames and door seals.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-28-30-410-050

A. Close Access

R (1) Install the emergency exit doors 833(843), 834(844) (Ref. TASK 52-21-
11-400-001).

(2) Close the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
00-410-001).

(3) Remove the access platform(s).



EFF :

ALL  05-28-30

Page 604
Nov 01/05
 
JSA 
TASK 05-28-30-200-005

Zonal Inspection of FWD and AFT Passenger/Crew Doors

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-831-02

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-46-000-001 Removal of the Door Linings at the FWD Passenger/Crew


Doors
25-23-46-000-002 Removal of the Door Linings at the AFT Passenger/Crew
Doors
25-23-46-400-001 Installation of the Door Linings at the FWD
Passenger/Crew Doors
25-23-46-400-002 Installation of the Door Linings at the AFT
Passenger/Crew Doors

3. __________
Job Set-up

Subtask 05-28-30-010-052

A. Get Access

(1) Remove the linings:

(a) For the FWD passenger/crew doors:


R 831AZ, 831BZ, 831CZ,
831DZ, 831EZ, 831FZ,
831GZ,
R 841AZ, 841BZ, 841CZ,
841DZ, 841EZ, 841FZ,
841GZ
(Ref. TASK 25-23-46-000-001).

(b) For the AFT passenger/crew doors:


R 832AZ, 832BZ, 832CZ,
832DZ, 832EZ, 832FZ,
832GZ,
R 842AZ, 842BZ, 842CZ,
842DZ, 842EZ, 842FZ,
842GZ
(Ref. TASK 25-23-46-000-002).

R (2) Lift the insulation.



EFF :

ALL  05-28-30

Page 605
Nov 01/05
 
JSA 
4. Procedure
_________

Subtask 05-28-30-210-054

A. Inspection

(1) Do a general visual inspection of the FWD and AFT passenger/crew


doors.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations (wiring, piping) are attached
correctly.

NOTE : Lift the insulation blankets sufficiently to complete a


____
correct general visual inspection as necessary.

5. Close-up
________

Subtask 05-28-30-410-052

A. Close Access

R (1) Put the insulation back in position.

R (2) Install the linings:

(a) For the FWD passenger/crew doors:


R 831AZ, 831BZ, 831CZ,
831DZ, 831EZ, 831FZ,
831GZ,
R 841AZ, 841BZ, 841CZ,
841DZ, 841EZ, 841FZ,
841GZ
(Ref. TASK 25-23-46-400-001).

(b) For the AFT passenger/crew doors:


R 832AZ, 832BZ, 832CZ,
832DZ, 832EZ, 832FZ,
832GZ,
R 842AZ, 842BZ, 842CZ,
842DZ, 842EZ, 842FZ,
842GZ
(Ref. TASK 25-23-46-400-002).



EFF :

ALL  05-28-30

Page 606
Nov 01/05
 
JSA 
TASK 05-28-30-200-007

Zonal Inspection of FWD and AFT Emergency Exits

1. __________________
Reason for the Job

Refer to the MPD TASK: ZL-833-02

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific 1 ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-47-000-001 Removal of the Lining from the Emergency Exit Hatches


25-23-47-400-001 Installation of the Lining on the Emergency Exit
Hatches
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-410-001 Closing of the Passenger/Crew Door
52-21-11-000-001 Removal of the Emergency Exit Hatch
52-21-11-400-001 Installation of the Emergency Exit Hatch

3. __________
Job Set-up

Subtask 05-28-30-010-054

A. Get Access

(1) Put an ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at zone


831(841) or 832(842).

(2) Open the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
00-010-001).

(3) Open the emergency exit doors 833(843) and 834(844) (Ref. TASK 52-21-
11-000-001).



EFF :

ALL  05-28-30

Page 607
Nov 01/04
 
JSA 
(4) Remove the emergency-exit door panels
833AZ, 833BZ, 834AZ, 834BZ, 843AZ, 843BZ, 844AZ, 844BZ (Ref. TASK 25-
23-47-000-001).

(5) Remove the insulation blanket.

4. Procedure
_________

Subtask 05-28-30-210-056

A. Inspection

(1) Do a general visual inspection of the forward and aft emergency


exits.

(2) Make sure that there are no signs of corrosion, cracks or damage.

(3) Make sure that all the installations are attached correctly.

5. Close-up
________

Subtask 05-28-30-410-054

A. Close Access

(1) Install the insulation blanket.

(2) Install the emergency-exit door panels


833AZ, 833BZ, 834AZ, 834BZ, 843AZ, 843BZ, 844AZ, 844BZ (Ref. TASK 25-
23-47-400-001).

(3) Close the emergency exit doors 833(843) and 834(844) (Ref. TASK 52-
21-11-400-001).

(4) Close the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
00-410-001).

(5) Remove the access platform(s).



EFF :

ALL  05-28-30

Page 608
Nov 01/04
 
JSA 
UNSCHEDULED MAINTENANCE CHECKS - DESCRIPTION AND OPERATION
__________________________________________________________

1. _______
General
This section gives information related to the unsheduled maintenance checks:
- inspection/checks after the aircraft has gone through special or abnormal
conditions (Ref. ATA 05-51),
- pressurization test of fuselage (leakage checks) after A/C abnormal
operation or repair (Ref. ATA 05-53),
- demagnetization of the external parts of the frames of the windshield and
sliding windows (Ref. ATA 05-54),
- levelling and measurement after aircraft abnormal operation (Ref. ATA
05-56),
- aircraft stability (Ref. ATA 05-57),
- requirements of non-revenue flight following maintenance actions (Ref. ATA
05-59).



EFF :

ALL  05-50-00

Page 1
Nov 01/04
 
JSA 
UNSCHEDULED MAINTENANCE CHECKS - MAINTENANCE PRACTICES
______________________________________________________

TASK 05-50-00-790-001

Fluid Leak Measurement - Maintenance Practices

1. __________________
Reason for the Job

This task gives you all the fluid leak measurement procedures for flight
controls, fuel, hydraulic, landing gear, cargo door and power plant systems.

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

28-11-00-280-002 Fuel Tank Leak Checks


29-00-00-790-001 Check of the External Leaks of the Hydraulic
Components
71-70-00-600-010 Leakage Rates at Drains Mast

3. __________
Job Set-up

Subtask 05-50-00-941-052

A. Not Applicable

4. Procedure
_________

Subtask 05-50-00-360-050

A. Measurement of Leaks

(1) Measurement of hydraulic system leaks (Ref. TASK 29-00-00-790-001).

(2) Measurement of flight control system leaks (Ref. TASK 29-00-00-790-


001).

(3) Measurement of fuel system leaks (Ref. TASK 28-11-00-280-002).

(4) Measurement of landing gear system leaks (Ref. TASK 29-00-00-790-


001).

(5) Measurement of cargo system leaks (Ref. TASK 29-00-00-790-001).



EFF :

ALL  05-50-00

Page 201
Nov 01/04
 
JSA 
(6) Measurement of power plant system leaks (Ref. TASK 71-70-00-600-010).



EFF :

ALL  05-50-00

Page 202
Nov 01/04
 
JSA 
INSPECTIONS - DESCRIPTION AND OPERATION
_______________________________________

1. _______
General
This section contains those inspections that are necessary after an incident
or flight in abnormal conditions and will, in most cases, be called for as a
result of flight crew report.
If there is no inspection in this section applicable to incident or abnormal
flight conditions that occurred, operators must tell Airbus and make a
request for more instructions.

A. Inspection Coverage
It is not possible to lay down precise details of the inspection
procedure to adopted after every incident because of the wide variations
of weight, speed, nature and direction of loads, weather conditions and
component failure patterns. Therefore these inspections have been written
for the worst possible case. In order to gain an indication of the
severity of the incident and to facilitate rapid location of primary
damage it is essential that full information is obtained from the flight
crew. Therefore prior to starting an inspection consult the crew and
ascertain details of:
- Weather conditions
- Aircraft speed and flight attitude
- Aircraft weight and fuel distribution
- In landing mode, if touchdown was straight, drifting, wing low, nose
high or low
- If any noise of impact or indicative of structure or component failure
was heard
- Relevant instrument indications
Printout of the maintenance data recorder tape will provide valuable
additional data and indication of system malfunction.

B. Inspection Sequence
To permit simultaneous inspection of several areas of the aircraft the
inspection has been divided into a number of Packages.
For example: Inspection after Hail Impact requires on Phase 1 a
complete airframe external check. Therefore this is divided into four
major zones: fuselage, wings, nacelles/pylons and stabilizers. These
major zones are further divided into smailer zones or major components.
The small zones are then broken down into items, which can be
individually signed off as inspection is completed.
The inspections are divided into three phases:
- Phase 1: is a general inspection for primary damage and indication of
remote damage and is mainly external.
- Phase 2: is a more detailed inspection and is mainly internal. Some
component removal may be called up.
- Phase 3: is a very detailed inspection involving component removal and
strip down.



EFF :

ALL  05-51-00

Page 1
Nov 01/04
 
JSA 
If the Phase 1 inspection reveals no damage, no further examination is
necessary.
If Phase 1 reveals damage then Phase 2 must be accomplished.
If Phase 2 reveals damage then Phase 3 must be accomplished.

C. Inspection Form
(Ref. Fig. 001)
The layout of the inspection form has been arranged as follows:
- columns are explained on the figure
- columns INSP. CODE and INSP. SIGN are provided for use by the
operators, they wish to use them, for inspection intensity code and
accomplishment signature. The forms may thus be photo-copied, used as
work cards and then filed with the aircraft technical record on
completion.



EFF :

ALL  05-51-00

Page 2
Nov 01/04
 
JSA 
Inspection Form
Figure 001



EFF :

ALL  05-51-00

Page 3
Nov 01/04
 
JSA 
INSPECTIONS AFTER HARD/OVERWEIGHT LANDING - INSPECTION/CHECK
____________________________________________________________

TASK 05-51-11-200-004

Inspection After Hard/Overweight Landing

1. __________________
Reason for the Job

After a flight crew report of a hard/overweight landing, you must do the


inspections that follow before the subsequent flight.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific adjustable access platform 11 m (36 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-56-00-200-001 Inspection/Check of the Leveling and Measurement


after Abnormal Operation of the Aircraft
07-11-00-581-001 Lifting for Aircraft Maintenance Operations
07-11-00-586-002 Lowering of the Aircraft for Maintenance Operations
12-14-32-614-003 Check Charge Pressure of Main Landing Gear Shock
Absorber
12-14-32-614-004 Check Shock Absorber Charge Pressure
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation
27-34-00-710-001 Operational Test of the Elevator and Hydraulic
Actuation
27-44-00-710-002 Operational Test of the Trimmable Horizontal
Stabilizer Actuator with the Individual Hydraulic
Systems
27-50-00-866-008 Extension of the Flaps on the Ground
27-54-00-200-001 Detailed Visual Inspection of the Transmission
Assembly (Including Part of the Transmission in Zone
140)



EFF :

ALL  05-51-11

Page 601
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-54-00-710-001 Operational Test of the Flap System


27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-80-00-866-004 Extending the Slats on the Ground
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
31-37-00-200-001 Check of the Load-Report Parameter after
Hard/Overweight Landing or Excessive Turbulence
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-11-00-200-004 Detailed Inspection of Main Wheels Axle and Axle
Sleeves
32-11-00-200-005 Inspection of the MLG after the Aircraft has gone off
the Runway
32-11-00-200-006 Inspection of the MLG Axles after the Aircraft has
gone off the Runway
32-11-11-000-001 Removal of the MLG Leg Assembly
32-11-11-400-001 Installation of the MLG Leg Assembly
32-11-13-000-001 Removal of the MLG Shock Absorber
32-11-13-400-001 Installation of the MLG Shock Absorber
32-11-16-000-001 Removal of the MLG Side-Stay Assembly 2505GM, 2506GM
32-11-16-400-001 Installation of the MLG Side-Stay Assembly 2505GM,
2506GM
32-11-17-000-001 Removal of the MLG Lock Stay
32-11-17-400-001 Installation of the MLG Lock Stay
32-11-21-000-001 Removal of the MLG Lockstay Actuating Cylinder
32-11-21-400-001 Installation of the MLG Lockstay Actuating Cylinder
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-21-00-200-006 Inspection/Check of the Barrel/Drag struct connection
32-21-11-000-002 Removal of the NLG Leg Assy (2526GM)
32-21-11-400-002 Installation of the NLG Leg Assy (2526GM)
32-21-13-000-001 Removal of the NLG Shock Absorber Assy
32-21-13-400-001 Installation of the NLG Shock Absorber Assy
32-21-16-000-002 Removal of the NLG Drag Strut Assy (2528GM)
32-21-16-400-002 Installation of the NLG Drag Strut Assy (2528GM)
32-21-17-000-001 Removal of the NLG Lockstay Assy
32-21-17-400-001 Installation of the NLG Lockstay Assy
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-31-00-720-002 Functional Test of the Normal Extension and
Retraction of the Landing Gear



EFF :

ALL  05-51-11

Page 602
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-31-22-000-001 Removal of the NLG Actuating Cylinder (2527GM)


32-31-22-400-001 Installation of the NLG Actuating Cylinder (2527GM)
32-31-46-000-001 Removal of the MLG Actuating Cylinder
32-31-46-400-001 Installation of the MLG Actuating Cylinder
32-33-00-720-001 Functional Check of Free-Fall Extension
32-41-00-210-002 Inspection/Check of the Wheels and Tires
32-41-12-000-001 Removal of the NLG Wheel (2659GM,2660GM)
32-41-12-000-002 Removal of the Axle Sleeve
32-41-12-400-001 Installation of the NLG Wheel (2659GM,2660GM)
32-41-12-400-002 Installation of the Axle Sleeve
54-51-17-000-001 Removal of the Pylon-to-Wing Forward Attach Fitting
at RIB4
54-51-17-000-002 Removal of the Pylon-to-Wing Aft Attach Fitting at
RIB10
54-51-17-200-001 Inspection of the Pylon-to-Wing Forward
Attach-Fitting
54-51-17-200-002 Inspection of the Pylon-to-Wing Aft Attach-Fitting
54-51-17-400-001 Installation of Pylon-to-Wing Forward Attach Fitting
at RIB4
54-51-17-400-002 Installation of the Pylon-to-Wing Aft Attach Fitting
at RIB10
55-10-00-210-001 Detailed Inspection of Horizontal Stabilizer Internal
Structure of Torque Box Inboard of Fuselage Fairings
55-16-00-200-001 Detailed Inspection of Horizontal Stabilizer Rear
Support Fittings, Upper and Lower Attach Fittings and
Surrounding External Structure, LH/RH
55-30-00-200-001 Detailed Visual Inspection of Vertical Stabilizer
Center Box Internal Structure as far as Visible,
Front Spar FWD Face Upper Closing Rib Upper Surface
55-36-00-210-001 Detailed Visual Inspection of the Vertical Stabilizer
Attach Fittings Including the Load Introduction Area
at the Skin Panels
71-00-00-710-013 Test No.11 : High Power Assurance Test
71-00-20-000-040 Removal of the Power Plant
71-00-20-400-040 Installation of the Power Plant
71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
78-31-00-710-041 Operational Test of the Thrust Reverser System with
the CFDS
78-32-00-010-010 Opening of the Thrust Reverser Halves
79-00-00-200-010 Inspection of the Oil System
05-51-11-991-015 Fig. 601
05-51-11-991-016 Fig. 602



EFF :

ALL  05-51-11

Page 603
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-51-11-210-090

A. Hard/Overweight Landing Inspection Requirements


(Ref. Fig. 601/TASK 05-51-11-991-015, 602/TASK 05-51-11-991-016)

(1) Definitions
There are several categories of hard/overweight landing:

(a) Hard landing


A hard landing is a landing with an aircraft weight less than the
Maximum landing Weight (MLW) and:
- a vertical acceleration (VertG) equal to or more than 2.6 g and
less than 2.86 g at aircraft Center of Gravity (CG) or,
- a vertical speed (Vs) equal to or more than 10 ft/s and less
than 14 ft/s.

(b) Severe hard landing


A severe hard landing is a landing with an aircraft weight less
than the Maximum landing Weight (MLW) and:
- a vertical acceleration (VertG) equal to or more than 2.86 g at
aircraft Center of Gravity (CG) or,
- a vertical speed (Vs) equal to or more than 14 ft/s.

(c) Overweight landing


An overweight landing is a landing with an aircraft weight more
than the Maximum landing Weight (MLW) and:
- a vertical acceleration (VertG) equal to or more than 1.7 g and
less than 2.6 g at aircraft Center of Gravity (CG) or,
- a vertical speed (Vs) equal to or more than 6 ft/s and less
than 13 ft/s.

(d) Severe overweight landing


A severe overweight landing is a landing with an aircraft weight
more than the Maximum landing Weight (MLW) and:
- a vertical acceleration (VertG) equal to or more than 2.6 g at
aircraft Center of Gravity (CG) or,
- a vertical speed (Vs) equal to or more than 13 ft/s.

(e) High pitch-rate landing


A high pitch-rate landing is a landing during which the pitch
rate is more than 10 Deg/sec.



EFF :

ALL  05-51-11

Page 604
Nov 01/04
 
JSA 
Hard/Overweight landing criteria
Figure 601/TASK 05-51-11-991-015



EFF :

ALL  05-51-11

Page 605
Nov 01/04
 
JSA 
R Inspection Flow Chart
Figure 602/TASK 05-51-11-991-016



EFF :

ALL  05-51-11

Page 606
May 01/06
 
JSA 
(2) Hard/overweight landing confirmation

(a) It is the responsibility of the flight crew to make a report if


they think there was a hard/overweight landing.

(b) After a crew report of a hard/overweight landing, you must


confirm the impact parameters to know the category of the
landing.
To know this, refer to:
- the DMU load report 15 (Ref. TASK 31-37-00-200-001) or,
- the FDRS read out.

(c) When you know the category of the landing, you must do the
inspections for that category.

NOTE : If you cannot comfirm the impact parameter values with the
____
DMU or the FDRS, you must do the inspection with the steps
for a severe hard/overweight landing.

(3) Inspection preparation

(a) Make sure that you know the category of landing (hard/overweight
or severe hard/overweight landing).

NOTE : If you do not know the category of landing, do the


____
inspection with the steps for a severe hard/overweight
landing.

(b) We recommend that you get information from the flight crew about
the landing conditions, e.g.:
- touch down straight, drifting, wing low, tail or nose heavy,
- touch down on main gears or on main and nose gears or high
pitch rate on nose gear,

NOTE : After a hard/overweight landing, 3 touchdown


____
configurations are possible:
- hard touchdown on main gears only:
The inspection of the nose gear area is not necessary.
- hard touchdown on nose gear only (high pitch-rate):
Only the inspection of the nose gear area is necessary.
- hard touchdown on nose and main gears:
The full inspection is necessary.

- weight of the aircraft,


- quantity of fuel in each tank,
- instrument indications,



EFF :

ALL  05-51-11

Page 607
Nov 01/04
 
JSA 
- other information such as noise that could be related to a
structural failure.

(c) We recommend that you get the related Post Flight Report (PFR).

(d) You must also do all additional checks related to the events
specified in the flight crew report or the PFR.
R

Subtask 05-51-11-481-069

B. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-11-866-052

C. Extension of the Flight Control Surfaces

(1) Extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Extend the slats (Ref. TASK 27-80-00-866-004).

(3) Extend the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-11-010-052

D. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).

Subtask 05-51-11-860-053

E. Aircraft Maintenance Configuration

(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).



EFF :

ALL  05-51-11

Page 608
Aug 01/06
 
JSA 
(3) Put warning notices in the cockpit to tell persons not to operate the
systems.

(4) Put the adjustable access platform in position.

4. Procedure
_________

R Subtask 05-51-11-210-105

R A. General inspection recommendations

R NOTE : Refer to the latest revision of the EASA AD 2006-0069 (or any
____
R related local Aiworthiness Authorities directive) for other
R possible inspection requirements for the wing bottom skin area at
R MLG support Rib 5, before the subsequent flight.

R NOTE : All the inspections are visual unless otherwise differently in the
____
R text. Operators can refer to the Non-destructive Testing Manual
R (NTM) and use the non-destructive procedures.

R (1) If you find damage during an inspection and if it is necessary to


R disconnect or remove components (pipes, ducts, cables, electrical
R connectors and mechanic linkages) do a functional test of the related
R system after re-assembly.

R (2) If it is necessary to open (remove) access panels and doors, examine


R them.
R Make sure that:
R - they are aligned correctly,
R - they have no distortion or cracks,
R - the paint is not damaged,
R - all fasteners and safety devices are in the correct position.

R (3) If there is damage to the aircraft structure, refer to the Structural


R Repair Manual (SRM). The SRM has the approved damage limits and
R repair procedures.

R Subtask 05-51-11-210-106

R B. General Inspection
R Do a walk around inspection of the aircraft. Make sure that you cannot
R see damage and fluid leaks. Carefully examine the landing gears, the
R wheels, the tires and the brake units.



EFF :

ALL  05-51-11

Page 609
Aug 01/06
 
JSA 
Subtask 05-51-11-210-091

C. Inspection of the Nose Landing Gear

NOTE : You must do this inspection if the hard/overweight landing was on


____
the nose gear only (high pitch rate) or on the nose and main
gears.

(Ref. TASK 12-14-32-614-004) (Ref. TASK 32-21-11-000-002)


(Ref. TASK 32-21-11-400-002) (Ref. TASK 32-21-17-000-001)
(Ref. TASK 32-21-17-400-001) (Ref. TASK 32-21-16-000-002)
(Ref. TASK 32-21-16-400-002) (Ref. TASK 32-31-22-000-001)
(Ref. TASK 32-31-22-400-001) (Ref. TASK 32-41-12-000-001)
(Ref. TASK 32-41-12-400-001) (Ref. TASK 32-41-12-000-002)
(Ref. TASK 32-41-12-400-002) (Ref. TASK 32-21-13-000-001)
(Ref. TASK 32-21-13-400-001) (Ref. TASK 32-21-00-200-006)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nose landing gear | | | | | |
| | |NOTE: You can do this inspection with | | | | | |
| | | the aircraft on its wheels or on | | | | | |
| | | jacks. | | | | | |
| | | However, if the crew makes a | | | | | |
R | | | a report of a hight pitch | | | | | |
| | | rate AIRBUS recommends to lift | | | | | |
| | | the aircraft at the nose | | | | | |
| | | jacking point to do a check of | | | | | |
| | | the shock absorber extension. | | | | | |
| | | | | | | | |
| A.| |Do a check of the pressure in the shock| X | | | | |
| | |absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-004) | | | | | |
| | |If you find unsatisfactory condition: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | | | | | | |
| B.| |Do a visual inspection of the wheels | X | | | | |
| | |for distortion, cracks and damaged | | | | | |
| | |paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | |(2) Remove the axle sleeve | | X | | | |



EFF :

ALL  05-51-11

Page 610
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | |(3) Do a visual inspection of the axle | | X | | | |
| | | and sleeve for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the NLG for overhaul | | | X | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | | | | | | |
| C.| |Examine: | X | | | | |
| | |- the nose landing gear and all the | | | | | |
| | | components installed on it for | | | | | |
| | | cracks, scores, tears, rupture, | | | | | |
| | | leakage and damaged paintwork. | | | | | |
| | |- the attachment fittings of the nose | | | | | |
| | | landing gear. | | | | | |
| | |- the hydraulic lines and electrical | | | | | |
| | | harnesses for correct condition. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) In the avionics compartment, | | X | | | |
| | | examine the gear-well roof, | | | | | |
| | | the roof-to-sidewall joint, and the| | | | | |
| | | floor support-strut attach-fittings| | | | | |
| | | for distortion, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| D.| |Make sure that you can install the NLG | X | | | | |
R | | |safety lock easily. | | | | | |
| | | | | | | | |
| E.| |Examine the shock absorber sliding rod | X | | | | |
| | |(the part you can see) for blue color, | | | | | |
| | |signs of bronze, chrome damage or | | | | | |
| | |external oil leaks. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | | | | | | |
| F.| |Examine the drag strut assembly and its| X | | | | |
| | |attachment fittings for distortion, | | | | | |
| | |cracks and damaged paintwork. | | | | | |
| | |If you find damage: | | | | | |



EFF :

ALL  05-51-11

Page 611
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(1) Remove the drag strut assembly for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-21-16-000-002) | | | | | |
| | | (refer to the manufactures | | | | | |
| | | instruction for the overhaul | | | | | |
| | | procedure) | | | | | |
| | |(2) On the aircraft, examine the | | X | | | |
| | | attachment fitting for damage. | | | | | |
| | |(3) Examine the drag strut | | X | | | |
| | | attachment-lugs on NLG leg and | | | | | |
| | | measure the distance between them: | | | | | |
| | | (Ref. TASK 32-21-00-200-006) | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the NLG | | | X | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | | | | | | |
| G.| |Examine the lockstay assembly for | X | | | | |
| | |distortion, cracks and damaged | | | | | |
| | |paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the lockstay assembly for | | X | | | |
| | | overhaul. | | | | | |
| | | (Ref. TASK 32-21-17-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) On the aircraft, examine the | | X | | | |
| | | attachment fittings for damage. | | | | | |
| | | | | | | | |
| H.| |Examine the NLG actuating cylinder and | X | | | | |
| | |its attachment fittings for distortion,| | | | | |
| | |cracks, pulled or torn fasteners and | | | | | |
| | |damaged paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the actuating cylinder for | | X | | | |
| | | strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down inspection). | | | | | |
| | |(2) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |



EFF :

ALL  05-51-11

Page 612
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| J.| |If you removed components, install | | | | | |
| | |serviceable components: | | | | | |
| | |- for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-22-400-001) | | | | | |
| | |- for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001) | | | | | |
| | |- for the NLG | | | | | |
| | | (Ref. TASK 32-21-11-400-002) | | | | | |
| | |- for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002) | | | | | |
| | |- for the shock absorber | | | | | |
| | | (Ref. TASK 32-21-13-400-001) | | | | | |
| | |- for the axle sleeve | | | | | |
| | | (Ref. TASK 32-41-12-400-002) | | | | | |
| | |- for the wheels | | | | | |
| | | (Ref. TASK 32-41-12-400-001) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-103

R D. Inspection of the NLG Section of the Fuselage

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Fuselage-Nose/landing-gear section | | | | | |
| | | between FR9 and FR20. | | | | | |
| | | NOTE : This inspection is necessary if| | | | | |
| | | you found damage during the | | | | | |
| | | phase 1 checks of the NLG. | | | | | |
| | | | | | | | |
| A.| | Nose-gear upper-strut attachments | | | | | |
| | | (FR14). | | | | | |
| | | (1) Examine: | | X | | | |
| | | - the area around the bearing, | | | | | |
| | | - the attachment of the fitting on| | | | | |
| | | FWD frame and roof of the nose | | | | | |
| | | wheel well, | | | | | |
| | | - the link rods. | | | | | |
| | | | | | | | |
| B.| | Nose-gear actuating cylinder | | | | | |



EFF :

ALL  05-51-11

Page 613
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachment-fitting (FR20). | | | | | |
| | | (1) Examine the attachment of the | | X | | | |
| | | actuating cylinder fitting to the | | | | | |
| | | upper link at FR19 and FR20. | | | | | |
| | | | | | | | |
| C.| | Nose-gear leg attachments (FR19). | | X | | | |
| | | (1) Examine the attachments at FR19 | | | | | |
| | | and FR20 and the longitudinal | | | | | |
| | | beams. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-092

R E. Inspection of the Main Landing Gears

NOTE : This inspection contains two inspection procedures:


____
- item 1. Inspection after a hard/overweight landing
- item 2. Inspection after a severe hard/overweight landing.
If you know the category of the landing, go directly to the
necessary inspection.
If you do not known the category, go directely to item 2.
Inspection after severe hard/overweight landing.

(Ref. TASK 12-14-32-614-003) (Ref. TASK 32-41-00-210-002)


(Ref. TASK 32-11-00-200-006) (Ref. TASK 32-11-13-000-001)
(Ref. TASK 32-11-16-000-001) (Ref. TASK 32-11-00-200-004)
(Ref. TASK 32-11-11-000-001) (Ref. TASK 32-11-17-000-001)
(Ref. TASK 32-11-21-000-001) (Ref. TASK 32-31-46-000-001)
(Ref. TASK 32-31-46-400-001) (Ref. TASK 32-11-21-400-001)
(Ref. TASK 32-11-17-400-001) (Ref. TASK 32-11-11-400-001)
(Ref. TASK 32-11-16-400-001) (Ref. TASK 32-11-13-400-001)
(Ref. TASK 07-11-00-581-001) (Ref. TASK 32-11-00-200-005)
(Ref. TASK 32-31-00-720-002) (Ref. TASK 32-33-00-720-001)
(Ref. TASK 05-56-00-200-001) (Ref. TASK 07-11-00-586-002)



EFF :

ALL  05-51-11

Page 614
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the MLG after | | | | | |
| | |hard/overweight landing | | | | | |
| | |NOTE : You can do this inspection with | | | | | |
| | | the aircraft on its wheels or on| | | | | |
| | | jacks. | | | | | |
| | | | | | | | |
| A.| |Do a check of the pressure in the MLG | X | | | | |
| | |shock absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-003) | | | | | |
| | | | | | | | |
| B.| |Do a visual inspection of the wheels | X | | | | |
| | |for distortion, cracks, damaged | | | | | |
| | |paintwork and correct installation. | | | | | |
| | |Examine the side walls of the tires for| | | | | |
| | |damage | | | | | |
| | |(Ref. TASK 32-41-00-210-002) | | | | | |
| | |If you find damage. | | | | | |
| | |(1) Do the inspection of the axle and | | X | | | |
| | | the axle sleeve for damage and | | | | | |
| | | out-of-roundness. | | | | | |
| | | (Ref. TASK 32-11-00-200-006) | | | | | |
| | | | | | | | |
| C.| |Examine: | X | | | | |
| | |- the MLG and all the components | | | | | |
| | | installed on it for cracks, scores, | | | | | |
| | | tears, rupture, leakage and damaged | | | | | |
| | | paintwork (carefully examine the drag| | | | | |
| | | stay blend and the forward pintle pin| | | | | |
| | | areas). | | | | | |
| | |- the attachment fittings of the MLG | | | | | |
| | | | | | | | |
| D.| |Examine the shock absorber sliding rod | X | | | | |
| | |(the part you can see) for blue color, | | | | | |
| | |signs of bronze, chrome damage or | | | | | |
| | |external oil leaks. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-11-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-11

Page 615
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| E.| |Examine the side stay assembly and its | X | | | | |
| | |attachment fittings for distortion, | | | | | |
| | |cracks and damaged paintwork and chrome| | | | | |
| | |plating. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the side-stay assembly for | | X | | | |
| | | overhaul. | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) Do the dimensional inspection of | | X | | | |
| | | the side-stay cardan pin-joint lugs| | | | | |
| | | on MLG leg. | | | | | |
| | | (Ref. TASK 32-11-00-200-004) | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the MLG | | | X | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | |(3) On the aircraft, continue the | | X | | | |
| | | inspection of the side-stay | | | | | |
| | | attachment fitting. | | | | | |
| | | | | | | | |
| F.| |Examine the lockstay assembly and | X | | | | |
| | |lockstay actuator for distortion, | | | | | |
| | |cracks and damaged paintwork and chrome| | | | | |
| | |plating. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the lockstay assembly and | | X | | | |
| | | lockstay actuator for overhaul | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | | | | | | |
| G.| |Examine the MLG retraction actuator and| X | | | | |
| | |its attachment fittings for distortion,| | | | | |
| | |cracks and damaged paintwork and chrome| | | | | |
| | |plating. | | | | | |
| | |If you find damage: | | | | | |



EFF :

ALL  05-51-11

Page 616
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(1) Remove the retraction actuator for | | X | | | |
| | | strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down procedure). | | | | | |
| | |(2) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | | | | | | |
| H.| |Examine the MLG well for distortion, | X | | | | |
| | |cracks, pulled or torn fasteners and | | | | | |
| | |damaged paintwork. | | | | | |
| | | | | | | | |
| I.| |Examine the electrical conduits, | X | | | | |
| | |connections, connectors and flexible | | | | | |
| | |conduits for damage. | | | | | |
| | | | | | | | |
| J.| |If you removed components, install | | | | | |
| | |serviceable components: | | | | | |
| | |- for the retraction actuator | | | | | |
| | | (Ref. TASK 32-31-46-400-001) | | | | | |
| | |- for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | |- for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | |- for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001) | | | | | |
| | |- for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001) | | | | | |
| | |- for the shock absorber | | | | | |
| | | (Ref. TASK 32-11-13-400-001) | | | | | |
| | | | | | | | |
|2. | | Inspection of the MLG after severe | | | | | |
| | | hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the MLG after | X | | | | |
| | |hard or overweight landing | | | | | |
| | |(Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Lift the aircraft: | X | | | | |
| | |(Ref. TASK 07-11-00-581-001) | | | | | |
| | |- make sure that extension of the shock| X | | | | |



EFF :

ALL  05-51-11

Page 617
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | absorber is smooth and full. | | | | | |
| | |- examine the sliding rod (the part you| X | | | | |
| | | can see) for blue color, signs of | | | | | |
| | | bronze or chrome damage. | | | | | |
| | | | | | | | |
| C.| |Examine the shock absorber for external| X | | | | |
| | |leaks. | | | | | |
| | | | | | | | |
| D.| |Do a check of the pressure in the MLG | X | | | | |
| | |shock absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-003) | | | | | |
| | | | | | | | |
| E.| |Do the inspection of the MLG | X | | | | |
| | |(Ref. TASK 32-11-00-200-005) for: | | | | | |
| | |- out-of-roundness of shock absorber | | | | | |
| | | sliding-rod. | | | | | |
| | |- distortion of side-stay lower cardan | | | | | |
| | | pin-joint (side-stay disconnected). | | | | | |
| | |- distortion of torque link pin. | | | | | |
| | |- detailed visual inspection of the | | | | | |
| | | barrel in the drag stay blend area. | | | | | |
| | |- detailed visual inspection of the | | | | | |
| | | barrel forward pintle-pin area. | | | | | |
| | | | | | | | |
| F.| |Do the functional test of the normal | X | | | | |
| | |Extension/Retraction of the landing | | | | | |
| | |gear | | | | | |
| | |(Ref. TASK 32-31-00-720-002) | | | | | |
| | |- with the MLG door open and the safety| | | | | |
| | | lock installed, make sure that the | | | | | |
| | | MLG is correctly engaged in the MLG | | | | | |
| | | uplock (MLG centered in uplock). | | | | | |
| | | | | | | | |
| G.| |Do the functional test of the free fall| X | | | | |
| | |extension of the landing gear | | | | | |
| | |(Ref. TASK 32-33-00-720-001) | | | | | |
| | | | | | | | |
| H.| |Do the alignment check of the main | X | | | | |
| | |landing gear, the axles and the main | | | | | |
| | |fitting. | | | | | |
| | |(Ref. TASK 05-56-00-200-001) | | | | | |
| | | | | | | | |
| J.| |If you find unsatisfactory | X | | | | |



EFF :

ALL  05-51-11

Page 618
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |condition(s): | | | | | |
| | |(1) Remove the MLG, the side-stay, the | | X | | | |
| | | lockstay assembly and lockstay | | | | | |
| | | actuator for overhaul: | | | | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | |(2) On the aircraft, examine the | | X | | | |
| | | attachment fittings and bearings of| | | | | |
| | | the side-stay for distorsion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
| | |(3) On the aircraft, examine the | | X | | | |
| | | attachment fittings of the MLG for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | |(4) Examine the MLG actuating cylinder | | X | | | |
| | | and its attachment fitting for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the actuating cylinder | | | X | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001) | | | | | |
| | | (refer to the manufactures | | | | | |
| | | instructions for the strip-down | | | | | |
| | | inspection procedure) | | | | | |
| | | - on the aircraft, continue the | | | X | | |
| | | inspection of the attachment | | | | | |
| | | fitting for damage. | | | | | |
| | |(5) Examine the gear-well for | | X | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | |(6) If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-46-400-001) | | | | | |
| | | - for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |



EFF :

ALL  05-51-11

Page 619
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001) | | | | | |
| | | - for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001) | | | | | |
| | | | | | | | |
| K.| |Lower the aircraft on its wheels | X | | | | |
| | |(Ref. TASK 07-11-00-586-002) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-093

R F. Inspection of the Nacelles

NOTE : This inspection contains two inspection procedures:


____
- item 1. Inspection after a hard/overweight landing
- item 2. Inspection after a severe hard/overweight landing.
If you know the category of the landing, go directly to the
necessary inspection.
If you do not known the category, go directely to item 2.
Inspection after severe hard/overweight landing.

(Ref. TASK 78-32-00-010-010) (Ref. TASK 78-31-00-710-041)


(Ref. TASK 71-13-00-010-010)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nacelles after | | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Examine externally the thrust reverser | X | | | | |
| | |cowls for distortion, delamination, | | | | | |
| | |cracks, cracked or flacking paint, | | | | | |
| | |loose rivets and signs of shearing. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Open the thrust reverser cowls | | X | | | |
| | | (Ref. TASK 78-32-00-010-010) | | | | | |
| | |(2) Examine internally the thrust | | X | | | |
| | | reverser cowls for damage. | | | | | |
| | |(3) Examine all the thrust reverser | | X | | | |
| | | cowl hinge fittings for distortion | | | | | |



EFF :

ALL  05-51-11

Page 620
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | cracks and damage. | | | | | |
| | |(4) Examine all the thrust reverser | | X | | | |
| | | cowl latches for damage and make | | | | | |
| | | sure that operation is correct. | | | | | |
| | |(5) Do an operational test of the | | X | | | |
| | | thrust reverser system. Make sure | | | | | |
| | | that the thrust reversers | | | | | |
| | | move fully and freely | | | | | |
| | | (Ref. TASK 78-31-00-710-041). | | | | | |
| | | | | | | | |
|2. | |Inspection of the nacelles after severe| | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the nacelles after| X | | | | |
| | |hard/overweight landing (Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Examine externally the fan and air | X | | | | |
| | |intake cowls for distortion, | | | | | |
| | |delamination, cracks, cracked or | | | | | |
| | |flacking paint, loose rivets and signs | | | | | |
| | |of shearing. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Open the fan cowls | | X | | | |
| | | (Ref. TASK 71-13-00-010-010) | | | | | |
| | |(2) Examine internally the fan cowls | | X | | | |
| | | for damage. | | | | | |
| | |(3) Examine all the fan cowl hinge | | X | | | |
| | | fittings for distortion and damage.| | | | | |
| | |(4) Examine all the fan cowl latches | | X | | | |
| | | for damage and make sure that | | | | | |
| | | operation is correct. | | | | | |
| | |(5) Examine the air intake cowl for | | X | | | |
| | | distortion and damage. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-094

R G. Inspection of the Pylons


(Ref. TASK 71-13-00-010-010) (Ref. TASK 78-32-00-010-010)
(Ref. TASK 71-00-20-000-040) (Ref. TASK 54-51-17-000-001)
(Ref. TASK 54-51-17-000-002) (Ref. TASK 54-51-17-200-001)
(Ref. TASK 54-51-17-200-002) (Ref. TASK 28-25-00-650-001)
(Ref. TASK 28-10-00-910-002) (Ref. TASK 54-51-17-400-001)



EFF :

ALL  05-51-11

Page 621
Aug 01/06
 
JSA 
(Ref. TASK 54-51-17-400-002) (Ref. TASK 71-00-20-400-040)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Examine externally the pylon secondary | X | | | | |
| | |structure and pylon box primary | | | | | |
| | |structure (all the items you can see) | | | | | |
| | |for buckling, cracks, pulled or missing| | | | | |
| | |fasteners and other damage. | | | | | |
| | |If you find damage: | | | | | |
| A.| |Open the fan and the thrust reverser | | X | | | |
| | |cowls | | | | | |
| | |(Ref. TASK 71-13-00-010-010) | | | | | |
| | |(Ref. TASK 78-32-00-010-010) | | | | | |
| B.| |Examine externally the lower spar and | | X | | | |
| | |pylon lower area (all the items you can| | | | | |
| | |see) for shearing, distortion, cracks, | | | | | |
| | |damaged paintwork and pulled or missing| | | | | |
| | |fasteners. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the pylon box access panels | | | X | | |
| | |(2) Examine internally the pylon box | | | X | | |
| | | (all the items you can see) for | | | | | |
| | | distortion, cracks, defective | | | | | |
| | | attachment or other damage: | | | | | |
| | | - lower and upper spars, | | | | | |
| | | - ribs, | | | | | |
| | | - side panels, | | | | | |
| | | - fire protection system (specially| | | | | |
| | | extinguishing bottles | | | | | |
| | | attachments), | | | | | |
| | | - electrical cables | | | | | |
| | | - hydraulic and fuel pipes, | | | | | |
| | | - air-bleed system components. | | | | | |
| | |(3) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-20-000-040). | | | | | |
| | |(4) Do an inspection of the attach | | | X | | |
| | | fittings at the head of rib 1 | | | | | |
| | | pyramid and under rib 3. | | | | | |
| | | Make sure that there are no signs | | | | | |
| | | of distortion, damage to the | | | | | |
| | | structure (cracks, rupture and | | | | | |
| | | signs of oxydation or burning). | | | | | |
| | |(5) Remove the center fillets at the | | | X | | |
| | | pylon-to-wing junction. | | | | | |



EFF :

ALL  05-51-11

Page 622
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(6) Remove the pylon-to-wing attach | | | X | | |
| | | fittings | | | | | |
| | | (Ref. TASK 54-51-17-000-001) | | | | | |
| | | (Ref. TASK 54-51-17-000-002) | | | | | |
| | |(7) Do a detailed visual inspection of:| | | X | | |
| | | - the forward attach fitting at | | | | | |
| | | at Rib 4 | | | | | |
| | | (Ref. TASK 54-51-17-200-001), | | | | | |
| | | - the spigot between ribs 4 and 5, | | | | | |
| | | - the rear attach fitting at rib 10| | | | | |
| | | (Ref. TASK 54-51-17-200-002). | | | | | |
| | | If there are signs of damage: | | | | | |
| | | (a) Defuel the wing | | | X | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (b) Get access to the internal | | | | | |
| | | structure adjacent to ribs 7 | | | X | | |
| | | and 8 | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (c) Examine the rear face of the | | | X | | |
| | | front spar, inboard of Rib 7 to| | | | | |
| | | outboard of Rib 8. | | | | | |
| | | Examine the front face of the | | | | | |
| | | rear spar, inboard of Rib 7 to | | | | | |
| | | outboard of Rib 8. | | | | | |
| | | Examine the pylon rear | | | | | |
| | | attachment: | | | | | |
| | | - ribs 7 and 8, | | | | | |
| | | - the stringers and brackets. | | | | | |
| | | Make a full inspection of these| | | | | |
| | | items and make sure that there | | | | | |
| | | are no cracks or damage, the | | | | | |
| | | paint and the sealant are not | | | | | |
| | | damaged, the fasteners and | | | | | |
| | | safety devices are in the | | | | | |
| | | correct condition. | | | | | |
| | | (d) Do an inspection of all the | | | X | | |
| | | pipes and holes. Make sure that| | | | | |
| | | they are attached correctly and| | | | | |
| | | that there are no leaks. | | | | | |
| | | (e) close access doors to the wing | | | | | |
| | | tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | |(8) Install the pylon-to-wing attach | | | | | |



EFF :

ALL  05-51-11

Page 623
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | fittings | | | | | |
| | | (Ref. TASK 54-51-17-400-001) | | | | | |
| | | (Ref. TASK 54-51-17-400-002). | | | | | |
| | |(9) Install the engine | | | | | |
| | | (Ref. TASK 71-00-20-400-040). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-095

R H. Inspection of the Engine (Ref. TASK 71-00-00-710-013) (Ref. TASK 79-00-


00-200-010) (Ref. TASK 71-00-20-000-040)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the Engine | | | | | |
| | | | | | | | |
| A.| | Turn the fan rotor by hand. Make sure | X | | | | |
| | | that there are no bearing roughness, | | | | | |
| | | unusual noises and bindings (high | | | | | |
| | | rubbing of the seals and the shrouds | | | | | |
| | | is normal). | | | | | |
| | | | | | | | |
| B.| | Examine the primary nozzle. Make sure | X | | | | |
| | | that : | | | | | |
| | | - it is correctly attached to the | | | | | |
| | | engine, | | | | | |
| | | - there are no distortion or cracks, | | | | | |
| | | no loose rivets, no signs of | | | | | |
| | | shearing or delamination. | | | | | |
| | | | | | | | |
| C.| | Examine the nose cowl attachments to | X | | | | |
| | | the fan case. Make sure that there are| | | | | |
| | | no distortion, delamination, cracks, | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Do a visual inspection of the | | X | | | |
| | | engine. | | | | | |
| | | (2) If you find seal or shroud | | X | | | |
| | | interference and you think it is | | | | | |
| | | minor : | | | | | |
| | | - the engine is serviceable after | | | | | |



EFF :

ALL  05-51-11

Page 624
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | you do a satisfactory power | | | | | |
| | | assurance check | | | | | |
| | | (Ref. TASK 71-00-00-710-013). | | | | | |
| | | (3) After the test, examine the | | X | | | |
| | | magnetic chip detectors and the | | | | | |
| | | elements of the scavenge oil | | | | | |
| | | filter. | | | | | |
| | | Make sure that there are no sign | | | | | |
| | | of bearing distress | | | | | |
| | | (Ref. TASK 79-00-00-200-010). | | | | | |
| | | If you find damage : | | | | | |
| | | (a) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-20-000-040). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-096

R J. Inspection of the Wing

NOTE : This inspection contains two inspection procedures:


____
- item 1. Inspection after a hard/overweight landing
- item 2. Inspection after a severe hard/overweight landing.
If you know the category of the landing, go directly to the
necessary inspection.
If you do not known the category, go directely to item 2.
Inspection after severe hard/overweight landing.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the wing after | | | | | |
| | | hard/overweight landing | | | | | |
| | | | | | | | |
| A.| | Examine the wing top skin from Rib 1 | X | | | | |
| | | to Rib 10 and from Rib 18 to Rib 20, | | | | | |
| | | the shroud panel and its attachment. | | | | | |
| | | Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |



EFF :

ALL  05-51-11

Page 625
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | condition. | | | | | |
| | | Carefully examine the fasteners at | | | | | |
| | | rear spar between Rib 3 and Rib 6 | | | | | |
| | | and gear rib. | | | | | |
| | | | | | | | |
| B.| | Do an inspection of the wing bottom | X | | | | |
| | | skin. Carefully examine the areas | | | | | |
| | | adjacent to: | | | | | |
| | | - the flap beams, | | | | | |
| | | - the engine pylon, | | | | | |
| | | - the MLG attachments, | | | | | |
| | | - the shroud box outboard seal and | | | | | |
| | | seal support. | | | | | |
| | | Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there are no fluid leaks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | Carefully examine the fasteners at | | | | | |
| | | rear spar between Rib 3 and Rib 6 | | | | | |
| | | and gear rib. | | | | | |
| | | | | | | | |
| | | If there are signs of damage on the | | | | | |
| | | wing top or bottom skins | | | | | |
| | | (1) Defuel the wing | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the area adjacent to| | X | | | |
| | | the damage | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Do an internal inspection of: | | X | | | |
| | | - the applicable ribs, the front | | | | | |
| | | and rear spars, the top and | | | | | |
| | | bottom skins, the stringers, | | | | | |
| | | the riblets, the brackets and | | | | | |
| | | the plates. | | | | | |
| | | | | | | | |
|2. | | Inspection of the wing after severe | | | | | |
| | | hard/overweight landing | | | | | |
| | | | | | | | |
| A.| | Do the inspection of the wing after | X | | | | |



EFF :

ALL  05-51-11

Page 626
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | hard/overweight landing | | | | | |
| | | (Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| | Do an inspection of the front and rear| X | | | | |
| | | spars. | | | | | |
| | | Examine: | | | | | |
| | | - the front spar at the forward pylon | | | | | |
| | | attachment area, | | | | | |
| | | - the rear spar aft face between Ribs | | | | | |
| | | 6 and 9 and the area between Ribs 7 | | | | | |
| | | and 8 and the aft pylon attachment | | | | | |
| | | fitting. | | | | | |
| | | - the inner rear spar at the MLG | | | | | |
| | | attachment fittings, | | | | | |
| | | - the shroud box. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - there are no fluid leaks, | | | | | |
| | | - the fasteners and safety devices are| | | | | |
| | | in the correct condition. | | | | | |
| | | | | | | | |
| | | If there are signs of damage on the | | | | | |
| | | front and rear spars: | | | | | |
| | | (1) Defuel the wing | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access in the wing adjacent to| | X | | | |
| | | the damage | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Do an internal inspection of all | | X | | | |
| | | the ribs, riblets, stringers, | | | | | |
| | | brackets and plates. | | | | | |
| | | (4) Do an inspection of all the pipes,| | X | | | |
| | | the hoses, the electrical looms | | | | | |
| | | and the raceways. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are | | | | | |
| | | not damaged, | | | | | |
| | | - the fasteners are in the correct| | | | | |



EFF :

ALL  05-51-11

Page 627
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | condition. | | | | | |
| | | | | | | | |
| | | If there are indications of damage on | | X | | | |
| | | the rear spar: | | | | | |
| | | (1) Do an inspection of these items: | | | | | |
| | | - the top diagonal stiffener, | | | | | |
| | | - the MLG attachment, | | | | | |
| | | - the top edge beam, | | | | | |
| | | - the MLG pintle fitting, | | | | | |
| | | - the MLG actuator fitting, | | | | | |
| | | - the sidestay attachment fitting,| | | | | |
| | | - the MLG support rib, | | | | | |
| | | - the riblets, stringers and | | | | | |
| | | brackets. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | | | | | | |
| C.| | Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-097

R K. Inspection of the Flaps


(Ref. TASK 27-54-00-710-001) (Ref. TASK 27-54-00-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the flaps | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the upper | X | | | | |
| | | and inner surfaces of the inner and | | | | | |
| | | outer flaps for distortion | | | | | |
| | | | | | | | |
| B.| | Do fully the operational test of the | X | | | | |
| | | flap system | | | | | |



EFF :

ALL  05-51-11

Page 628
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | If there are indications of damage: | | | | | |
| | | (1) Do the detailed visual inspection | | X | | | |
| | | of the transmission assembly | | | | | |
| | | (Ref. TASK 27-54-00-200-001). | | | | | |
| | | (2) Do the detailed inspection of the | | X | | | |
| | | flap attachment parts (drive arms | | | | | |
| | | and brackets). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-100

R L. Inspection of the Fuselage

NOTE : This inspection contains two inspection procedures:


____
- item 1. Inspection after a hard/overweight landing
- item 2. Inspection after a severe hard/overweight landing.
If you know the category of the landing, go directly to the
necessary inspection.
If you do not known the category, go directely to item 2.
Inspection after severe hard/overweight landing.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the fuselage after | | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Fuselage section between FR20 and FR35:| | | | | |
| | |- From the ground, examine the lower | X | | | | |
| | | skin for loose fasteners, cracked | | | | | |
| | | or flaking paint or distortion. | | | | | |
| | | | | | | | |
| B.| |Fuselage section between FR35 and FR47 | | | | | |
| | |- Examine the belly fairing panels | X | | | | |
| | | for loose fasteners, cracked or | | | | | |
| | | flaking paint, incorrect attachment | | | | | |
| | | or delamination. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the panels and examine | | X | | | |
| | | internally the belly fairing for: | | | | | |
| | | - the correct attachment of all | | | | | |



EFF :

ALL  05-51-11

Page 629
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the components or loose rivets. | | | | | |
| | |(2) Examine the fuselage skin | | X | | | |
| | | externally below the belly fairing | | | | | |
| | | zone for: | | | | | |
| | | - buckling, loose rivets, cracked | | | | | |
| | | or flaking paint. | | | | | |
| | | | | | | | |
| C.| |Fuselage section between FR47 and FR70 | | | | | |
| | |- From the ground, examine the lower | X | | | | |
| | | skin for loose fasteners, cracked | | | | | |
| | | or flaking paint or distortion. | | | | | |
| | | | | | | | |
| 2.| |Inspection of the fuselage after severe| | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the fuselage after| X | | | | |
| | |hard/overweight landing (Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Examine the keel beam connections to | X | | | | |
| | |the fuselage under forward cargo | | | | | |
| | |compartment at frame 35 and under aft | | | | | |
| | |cargo compartment at frame 46/47 for | | | | | |
| | |distortion and cracks. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-099

R M. Inspection of the Tail Area

NOTE : This inspection contains two inspection procedures:


____
- item 1. Inspection after a hard/overweight landing
- item 2. Inspection after a severe hard/overweight landing.
If you know the category of the landing, go directly to the
necessary inspection.
If you do not known the category, go directely to item 2.
Inspection after severe hard/overweight landing.

(Ref. TASK 27-44-00-710-002) (Ref. TASK 55-16-00-200-001)


(Ref. TASK 55-36-00-210-001) (Ref. TASK 55-30-00-200-001)
(Ref. TASK 55-10-00-210-001) (Ref. TASK 27-24-00-710-001)
(Ref. TASK 27-34-00-710-001)



EFF :

ALL  05-51-11

Page 630
Aug 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the tail area after | | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the operational test of the THS | X | | | | |
| | |(Ref. TASK 27-44-00-710-002) | | | | | |
| | |If you find unsatisfactory | | | | | |
| | |condition(s): | | | | | |
| | |(1) Do a general visual inspection of: | | X | | | |
| | | - the attachment areas of the | | | | | |
| | | horizontal stabilizer | | | | | |
| | | (Ref. TASK 55-16-00-200-001) | | | | | |
| | | - the attachment areas of the | | | | | |
| | | vertical stabilizer | | | | | |
| | | (Ref. TASK 55-36-00-210-001) | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Do a detailed visual inspection| | | X | | |
| | | of the vertical stabilizer | | | | | |
| | | center box | | | | | |
| | | (Ref. TASK 55-30-00-200-001) | | | | | |
| | | (b) Do a visual inspection of the | | | X | | |
| | | THS sparbox | | | | | |
| | | (Ref. TASK 55-10-00-210-001) | | | | | |
| | | | | | | | |
| B.| |Do the operational test of the rudder | X | | | | |
| | |and the elevators | | | | | |
| | |(Ref. TASK 27-24-00-710-001) | | | | | |
| | |(Ref. TASK 27-34-00-710-001) | | | | | |
| | |If you find unsatisfactory | | | | | |
| | |condition(s): | | | | | |
| | |(1) Examine the hinges of the elevators| | X | | | |
| | | and the rudder for cracks | | | | | |
| | | | | | | | |
|2. | |Inspection of the tail area after | | | | | |
| | |severe hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the tail area | X | | | | |
| | |after hard/overweight landing | | | | | |
| | |(Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Do a general inspection of the APU | X | | | | |
| | |compartment for leaks. | | | | | |
| | | | | | | | |
| C.| |Examine the APU for correct | X | | | | |



EFF :

ALL  05-51-11

Page 631
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |installation. | | | | | |
| | |Examine the mountings for damage, | | | | | |
| | |distortion and signs of movement. | | | | | |
| | | | | | | | |
| D.| |Examine the container brackets and the | X | | | | |
| | |container of the APU fire extinguisher | | | | | |
| | |for damage, condition and correct | | | | | |
| | |installation. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-098

R N. Inspection of the Avionics compartment

NOTE : This inspection is necessary only for a severe hard/overweight


____
landing

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the avionics Compartment| | | | | |
| | | | | | | | |
| A.| | Examine the attachments of rack 80VU | X | | | | |
| | | and 90VU. | | | | | |
| | | | | | | | |
| B.| | Examine the vertical rods above the | X | | | | |
| | | NLG bay between FR12 and FR20. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-11

Page 632
Aug 01/06
 
JSA 
Subtask 05-51-11-210-101

R P. Inspection of the Water tanks

NOTE : This inspection is necessary only for a severe hard/overweight


____
landing

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the water tanks | | | | | |
| | | | | | | | |
| A.| |Examine the tanks for correct | X | | | | |
| | |attachment and signs of leaks. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-11-210-102

R Q. Inspection of the Equipment/Furnishings

NOTE : This inspection is necessary only for a severe hard/overweight


____
landing

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the equipment/furnishings| | | | | |
| | | | | | | | |
| A.| |Examine the crew seats for correct | X | | | | |
| | |installation: | | | | | |
| | |- do a check of vertical movement (with| | | | | |
| | | and without load on the seats). | | | | | |
| | | | | | | | |
| B.| |Do a general inspection of the cockpit | X | | | | |
| | |and cabin for loose equipment | | | | | |
| | | | | | | | |
| C.| |Do a general inspection of the cargo | X | | | | |
| | |compartments for loose equipment. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-11

Page 633
Aug 01/06
 
JSA 
5. Close-up
________

Subtask 05-51-11-410-051

A. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close the access doors and panels opened during the inspection.

(3) Close the nose gear doors (Ref. TASK 32-22-00-410-001).

(4) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(5) Remove the access platform(s).

(6) Remove the warning notice(s).



EFF :

ALL  05-51-11

Page 634
Aug 01/06
R  
JSA 
Primary Structure - Materials and Protections Description
R Figure 603/TASK 05-51-11-991-007



EFF :

ALL  05-51-11

Page 635
Aug 01/06
 
JSA 
Engine-to-Pylon Attach Fittings
R Figure 604/TASK 05-51-11-991-008



EFF :

ALL  05-51-11

Page 636
Aug 01/06
 
JSA 
Pylon-to-Wing Attach Fittings
R Figure 605/TASK 05-51-11-991-009



EFF :

ALL  05-51-11

Page 637
Aug 01/06
 
JSA 
Nose Landing Gear
R Figure 606/TASK 05-51-11-991-010



EFF :

ALL  05-51-11

Page 638
Aug 01/06
 
JSA 
Main Structure of the Cone/Rear Fuselage
R Figure 607/TASK 05-51-11-991-011



EFF :

ALL  05-51-11

Page 639
Aug 01/06
 
JSA 
Lower Part of the Center Fuselage
R Figure 608/TASK 05-51-11-991-012



EFF :

ALL  05-51-11

Page 640
Aug 01/06
 
JSA 
Center Section
R Figure 609/TASK 05-51-11-991-013



EFF :

ALL  05-51-11

Page 641
Aug 01/06
 
JSA 
Component Location in the Belly Fairing Structure
R Figure 610/TASK 05-51-11-991-014



EFF :

ALL  05-51-11

Page 642
Aug 01/06
 
JSA 
INSPECTION AFTER LANDING GEAR DOWN LIMITING SPEED EXCEEDED - INSPECTION/CHECK
_____________________________________________________________________________

TASK 05-51-12-200-001

Inspection after Landing Gear Extension at more than the Geardown Limiting
Speed

1. __________________
Reason for the Job

You must do this inspection if:


- the landing gear extends/retracts, while the aircraft speed is more than
the limit speed (VLO),
- the aircraft speed increases to more than the limit speed (VLE), while the
landing gear is downlocked.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notice


No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-56-00-200-001 Inspection/Check of the Leveling and Measurement


after Abnormal Operation of the Aircraft
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-54-00-710-001 Operational Test of the Flap System
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-11-00-200-001 Inspection/Check of the Main Gear
32-12-00-010-001 Open the Main Gear Doors for Access



EFF :

ALL  05-51-12

Page 601
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-410-001 Close the Main Gear Doors after Access


32-12-00-710-002 Operational Test of the Main Landing Gear (MLG) Doors
Ground-Opening-Mechanism
32-21-00-200-002 General Visual Inspection of the Nose Landing Gear
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-22-11-000-001 Removal of the Main Door Assy
32-22-11-400-001 Installation of the Main Door Assy
32-22-13-000-001 Removal of the Aft Door Assy
32-22-13-400-001 Installation of the Aft Door Assy
32-22-15-000-001 Removal of the Leg Door Assy
32-22-15-400-001 Installation of the Leg Door Assy
32-31-00-720-002 Functional Test of the Normal Extension and
Retraction of the Landing Gear
32-31-16-000-001 Removal of the NLG Door Actuating Cylinder (2531GM)
32-31-16-400-001 Installation of the NLG Door Actuating Cylinder
(2531GM)
32-69-00-740-001 BITE Check Landing Gear Control Interface Unit
(LGCIU) using MCDU to Ensure that Continuous BITE is
Operative
57-27-11-400-001 Installation of the Access Panel (540AB, 540BB,
540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
640CB, 640DB, 640EB, 640FB, 640GB)
57-27-11-400-002 Installation of the Access Panel (540HB, 540JB,
540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
....)
05-51-12-991-001 Fig. 601
05-51-12-991-002 Fig. 602
05-51-12-991-003 Fig. 603
05-51-12-991-004 Fig. 604
05-51-12-991-005 Fig. 605
05-51-12-991-006 Fig. 606



EFF :

ALL  05-51-12

Page 602
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-51-12-860-050

A. Aircraft Maintenance Configuration

(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001)

(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

Subtask 05-51-12-481-050

B. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gear
(Ref. TASK 32-00-00-481-001).

(2) Put a warning notice in the cockpit to tell persons not to operate
the aircraft systems.

Subtask 05-51-12-010-051

C. Get Access

(1) Put an access platform in position.

(2) Open all the access panels in the main landing-gear well.

(3) Open and/or remove the access panels in the wing trailing-edge
falsework between rib1 and rib8.

Subtask 05-51-12-010-050

D. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).



EFF :

ALL  05-51-12

Page 603
Nov 01/04
 
JSA 
Subtask 05-51-12-866-050

E. Extension of the Flaps

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

4. Procedure
_________

Subtask 05-51-12-869-051

A. General

NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive test procedures.

Subtask 05-51-12-210-051

B. Inspection of the Fuselage and the Nose Landing Gear Well

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the external fuselage and the | X | | | | |
| | | skin panels for distorsion, cracks, | | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | | | |
| | | - internally examine the frames, the| | X | | | |
| | | stringers and the cleats for | | | | | |
| | | buckling, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
|2. | | NLG Well | | | | | |
| | | | | | | | |
| A.| | Examine: | X | | | | |
| | | - the hinge fittings of the nose gear,| | | | | |
| | | - the attach fittings of the actuating| | | | | |
| | | cylinder, | | | | | |
| | | - the drag strut and the attach | | | | | |
| | | fittings, | | | | | |
| | | for distortion, cracks and damaged | | | | | |



EFF :

ALL  05-51-12

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the gear well roof and the | X | | | | |
| | | forward, aft and side wall structure | | | | | |
| | | for distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - in the avionics compartment, examine| | X | | | |
| | | the nose-gear well roof and wall | | | | | |
| | | structure for distortion, cracks and| | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| C.| | Examine all the components, the hoses,| X | | | | |
| | | the pipes, the electrical looms, the | | | | | |
| | | control rods, the bellcranks and | | | | | |
| | | their mounts for: | | | | | |
| | | - distortion,cracks,rupture and oil | | | | | |
| | | leakage. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-12-210-053

C. Inspection of the Belly Fairing and MLG Wells


(Ref. Fig. 601/TASK 05-51-12-991-001, 602/TASK 05-51-12-991-002, 603/TASK
05-51-12-991-003)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the aft panels of the belly | X | | | | |
| | | fairing for loose fasteners, cracked | | | | | |
| | | or flaking paint and make sure that | | | | | |
| | | the panels are correctly attached. | | | | | |
| | | | | | | | |
| B.| | Make sure that the belly fairing rods | X | | | | |
| | | are correctly attached. | | | | | |
| | | | | | | | |
| C.| | Externally examine the cover of the | X | | | | |
| | | keel beam for cracked or flaking paint| | | | | |
| | | and delamination. Make sure that it is| | | | | |



EFF :

ALL  05-51-12

Page 605
Nov 01/04
 
JSA 
Lower Part of the Center Fuselage
Figure 601/TASK 05-51-12-991-001



EFF :

ALL  05-51-12

Page 606
Nov 01/04
 
JSA 
Center Section
Figure 602/TASK 05-51-12-991-002



EFF :

ALL  05-51-12

Page 607
Nov 01/04
 
JSA 
Component Location in the Belly Fairing Structure
Figure 603/TASK 05-51-12-991-003



EFF :

ALL  05-51-12

Page 608
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | correctly attached. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the panels and internally | | X | | | |
| | | examine the structure of the belly| | | | | |
| | | fairing for buckling, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove all the panels of the belly| | | X | | |
| | | fairing and examine the fuselage | | | | | |
| | | skin for: | | | | | |
| | | - buckling, | | | | | |
| | | - loose rivets, | | | | | |
| | | - cracked or flaking paint. | | | | | |
| | | (b) Examine the pipes, the ducts, the | | | X | | |
| | | electrical looms and their mounts | | | | | |
| | | for: | | | | | |
| | | - fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks. | | | | | |
| | | Make sure that safety devices | | | | | |
| | | are correctly attached and in | | | | | |
| | | the correct condition. | | | | | |
| | | | | | | | |
|2. | | MLG Wells | | | | | |
| | | | | | | | |
| A.| | Examine the diagonal frames at the | X | | | | |
| | | edges of the wheel wells, their | | | | | |
| | | junctions at FR44 and the adjacent | | | | | |
| | | areas for: | | | | | |
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the attachment of the MLG | X | | | | |
| | | locking system for distortion. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine: | | X | | | |
| | | (a) All the components, the pipes, the| | | | | |
| | | ducts, the electrical looms. | | | | | |
| | | (b) The control cables, the pulleys, | | | | | |
| | | the transmission systems and their| | | | | |
| | | mountings for: | | | | | |
| | | - distortion, cracks, rupture, | | | | | |
| | | misalignment, fluid leakage, | | | | | |
| | | pulled or torn fasteners, | | | | | |



EFF :

ALL  05-51-12

Page 609
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | damaged paintwork and the | | | | | |
| | | condition of the safety devices.| | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-12-210-054

D. Inspection of the Main Landing Gear (Ref. TASK 32-11-00-200-001)


(Ref. Fig. 604/TASK 05-51-12-991-004)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Main Gear | | | | | |
| | | | | | | | |
| A.| | Do the inspection of the main landing | X | | | | |
| | | gear | | | | | |
| | | (Ref. TASK 32-11-00-200-00100). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-12-210-055

E. Inspection of the Main Gear Doors (Ref. TASK 32-12-00-710-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Main-Gear Main Doors | | | | | |
| | | | | | | | |
| A.| | Examine the doors, their hinges and | X | | | | |
| | | the adjacent structure | | | | | |
| | | (REF. TASK 32-12-00-710-002). | | | | | |
| | | | | | | | |
| B.| | Examine the door actuating cylinders, | X | | | | |
| | | the selector valves and their hoses | | | | | |
| | | and pipes. | | | | | |
| | | | | | | | |
|2. | | Main-Gear Fixed Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the fixed fairings: | X | | | | |
| | | - Make sure that they are correctly | | | | | |
| | | attached to the main gear leg. | | | | | |



EFF :

ALL  05-51-12

Page 610
Nov 01/04
 
JSA 
Main Gear Assembly
Figure 604/TASK 05-51-12-991-004



EFF :

ALL  05-51-12

Page 611
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|3. | | Main-Gear Hinged Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the hinged fairings: | X | | | | |
| | | - Make sure that they are correctly | | | | | |
| | | attached to the main-gear leg and | | | | | |
| | | the wing. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-12-210-056

F. Inspection of the Nose Landing Gear and Nose Gear Doors (Ref. TASK 32-21-
00-200-002) (Ref. TASK 32-22-11-000-001) (Ref. TASK 32-31-16-000-001)
(Ref. TASK 32-22-13-000-001) (Ref. TASK 32-22-15-000-001)
(Ref. TASK 32-22-11-400-001) (Ref. TASK 32-31-16-400-001) (Ref. TASK 32-
22-13-400-001) (Ref. TASK 32-22-15-400-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Gear Assembly | | | | | |
| | | | | | | | |
| A.| | Do the inspection of the Nose Landing | X | | | | |
| | | Gear | | | | | |
| | | (Ref. TASK 32-21-00-200-002) | | | | | |
| | | | | | | | |
|2. | | Nose-Gear Main Doors | | | | | |
| | | | | | | | |
| A.| | Examine the doors, the door hinge | X | | | | |
| | | fittings and the adjacent structure | | | | | |
| | | for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Remove the doors | | X | | | |
| | | (Ref. TASK 32-22-11-000-001) | | | | | |
| | | (Ref. TASK 32-22-11-400-001). | | | | | |
| | | | | | | | |
| B.| | Examine the door actuating cylinder, | X | | | | |
| | | the related linkages and the sequence | | | | | |
| | | valves for leakage or damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Remove the door actuating cylinder | | X | | | |
| | | (Ref. TASK 32-31-16-000-001) | | | | | |



EFF :

ALL  05-51-12

Page 612
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-31-16-400-001). | | | | | |
| | | | | | | | |
|3. | | Nose-Gear Aft Doors | | | | | |
| | | | | | | | |
| A.| | Examine the doors, the door hinge | X | | | | |
| | | fittings and the related linkage for | | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Remove the doors | | X | | | |
| | | (Ref. TASK 32-22-13-000-001) | | | | | |
| | | (Ref. TASK 32-22-13-400-001). | | | | | |
| | | | | | | | |
|4. | | Nose-Gear Leg Door | | | | | |
| | | | | | | | |
| A.| | Examine the door, the linkage rollers | X | | | | |
| | | and the uplock hooks for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Remove the door | | X | | | |
| | | (Ref. TASK 32-22-15-000-001) | | | | | |
| | | (Ref. TASK 32-22-15-400-001). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-12-210-057

G. Inspection of the Wings


(Ref. Fig. 605/TASK 05-51-12-991-005, 606/TASK 05-51-12-991-006)
(Ref. TASK 28-10-00-910-002) (Ref. TASK 57-27-11-400-001) (Ref. TASK 57-
27-11-400-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Trailing Edge Falsework | | | | | |
| | | | | | | | |
| A.| | Examine these areas for distortion, | X | | | | |
| | | cracks, torn or pulled fasteners and | | | | | |
| | | damaged paintwork: | | | | | |
| | | - the skin of the trailing edge | | | | | |
| | | falsework, | | | | | |
| | | - the inner flap, | | | | | |
| | | - the No. 1 spoiler, | | | | | |
| | | - the fixed shroud, | | | | | |



EFF :

ALL  05-51-12

Page 613
Nov 01/04
 
JSA 
Inspection on the Wing
Figure 605/TASK 05-51-12-991-005



EFF :

ALL  05-51-12

Page 614
Nov 01/04
 
JSA 
Inspection on the Wing
Figure 606/TASK 05-51-12-991-006



EFF :

ALL  05-51-12

Page 615
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the shroud box. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine these areas for cracks, | | X | | | |
| | | distortion, torn or pulled | | | | | |
| | | fasteners, damaged paintwork and | | | | | |
| | | fuel leaks: | | | | | |
| | | - the false rear spar, | | | | | |
| | | - the ribs, | | | | | |
| | | - the top diagonal stiffeners. | | | | | |
| | | (2) Examine these areas for | | X | | | |
| | | distortion, cracks, and damaged | | | | | |
| | | paintwork: | | | | | |
| | | - the main-gear pintle fitting, | | | | | |
| | | - the main-gear support, | | | | | |
| | | - the actuator bracket, | | | | | |
| | | - the sidestay bracket. | | | | | |
| | | If you find damage: | | | | | |
| | | (3) Get access to the wing tanks | | | X | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | Examine these areas for | | | | | |
| | | distortion, cracks, pulled or torn| | | | | |
| | | fasteners, damaged paintwork or | | | | | |
| | | sealant fillets: | | | | | |
| | | - the spars, | | | | | |
| | | - the ribs, | | | | | |
| | | - the stringer, | | | | | |
| | | - the engine pylon mountings. | | | | | |
| | | (4) Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | | | | | | |
| B.| | Examine all the pipes and the | X | | | | |
| | | components for fluid leakage and | | | | | |
| | | damage. | | | | | |
| | | Make sure that they are correctly | | | | | |
| | | aligned and that the attachments are | | | | | |
| | | not damaged. | | | | | |
| | | | | | | | |
| C.| | Examine the electrical looms, the flap| X | | | | |
| | | transmission system and their moun- | | | | | |
| | | tings for: | | | | | |
| | | - cracks, | | | | | |
| | | - torn or pulled fasteners, | | | | | |
| | | - damaged paintwork, | | | | | |



EFF :

ALL  05-51-12

Page 616
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the correct condition of the safety | | | | | |
| | | devices. | | | | | |
| | | Make sure that they are correctly | | | | | |
| | | aligned. | | | | | |
| | | | | | | | |
|2. | | Wing skins | | | | | |
| | | | | | | | |
| A.| | Examine the external surface of the | X | | | | |
| | | wing skin panels for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - pulled or torn fasteners, | | | | | |
| | | - damaged paintwork, | | | | | |
| | | - fuel leaks. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (2) Examine these areas for cracks, | | X | | | |
| | | distortion, pulled or torn | | | | | |
| | | fasteners, damaged paintwork or | | | | | |
| | | sealant fillets: | | | | | |
| | | - the ribs, | | | | | |
| | | - the spars, | | | | | |
| | | - the stringers, | | | | | |
| | | - the engine pylon mountings. | | | | | |
| | | (3) Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-12

Page 617
Nov 01/04
 
JSA 
Subtask 05-51-12-210-058

H. Inspection of the Pylon

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine the engine pylon skins and the| X | | | | |
| | | panels for distortion, cracks, pulled | | | | | |
| | | or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the pylon access panels | | X | | | |
| | | adjacent to the damage. | | | | | |
| | | Examine the internal structure for| | | | | |
| | | distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | (2) Examine: | | X | | | |
| | | - all the components, | | | | | |
| | | - the pipes, | | | | | |
| | | - the ducts, | | | | | |
| | | - the electrical cable looms, | | | | | |
| | | - the control cable pulleys and | | | | | |
| | | their mounts, | | | | | |
| | | - the fire protection system for | | | | | |
| | | distortion, cracks, rupture and | | | | | |
| | | breaks. | | | | | |
| | | Make sure that the safety devices | | | | | |
| | | are in the correct condition and | | | | | |
| | | that they are correctly attached. | | | | | |
| | | If you find other damage: | | | | | |
| | | - Remove all the panels, open the| | | X | | |
| | | engine cowls and examine all of| | | | | |
| | | the main structure. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-12-869-050

J. Inspection

(1) If you find Phase 2 damage, do the landing-gear measurement and


angle-to-the-aircraft axes check (Ref. TASK 05-56-00-200-001).



EFF :

ALL  05-51-12

Page 618
Nov 01/04
 
JSA 
Subtask 05-51-12-410-050

K. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Install and/or close all the access doors and the panels applicable
to this inspection.

(3) Remove the warning notice(s).

(4) Remove the access platform(s).

(5) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(6) Close the nose gear doors (Ref. TASK 32-22-00-410-001).

Subtask 05-51-12-210-052

L. Retraction of the Flaps

(1) Make sure the flaps are retracted (Ref. TASK 27-50-00-866-009).

Subtask 05-51-12-700-050

M. Tests of the System (Ref. TASK 32-31-00-720-002) (Ref. TASK 27-54-00-710-


001) (Ref. TASK 27-64-00-710-001) (Ref. TASK 32-12-00-710-002) (Ref. TASK
32-69-00-740-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | If you found damage on the landing | | | | | |
| | | gear, the attached parts or the | | | | | |
| | | adjacent structure: | | | | | |
| | | - Do a functional test of the landing | | X | | | |
| | | gear | | | | | |
| | | (Ref. TASK 32-31-00-720-002). | | | | | |
| | | Make sure that it moves smoothly and| | | | | |
| | | freely. | | | | | |
| | | | | | | | |
|2. | | If you found damage on the doors, | | | | | |
| | | their attached parts or the adjacent | | | | | |
| | | structure: | | | | | |
| | | - Do an operational test of the main | | X | | | |



EFF :

ALL  05-51-12

Page 619
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | landing gear doors | | | | | |
| | | (Ref. TASK 32-12-00-710-002). | | | | | |
| | | | | | | | |
|3. | | If you found damage on the wing: | | | | | |
| | | Do an operational test of the flaps | | X | | | |
| | | and the spoilers | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | Make sure that they move smoothly and | | | | | |
| | | freely. | | | | | |
| | | | | | | | |
|4. | | Do a BITE test of the proximity | X | | | | |
| | | detectors | | | | | |
| | | (Ref. TASK 32-69-00-740-001). | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-12-942-050

A. Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :

ALL  05-51-12

Page 620
Nov 01/04
 
JSA 
INSPECTION AFTER FLAP/SLAT LIMITING SPEED EXCEEDED - INSPECTION/CHECK
_____________________________________________________________________

TASK 05-51-13-200-001

Inspection after Flap/Slat Extension at more than the Flap/Slat Limiting Speed

1. __________________
Reason for the Job

This inspection is necessary after an activation of the overspeed aural


warning:
- If the overspeed was not more than 10 Kts higher than the value shown on
the VFE placard, only an extension and retraction test of the flaps and
slats is necessary (refer to the operational test of the Flight Control
Surfaces paragraph given in this procedure).

NOTE : If you find unsatisfactory condition(s) during the operational test,


____
you must do the full inspection given in this procedure.

- If the overspeed was more than 10 Kts higher than the value shown on the
VFE placard, you must do the full inspection given in this procedure.
- If activation of the overspeed warning occurred during movement of the
flap and slat control lever from the position 0 to the position 1, it is
not necessary to do the inspection and the operational test of the flap
system (steps 4.C and 4.E.1 of this procedure).

NOTE : You can get confirmation of the slat and/or flap movement from the
____
flight data recorder. If these data are not available, you must do
the maintenance actions applicable to the pilots report.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notice


No specific access platform 4.20 m (13 ft. 9 in.)



EFF :

ALL  05-51-13

Page 601
Nov 01/04
 
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied


from the External Power
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-54-00-200-001 Detailed Visual Inspection of the Transmission
Assembly (Including Part of the Transmission in Zone
140)
27-54-00-710-001 Operational Test of the Flap System
27-54-46-200-001 Detailed Visual Inspection of the Flap Tracks and
Rollers (as far as is possible)
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground
27-84-00-200-001 Detailed Visual Inspection of the Slat Transmission
System
27-84-00-210-001 Detailed Visual Inspection of the Slat Track Rollers,
the Pinions and the Curved Rack Gears (As Far As
Visible)
27-84-00-710-001 Operational Test of the Slat System
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
57-26-00-200-001 Detailed Visual Inspection of Outer Wing Flap Track 2
Aft Attachment Fittings on Wing Bottom Skin at Rear
False Spar, and Flap Track 3 and 4 ....
57-26-00-200-006 Detailed Visual Inspection of Outer Wing Flap Track
Beams 2, 3, 4 Fwd Spigot Pins, Bolts and Fittings
05-51-13-991-001 Fig. 601
05-51-13-991-002 Fig. 602
05-51-13-991-005 Fig. 603
05-51-13-991-006 Fig. 604
05-51-13-991-004 Fig. 605
05-51-13-991-003 Fig. 606



EFF :

ALL  05-51-13

Page 602
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-51-13-869-051

A. Not Applicable

Subtask 05-51-13-481-050

B. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-13-010-050

C. Get Access

(1) Open the main doors of the main gear and install the safety devices
(Ref. TASK 32-12-00-010-001).

Subtask 05-51-13-866-050

D. Extension of the Flight Control Surfaces

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Fully extend the slats (Ref. TASK 27-80-00-866-004).

(3) Fully extend the spoilers (Ref. TASK 27-60-00-866-002).

(4) Put a warning notice in the cockpit to tell persons not to operate
the landing gear or the flight controls.

Subtask 05-51-13-860-050

E. Aircraft Maintenance Configuration

(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).



EFF :

ALL  05-51-13

Page 603
Nov 01/04
 
JSA 
Subtask 05-51-13-010-051

F. Get Access

(1) Put the access platform in position.

4. Procedure
_________

Subtask 05-51-13-869-050

A. General

NOTE : All the inspections are visual unless the text gives other
____
instructions. Operators can refer to the Non-destructive Testing
Manual (NTM) and use the non-destructive procedures.

Subtask 05-51-13-210-051

B. Inspection of the Wings

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the wing leading edge | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin | X | | | | |
| | | panels of the leading edge for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the other side of | | X | | | |
| | | the damaged area. | | | | | |
| | | (2) Examine internally the related | | X | | | |
| | | area for distortion and damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the wing trailing edge | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin | X | | | | |
| | | panels of the wing trailing edge for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners, skin/honeycomb-core | | | | | |
| | | delamination and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the other side of | | X | | | |
| | | the damaged area. | | | | | |
| | | (2) Examine internally the related | | X | | | |



EFF :

ALL  05-51-13

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | area for distortion and damage. | | | | | |
| | | | | | | | |
| B.| | Examine all the pipes, the hoses, the | | X | | | |
| | | ducts, electrical looms and mountings | | | | | |
| | | in the wing trailing edge area for | | | | | |
| | | distortion, cracks, failure and | | | | | |
| | | leakage. | | | | | |
| | | | | | | | |
|3. | | Inspection of the wing tip | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin | X | | | | |
| | | panels of the wing tip for distortion,| | | | | |
| | | cracks, pulled or torn fasteners and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the other side of | | X | | | |
| | | the damaged area. | | | | | |
| | | (2) Examine internally the related | | X | | | |
| | | area for distortion and damage. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-13-210-053

C. Inspection of the Flap System


(Ref. Fig. 601/TASK 05-51-13-991-001, 602/TASK 05-51-13-991-002, 603/TASK
05-51-13-991-005, 604/TASK 05-51-13-991-006)
(Ref. TASK 27-54-00-200-001) (Ref. TASK 27-54-46-200-001)
(Ref. TASK 57-26-00-200-001) (Ref. TASK 57-26-00-200-006)
(Ref. TASK 28-25-00-650-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the flap assemblies and | | | | | |
| | | flap transmission system | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin of | X | | | | |
| | | the inboard and outboard flaps for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners, skin/honeycomb-core | | | | | |
| | | delamination and damaged paintwork. | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-13

Page 605
Nov 01/04
 
JSA 
Component Location of the Flap System
Figure 601/TASK 05-51-13-991-001



EFF :

ALL  05-51-13

Page 606
Nov 01/04
 
JSA 
Flap Components
Figure 602/TASK 05-51-13-991-002



EFF :

ALL  05-51-13

Page 607
Nov 01/04
 
JSA 
Track No. 1 Actuator
Figure 603/TASK 05-51-13-991-005



EFF :

ALL  05-51-13

Page 608
Nov 01/04
 
JSA 
Typical Installation of the Actuator
Figure 604/TASK 05-51-13-991-006



EFF :

ALL  05-51-13

Page 609
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| B.| | Examine the flap to carriage | X | | | | |
| | | attachmemt fittings for distortion, | | | | | |
| | | cracks and damage. | | | | | |
| | | | | | | | |
| C.| | Examine the torque limiter indicators.| X | | | | |
| | | Make sure that they are not extended. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. to C.: | | | | | |
| | | (1) Examine the flap transmission | | X | | | |
| | | assy (Ref. TASK 27-54-00-200-001) | | | | | |
| | | for distortion and damage. | | | | | |
| | | If you find damage in the trans- | | | | | |
| | | mission system: | | | | | |
| | | - remove the system actuators, the| | | X | | |
| | | shafts, the bearings and the | | | | | |
| | | gear boxes for component | | | | | |
| | | maintenance. | | | | | |
| | | (2) Examine the flap tracks and | | X | | | |
| | | rollers for distortion and damage | | | | | |
| | | (Ref. TASK 27-54-46-200-001). | | | | | |
| | | | | | | | |
|2. | | Inspection of the flap track | | | | | |
| | | attachments | | | | | |
| | | | | | | | |
| A.| | Examine the attachment of the flap | X | | | | |
| | | track No.1 at the wing root and their | | | | | |
| | | attachment fittings for distortion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the main gear | | X | | | |
| | | compartment and the aft cargo | | | | | |
| | | compartment. | | | | | |
| | | (2) Examine the FR45 and FR47 for | | X | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine externally (as far as | X | | | | |
| | | possible) the beam assemblies of the | | | | | |
| | | flap tracks No. 2 to No. 4 and all the| | | | | |
| | | the components installed on them for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |



EFF :

ALL  05-51-13

Page 610
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (1) Do a detailed visual inspection of| | X | | | |
| | | the flap track No.2 to No. 4 beams| | | | | |
| | | Aft attachment (pay particular | | | | | |
| | | attention to the failsafe devices | | | | | |
| | | and the spigot pin). | | | | | |
| | | (Ref. TASK 57-26-00-200-001). | | | | | |
| | | NOTE: Make sure that the clearence| | | | | |
| | | at failsafe pins (adjacent | | | | | |
| | | to the spigot) is correct. | | | | | |
| | | (2) Do a detailed visual inspection of| | X | | | |
| | | the flap tracks No. 2 to No.4 | | | | | |
| | | beams Fwd attachment (pay | | | | | |
| | | particular attention to the | | | | | |
| | | failsafe devices and the spigot | | | | | |
| | | pin). | | | | | |
| | | (Ref. TASK 57-26-00-200-006) | | | | | |
| | | (3) Defuel the wing tank | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (4) Examine the ribs 6, 12 and 19 and | | X | | | |
| | | the rear spar for distortion, | | | | | |
| | | cracks and damaged sealant fillets| | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-13-210-054

D. Inspection of the Slat System


(Ref. Fig. 605/TASK 05-51-13-991-004, 606/TASK 05-51-13-991-003)
(Ref. TASK 27-84-00-200-001) (Ref. TASK 27-84-00-210-001)
(Ref. TASK 28-25-00-650-001) (Ref. TASK 28-10-00-910-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the slat assemblies and | | | | | |
| | | slat transmission | | | | | |
| | | | | | | | |
| A.| | Examine the slats for distortion, | X | | | | |
| | | cracks, pulled or torn fasteners, | | | | | |
| | | skin/honeycomb-core delamination and | | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the hold-down stop-bracket and| X | | | | |



EFF :

ALL  05-51-13

Page 611
Nov 01/04
 
JSA 
Component Location of the Slat System
Figure 605/TASK 05-51-13-991-004



EFF :

ALL  05-51-13

Page 612
Nov 01/04
 
JSA 
Slat Components
Figure 606/TASK 05-51-13-991-003



EFF :

ALL  05-51-13

Page 613
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachments for distortion, cracks and| | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | | | | | | |
| C.| | Examine the anti-ice telescopic-duct | X | | | | |
| | | attachments for distortion, cracks and| | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | | | | | | |
| D.| | Examine the torque limiter indicators.| X | | | | |
| | | Make sure that they are not extended. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. to D.: | | | | | |
| | | (1) Examine the slat transmission | | X | | | |
| | | system for distortion and damage | | | | | |
| | | (Ref. TASK 27-84-00-200-001). | | | | | |
| | | If you find damage in the slat | | | | | |
| | | transmission system: | | | | | |
| | | - remove the system actuators, the| | | X | | |
| | | shafts, the bearings and the | | | | | |
| | | gear boxes for component | | | | | |
| | | maintenance. | | | | | |
| | | (2) Examine the slat tracks and | | X | | | |
| | | rollers for distortion and damage | | | | | |
| | | (Ref. TASK 27-84-00-210-001). | | | | | |
| | | (3) Examine all the pipes, hoses, | | X | | | |
| | | ducts, electrical looms and | | | | | |
| | | mountings for distortion, cracks, | | | | | |
| | | failure and leaks. | | | | | |
| | | | | | | | |
|2. | | Inspection of the slat track | | | | | |
| | | attachments | | | | | |
| | | | | | | | |
| A.| | Examine the tracks No. 5 and 10 and | X | | | | |
| | | their mountings for distortion, | | | | | |
| | | cracks, pulled or torn fasteners and | | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the rack teeth of tracks No. | X | | | | |
| | | 5 and 10 and their attachments for | | | | | |
| | | distortion, cracks and pulled or torn | | | | | |
| | | fasteners. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. or B.: | | | | | |
| | | (1) Open all the access panels of the | | X | | | |



EFF :

ALL  05-51-13

Page 614
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | wing leading edges. | | | | | |
| | | (2) Examine the remaining tracks and | | X | | | |
| | | their mountings for distortion, | | | | | |
| | | cracks, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | (3) Examine the rack teeth of the | | X | | | |
| | | remaining tracks and their | | | | | |
| | | attachments for distortion, cracks| | | | | |
| | | and pulled or torn fasteners. | | | | | |
| | | | | | | | |
|3. | | Slat Track Rib and Hold-Down Rib | | | | | |
| | | Structure | | | | | |
| | | | | | | | |
| A.| | Examine the ribs of tracks No. 5 and | X | | | | |
| | | 10 for distortion, cracks, pulled or | | | | | |
| | | torn fasteners, damaged paintwork and | | | | | |
| | | fuel leaks. | | | | | |
| | | | | | | | |
| B.| | Examine the hold-down stops for | X | | | | |
| | | distortion, cracks and damage. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. or B.: | | | | | |
| | | (1) Open all the access panels of the | | X | | | |
| | | wing leading edges. | | | | | |
| | | (2) Examine the ribs of the remaining | | X | | | |
| | | tracks for distortion, cracks, | | | | | |
| | | pulled or torn fasteners, damaged | | | | | |
| | | paintwork and fuel leaks. | | | | | |
| | | (3) Defuel the wing tanks | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (4) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (5) Examine the front spar area for | | X | | | |
| | | distortion, cracks and damaged | | | | | |
| | | sealant fillets. | | | | | |
| | | (6) Close access to the wing tanks | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-13

Page 615
Nov 01/04
 
JSA 
Subtask 05-51-13-710-050

E. Operational Test of the Flight Control Surfaces (Ref. TASK 27-54-00-710-


001), (Ref. TASK 27-84-00-710-001), (Ref. TASK 27-64-00-710-001).

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Do an operational test of the flaps | X | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | Make sure that the flaps move | | | | | |
| | | smoothly and freely. | | | | | |
| | | | | | | | |
|2. | | Do an operational test of the slats | X | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | Make sure that the slats move | | | | | |
| | | smoothly and freely. | | | | | |
| | | | | | | | |
|3. | | Do an operational test of the | X | | | | |
| | | spoilers (Ref. TASK 27-64-00-710-001).| | | | | |
| | | Make sure that the spoilers move | | | | | |
| | | smoothly and freely. | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-13-410-050

A. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close/install the access doors/panels opened during this inspection.

(3) Close the main gear doors (Ref. TASK 32-12-00-410-001).

Subtask 05-51-13-866-051

B. Retraction of the Flight Control Surfaces

(1) Retract the spoilers (Ref. TASK 27-60-00-866-002).

(2) Retract the slats (Ref. TASK 27-80-00-866-005).

(3) Retract the flaps (Ref. TASK 27-50-00-866-009).



EFF :

ALL  05-51-13

Page 616
Nov 01/04
 
JSA 
INSPECTION OF AIRFRAME AFTER BIRD OR HAIL STRIKE - INSPECTION/CHECK
___________________________________________________________________

TASK 05-51-14-200-001

Inspection of the Airframe after a Bird or Hail Strike

R WARNING : THERE IS A POSSIBLE HEALTH RISK TO PERSONNEL WHO DO MAINTENANCE TASKS


_______
R AFTER A BIRD STRIKE. THE SAFETY MEASURES THAT FOLLOW ARE RECOMMENDED:
R - USE DISPOSABLE GLOVES.
R - USE A DISPOSABLE COVERALL IF THERE IS A RISK OF BODY CONTACT WITH
R THE BIRD REMAINS.
R - DO NOT USE PRESSURIZED AIR OR WATER TO CLEAN THE PARTS WHICH WERE
R IN CONTACT WITH THE BIRD.
R - REMOVE THE BIRD REMAINS AND PUT THEM IN A PLASTIC BAG.
R - DO NOT TOUCH YOUR FACE, EYES, NOSE, ETC. WITH YOUR GLOVES.
R - REMOVE THE GLOVES AND THE DISPOSABLE COVERALL AND PUT THEM IN THE
R SAME PLASTIC BAG AS THE REMAINS. SEAL THE BAG.
R - DISCARD THE BAG AS YOU DO FOR USUAL GARBAGE.
R - CAREFULLY WASH YOUR HANDS WITH SOAP AND WATER.

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific access platform 3 m (9 ft. 10 in.)



EFF :

ALL  05-51-14

Page 601
Aug 01/06
 
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied


from the External Power
27-14-00-710-001 Operational Test of the Aileron and Hydraulic
Actuation
27-24-00-710-002 Operational Test of the Rudder Servocontrols with
Individual Hydraulic System
27-34-00-710-001 Operational Test of the Elevator and Hydraulic
Actuation
27-44-00-710-001 Operational Test of the Jamming Protection Device of
the Trimmable Horizontal Stabilizer Actuator
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-54-00-710-001 Operational Test of the Flap System
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground
27-84-00-710-001 Operational Test of the Slat System
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-11-00-200-001 Inspection/Check of the Main Gear
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-30-00-867-001 Retraction of the Landing Gear for Maintenance
32-30-00-867-002 Extension of the Landing Gear after Maintenance
36-11-00-200-002 Visual Inspection of the Fan Air Valve and Bleed-Air
Precooler Exchanger after Hail Strike
53-15-11-200-001 Detailed Inspection of the Radome
71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
72-00-00-200-010 Inspection of the Engine after Bird Strike, Foreign
Object or Slush Ingestion
78-32-00-010-010 Opening of the Thrust Reverser Halves



EFF :

ALL  05-51-14

Page 602
Aug 01/06
R  
JSA 
3. __________
Job Set-up

Subtask 05-51-14-481-050

A. Safety Precautions

R (1) Make sure that the safety devices are installed on the landing gears
R (Ref. TASK 32-00-00-481-001).

(2) Put the warning notices in the cockpit to tell persons not to operate
the systems.

(3) Put the access platform in position.

Subtask 05-51-14-010-050

B. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).

Subtask 05-51-14-866-050

C. Extension of the Flight Control Surfaces

(1) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-80-00-866-004).

(2) Extend the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-14-860-050

D. Aircraft Maintenance Configuration

(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).



EFF :

ALL  05-51-14

Page 603
Aug 01/06
 
JSA 
4. Procedure
_________

Subtask 05-51-14-869-050

A. General

NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.

(1) Inspection recommendations on composite parts

(a) if you find damage (signs of impact, damaged paintwork,


abrasions, scratches or dents) on a composite part, you must do
an inspection of the related damaged area for delamination and
internal damage.

(2) If there is damage to the aircraft structure, refer to the Structural


Repair Manual (SRM). The SRM has the approved damage limits and
repair procedures.

Subtask 05-51-14-210-051

B. Inspection of the Fuselage (Ref. TASK 53-15-11-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Radome | | | | | |
| | | | | | | | |
| A.| | Examine the radome for erosion, | X | | | | |
| | | delamination and core damage, | | | | | |
| | | internally and externally | | | | | |
| | | (Ref. TASK 53-15-11-200-00100). | | | | | |
| | | | | | | | |
| B.| | Make sure that the lightning arresters| X | | | | |
| | | are in the correct condition and that | | | | | |
| | | they are correctly bonded. | | | | | |
| | | If you find damage, bond them back | | | | | |
| | | into position. | | | | | |
| | | | | | | | |
|2. | | Flight Compartment Windshields and | | | | | |
| | | Side Windows | | | | | |
| | | | | | | | |
| A.| | Examine them for cracking, | X | | | | |



EFF :

ALL  05-51-14

Page 604
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | delamination and changes in color | | | | | |
| | | (indication of damage caused by too | | | | | |
| | | much heat). | | | | | |
| | | If you find much damage (heavy bird | | | | | |
| | | strike): | | | | | |
| | | (1) Examine the windshield and the | | X | | | |
| | | internal side of the side window | | | | | |
| | | uprights and frames internally for| | | | | |
| | | distortion, cracks and pulled or | | | | | |
| | | torn fasteners. | | | | | |
| | | | | | | | |
|3. | | Passenger Compartment Windows | | | | | |
| | | | | | | | |
| A.| | Examine them for cracks, delamination | X | | | | |
| | | and crazing. | | | | | |
| | | | | | | | |
|4. | | External Fuselage Structure | | | | | |
| | | | | | | | |
| A.| | Examine the skin, the doors, the | X | | | | |
| | | fairings, the belly fairing and the | | | | | |
| | | fillets for: | | | | | |
| | | - erosion, distortion, cracks and | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | (a) Get access to and internally | | | | | |
| | | examine: | | | | | |
| | | - all the frames, the stringers, | | X | | | |
| | | the cleats, the fittings and the | | | | | |
| | | component mounts (at and near | | | | | |
| | | the location of the damage) for: | | | | | |
| | | . distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | - all the components, the pipes, | | X | | | |
| | | the ducts, the electrical looms, | | | | | |
| | | the cables, the pulleys and the | | | | | |
| | | mechanical linkages for: | | | | | |
| | | . distortion, cracks, rupture, | | | | | |
| | | fluid leakage and breaks. | | | | | |
|B. | | Examine all the antennas, the TAT | | | | | |



EFF :

ALL  05-51-14

Page 605
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | sensor, the pitot probe, the | X | | | | |
| | | angle-of-attack sensor and the drain | | | | | |
| | | masts for: | | | | | |
| | | - cracks and damage. | | | | | |
| | | | | | | | |
|5. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine externally all the belly | X | | | | |
| | | fairing panels, specially the leading-| | | | | |
| | | edge root fairing and upper and lower | | | | | |
| | | wing fairings, for: | | | | | |
| | | - erosion, distortion, cracks and | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the damaged panel and | | X | | | |
| | | internally examine the belly | | | | | |
| | | fairing structure. | | | | | |
| | | (2) Examine all the components, pipes,| | X | | | |
| | | ducts, electrical looms and their | | | | | |
| | | mounts for distortion, cracks, | | | | | |
| | | breaks and fluid leakage. | | | | | |
| | | | | | | | |
|6. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| A.| | Examine the nose landing gear. You | X | | | | |
| | | must be specially careful when you | | | | | |
| | | examine: | | | | | |
| | | - the components, the pipes, the | | | | | |
| | | electrical looms, the control rods | | | | | |
| | | and the bellcranks. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-14

Page 606
Aug 01/06
R  
JSA 
Subtask 05-51-14-210-052

C. Inspection of the Nacelles, Engines and Pylons (Ref. TASK 71-13-00-010-


010) (Ref. TASK 78-32-00-010-010) (Ref. TASK 72-00-00-200-010) (Ref. TASK
36-11-00-200-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nacelles | | | | | |
| | | | | | | | |
| A.| | Examine externally for erosion, | X | | | | |
| | | distortion, delamination, cracked or | | | | | |
| | | flaking paint, loose rivets and signs | | | | | |
| | | of shearing: | | | | | |
| | | - the air intake cowls, | | | | | |
| | | - the fan cowls, | | | | | |
| | | - the thrust reverser cowls of the | | | | | |
| | | fan. | | | | | |
| | | | | | | | |
| B.| | Examine the primary nozzle for | X | | | | |
| | | erosion, delamination, distortion, | | | | | |
| | | cracks, loose rivets and signs of | | | | | |
| | | shearing. | | | | | |
| | | If you find: | | | | | |
| | | - only erosion: | | | | | |
| | | no other inspection is necessary. | | | | | |
| | | - other damage: | | | | | |
| | | (1) Open the fan cowls | | X | | | |
| | | (Ref. TASK 71-13-00-010-010). | | | | | |
| | | (2) Open the fan thrust-reverser cowls| | | | | |
| | | (Ref. TASK 78-32-00-010-010). | | | | | |
| | | Examine internally for sure signs | | | | | |
| | | of damage. | | | | | |
| | | (3) Examine the nose-cowl attach | | X | | | |
| | | points on the fan case for: | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
| | | torn fasteners. | | | | | |
| | | Examine the primary-nozzle attach | | | | | |
| | | points on the engine. | | | | | |
| | | (4) Examine all the cowl attach points| | X | | | |
| | | on the pylon and all the cowl | | | | | |
| | | hinge fittings. | | | | | |
| | | (5) Examine all the cowl latches for | | X | | | |
| | | damage and make sure that their | | | | | |
| | | operation is satisfactory. | | | | | |



EFF :

ALL  05-51-14

Page 607
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | X | | | |
|2. | | Engines | | | | | |
| | | | | | | | |
| A.| | Examine the engines for foreign object| X | | | | |
| | | damage | | | | | |
| | | (Ref. TASK 72-00-00-200-010). | | | | | |
| | | | | | | | |
|2. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Examine the pylons externally for | X | | | | |
| | | erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | X | | | |
| | | - examine the pylon internally for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - examine the components, the | | X | | | |
| | | pipes, the ducts, the electrical | | | | | |
| | | looms and their mounts for: | | | | | |
| | | . distortion, cracks, rupture | | | | | |
| | | breaks and fluid leakage. | | | | | |
| | | | | | | | |
| B.| |Do the inspection of the Fan Air Valve | | | | | |
| | |and Bleed-air Precooler Exchanger. | X | | | | |
| | |(Ref. TASK 36-11-00-200-002) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-14

Page 608
Aug 01/06
R  
JSA 
Subtask 05-51-14-210-053

D. Inspection of the Stabilizers

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine the dorsal fin, the leading | X | | | | |
| | | edge and the tip fairing externally | | | | | |
| | | for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | (a) Examine internally at and near the| | X | | | |
| | | damage for: | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
| | | torn fasteners, honeycomb | | | | | |
| | | delamination or core damage and | | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| B. | | Examine the spar box of the vertical | X | | | | |
| | | stabilizer for erosion and scores. | | | | | |
| | | | | | | | |
| C. | | Examine the rudder and the trailing- | X | | | | |
| | | edge access doors externally for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the rudder hinge and the | | X | | | |
| | | actuator attach fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
|2. | | Horizontal Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine the leading edge and the tip | X | | | | |



EFF :

ALL  05-51-14

Page 609
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | fairing externally for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine internally for cracks, | | X | | | |
| | | distortion, pulled, or torn | | | | | |
| | | fasteners and damaged paint- | | | | | |
| | | work. | | | | | |
| | | | | | | | |
| B.| | Examine the spar box of the | X | | | | |
| | | horizontal stabilizer for erosion | | | | | |
| | | and scores. | | | | | |
| | | | | | | | |
| C.| | Examine the elevators and the | X | | | | |
| | | trailing-edge access doors externally | | | | | |
| | | for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the elevator hinge and | | X | | | |
| | | the actuator fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-14

Page 610
Aug 01/06
R  
JSA 
Subtask 05-51-14-210-054

E. Inspection of the Wings (Ref. TASK 32-11-00-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Leading Edge, Fillets and Slats | | | | | |
| | | | | | | | |
| A.| | Examine for erosion, distortion, | X | | | | |
| | | cracks and pulled or torn fasteners. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the leading edge | | X | | | |
| | | section internally at and near | | | | | |
| | | the damage, for distortion, | | | | | |
| | | cracks and pulled or torn | | | | | |
| | | fasteners, | | | | | |
| | | - examine the ducts and the related| | X | | | |
| | | attach points for damage, | | | | | |
| | | - examine the slat section for | | X | | | |
| | | distortion, cracks, pulled | | | | | |
| | | or torn fasteners and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - examine the actuators, the slat | | X | | | |
| | | tracks and the slat-track attach | | | | | |
| | | points for damage, | | | | | |
| | | - examine the slat tracks for | | X | | | |
| | | brinelling on the roller tracks. | | | | | |
| | | - examine the aileron servo- | | X | | | |
| | | controls and the hinge fittings | | | | | |
| | | for damage, | | | | | |
| | | - examine the spoiler actuators | | X | | | |
| | | and the hinge fittings for | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|2. | | Wing Tip Fairings and Navigation | | | | | |
| | | Lights | | | | | |
| | | | | | | | |
| A.| | Examine for erosion, distortion, | X | | | | |
| | | cracks, and pulled or torn fasteners. | | | | | |
| | | | | | | | |
|3. | | Main Landing Gear (MLG) and Doors | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-14

Page 611
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If the MLG was extended during the | | | | | |
| | | bird or hail strike: | | | | | |
| | | - examine the MLG. Examine the doors, | X | | | | |
| | | the components, the pipes, the | | | | | |
| | | cables, the pulleys and the | | | | | |
| | | electrical looms installed on the | | | | | |
| | | MLG | | | | | |
| | | (Ref. TASK 32-11-00-200-001). | | | | | |
| | | | | | | | |
| B.| | If the MLG was retracted during the | | | | | |
| | | bird or hail strike: | | | | | |
| | | - examine the MLG doors for damage. | X | | | | |
| | | | | | | | |
|4. | | Main Structure of the Wing | | | | | |
| | | | | | | | |
| A.| | Examine for erosion and scores. | X | | | | |
| | | | | | | | |
|5. | | Trailing Edge Falsework, Flaps, | | | | | |
| | | Ailerons and Spoilers | | | | | |
| | | | | | | | |
| A.| | Examine externally the control | X | | | | |
| | | surfaces for erosion, signs of impact,| | | | | |
| | | damaged paintwork, abrasions, | | | | | |
| | | scratches or dents, distortion, cracks| | | | | |
| | | and pulled and torn fasteners. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the falsework internally | | X | | | |
| | | at and near the damage for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - examine the flap carriages and | | X | | | |
| | | the fairing for distortion and | | | | | |
| | | cracks, | | | | | |
| | | - examine the flap tracks for | | X | | | |
| | | brinelling and damage. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-14

Page 612
Aug 01/06
R  
JSA 
Subtask 05-51-14-410-050

F. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close all the panels and doors that where open for this inspection.

(3) Remove the access platform(s).

(4) Remove the warning notices from the cockpit.

(5) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(6) Close the nose gear doors (Ref. TASK 32-22-00-410-001).

Subtask 05-51-14-866-051

G. Retraction of the Flight Control Surfaces

(1) Retract the spoilers (Ref. TASK 27-60-00-866-002).

(2) Retract the flaps (Ref. TASK 27-50-00-866-009).

(3) Retract the slats (Ref. TASK 27-80-00-866-005).

Subtask 05-51-14-710-050

H. Operational Test of the Systems (Ref. TASK 27-14-00-710-001) (Ref. TASK


27-24-00-710-002)
(Ref. TASK 27-34-00-710-001) (Ref. TASK 27-44-00-710-001)
(Ref. TASK 27-54-00-710-001) (Ref. TASK 27-84-00-710-001)
(Ref. TASK 32-30-00-867-001) (Ref. TASK 27-64-00-710-001) (Ref. TASK 32-
30-00-867-002)



EFF :

ALL  05-51-14

Page 613
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | NOTE : The tests below are only | | | | | |
| | | necessary if: | | | | | |
| | | - you did work on the system | | | | | |
| | | subsequent to the inspection | | | | | |
| | | for damage, | | | | | |
| | | - you found damage on the | | | | | |
| | | structure adjacent to a | | | | | |
| | | flight control surface. | | | | | |
| | | | | | | | |
|1. | | Operate the ailerons 3 times. Make | | X | | | |
| | | sure that the travel is full and that | | | | | |
| | | the ailerons move freely | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
| | | | | | | | |
|2. | | Operate the rudder 3 times. Make sure | | X | | | |
| | | that the travel is full and that the | | | | | |
| | | rudder moves freely | | | | | |
| | | (Ref. TASK 27-24-00-710-002). | | | | | |
| | | | | | | | |
|3. | | Operate the elevator 3 times. Make | | X | | | |
| | | sure that the travel is full and that | | | | | |
| | | the elevator moves freely | | | | | |
| | | (Ref. TASK 27-34-00-710-001). | | | | | |
| | | | | | | | |
|4. | | Operate the trimmable horizontal | | X | | | |
| | | stabilizer 3 times. Make sure that the| | | | | |
| | | travel is full and that the trimmable | | | | | |
| | | horizontal stabilizer moves freely | | | | | |
| | | (Ref. TASK 27-44-00-710-001). | | | | | |
| | | | | | | | |
|5. | | Operate the spoilers 3 times. Make | | X | | | |
| | | sure that the travel is full and that | | | | | |
| | | the spoilers move freely | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
|6. | | Operate the flaps and the slats 3 | | X | | | |
| | | times. Make sure that the travel is | | | | | |
| | | full and that these control surfaces | | | | | |
| | | move freely | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
| | | NOTE : The tests below are necessary | | | | | |



EFF :

ALL  05-51-14

Page 614
Aug 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | only if: | | | | | |
| | | - you did work on the system | | | | | |
| | | subsequent to the inspection | | | | | |
| | | for damage, | | | | | |
| | | - you found damage on the | | | | | |
| | | structure adjacent to a | | | | | |
| | | landing gear doors. | | | | | |
|7. | | Retract and extend the landing gear 3 | | X | | | |
| | | times | | | | | |
| | | (Ref. TASK 32-30-00-867-001) | | | | | |
| | | (Ref. TASK 32-30-00-867-002). | | | | | |
| | | Make sure that the landing gear and | | | | | |
| | | the doors move smoothly and freely. | | | | | |
| | | | | | | | |
| | | NOTE : If you find damage only on the | | | | | |
| | | main doors of the main gear or | | | | | |
| | | only on the fuselage structure | | | | | |
| | | adjacent to the main doors: | | | | | |
| | | - do a test of the main doors | | | | | |
| | | only. | | | | | |
| | | Use the circuit which | | | | | |
| | | opens/closes the doors when | | | | | |
| | | the aircraft is on the ground. | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________



EFF :

ALL  05-51-14

Page 615
Aug 01/06
 
JSA 
R _____________________________________________________________
INSPECTION AFTER A TIRE BURST OR TREAD THROW OR WHEEL FAILURE
R ________________
INSPECTION/CHECK

TASK 05-51-15-200-001

R Inspection after a Tire Burst or Tread Throw or Wheel Failure

WARNING : LET THE BRAKES AND THE WHEELS BECOME COOL BEFORE YOU GO NEAR THE
_______
LANDING GEAR. DO NOT APPLY A LIQUID OR GAS FIRE EXTINGUISHER DIRECTLY
ON A HOT WHEEL OR BRAKE UNIT. THIS COULD CAUSE AN EXPLOSION.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific access platform 3 m (9 ft. 10 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-51-16-200-001 Inspection After Brake Overheat


24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
27-14-00-710-001 Operational Test of the Aileron and Hydraulic
Actuation
27-50-00-866-008 Extension of the Flaps on the Ground
27-54-00-710-001 Operational Test of the Flap System
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
27-80-00-866-004 Extending the Slats on the Ground
27-84-00-710-001 Operational Test of the Slat System
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action



EFF :

ALL  05-51-15

Page 601
May 01/05
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-00-00-481-001 Installation of the Safety Devices on the Landing


Gears
32-11-00-200-001 Inspection/Check of the Main Gear
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-30-00-867-001 Retraction of the Landing Gear for Maintenance
71-13-00-200-010 Detailed Inspection of the Fan Cowl Doors
72-00-00-200-010 Inspection of the Engine after Bird Strike, Foreign
Object or Slush Ingestion
78-31-00-710-041 Operational Test of the Thrust Reverser System with
the CFDS

3. __________
Job Set-up

Subtask 05-51-15-481-050

A. Safety Precautions

R (1) Make sure that the safety devices are installed on the landing gears
R (Ref. TASK 32-00-00-481-001).

Subtask 05-51-15-010-050

B. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).

Subtask 05-51-15-866-050

C. Extension of the Flight Control Surfaces

(1) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008),
(Ref. TASK 27-80-00-866-004).

(2) Extend the spoilers (Ref. TASK 27-60-00-866-002).



EFF :

ALL  05-51-15

Page 602
May 01/05
 
JSA 
Subtask 05-51-15-860-050

D. Aircraft Maintenance Configuration

(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

(3) Put the warning notices in position in the cockpit to tell persons
not to operate the systems.

(4) Put the access platform in position.

4. Procedure
_________

Subtask 05-51-15-210-051

A. General

NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.

(1) Inspection recommendations on composite parts

(a) If you find damage (signs of impact, damaged paintwork,


abrasions, scratches or dents) on a composite part, you must do
an inspection of the related damaged area for delamination and
internal damage.

(2) If there is damage to the aircraft structure, refer to the Structural


Repair Manual (SRM). The SRM has the approved damage limits and
repair procedures.

(3) If you replace a component because of an inspection, you must do an


operational test of the related system.

(4) If a tire burst occurs when the landing gear is fully retracted, then
only examine the items of equipment below:
- the landing gear well,
- the landing gear doors,
- the landing gear assemblies,
- the hydraulic bay compartment.

(5) If a tire burst occurs because of emergency operation of the brakes


or locking of the brakes, do an inspection (Ref. TASK 05-51-16-200-
001).



EFF :

ALL  05-51-15

Page 603
Feb 01/06
R  
JSA 
Subtask 05-51-15-210-055

B. Inspection of the Fuselage (FR1 to FR34)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Fuselage Lower Surface. This includes | | | | | |
R | | | cargo doors. | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels for | X | | | | |
| | | distortion, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the floor panels of the | | X | | | |
| | | avionics and/or forward cargo | | | | | |
| | | compartment and examine: | | | | | |
| | | - the frames | | | | | |
| | | - the stringers | | | | | |
| | | - the cleats | | | | | |
| | | - the fittings | | | | | |
| | | for distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork adjacent to the damaged | | | | | |
| | | area. | | | | | |
| | | (2) Examine: | | X | | | |
| | | - the components | | | | | |
| | | - the pipes | | | | | |
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the control cables | | | | | |
| | | - the pulleys | | | | | |
| | | - the mounts | | | | | |
| | | for cracks, rupture, fluid | | | | | |
| | | leakage. | | | | | |
| | | Also examine the condition of the | | | | | |
| | | safety devices. | | | | | |
| | | | | | | | |
| B.| | In the nose landing-gear well, | X | | | | |
| | | examine: | | | | | |
| | | - the structure | | | | | |
| | | - the components | | | | | |
| | | - the pipes | | | | | |



EFF :

ALL  05-51-15

Page 604
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the control cables | | | | | |
| | | - the pulleys | | | | | |
| | | - the mounts | | | | | |
| | | for distortion, rupture, fluid | | | | | |
| | | leakage. | | | | | |
| | | Also examine the condition of the | | | | | |
| | | safety devices. | | | | | |
| | | | | | | | |
R | C.| | Examine: | X | | | | |
| | | - the nose landing-gear doors | | | | | |
| | | - the hinges | | | | | |
| | | - the attachments of the actuating | | | | | |
| | | cylinder | | | | | |
| | | for distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| D.| | Examine the nose landing-gear and | X | | | | |
R | | | specially: | | | | | |
| | | - the components | | | | | |
| | | - the pipes | | | | | |
| | | - the electrical looms | | | | | |
| | | - the control cables | | | | | |
| | | - the pulleys | | | | | |
| | | - the linkages | | | | | |
| | | - the mount. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-15

Page 605
May 01/05
 
JSA 
Subtask 05-51-15-210-052

C. Inspection of the Fuselage (FR35 to FR50)


(Ref. TASK 32-11-00-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the belly fairing panels for | X | | | | |
| | | holes, delamination, cracked or | | | | | |
| | | flaking paint and loose fasteners. | | | | | |
| | | Make sure that the panels are | | | | | |
| | | correctly attached. | | | | | |
R | | | If you find damage: | | | | | |
| | | (1) Remove the panels and internally | | X | | | |
| | | examine the belly fairing | | | | | |
| | | structure for buckling, cracks and| | | | | |
| | | damaged paintwork. | | | | | |
R | | | (2) Examine: | | X | | | |
| | | - the pipes | | | | | |
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the mounts | | | | | |
| | | for fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks. | | | | | |
| | | Make sure that the components are | | | | | |
| | | correctly attached and examine the | | | | | |
| | | condition of the safety devices. | | | | | |
| | | | | | | | |
|2. | | Main Landing-Gear Well | | | | | |
| | | | | | | | |
| A.| | In the main landing-gear well, examine| X | | | | |
| | | the protective panels and the | | | | | |
| | | structure for distortion, cracks, | | | | | |
| | | pulled or torn fasteners, honeycomb | | | | | |
| | | delamination, core damage. | | | | | |
| | | | | | | | |
| B.| | Examine the main landing gear and | X | | | | |
R | | | specially: | | | | | |
| | | - the pipes | | | | | |
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the mounts | | | | | |
| | | - the control actuators | | | | | |



EFF :

ALL  05-51-15

Page 606
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | for fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks. | | | | | |
| | | Make sure that the components are | | | | | |
| | | correctly attached and examine the | | | | | |
| | | condition of the safety devices | | | | | |
| | | (Ref. TASK 32-11-00-200-001). | | | | | |
| | | | | | | | |
| 3. | | Main Landing-Gear Main-Doors | | | | | |
| | | | | | | | |
R | A.| | Examine: | X | | | | |
| | | - the door | | | | | |
| | | - the hinges | | | | | |
| | | - the actuating cylinder attachments | | | | | |
| | | - the sequence valve mounts | | | | | |
| | | - the linkage | | | | | |
| | | for distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the actuating cylinder, the | X | | | | |
| | | sequence valve, the hoses and the | | | | | |
| | | pipes for distortion, cracks, rupture | | | | | |
| | | and fluid leakage. Also examine the | | | | | |
| | | condition of the safety devices. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-15-210-053

D. Inspection of the Nacelles, Engines and Pylons


R (Ref. TASK 71-13-00-200-010) (Ref. TASK 72-00-00-200-010)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nacelles and Engine | | | | | |
| | | | | | | | |
| A.| | Externally examine the nacelle and the| X | | | | |
R | | | primary nozzle for: | | | | | |
| | | distortion, cracks, delamination, | | | | | |
| | | cracked or flaking paint, loose rivets| | | | | |
| | | and signs of shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Open the cowls and internally | | X | | | |



EFF :

ALL  05-51-15

Page 607
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | | | examine them for distortion, | | | | | |
| | | cracks, pulled or torn fasteners | | | | | |
| | | and damaged paintwork | | | | | |
| | | (Ref. TASK 71-13-00-200-010). | | | | | |
| | | (2) Examine the components, the ducts,| | X | | | |
| | | the cables and the looms in the | | | | | |
| | | cowls for distortion, cracks and | | | | | |
| | | rupture. | | | | | |
| | | | | | | | |
| B.| | If the tire burst occurred during | X | | | | |
| | | thrust reverser operation, do a | | | | | |
| | | functional test of the thrust reverser| | | | | |
| | | system (Refer to the Test paragraph). | | | | | |
| | | Make sure that the travel is full and | | | | | |
| | | that the related controls do not catch| | | | | |
| | | or become blocked. Internally examine | | | | | |
| | | the doors for damage. | | | | | |
| | | | | | | | |
|2. | | Engines | | | | | |
| | | | | | | | |
| A.| | Examine the engines for possible | X | | | | |
| | | foreign object damage | | | | | |
| | | (Ref. TASK 72-00-00-200-010). | | | | | |
| | | | | | | | |
|3. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Externally examine the pylons for | X | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
R | | | If you find damage: | | | | | |
| | | (1) Internally examine the structure | | X | | | |
| | | for distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the components, the pipes,| | X | | | |
| | | the ducts, the looms, the cables, | | | | | |
| | | the pulleys and the mounts for | | | | | |
| | | distortion, cracks, rupture, fluid| | | | | |
| | | leakage. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-15

Page 608
May 01/05
 
JSA 
Subtask 05-51-15-210-054

E. Inspection of the Wings


(Ref. TASK 28-25-00-650-001) (Ref. TASK 28-10-00-910-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Skin panels | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels, specially | X | | | | |
| | | on the bottom surface of the wings, | | | | | |
R | | | for: | | | | | |
| | | - damage to the paint | | | | | |
| | | - distortion | | | | | |
| | | - cracks | | | | | |
| | | - tears | | | | | |
| | | - fuel leaks. | | | | | |
R | | | If you find damage or fuel leaks: | | | | | |
| | | (1) Defuel the tanks | | X | | | |
R | | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Examine the front and rear spars, | | X | | | |
| | | the internal structure and the | | | | | |
| | | fasteners for distortion, cracks, | | | | | |
| | | pulled fasteners. | | | | | |
| | | Make sure that the condition of | | | | | |
| | | the sealant beads is good. | | | | | |
| | | (4) Examine the ducts, the cables, | | X | | | |
| | | the electrical looms, the pipes, | | | | | |
| | | the mechanical linkages and their | | | | | |
| | | installations for damage, | | | | | |
| | | distortion, cracks, fluid leaks. | | | | | |
| | | Make sure that the components are | | | | | |
| | | correctly attached. | | | | | |
| | | | | | | | |
| | | (5) Close access to the wing tanks | | | | | |
R | | | (Ref Task 28-10-00-910-002). | | | | | |
| | | | | | | | |
|2. | | Flaps and Slats | | | | | |
| | | | | | | | |
| A.| | Examine the slats, the flaps, and the | X | | | | |
| | | fairings for distortion, cracks or | | | | | |
| | | pulled fasteners and signs of impact. | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-15

Page 609
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|3. | | Ailerons | | | | | |
| | | | | | | | |
| A.| | Examine the ailerons for: | X | | | | |
| | | - damaged paintwork | | | | | |
| | | - distortion | | | | | |
| | | - cracks | | | | | |
| | | - pulled fasteners | | | | | |
| | | - signs of impact. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the hinges and the | | | | | |
| | | actuators for damage, distortion and | | | | | |
| | | cracks. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-15-410-050

F. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close the panels and the doors that were open for the inspection.

(3) Remove the access platform(s).

(4) Remove the warning notice(s).

(5) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).

(6) Close the doors of the nose gear (Ref. TASK 32-22-00-410-001).

Subtask 05-51-15-710-050

G. Operational Test of the Systems


(Ref. TASK 78-31-00-710-041) (Ref. TASK 27-14-00-710-001) (Ref. TASK 27-
54-00-710-001) (Ref. TASK 27-84-00-710-001) (Ref. TASK 27-64-00-710-001)
(Ref. TASK 32-30-00-867-001)

R NOTE : Do these tests only if the inspection shows damage on or near:


____
- a flight control surface,
- the landing gears and doors,
- an adjacent structure.



EFF :

ALL  05-51-15

Page 610
May 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | NOTE : The subsequent tests are | | | | | |
| | | applicable only if the | | | | | |
| | | inspection showed damage to a | | | | | |
| | | flight control surface, the | | | | | |
| | | landing gears or doors or the | | | | | |
| | | adjacent structure. | | | | | |
| A. | | Do an operational test of the thrust | X | | | | |
| | | reverser system as specified in the | | | | | |
| | | inspection procedure | | | | | |
| | | (Ref. TASK 78-31-00-710-041). | | | | | |
| | | | | | | | |
| B.| | Do an operational test of the aileron.| | X | | | |
| | | Make sure that the travel is full and | | | | | |
| | | that the related controls do not catch| | | | | |
| | | or become blocked | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
| | | | | | | | |
| C.| | Do an operational test of the flaps | | X | | | |
| | | and the slats. Make sure that the | | | | | |
| | | travel is full and that the related | | | | | |
| | | controls do not catch or become | | | | | |
| | | blocked | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
| D.| | Do an operational test of the | | X | | | |
| | | spoilers. | | | | | |
| | | Make sure that the travel is full and | | | | | |
| | | that the related controls do not catch| | | | | |
| | | or become blocked | | | | | |
R | | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
| E.| | Do a retraction test of the landing | | X | | | |
| | | gear. Make sure that the travel is | | | | | |
| | | smooth and that the related controls | | | | | |
| | | do not catch or become blocked | | | | | |
| | | (Ref. TASK 32-30-00-867-001) | | | | | |
R | | | (Ref. TASK 32-30-00-867-002). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-15

Page 611
May 01/06
 
JSA 
INSPECTION AFTER BRAKE EMERGENCY APPLICATION OR OVERHEAT - INSPECTION/CHECK
___________________________________________________________________________

TASK 05-51-16-200-001

R Inspection After Brake Emergency Application or Overheat

WARNING : DO NOT GO NEAR A HOT WHEEL FOR ONE HOUR AFTER A BRAKE OVERHEAT IF THE
_______
TIRE IS INFLATED, EXCEPT TO PUT THE WHEEL CHOCKS IN POSITION. IF YOU
MUST GO NEAR THE WHEEL, GO FROM THE FRONT OR THE REAR BUT NOT FROM
THE SIDE OF THE WHEEL. THERE IS A RISK OF A TIRE BURST.

WARNING : LET THE BRAKES AND THE WHEELS BECOME COOL BEFORE YOU GO NEAR THE
_______
LANDING GEAR. DO NOT APPLY A LIQUID OR GAS FIRE EXTINGUISHER DIRECTLY
ON A HOT WHEEL OR BRAKE UNIT. THIS COULD CAUSE AN EXPLOSION.

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

WARNING : DO NOT RECOMMEND THE USE OF POWDER EXTINGUISHANTS. THE DEPOSITS


_______
SMOTHER THE FIRE BUT THEY ALSO LIMIT THE DISSIPATION OF THE HEAT AND
THIS CAN CAUSE PERMANENT STRUCTURAL DAMAGE TO :
- BRAKE
- WHEEL
- AXLE
YOU MUST NOT APPLY THE EXTINGUISHANT (EVEN WATER MIST) WITH A SPRAY
GUN DIRECTLY ON THE CARBON HEAT PACK OF THE BRAKE. THIS CAN CAUSE
THERMAL SHOCK.

1. __________________
Reason for the Job

This inspection is necessary after a crew report of:


- a brake temperature of more than 900 deg.C,
- wheel fuse plug(s) melt.
The temperature of the brakes can be too high after:
- an acceleration-stop,
- the emergency application of the brakes,
- frequent use of the brakes,
- a failure of the braking control.
If the temperature of the brakes is too high, one or more of the fuse plugs
can melt. This causes:
- damage to the tire,
- possible damage to the wheel,
- too much load on the opposite tire. This can cause damage to the tire.



EFF :

ALL  05-51-16

Page 601
Nov 01/06
 
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notice


No specific wheel chocks

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-51-15-200-001 Inspection after a Tire Burst or Tread Throw or Wheel


Failure
10-20-00-556-001 Mooring of the Aircraft
32-11-00-200-007 Inspection of the MLG Axles after a Brake Overheat
32-41-11-000-006 Removal of the MLG Wheel
(2649GM,2650GM,2651GM,2652GM)
32-41-11-400-006 Installation of the MLG Wheel
(2649GM,2650GM,2651GM,2652GM)
32-42-00-710-001 Operational Check of the Normal Braking System
32-42-27-000-001 Removal of the Brake (2641GM,2642GM,2643GM,2644GM)
32-42-27-210-006 Inspection/Check of the Brake with the Wheel Removed
32-42-27-400-001 Installation of the Brake
(2641GM,2642GM,2643GM,2644GM)
32-42-71-000-001 Removal of the MLG Axle Adaptor-Sleeves
32-42-71-400-001 Installation of the MLG Axle Adaptor-Sleeves
32-43-00-710-001 Operational Check of Alternate Braking System

3. __________
Job Set-up

Subtask 05-51-16-941-050

R A. Safety Precautions

(1) Instruction after brake overheat

(a) To prevent movement of the aircraft, you can moor the aircraft
(Ref. TASK 10-20-00-556-001) or let the aircraft stay attached to
the towing tractor.



EFF :

ALL  05-51-16

Page 602
Nov 01/06
 
JSA 
R (b) Unless there is a fire, do not apply the extinguishing agent
R (liquid, water, mist, foam, etc.) with a spray gun on a hot tire
R if it is inflated.
Do not apply the extinguishing agent directly into the heat pack
of the brake or into the wheel. This can cause thermal shock to
R the stressed parts. Specially, do not use CO2 as this has a
R strong cooling effect which is not the same in all areas. It can
cause an explosion in the stressed parts.
Extinguishant on hot wheels can:
- increase the time necessary for the fuse(s) to melt, or
- prevent operation of the fuse(s).
R If the fuse plugs are not melted, you must let the brake get cool
R for at least one hour with no external cooling devices (you can
R use brake cooling fans, if installed).

NOTE : You can use blowers or air conditioning equipment only


____
after:
- the temperature of the fuses decreases (more than one
hour after the aircraft stops) or
- the fuses are melted.
R You must not use these if you can see flames or burning
R embers.

R (c) If there is a fire, immediately extinguish the fire. Do not wait


R until the tires are deflated. Come near the wheel only from the
R front or from the rear.

R NOTE : We recommend that you do not use multi-purpose powders, as


____
R they can be changed into solid or enameled deposit. These
R agents stop the fire but they decrease the heat
R dissipation speed. This can cause permanent structural
R damage at the brake, the wheel or wheel axle.

R (d) Do not set the parking brake ON when BRAKES HOT warning is
R shown on the upper ECAM DU.

R (e) Put a warning notice in the cockpit to tell persons not to


R operate the landing-gear control lever.

R (f) If a tire is inflated, do not go near the area around the wheel
R for approximately one hour.

(g) Put the wheel chocks in position when there is no risk of tire
burst.

(h) Clean all the parts if extinguishing agents were used.



EFF :

ALL  05-51-16

Page 603
Aug 01/05
 
JSA 
4. Procedure
_________

Subtask 05-51-16-210-053

A. Inspection of the Aircraft

R (1) If there is tire burst:


- do the Inspection of the Aircraft after a Tire Burst or Tread Throw
(Ref. TASK 05-51-15-200-001).

Subtask 05-51-16-210-051

R B. Inspection of the Wheels and Brakes

CAUTION : DO NOT TRY TO APPLY PRESSURE TO THE BRAKES WHEN THE ROTORS ARE
_______
NOT ALIGNED.

(Ref. TASK 32-42-27-000-001) (Ref. TASK 32-42-27-400-001) (Ref. TASK 32-


42-27-210-006) (Ref. TASK 32-41-11-000-006) (Ref. TASK 32-41-11-400-006)
(Ref. TASK 32-42-71-000-001) (Ref. TASK 32-42-71-400-001) (Ref. TASK 32-
11-00-200-007)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | A.| |Inspection after the melting of the | | | | | |
R | | |183 deg.C (361.4 deg.F) fuse plug(s) | | | | | |
R | | |and the reported cockpit indication of | | | | | |
R | | |the brakes temperature not more than | | | | | |
R | | |900 deg.C (1652 deg.F) | | | | | |
| | | | | | | | |
| | |(1) Remove the related wheel and the | X | | | | |
R | | | adjacent wheel for overhaul | | | | | |
R | | | (Ref. TASK 32-41-11-000-006). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) Examine the brake unit for damage | X | | | | |
R | | | or distortion | | | | | |
R | | | (Ref. TASK 32-42-27-210-006). | | | | | |
R | | | (a) Make sure that there is no | | | | | |
R | | | hydraulic fluid leakage at the | | | | | |
R | | | piston, liners, supply lines, | | | | | |
R | | | self-blanking unions and bleed | | | | | |
R | | | screws. | | | | | |
R | | | (b) Clean the piston housing with | | | | | |


R

EFF :

ALL  05-51-16

Page 604
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | a cloth and make sure it is in | | | | | |
| | | the correct condition (no | | | | | |
| | | separation, no blisters). | | | | | |
R | | | (c) Make sure that the heat pack is| | | | | |
| | | serviceable: | | | | | |
| | | - carbon integrity | | | | | |
| | | - free movement of the rotor | | | | | |
R | | | discs | | | | | |
| | | - cracks or signs of oxidation | | | | | |
R | | | on the part of the rotor | | | | | |
R | | | discs you can see. | | | | | |
R | | | NOTE: Be careful with the | | | | | |
| | | discs to prevent damage| | | | | |
| | | to the protective | | | | | |
| | | finish (anti-oxidation | | | | | |
R | | | paint). | | | | | |
| | |If you find damage: | | | | | |
R | | |- Remove the damaged brake unit for | | X | | | |
R | | | overhaul | | | | | |
R | | | (Ref. TASK 32-42-27-000-001). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
R | | | instructions for the overhaul | | | | | |
R | | | procedure). | | | | | |
| | |(3) Installation of the removed | | | | | |
| | | components | | | | | |
R | | | (a) Install serviceable components:| | | | | |
| | | - for the wheels | | | | | |
| | | (Ref. TASK 32-41-11-400-006) | | | | | |
| | | - for the brakes | | | | | |
R | | | (Ref. TASK 32-42-27-400-001). | | | | | |
| | | | | | | | |
R | B.| |Inspection after the melting of the | | | | | |
R | | |183 deg.C (361.4 deg.F) fuse plug(s) | | | | | |
R | | |and/or the reported cockpit indication | | | | | |
R | | |of the brakes temperature equal to or | | | | | |
| | |more than 900 deg.C (1652 deg.F) | | | | | |
| | | | | | | | |
| | |(1) Remove the related wheel for | X | | | | |
| | | overhaul | | | | | |
R | | | (Ref. TASK 32-41-11-000-006). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |



EFF :

ALL  05-51-16

Page 605
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | | | NOTE: If fuse plug is melted, also | | | | | |
| | | remove the adjacent wheel for| | | | | |
| | | overhaul. | | | | | |
| | |(2) Remove the brake for overhaul | X | | | | |
R | | | (Ref. TASK 32-42-27-000-001). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(3) Remove the axle sleeve | X | | | | |
R | | | (Ref. TASK 32-42-71-000-001). | | | | | |
| | |(4) Do the Inspection of the MLG Axles | X | | | | |
| | | after Brake Overheat | | | | | |
R | | | (Ref. TASK 32-11-00-200-007). | | | | | |
| | |(5) Examine the axle sleeve for | X | | | | |
R | | | distortion and damaged surface. | | | | | |
| | |(6) Installation of the removed | | | | | |
R | | | components | | | | | |
| | | (a) Install serviceable components:| | | | | |
| | | - for the axle sleeve | | | | | |
| | | (Ref. TASK 32-42-71-400-001) | | | | | |
| | | - for the brakes | | | | | |
| | | (Ref. TASK 32-42-27-400-001) | | | | | |
| | | - for the wheels | | | | | |
R | | | (Ref. TASK 32-41-11-400-006). | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-16-710-050

A. Operational Test of the Systems

R (1) Do an operational test of the normal braking system (Ref. TASK 32-42-
00-710-001).

R (2) Do an operational test of the alternate braking system (Ref. TASK 32-
43-00-710-001).



EFF :

ALL  05-51-16

Page 606
Aug 01/05
 
JSA 
Subtask 05-51-16-942-051

B. Put the aircraft back to its initial configuration.

(1) Remove the warning notice(s).

(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :

ALL  05-51-16

Page 607
Aug 01/05
R  
JSA 
_______________________________________________________________________
INSPECTION AFTER FLIGHT IN EXCESSIVE TURBULENCE OR IN EXCESS OF VMO/MMO
________________
INSPECTION/CHECK

TASK 05-51-17-200-001

Inspection after in Flight Excessive Load Factor due to Turbulence or Maneuver


or in Excess of VMO/MMO

1. __________________
Reason for the Job

To examine the aircraft for structural damage after a flight where excessive
load factors occurred. Such load factors can be caused by high turbulence,
maneuvers not in the usual limits, or VMO/MMO values that are more than the
specified limits.
Refer to Para. 3. A. for the conditions in which an inspection is necessary.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-56-00-200-001 Inspection/Check of the Leveling and Measurement


after Abnormal Operation of the Aircraft
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
27-14-00-710-001 Operational Test of the Aileron and Hydraulic
Actuation
27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation
27-34-00-710-001 Operational Test of the Elevator and Hydraulic
Actuation
27-44-00-710-002 Operational Test of the Trimmable Horizontal
Stabilizer Actuator with the Individual Hydraulic
Systems
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-54-00-710-001 Operational Test of the Flap System



EFF :

ALL  05-51-17

Page 601
May 01/06
R  
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation


27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground
27-84-00-710-001 Operational Test of the Slat System
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
31-37-00-200-001 Check of the Load-Report Parameter after
Hard/Overweight Landing or Excessive Turbulence
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
78-31-00-710-041 Operational Test of the Thrust Reverser System with
the CFDS
78-32-00-010-010 Opening of the Thrust Reverser Halves

3. __________
Job Set-up

R Subtask 05-51-17-941-053-A

R A. Inspection Requirements

R (1) Do this inspection if the flight crew report and/or the data from the
R Digital Flight Recording System (DFDRS) and/or the data from the QAR
R (if installed) show:

R NOTE : Excessive turbulence is identified as turbulence that causes


____
R large, abrupt changes in altitude and/or attitude. It usually
R causes large variations in airspeed. Passengers and crew are
R moved violently against their seat belts and loose objects are
R moved around the aircraft.

R (a) Turbulence or maneuvers that caused a vertical load factor equal


R to or more than:
R - +2.5 g or -1 g (clean configuration)
R - +2 g or 0 g (flaps and/or slats extended), or

R (b) Speeds that were more than VMO + 20 Kts (CAS), or

R (c) Speeds that were more than MMO + 0.04 M, or



EFF :

ALL  05-51-17

Page 602
May 01/06
 
JSA 
R (d) Speeds that were more than VMO or MMO and at which there was a
R vertical load factor equal to or more than +2 g or 0 g.

R (2) Also do this inspection if a DMU load report 15 was generated. This
R report shows that excessive vertical acceleration occurred during the
R flight (Ref. TASK 31-37-00-200-001).

R NOTE : The load report 15 can be generated immediately after the


____
R vertical acceleration, or during flight phase 9 or 10 in
R relation with the DMU programming.

Subtask 05-51-17-941-052

B. Not Applicable

Subtask 05-51-17-010-050

C. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

Subtask 05-51-17-481-050

D. Safety Precautions

(1) Make sure that the safety devices are installed on the main landing
gear (Ref. TASK 32-00-00-481-001).

Subtask 05-51-17-866-050

E. Extension of the Flaps and the Slats

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Fully extend the slats (Ref. TASK 27-80-00-866-004).

Subtask 05-51-17-860-050

F. Aircraft Maintenance Configuration

(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

(3) Put the warning notices in the cockpit to tell persons not to operate
the aircraft systems.

(4) Put the access platform in position.



EFF :

ALL  05-51-17

Page 603
May 01/06
 
JSA 
4. Procedure
_________

Subtask 05-51-17-210-051

A. General

NOTE : All these inspections are visual unless the text gives other
____
instructions.
You can do non-destructive tests (refer to the Aircraft
Non-destructive Test Manual - NTM) if:
- You think it is necessary;
- Your airworthiness authority tells you to.
If, because of the inspection, you must disconnect or remove
components, pipes, ducts, cables, electrical connectors or
mechanical linkages, you must then do a functional test of the
related system(s).

Subtask 05-51-17-210-063

B. Inspection of the Fuselage

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Belly fairing | | | | | |
| | | | | | | | |
| A.| | Examine externally all the belly | X | | | | |
| | | fairing panels, specially the leading-| | | | | |
| | | edge roof fairing and upper and lower | | | | | |
| | | wing fairings, for : | | | | | |
| | | - correct attachment, delamination, | | | | | |
| | | damaged paintwork, pulled or torn | | | | | |
| | | fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Remove the damaged panel and | | X | | | |
| | | internally examine the belly | | | | | |
| | | fairing structure. | | | | | |
| | | (2) Examine all the components, pipes,| | X | | | |
| | | ducts, electrical looms and their | | | | | |
| | | mounts, for distortion, cracks, | | | | | |
| | | breaks and fluid leakage. | | | | | |
| | | | | | | | |
|2. | | Fuselage (FR36 to FR46) | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-17

Page 604
May 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | At the joint of the wing spar box with| X | | | | |
| | | the wing, rib1, examine : | | | | | |
| | | - the rear-spar web splice, | | | | | |
| | | - the fuselage skin panels, | | | | | |
| | | - the panel splices. | | | | | |
| | | For distortion, cracks, pulled or torn| | | | | |
| | | fasteners, damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | At and around FR46, examine the lower | X | | | | |
| | | skin panel of the fuselage between the| | | | | |
| | | R stringer 41RH and the L stringer | | | | | |
| | | 41LH for : | | | | | |
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners, damaged paintwork. | | | | | |
| | | | | | | | |
|3. | | Fuselage (FR29 to FR70) | | | | | |
| | | If you find damage (refer to 1 or 2 | | | | | |
| | | above): | | | | | |
| | | | | | | | |
| A.| | From FR26 to FR35 : | | X | | | |
| | | - externally examine the skin panels, | | | | | |
| | | the splicing and the riveting for | | | | | |
R | | | distorsion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Remove the forward cargo- | | | X | | |
| | | compartment panels and examine the| | | | | |
| | | floor support structure, frames, | | | | | |
| | | skin panels, splicing, rivets and | | | | | |
| | | stringers for: | | | | | |
| | | - distortion, cracks, pulled and | | | | | |
| | | torn fasteners, damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| B.| | At FR35, examine the top of the joint | | | | | |
| | | between the R stringer 6 and the L | | | | | |
| | | stringer 6 for: | | | | | |
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners, damaged paintwork. | | | | | |
| | | | | | | | |
| C.| | From FR35 to FR47: | | | | | |
| | | - in the main landing-gear well and on| | X | | | |
| | | the upper fuselage section (exter- | | | | | |



EFF :

ALL  05-51-17

Page 605
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | nal): | | | | | |
| | | - examine the frames, skin panels, | | | | | |
| | | splices, stringers and riveting for | | | | | |
R | | | distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Examine the upper fuselage section| | | X | | |
| | | internally (the frames, stringers,| | | | | |
| | | cleats, and splices) for : | | | | | |
| | | - distortion, cracks pulled or | | | | | |
| | | torn fasteners, damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| D.| | From FR47 to FR70 : | | | | | |
| | | - examine the frames, skin panels, | | | | | |
| | | splices, stringers and rivets for: | | | | | |
| | | - distortion, cracks, pulling, tears | | | | | |
R | | | and damaged paintwork. | | | | | |
| | | | | | | | |
| E.| | Examine the cut-out corners and rivets| | | | | |
| | | of the emergency-exit surround panel | | | | | |
| | | for : | | | | | |
R | | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |
| F.| | Examine the hinge fittings of the bulk| | X | | | |
| | | cargo-compartment door for cracks, | | | | | |
R | | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| G.| | Examine the cut-out corner and rivet | | X | | | |
| | | areas of the surround panel of the | | | | | |
| | | bulk cargo-compartment door for : | | | | | |
| | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |
|4. | | Horizontal stabilizer cut-out | | | | | |
| | | | | | | | |
| A.| | Examine the cut-out corners for | X | | | | |
| | | cracks. | | | | | |
| | | If you find damage : | | | | | |
| | | Examine the cut-out edges of the top | | X | | | |
| | | and bottom stringers for : | | | | | |



EFF :

ALL  05-51-17

Page 606
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | NOTE: Do these inspections together, | | | | | |
| | | with the horizontal stabilizer | | | | | |
| | | inspection. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-17-210-052

C. Inspection of the Pylons and Nacelles


(Ref. TASK 71-13-00-010-010)
(Ref. TASK 78-32-00-010-010)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Examine for distortion and cracks the | X | | | | |
| | | pylon lateral panels around the access| | | | | |
| | | door cut-outs between : | | | | | |
| | | - ribs 2 and 3, | | | | | |
| | | - ribs 5 and 6. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Open the engine cowls and examine | | X | | | |
R | | | the main frame, the lower spar | | | | | |
| | | and the rib-to-panel attachments | | | | | |
| | | for: | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
| | | torn fasteners. | | | | | |
| | | (2) Examine all the ducts, lines, | | X | | | |
| | | electrical looms and their mounts | | | | | |
| | | for distortion, cracks, rupture | | | | | |
| | | and fluid leakage. | | | | | |
| | | | | | | | |
|2. | | Nacelles | | | | | |
| | | | | | | | |
| A.| | Examine the nacelle and the primary | X | | | | |
| | | nozzle externally for : | | | | | |
| | | - distortion, cracks, delamination, | | | | | |
| | | cracked or flaking paint, loose | | | | | |
R | | | rivets, signs of shearing. | | | | | |



EFF :

ALL  05-51-17

Page 607
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | If you fing damage : | | | | | |
| | | (1) Open the fan cowl doors | | X | | | |
| | | (Ref. TASK 71-13-00-010-010). | | | | | |
| | | (2) Open the thrust reverser doors | | | | | |
| | | (Ref. TASK 78-32-00-010-010). | | | | | |
| | | Examine internally for signs of | | | | | |
| | | damage. | | | | | |
| | | (3) Examine the attachments of the air| | X | | | |
| | | intake cowl to the fan case for | | | | | |
| | | distortion, cracks, and pulled or | | | | | |
| | | torn fasteners. Examine the | | | | | |
| | | attachments of the primary nozzle | | | | | |
| | | to the engine. | | | | | |
| | | (4) Examine all the cowl attachment | | X | | | |
| | | points on the pylon. Examine all | | | | | |
| | | the cowl hinge fittings. | | | | | |
| | | (5) Visually examine the engine | | X | | | |
| | | equipment, support, fasteners, | | | | | |
| | | brackets and pipes for damage. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-17-210-053

D. Inspection of the Horizontal Stabilizer

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Wing center box (rib 3) | | | | | |
| | | | | | | | |
| A.| | Examine the top and bottom skin panels| X | | | | |
| | | and actuator fittings, the ribs and | | | | | |
| | | the spar rivets for : | | | | | |
R | | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Examine the rear spar web on each | | X | | | |
| | | side of the pivot bearing fittings| | | | | |
| | | for : | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
R | | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |



EFF :

ALL  05-51-17

Page 608
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (2) Examine the hydraulic lines, | | X | | | |
| | | mechanical linkages electrical | | | | | |
| | | looms and their mounts for : | | | | | |
R | | | - distortion, cracks, rupture | | | | | |
| | | and fluid leakage. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-17-210-054

E. Inspection of the Vertical Stabilizer

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Primary Structure of the Vertical | | | | | |
| | | Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine the primary structure | X | | | | |
| | | externally for distortion, cracks, | | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Open the access panels and examine| | X | | | |
| | | the attachment fittings and their | | | | | |
| | | adjacent structure for : | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
R | | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the front and rear spar | | X | | | |
| | | webs for : | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
R | | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (3) On the rear spar, examine the | | X | | | |
| | | hydraulic lines, mechanical | | | | | |
R | | | linkages, electrical looms and | | | | | |
| | | their mounts for : | | | | | |
R | | | - distortion, cracks, rupture and | | | | | |
| | | fluid leakage. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-17

Page 609
Aug 01/05
 
JSA 
Subtask 05-51-17-210-055

F. Inspection of the Wings and Flight Control Surfaces


(Ref. TASK 28-25-00-650-001)
(Ref. TASK 28-10-00-910-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Skin Panels | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the skin panels : | X | | | | |
| | | - make sure that there is (are) no : | | | | | |
| | | - distortion or damage, | | | | | |
| | | - cracks, tears or fuel leaks. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Defuel the tanks | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Examine the front spar, the rear | | X | | | |
| | | spar, the ribs, the skin panels | | | | | |
| | | and the skin panel joints. | | | | | |
| | | Make sure that : | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, the skin | | | | | |
| | | panels are correctly attached. | | | | | |
| | | (4) Examine the internal structure and| | X | | | |
| | | the fasteners. | | | | | |
| | | Make sure that : | | | | | |
| | | - there is no damage or | | | | | |
R | | | distortion, | | | | | |
| | | - the sealant beads are in good | | | | | |
| | | condition, | | | | | |
| | | - there are no pulled fasteners. | | | | | |
| | | (5) Examine the attachment fittings of| | X | | | |
| | | the engine pylon. | | | | | |
| | | Make sure that : | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - the components are correctly | | | | | |
| | | attached. | | | | | |
| | | (6) On the front and rear spars, | | X | | | |
| | | examine the ducts, lines, cables, | | | | | |
R | | | mechanical linkages and their | | | | | |
| | | installation. | | | | | |



EFF :

ALL  05-51-17

Page 610
Aug 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | Make sure that : | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there are no leaks, | | | | | |
| | | - the components are correctly | | | | | |
| | | attached. | | | | | |
| | | | | | | | |
| | | (7) Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | | | | | | |
|2. | | Flaps and Slats | | | | | |
| | | | | | | | |
| A.| | Examine the slats, flaps and fairing. | X | | | | |
| | | Make sure that there is (are) no : | | | | | |
| | | - distortion, | | | | | |
| | | - cracks or pulled fasteners, | | | | | |
| | | - damage. | | | | | |
| | | | | | | | |
|3. | | Ailerons | | | | | |
| | | | | | | | |
| A.| | Examine the ailerons. | X | | | | |
| | | Make sure that there is (are) no : | | | | | |
| | | - damage or distortion, | | | | | |
| | | - cracks or pulled fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Examine the aileron hinges and | | X | | | |
| | | actuator : | | | | | |
| | | Make sure that there is (are) no: | | | | | |
| | | - cracks, | | | | | |
| | | - damage or distortion. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-17-869-050

G. Leveling and Measurement

(1) If you find structural damage during a phase 2 inspection:


- Do a full leveling and measurement check of the aircraft (Ref. TASK
05-56-00-200-001) .



EFF :

ALL  05-51-17

Page 611
Nov 01/04
 
JSA 
Subtask 05-51-17-410-050

H. Close Access

(1) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(2) Make sure that the work area is clean and clear of tool(s) and other
items.

(3) Close all the panels and doors that you opened for the inspection.

(4) Remove the warning notice(s).

(5) Remove the access platform(s).

Subtask 05-51-17-866-052

J. Retraction of the Flaps and Slats

(1) Retract the flaps (Ref. TASK 27-50-00-866-009).

(2) Retract the slats (Ref. TASK 27-80-00-866-005).

Subtask 05-51-17-710-050

K. Operational Test of the System


(Ref. TASK 27-14-00-710-001) (Ref. TASK 27-24-00-710-001)
(Ref. TASK 27-34-00-710-001) (Ref. TASK 27-44-00-710-002)
(Ref. TASK 27-54-00-710-001) (Ref. TASK 27-64-00-710-001)
(Ref. TASK 27-84-00-710-001) (Ref. TASK 78-31-00-710-041)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | NOTE: You must do these tests only if | | | | | |
| | | during the inspection you found | | | | | |
| | | damage on the structure adjacent| | | | | |
| | | to: | | | | | |
| | | - a flight control surface, | | | | | |
| | | - a cowl. | | | | | |
|1. | | Do an operational test of the ailerons| | X | | | |
| | | | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |



EFF :

ALL  05-51-17

Page 612
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|2. | | Do an operational test of the rudder. | | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-24-00-710-001). | | | | | |
| | | | | | | | |
|3. | | Do an operational test of the | | X | | | |
| | | elevators. | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-34-00-710-001). | | | | | |
| | | | | | | | |
|4. | | Do an operational test of the | | X | | | |
| | | trimmable horizontal stabilizer. | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-44-00-710-002). | | | | | |
| | | | | | | | |
|5. | | Do an operational test of the flaps. | | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling and | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | | | | | | |
|6. | | Do an operational test of the spoilers| | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
|7. | | Do an operational test of the slats. | | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling and | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
|8. | | Do an operational test of the thrust | | X | | | |
| | | reverser system. | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |



EFF :

ALL  05-51-17

Page 613
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | binding) | | | | | |
| | | (Ref. TASK 78-31-00-710-04100). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-17

Page 614
Nov 01/04
 
JSA 
INSPECTION AFTER LIGHTNING STRIKE - INSPECTION/CHECK
____________________________________________________

TASK 05-51-18-200-001

Inspection after Lightning Strike

WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

1. __________________
Reason for the Job

After a lightning strike, before the aircraft continues in service, you


must:
- do a general inspection of the total surface of the aircraft to find the
strike areas,
- do a careful inspection of the strike areas to find the type and quantity
of possible damage
- if you find damage, make a decision about the necessary repair/action.

NOTE : To do this inspection, you must have:


____
- a set of access platforms, 2 m (6.56 ft.) to 11 m (36.1 ft.)
- or an adjustable access platform, 2 m (6.56 ft.) to 11 m (36.1 ft.)
- or a manlift aerial boom, 2 m (6.56 ft.) to 11 m (36.1 ft.)

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific adjustable access platform 11 m (36 ft. 1 in.)



EFF :

ALL  05-51-18

Page 601
Nov 01/04
 
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

23-11-00-710-001 Operational Test of the HF System


23-12-00-710-001 Operational Test of the VHF System
23-61-00-200-001 - Check Resistance of Tip to Retainer - Check Bonding
of Retainer to Structure
24-22-51-200-001 Check of the Lightning Protection Modules (19XU1,
19XU2)
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
27-14-00-710-001 Operational Test of the Aileron and Hydraulic
Actuation
27-14-51-000-001 Removal of the Aileron Servo Control
27-14-51-400-001 Installation of the Aileron Servo Control
27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation
27-24-51-000-001 Removal of the Rudder Servo Control
1025GM/2025GM/3025GM
27-24-51-400-001 Installation of the Rudder Servo Control
1025GM/2025GM/3025GM
27-34-00-710-001 Operational Test of the Elevator and Hydraulic
Actuation
27-34-51-000-001 Removal of the Elevator Servo Control
27-34-51-400-001 Installation of the Elevator Servo Control
27-44-00-710-001 Operational Test of the Jamming Protection Device of
the Trimmable Horizontal Stabilizer Actuator
27-50-00-866-008 Extension of the Flaps on the Ground
27-54-00-710-001 Operational Test of the Flap System
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
27-80-00-866-004 Extending the Slats on the Ground
27-84-00-710-001 Operational Test of the Slat System
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
30-31-00-710-001 Operational Test of the Probe Ice Protection
30-42-00-710-001 Operational Test of the Windshield Anti-Icing and
Defogging
30-71-00-710-001 Operational Test of the Drainmast Ice Protection
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-11-00-200-001 Inspection/Check of the Main Gear
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-21-00-200-002 General Visual Inspection of the Nose Landing Gear



EFF :

ALL  05-51-18

Page 602
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-22-00-010-001 Nose Gear Doors - Ground Doors Opening


32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-46-00-740-001 BITE Test of the BSCU
32-69-00-740-001 BITE Check Landing Gear Control Interface Unit
(LGCIU) using MCDU to Ensure that Continuous BITE is
Operative
33-41-00-710-001 Operational Test of the Navigation Lights
33-42-00-710-001 Operational Test of the Landing Lights
33-47-00-710-002 Operational Test of the Logo Lights
33-48-00-710-002 Operational Test of the Anti-Collision/Strobe
Lighting
33-49-00-710-001 Operational Test of the Wing and Engine Scan Lights
33-51-15-400-001 Installation of the Emergency Overwing Lights 60WL
(61WL, 62WL, 63WL)
34-10-00-710-007 Test of the Angle of Attack Warning
34-11-15-200-001 Inspection/Check of the Pitot Probe (9DA1,9DA2,9DA3)
R 34-11-18-200-002 Inspection/Check of the TAT Sensor (11FP1, 11FP2)
34-11-19-000-001 Removal of the Angle of Attack Sensor (3FP1, 3FP2,
3FP3)
34-11-19-400-001 Installation of the Angle of Attack Sensor (3FP1,
3FP2, 3FP3)
34-13-00-710-001 Operational Test of the AIR DATA Switching Function
34-22-00-710-001 Operational Check of the standby compass including
light test and visual check
34-36-00-710-002 Operational Test of the GPS
34-36-00-710-003 Operational Test of the ILS
34-36-00-720-002 Functional Test of the ILS
34-41-00-730-001 System Test of the Weather Radar
34-41-00-740-002 BITE Test of the Weather Radar
34-41-11-000-004 Removal of the Weather Radar Antenna Assembly
(7SQ,11SQ)
34-41-11-400-005 Installation of the Weather Radar Antenna Assembly
(7SQ,11SQ)
34-42-00-740-002 BITE Test of the Radio Altimeter
34-43-00-740-001 BITE Test of the TCAS
34-48-00-710-001 Operational Test of GPWS Ground Self-test Function
34-51-00-710-001 Operational Test of the DME
34-52-00-740-004 BITE Test of the ATC
34-53-00-710-002 Operational Test of the ADF
34-55-00-710-001 Operational Test of the VOR/MKR
49-00-00-710-010 Operational Test of the APU (131-9(A))
53-15-11-200-001 Detailed Inspection of the Radome
55-32-11-000-001 Removal of the Vertical Stabilizer Leading-Edge



EFF :

ALL  05-51-18

Page 603
Nov 01/06
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

55-34-11-000-001 Removal of the Vertical Stabilizer Tip


56-11-11-000-001 Removal of the Windshield
56-11-11-200-001 Inspection of the Windshields
56-11-12-000-001 Removal of the Fixed Windows
56-11-12-200-001 Inspection of the Fixed Windows
56-12-11-000-001 Removal of the Sliding Windows
56-12-11-200-001 Inspection of the Sliding Windows
73-22-00-710-040 Operational Test of the FADEC SYSTEM on the Ground
73-22-34-710-040 Operational Test of the EEC
78-31-00-710-041 Operational Test of the Thrust Reverser System with
the CFDS
05-51-18-991-001 Fig. 601
05-51-18-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-51-18-941-052

A. Not Applicable

Subtask 05-51-18-210-077

B. General

(1) Lightning

(a) Lightning always has two or more attachment points (one entry and
one exit) on the aircraft skin.

(b) Lightning moves back along the surface of the aircraft (swept
stroke zone) between the entry and exit point. This can cause a
chain of scattered attachment points along a line in the
direction of travel of the aircraft.

(c) Lightning hits some areas more frequently than others.



EFF :

ALL  05-51-18

Page 604
Nov 01/06
R  
JSA 
(2) Aircraft zoning
(Ref. Fig. 601/TASK 05-51-18-991-001)

(a) The aircraft is divided into three zones related to the


probability of lightning strike:

1
_ Zone 1:
- surfaces where there is a high probability of initial
lightning attachment (entry or exit).

2
_ Zone 2:
- surfaces where there is a high probability of a swept
stroke zone. The lightning strike has its initial point of
attachment in Zone 1 and moves into Zone 2.

3
_ Zone 3:
- this zone includes all of the aircraft surfaces that are not
in Zone 1 and 2. In Zone 3 there is a low probability of
attachment of a lightning strike. However, high lightning
currents can go through Zone 3 by direct conduction between
2 attachment points. Zone 3 currents will also go into Zones
1 and 2.

(b) Zones 1 and 2 are divided into A and B areas related to the
probability of continued attachment of the arc (hang on).
The probability of arc hang on is low in A areas and high in B
areas.

1
_ Zone 1A:
- area where there is a high probability of initial attachment
and low probability of arc hang on, such as the
forward-mounted pitot probes, the radome diverter strips and
the nacelle leading edges.

2
_ Zone 1B:
- area where there is a high probability of initial attachment
and high probability of arc hang on, such as the wing,
stabilizers and fin tips and some trailing edge areas.

3
_ Zone 2A:
- a swept stroke zone with low probability of arc hang on,
such as mid-chord regions of the wing surface, aft of an
engine and the total fuselage surface.

4
_ Zone 2B:
- a swept stroke zone with high probability of arc hang on,
such as the wing trailing edge aft of Zone 2A.



EFF :

ALL  05-51-18

Page 605
Nov 01/04
 
JSA 
Lightning Strike Inspection Areas
Figure 601/TASK 05-51-18-991-001



EFF :

ALL  05-51-18

Page 606
Nov 01/04
 
JSA 
(3) Effects on the aircraft structure and systems.
There are two types of possible risks to the aircraft:
- indirect effects
- direct effects.

(a) Indirect effects.

1
_ Electromagnetic fields:
- the electromagnetic fields related to the lightning
attachment can cause unwanted transient voltages and
currents in the aircraft wiring and systems.
In some conditions (low intensity strike, high protection),
the effect on the systems can be temporary and the systems
can operate correctly again after the strike.
In other conditions (low protection, no circuit protection
devices), the damage can be permanent and it will be
necessary to replace parts.

(b) Direct effects


The direct effects are the physical damage related to signs such
as:

1
_ Pitting/meltthrough:
- this is the action of the electrical arc formed when a
lightning stroke attaches to the aircraft (arc root damage
at the attachment points or damage caused by current flow
which can appear also far from the attachment points).
- signs of a lightning attachment are pitting and scorch marks
and paint discoloration.
On composite components, in addition to paint discoloration
and skin puncturing, some delamination of the fibers can
occur. If there is skin puncturing, there can be damage to
the grounded equipment below composite material fairings.
- you must always compare the damage you find with the limits
given in the Structural Repair Manual (SRM).

2
_ Magnetic force:
- the damage usually occurs where a small area causes the
density of the current to be high (e.g. a bonding lead
installed at a control surface hinge).

3
_ Resistive heating:
- when lightning currents flow through an aircraft structure,
energy is changed to heat along its path.
- resistive heating usually causes marks of the weld type,
specially where the lightning current flows for some time.



EFF :

ALL  05-51-18

Page 607
Nov 01/04
 
JSA 
4
_ Acoustic shock wave:
- When a lightning strike occurs, there is an acoustic shock
wave. If the intensity of this shock wave is high, it can
cause deformation of thin metal skins or rupture of thin
composite skins.

(4) Inspection requirements:

(a) Aircraft are designed to keep the effects of lightning to a


minimum and make sure it can continue its flight and land safely
after a lightning attachment.

(b) It is not possible to accurately know where the attachment will


occur but Zone 1 and Zone 2 show the most probable areas of
lightning attachment.

(c) Lightning strikes do not always give the same quantity of damage.
The quantity of damage comes from the intensity of the lightning
strike.

(d) Therefore, it is necessary to do a full inspection after a


lightning strike to make an estimate of the damage and make sure
that the aircraft can, as a minimum, continue service in a Master
Minimum Equipment List (MMEL) condition.
The inspection after a lightning strike refers to:
- the type of the system (critical/essential) to specify the
tests that are necessary
- the requirements of the MMEL

NOTE : Critical function:


____
If a critical function fails, it can result in a failure
condition that can prevent continued safe flight and
landing of the aircraft.
Essential function:
If an essential function fails, it can result in a failure
condition which can have an effect on :
- the performance of the aircraft
- or the ability of the flight crew to fly the aircraft in
the adverse conditions.



EFF :

ALL  05-51-18

Page 608
Nov 01/04
 
JSA 
Subtask 05-51-18-210-078

C. Inspection Preparation

(1) Before you start, we recommend that you get information from the crew
about the flight condition

(2) Make sure that you have the related aircraft Post Flight Report
(PFR).

(3) All events reported by the crew or by the PFR must be checked in
addition/ conjunction with this inspection.

Subtask 05-51-18-481-050

D. Safety Precautions
Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-18-866-050

E. Extension of the Flight Control Surfaces

(1) Extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Extend the slats (Ref. TASK 27-80-00-866-004).

(3) Extend the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-18-010-050

F. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).



EFF :

ALL  05-51-18

Page 609
Nov 01/04
 
JSA 
Subtask 05-51-18-860-050

G. Aircraft Maintenance Configuration

(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(3) Put warning notices in the cockpit to tell persons not to operate the
systems.

(4) Put the adjustable access platform in position.

4. Procedure
_________

Subtask 05-51-18-210-089

A. Inspection of the Total Surface of the Aircraft


(Ref. Fig. 602/TASK 05-51-18-991-002)

NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the Radome | | | | | |
| | | | | | | | |
| A.| | Examine visually the radome external | X | | | | |
| | | skin and the lightning diverters for | | | | | |
| | | burn marks, change of color, | | | | | |
| | | puncturing and other damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Windshield, Fixed | | | | | |
| | | Windows, Sliding Windows, Window | | | | | |
| | | Frames and Attaching Fasteners. | | | | | |
| | | | | | | | |
| A.| | Examine visually: | X | | | | |
| | | - the windshield, | | | | | |
| | | - the fixed windows, | | | | | |
| | | - the sliding windows, | | | | | |
| | | - the window frames, | | | | | |



EFF :

ALL  05-51-18

Page 610
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the attaching fasteners | | | | | |
| | | for burn marks, change of color and | | | | | |
| | | other damage. | | | | | |
| | | | | | | | |
|3. | | Inspection of the Nose and Main | | | | | |
| | | Landing Gear Doors. | | | | | |
| | | | | | | | |
| A.| | Examine the skin of the nose and the | X | | | | |
| | | main landing gear doors for burn | | | | | |
| | | marks, change of color, puncturing and| | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| B.| | Examine the electrical bonding leads | X | | | | |
| | | for breakage and defective attachment.| | | | | |
| | | | | | | | |
|4. | | Inspection of the Nose and the Main | | | | | |
| | | Landing Gears. | | | | | |
| | | | | | | | |
| | | NOTE: Do these checks if the lightning| | | | | |
| | | strike occurred: | | | | | |
| | | - when the LG was extended and locked | | | | | |
| | | down, | | | | | |
| | | - during the extension of the LG. | | | | | |
| | | and when you find a through hole | | | | | |
| | | during the inspection of the landing | | | | | |
| | | gears doors. | | | | | |
| | | | | | | | |
| A.| | Examine the nose landing gear and the | X | | | | |
| | | main landing gear: | | | | | |
| | | (1) Examine the LG structure and the | | | | | |
| | | points where it is attached for | | | | | |
| | | change of color, burn marks and | | | | | |
| | | other damage. | | | | | |
| | | (2) Examine the shock absorber for | | | | | |
| | | change of color and burn marks. | | | | | |
| | | (3) Examine all the components | | | | | |
| | | attached to the landing gear and | | | | | |
| | | fully examine the electrical looms| | | | | |
| | | and components for a change of | | | | | |
| | | color and burn marks. | | | | | |
| | | | | | | | |
|5. | | Inspection of the Belly Fairing | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-18

Page 611
Nov 01/04
 
JSA 
Location of the Antennas, Probes and Sensors and Exterior Lights
Figure 602/TASK 05-51-18-991-002- 12 (SHEET 1)



EFF :

ALL  05-51-18

Page 612
Nov 01/04
 
JSA 
Location of the Antennas, Probes and Sensors and Exterior Lights
Figure 602/TASK 05-51-18-991-002- 22 (SHEET 2)



EFF :

ALL  05-51-18

Page 613
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine the belly fairing panels | X | | | | |
| | | (including the wing-to-fuselage | | | | | |
| | | fairings) for change of color, burn | | | | | |
| | | marks, puncturing and delamination. | | | | | |
| | | Examine fairing screws and fasteners | X | | | | |
| | | for burn marks. | | | | | |
| | | | | | | | |
|6. | | Inspection of the Fuselage | | | | | |
| | | | | | | | |
| A.| | Examine externally all of the fuselage| X | | | | |
| | | skin with rivets and screws for | | | | | |
| | | change of color, burns marks and | | | | | |
| | | small holes. | | | | | |
| | | | | | | | |
| B.| | Examine all the probes, sensors and | X | | | | |
| | | drain masts and the adjacent area for | | | | | |
| | | burn marks and change of color. | | | | | |
| | | | | | | | |
| C.| | Examine carefully all the | X | | | | |
| | | communication and navigation antennas | | | | | |
| | | and the adjacent area for burn marks, | | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| D.| | Examine all exterior lights and | X | | | | |
| | | adjacent area for burn marks and other| | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| E.| | Examine the APU exhaust for burn marks| X | | | | |
| | | and change of color. | | | | | |
| | | | | | | | |
|7. | | Inspection of the Wings | | | | | |
| | | | | | | | |
| A.| | Examine the top and bottom skin of the| X | | | | |
| | | wings and the leading and trailing | | | | | |
| | | edges for burn marks, change of color.| | | | | |
| | | | | | | | |
| B.| | Examine the slats for burn marks and | X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| C.| | Examine the flap track fairings for | X | | | | |
| | | burn marks, change of color, | | | | | |
| | | puncturing and other damage. | | | | | |



EFF :

ALL  05-51-18

Page 614
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| D.| | Examine the flaps for burn marks, | X | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| E.| | Examine the spoilers for burn marks, | X | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| F.| | Examine the ailerons for burn marks, | X | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| G.| | Examine all the static dischargers for| X | | | | |
| | | burn marks, damaged tip and breakage. | | | | | |
| | | | | | | | |
| H.| | Examine the wing tip for burn marks | X | | | | |
| | | and burn holes. | | | | | |
| | | | | | | | |
| I.| | Examine the lights on the wing tip for| X | | | | |
| | | burn marks and other damage. | | | | | |
| | | | | | | | |
|8. | | Inspection of the Engine Nacelles and | | | | | |
| | | the Pylons. | | | | | |
| | | | | | | | |
| A.| | Examine each air-intake, inlet-cowl, | X | | | | |
| | | fan-cowl, thrust-reverser, exhaust | | | | | |
| | | nozzle and the pylon for burn marks, | | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
|9. | | Inspection of the Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | burn marks, damaged tip and breakage. | | | | | |
| | | | | | | | |
| B.| | Examine:the skin of the vertical | X | | | | |
| | | - the skin of the vertical stabilizer | | | | | |
| | | and the rudder (specially the | | | | | |
| | | leading and the trailing edges, | | | | | |
| | | the rudder surface in the hinge area| | | | | |
| | | and the antenna fairings), | | | | | |
| | | - the fin tip cap, | | | | | |



EFF :

ALL  05-51-18

Page 615
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the fin and rudder tip cap | | | | | |
| | | - lightning diverters | | | | | |
| | | for burn marks, change of color, | | | | | |
| | | puncturing, delamination and other | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|10. | | Inspection of the Horizontal | | | | | |
| | | Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | burn marks, damaged tip and breakage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the horizontal | X | | | | |
| | | stabilizer and elevators (specially | | | | | |
| | | the leading and the trailing edges, | | | | | |
| | | the elevator surface in the hinge | | | | | |
| | | area and the tip) for burn marks, | | | | | |
| | | change of color, puncturing, | | | | | |
| | | delamination and other damage. | | | | | |
-------------------------------------------------------------------------------

R Subtask 05-51-18-710-050

R B. Operational test of the HF system


R (Ref. TASK 23-11-00-710-001)

R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R | A.| | Do the operational test of the HF | X | | | | |
R | | | system (Ref. TASK 23-11-00-710-001). | | | | | |
R -------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 616
May 01/05
 
JSA 
Subtask 05-51-18-210-051

R C. Check after Damage on the Radome


(Ref. TASK 53-15-11-200-001) (Ref. TASK 34-41-00-740-002) (Ref. TASK 34-
36-00-710-003) (Ref. TASK 34-36-00-720-002) (Ref. TASK 34-41-11-000-004)
(Ref. TASK 34-41-11-400-005) (Ref. TASK 34-41-00-730-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Do the detailed inspection of the | | X | | | |
| | | radome: | | | | | |
| | | (Ref. TASK 53-15-11-200-001) | | | | | |
| | | If you find a through hole: | | | | | |
| | | (a) Examine the weather radar and | | | X | | |
| | | the WR antenna drive for burn | | | | | |
| | | marks, pitting and other | | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - if you find damage on the | | | X | | |
| | | flat plate antenna, replace | | | | | |
| | | it: | | | | | |
| | | (Ref. TASK 34-41-11-000-004)| | | | | |
| | | (Ref. TASK 34-41-11-400-005)| | | | | |
| | | - do the BITE test of the | | | X | | |
| | | weather radar: | | | | | |
| | | (Ref. TASK 34-41-00-740-002)| | | | | |
| | | - do the system test of the | | | X | | |
| | | weather radar. | | | | | |
| | | (Ref. TASK 34-41-00-730-001)| | | | | |
| | | (b) Examine the localizer antenna | | | X | | |
| | | and the glide/slope antenna | | | | | |
| | | for burn marks, pitting and | | | | | |
| | | other damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Do the functional test of | | | X | | |
| | | the ILS: | | | | | |
| | | (Ref. TASK 34-36-00-720-002)| | | | | |
| | | NOTE: If an ILS ground test unit is | | | | | |
| | | not available, do an operational| | | | | |
| | | test of the ILS | | | | | |
| | | (Ref. TASK 34-36-00-710-003) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 617
May 01/05
 
JSA 
Subtask 05-51-18-210-052

R D. Check after Damage on the Windshield, Fixed Windows, Sliding Windows,


Window Frames and Attaching Fasteners
(Ref. TASK 56-11-11-200-001) (Ref. TASK 56-11-12-200-001) (Ref. TASK 56-
12-11-200-001) (Ref. TASK 30-42-00-710-001) (Ref. TASK 34-22-00-710-001)
(Ref. TASK 56-11-11-000-001) (Ref. TASK 56-11-12-000-001) (Ref. TASK 56-
12-11-000-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Do the inspection of the related | | X | | | |
| | | component: | | | | | |
| | | (a) for the windshield | | | | | |
| | | (Ref. TASK 56-11-11-200-001) | | | | | |
| | | (b) for the fixed windows | | | | | |
| | | (Ref. TASK 56-11-12-200-001) | | | | | |
| | | (c) for the sliding windows | | | | | |
| | | (Ref. TASK 56-12-11-200-001) | | | | | |
| | | (d) for the attaching fasteners: | | | | | |
| | | - if you find damage, remove | | | | | |
| | | the windshield, the fixed | | | | | |
| | | windows or the sliding | | | | | |
| | | windows | | | | | |
| | | (Ref. TASK 56-11-11-000-001)| | | | | |
| | | (Ref. TASK 56-11-12-000-001)| | | | | |
| | | (Ref. TASK 56-12-11-000-001)| | | | | |
| | | - do the inspection of the | | | | | |
| | | window bearing surface | | | | | |
| | | (fuselage side) for damage. | | | | | |
| | | (2) Do the operational test of the | | X | | | |
| | | windshield anti-icing and | | | | | |
| | | defogging | | | | | |
| | | (Ref. TASK 30-42-00-710-001). | | | | | |
| | | (3) Do the operational test of the | | X | | | |
| | | standby compass | | | | | |
| | | (Ref. TASK 34-22-00-710-001). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 618
May 01/05
 
JSA 
Subtask 05-51-18-210-055

R E. Check after Damage on the Nose and/or the Main Landing Gear Doors

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM). | | | | | |
| | | (2) If you find a through hole: | | X | | | |
| | | - examine internally the adjacent | | | | | |
| | | and underneath area including | | | | | |
| | | all the components (pipes, items| | | | | |
| | | of equipment, electrical | | | | | |
| | | harnesses...) for damage. | | | | | |
| | | if you find damage: | | | | | |
| | | - replace or repair the | | | X | | |
| | | the related component | | | | | |
| | | | | | | | |
| B.| | If you find damage on the electrical | | | | | |
| | | bonding leads during the inspection: | | | | | |
| | | (1) Replace the electrical bonding | | X | | | |
| | | lead and/or the defective | | | | | |
| | | attachment. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 619
May 01/05
 
JSA 
Subtask 05-51-18-210-053

R F. Check after Damage on the Nose and/or the Main Landing Gear
(Ref. TASK 32-21-00-200-002) (Ref. TASK 32-11-00-200-001) (Ref. TASK 32-
69-00-740-001) (Ref. TASK 32-46-00-740-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the nose and/or | | | | | |
| | | the main landing gear during the | | | | | |
| | | inspection: | | | | | |
| | | (1) do the inspection of the LG: | | | | | |
| | | (a) For the NLG: | | X | | | |
| | | - (Ref. TASK 32-21-00-200-002)| | | | | |
| | | (b) For the MLG: | | X | | | |
| | | - (Ref. TASK 32-11-00-200-001)| | | | | |
| | | (2) Do a BITE test of the landing gear| | X | | | |
| | | (Ref. TASK 32-69-00-740-001) | | | | | |
| | | (3) Do a BITE test of the BSCU | | X | | | |
| | | (Ref. TASK 32-46-00-740-001) | | | | | |
| | | | | | | | |
| B.| | If you find damage on the components | | | | | |
| | | attached to the landing gear: | | | | | |
| | | (1) Examine the electrical components | | X | | | |
| | | internally. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-054

R G. Check after Damage on the Belly Fairing

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.



EFF :

ALL  05-51-18

Page 620
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Refer to the allowable damage and | | X | | | |
| | | repair (Ref. SRM). | | | | | |
| | | (2) If you find a through hole: | | | | | |
| | | (a) Get access internally and | | X | | | |
| | | examine the adjacent and | | | | | |
| | | underneath area to do a check | | | | | |
| | | of all the components (pipes, | | | | | |
| | | items of equpment, electrical | | | | | |
| | | harnesses...) for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - replace or repair the | | | X | | |
| | | related component. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-079

H. Check after Damage on the ADIRS Probes and Sensors

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

R (Ref. TASK 34-11-15-200-001) (Ref. TASK 34-11-18-200-002) (Ref. TASK 34-


10-00-710-007) (Ref. TASK 34-11-19-000-001) (Ref. TASK 34-11-19-400-001)
(Ref. TASK 30-31-00-710-001) (Ref. TASK 34-13-00-710-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Pitot probes | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) do the inspection/check of the| | X | | | |
| | | pitot probes | | | | | |
| | | (Ref. TASK 34-11-15-200-001). | | | | | |
| | | (b) If you find damage on the | | | | | |
| | | adjacent area: | | | | | |
| | | - refer to the allowable | | X | | | |
| | | damage and repair (Ref. SRM)| | | | | |
| | | | | | | | |



EFF :

ALL  05-51-18

Page 621
Nov 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| B.| | Static probes | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
R | | | (a) refer to the allowable damage | | X | | | |
R | | | and repair (Ref. SRM) | | | | | |
| | | | | | | | |
| C.| | TAT sensors | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
R | | | (a) do the inspection/check of the| | X | | | |
| | | TAT sensors | | | | | |
R | | | (Ref. TASK 34-11-18-200-002). | | | | | |
| | | (b) If you find damage on the | | | | | |
| | | adjacent area: | | | | | |
| | | - refer to the allowable | | X | | | |
| | | damage and repair (Ref. SRM)| | | | | |
| | | | | | | | |
| D.| | AOA sensors | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) Do the operational test of | | X | | | |
| | | the AOA warning | | | | | |
| | | (Ref. TASK 34-10-00-710-007) | | | | | |
R | | | (b) Manually turn the AOA | | X | | | |
| | | sensors to the full up | | | | | |
| | | position then to the full down| | | | | |
| | | position and make sure that | | | | | |
| | | there is no hard point. | | | | | |
| | | If you find a hard point: | | | | | |
| | | - replace the related AOA | | | X | | |
| | | sensor | | | | | |
| | | (Ref. TASK 34-11-19-000-001)| | | | | |
| | | (Ref. TASK 34-11-19-400-001)| | | | | |
| | | (c) If you find damage on the | | | | | |
| | | adjacent area: | | | | | |
| | | - refer to the allowable | | X | | | |
| | | damage and repair (Ref. SRM)| | | | | |
| | | | | | | | |
R | E.| | If you find damage on the AOA, TAT, | | | | | |
R | | | static or pitot probes: | | | | | |
| | | (1) Do the operational test of the | | X | | | |
| | | probe ice protection system | | | | | |
| | | (Ref. TASK 30-31-00-710-001). | | | | | |



EFF :

ALL  05-51-18

Page 622
Nov 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (2) Do an operational test of the AIR | | X | | | |
| | | DATA switching function | | | | | |
| | | (Ref. TASK 34-13-00-710-001) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-080

R J. Not Applicable

Subtask 05-51-18-210-081

R K. Check after damage on the Drain Masts


(Ref. TASK 30-71-00-710-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Drain masts | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) Do the operational test of the| | X | | | |
| | | drain mast ice protection | | | | | |
| | | (Ref. TASK 30-71-00-710-001). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 623
May 01/05
 
JSA 
Subtask 05-51-18-210-082

R L. Check after Damage on the Exterior Lights


(Ref. TASK 33-41-00-710-001) (Ref. TASK 33-42-00-710-001) (Ref. TASK 33-
47-00-710-002) (Ref. TASK 33-48-00-710-002) (Ref. TASK 33-49-00-710-001)
(Ref. TASK 33-51-15-400-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on exterior lights:| | | | | |
| | | (1) Do the operational test of the | | X | | | |
| | | related system: | | | | | |
| | | (a) For the navigation lights: | | | | | |
| | | - (Ref. TASK 33-41-00-710-001)| | | | | |
| | | (b) For the landing lights: | | | | | |
| | | - (Ref. TASK 33-42-00-710-001)| | | | | |
| | | (c) For the logo lights: | | | | | |
| | | - (Ref. TASK 33-47-00-710-002)| | | | | |
| | | (d) For the anti-collision/strobe | | | | | |
| | | lightning: | | | | | |
| | | - (Ref. TASK 33-48-00-710-002)| | | | | |
| | | (e) For the wing and engine scan | | | | | |
| | | lightning: | | | | | |
| | | - (Ref. TASK 33-49-00-710-001)| | | | | |
| | | (f) For the emergency overwing | | | | | |
| | | lights: | | | | | |
| | | - do the test given in the | | | | | |
| | | installation of the | | | | | |
| | | emergency overwing lights | | | | | |
| | | (Ref. TASK 33-51-15-400-001)| | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-083

R M. Not Applicable

Subtask 05-51-18-210-084

R N. Check after Damage on the Communication Antennas

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.



EFF :

ALL  05-51-18

Page 624
May 01/05
 
JSA 
(Ref. TASK 23-12-00-710-001) (Ref. TASK 23-11-00-710-001) (Ref. TASK 55-
32-11-000-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | VHF antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) Do the operational test of the| | X | | | |
| | | VHF system | | | | | |
| | | (Ref. TASK 23-12-00-710-001). | | | | | |
| B.| | HF fairing | | | | | |
| | | (1) If you find damage on the HF | | | | | |
| | | fairing: | | | | | |
| | | - refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) If you find a through hole on the | | | | | |
| | | HF fairing during the inspection: | | | | | |
| | | (a) Remove the HF fairing | | X | | | |
| | | (Ref. TASK 55-32-11-000-001) | | | | | |
| | | (b) Examine the HF antenna for | | X | | | |
| | | signs of arc attachment | | | | | |
| | | (c) Do the operational test of the| | X | | | |
| | | HF system | | | | | |
| | | (Ref. TASK 23-11-00-710-001). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-085

R P. Check after Damage on the Navigation Antennas

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

(Ref. TASK 34-51-00-710-001) (Ref. TASK 34-42-00-740-002) (Ref. TASK 34-


43-00-740-001) (Ref. TASK 34-53-00-710-002) (Ref. TASK 34-52-00-740-004)
(Ref. TASK 34-36-00-710-002) (Ref. TASK 34-55-00-710-001) (Ref. TASK 34-
48-00-710-001)
(Ref. TASK 55-34-11-000-001)



EFF :

ALL  05-51-18

Page 625
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | DME antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | DME | | | | | |
| | | (Ref. TASK 34-51-00-710-001). | | | | | |
| | | | | | | | |
| B.| | Radio altimeter antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the BITE test of the radio | | X | | | |
| | | altimeter | | | | | |
| | | (Ref. TASK 34-42-00-740-002). | | | | | |
| | | | | | | | |
| C.| | ADF antenna(s) | | | | | |
| | | (1) If you find a through hole during | | | | | |
| | | the inspection: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | ADF | | | | | |
| | | (Ref. TASK 34-53-00-710-002). | | | | | |
| | | | | | | | |
| D.| | ATC antenna(s) | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the BITE test of the ATC | | X | | | |
| | | (Ref. TASK 34-52-00-740-004). | | | | | |
| | | | | | | | |
| E.| | TCAS antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the BITE test of the TCAS | | X | | | |
| | | (Ref. TASK 34-43-00-740-001). | | | | | |
| | | | | | | | |
| F.| | GPS antennas | | | | | |
| | | (1) If you find a through hole during | | | | | |
| | | the inspection: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | GPS | | | | | |
| | | (Ref. TASK 34-36-00-710-002). | | | | | |
| | | | | | | | |
| G.| | VOR/MKR antennas | | | | | |
| | | (1) If you find damage on the fin tip | | | | | |
| | | cap (VOR fairing): | | | | | |



EFF :

ALL  05-51-18

Page 626
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | If you find a through hole on the | | | | | |
| | | fin tip cap: | | | | | |
| | | - remove the fin tip cap | | X | | | |
| | | (Ref. TASK 55-34-11-000-001) | | | | | |
| | | - examine the VOR antenna for | | X | | | |
| | | signs of arc attachment | | | | | |
| | | (2) If you find damage on the MKR | | | | | |
| | | antenna and/or a through hole on | | | | | |
| | | the fin tip cap: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | VOR/MKR system | | | | | |
| | | (Ref. TASK 34-55-00-710-001). | | | | | |
| | | | | | | | |
| H.| | GPWS system | | | | | |
| | | (1) If you find damage on the radio | | | | | |
| | | altimeter antennas and/or ILS | | | | | |
| | | antennas (glide and/or localizer):| | | | | |
| | | - do the operational test of the | | X | | | |
| | | GPWS | | | | | |
| | | (Ref. TASK 34-48-00-710-001). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-086

R Q. Check after Damage on the Fuselage Skin

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.



EFF :

ALL  05-51-18

Page 627
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Refer to the flow chart for the | | X | | | |
| | | allowable damage and repair | | | | | |
| | | (Ref. SRM). | | | | | |
| | | (2) If you find a through hole: | | X | | | |
| | | (a) Examine internally the | | | | | |
| | | adjacent area of the damage | | | | | |
| | | specially the components, the | | | | | |
| | | pipes and the electrical looms| | | | | |
| | | for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - repair or replace the | | | X | | |
| | | related component. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-087

R R. Check of the APU after Damage on the APU Exhaust (Ref. TASK 49-00-00-710-
010)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the APU exhaust | | | | | |
| | | during the inspection: | | | | | |
| | | (1) Do the operational test of the | | X | | | |
| | | APU | | | | | |
| | | (Ref. TASK 49-00-00-710-010). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-088

R S. Check after Damage on the Wings

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

(Ref. TASK 27-84-00-710-001) (Ref. TASK 27-54-00-710-001) (Ref. TASK 27-


64-00-710-001) (Ref. TASK 27-14-51-000-001)
(Ref. TASK 27-14-51-400-001) (Ref. TASK 27-14-00-710-001)



EFF :

ALL  05-51-18

Page 628
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the top or | | | | | |
| | | bottom of the wings: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | | | | | | |
| B.| | If you find damage on the slats: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Do the operational test of the | | X | | | |
| | | slats | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
| C.| | If you find damage on the flap track | | | | | |
| | | fairings: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | | | | | | |
| D.| | If you find damage on the flaps: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine the bonding leads (on the | | X | | | |
| | | hinges) of the related damaged | | | | | |
| | | flap for breakage and defective | | | | | |
| | | attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | - replace the bonding lead and/or | | | X | | |
| | | the defective attachment | | | | | |
| | | (3) Do the operational test of the | | X | | | |
| | | flaps | | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | | | | | | |
| E.| | If you find damage on the spoilers: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine the bonding leads (on the | | X | | | |
| | | hinges) of the related damaged | | | | | |
| | | spoiler for breakage and | | | | | |
| | | defective attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | - replace the bonding lead and/or | | | X | | |
| | | the defective attachment | | | | | |
| | | (3) Do the operational test of the | | X | | | |
| | | spoilers | | | | | |



EFF :

ALL  05-51-18

Page 629
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
| F.| | If you find damage on the ailerons: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine all the bonding leads of | | X | | | |
| | | the aileron hinges and | | | | | |
| | | servocontrols of the related | | | | | |
| | | damaged aileron for breakage and | | | | | |
| | | defective attachment.
| | | If you find damage: | | | | | |
| | | - replace the bonding lead and/or | | | X | | |
| | | the defective attachment | | | | | |
| | | (3) Examine the piston rod of each | | X | | | |
| | | servocontrol (it must be fully | | | | | |
| | | extended) of the related damaged | | | | | |
| | | aileron for burn marks, damage and| | | | | |
| | | leaks. | | | | | |
| | | If you find a leak or damage: | | | | | |
| | | (a) replace the related aileron | | | X | | |
| | | servocontrol | | | | | |
| | | (Ref. TASK 27-14-51-000-001) | | | | | |
| | | (Ref. TASK 27-14-51-400-001) | | | | | |
| | |NOTE: If you are at a line station and | | | | | |
| | | you cannot do the inspection of | | | | | |
| | | the piston rod, do this check: | | | | | |
| | | - operate the ailerons 10 times | | | | | |
| | | fully in each direction then | | | | | |
| | | make sure from the ground that | | | | | |
| | | there are no leaks below the | | | | | |
| | | aileron servocontrols. | | | | | |
| | | You must do this check before | | | | | |
| | | each flight until the return to| | | | | |
| | | the main base. you can do the | | | | | |
| | | check before each flight for a | | | | | |
| | | maximum of 3 days or 10 flights| | | | | |
| | | - at the first return to the main| | | | | |
| | | base, you must do the | | | | | |
| | | inspection of the piston rods. | | | | | |
| | | (4) Do the operational test of the | | X | | | |
| | | ailerons | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 630
May 01/05
R  
JSA 
Subtask 05-51-18-210-056

T. Check after Damage on the Engine Nacelles and Pylons

R NOTE : If there is damage to the aircraft structure, refer to the


____
R Structural Repair Manual (SRM) and/or to the applicable Nacelle
R Structural Repair Manual. The SRM has the approved damage limits
R and repair procedures.

R
(Ref. TASK 78-31-00-710-041) (Ref. TASK 73-22-00-710-040) (Ref. TASK 73-
22-34-710-040) (Ref. TASK 24-22-51-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the air intake, | | | | | |
| | | inlet cowl, fan cowl, thrust reverser,| | | | | |
| | | exhaust nozzle or the pylon: | | | | | |
R | | | (1) Refer to the allowable damage and | | X | | | |
R | | | repair (Ref. SRM and/or applicable| | | | | |
R | | | Nacelle SRM). | | | | | |
R
| | | (2) At the first return to the main | | X | | | |
| | | base, do the inspection of the | | | | | |
| | | lightning protection module | | | | | |
| | | (Ref. TASK 24-22-51-200-001) | | | | | |
| | | (3) If you find damage on the thrust | | | | | |
| | | reverser: | | | | | |
| | | (a) Do an operational test of the | | X | | | |
| | | thrust reverser system | | | | | |
| | | (Ref. TASK 78-31-00-710-041). | | | | | |
| | | (4) If you find a through hole | | | | | |
| | | on the fan cowl: | | | | | |
| | | (a) Do a ground test of the FADEC | | X | | | |
| | | (Ref. TASK 73-22-00-710-040) | | | | | |
| | | (b) Do a ground test of the EEC | | X | | | |
| | | (Ref.TASK 73-22-34-720-040). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-18-210-090

U. Check after Damage on the Stabilizers

NOTE : If there is damage to the aircraft structure, refer to the


____
Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

(Ref. TASK 27-24-51-000-001) (Ref. TASK 27-24-51-400-001) (Ref. TASK 27-


24-00-710-001) (Ref. TASK 27-34-51-000-001) (Ref. TASK 27-34-51-400-001)
(Ref. TASK 27-34-00-710-001) (Ref. TASK 27-44-00-710-001)



EFF :

ALL  05-51-18

Page 631
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection on the skin of the vertical| X | | | | |
| | | stabilizer and the rudder, the fin | | | | | |
| | | tip cap, the fin and rudder tip cap | | | | | |
| | | lightning diverters: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine all the electrical bonding| | X | | | |
| | | leads of the rudder hinges and | | | | | |
| | | servocontrols for breakage and | | | | | |
| | | defective attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) replace the electrical bonding| | | X | | |
| | | lead and/or the defective | | | | | |
| | | attachment | | | | | |
| | | (3) At the first return to the main | | X | | | |
| | | base, examine the piston rod of | | | | | |
| | | each rudder servocontrol (it must | | | | | |
| | | be fully extended) for damage and | | | | | |
| | | burn marks and make sure that | | | | | |
| | | there are no leaks. | | | | | |
| | | If you find a leak or damage: | | | | | |
| | | - replace the related rudder | | | X | | |
| | | servocontrol | | | | | |
| | | (Ref. TASK 27-24-51-000-001) | | | | | |
| | | (Ref. TASK 27-24-51-400-001). | | | | | |
| | | (4) Do an operational test of the | | X | | | |
| | | rudder | | | | | |
| | | (Ref. TASK 27-24-00-710-001). | | | | | |
| | | | | | | | |
| B.| | If you find damage during the | | | | | |
| | | inspection of the horizontal | | | | | |
| | | stabilizer and elevators: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine all the electrical bonding| | X | | | |
| | | leads of the elevator hinges and | | | | | |
| | | servocontrols of the related | | | | | |
| | | damaged elevator for breakage and | | | | | |



EFF :

ALL  05-51-18

Page 632
Feb 01/06
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | defective attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) replace the electrical bonding| | | X | | |
| | | lead and/or the defective | | | | | |
| | | attachment. | | | | | |
| | | (3) Examine the piston rod of each | | X | | | |
| | | elevator servocontrol (it must be | | | | | |
| | | fully extended) of the related | | | | | |
| | | damaged elevator for burn marks, | | | | | |
| | | damage and leaks. | | | | | |
| | | If you find a leak or damage: | | | | | |
| | | (a) replace the related elevator | | | X | | |
| | | servocontrol | | | | | |
| | | (Ref. TASK 27-34-51-000-001) | | | | | |
| | | (Ref. TASK 27-34-51-400-001). | | | | | |
| | |NOTE: If you are at a line station and | | | | | |
| | | you cannot do the inspection of | | | | | |
| | | the piston rod, do this check: | | | | | |
| | | - operate the elevators 10 times | | | | | |
| | | fully in each direction then | | | | | |
| | | make sure from the ground that | | | | | |
| | | there are no leaks below the | | | | | |
| | | elevator servocontrols. | | | | | |
| | | You must do this check before | | | | | |
| | | each flight until the return to| | | | | |
| | | the main base. You can do the | | | | | |
| | | check before each flight for a | | | | | |
| | | maximum of 3 days or 10 flights| | | | | |
| | | - at the first return to the main| | | | | |
| | | base, you must do the | | | | | |
| | | inspection of the piston rods. | | | | | |
| | | (4) Do an operational test of the | | X | | | |
| | | elevators | | | | | |
| | | (Ref. TASK 27-34-00-710-001). | | | | | |
| | | (5) Do an operational test of the THS | | X | | | |
| | | (Ref. TASK 27-44-00-710-001). | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-18

Page 633
May 01/05
R  
JSA 
Subtask 05-51-18-210-091

R V. Check after Damage on the Static Dischargers


(Ref. TASK 23-61-00-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the static | | | | | |
| | | dischargers of the wing or vertical | | | | | |
| | | and horizontal stabilizer. | | | | | |
| | | (1) Do a check of the related static | | X | | | |
| | | discharger | | | | | |
| | | (Ref. TASK 23-61-00-200-001). | | | | | |
| | | NOTE: (Ref. CDL 6.01.23 P01): | | | | | |
| | | - 2 static dischargers can be i | | | | |
| | | missing on each wing tip zone | | | | | |
| | | including the aileron. | | | | | |
| | | - 1 static discharger can be i | | | | |
| | | missing on each horizontal | | | | | |
| | | stabilizer tip zone including | | | | | |
| | | the elevator. | | | | | |
| | | - 1 static discharger can be i | | | | |
| | | missing on the fin and the | | | | | |
| | | rudder. | | | | | |
| | | - 1 static discharger can be i | | | | |
| | | missing on each wing on the | | | | | |
| | | flap track fairings. | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-18-410-050

A. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close the access doors and panels opened during the inspection.

(3) Close the nose gear doors (Ref. TASK 32-22-00-410-001).

(4) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(5) Remove the access platform(s).



EFF :

ALL  05-51-18

Page 634
May 01/05
 
JSA 
(6) Remove the warning notice(s).



EFF :

ALL  05-51-18

Page 635
May 01/05
 
JSA 
INSPECTION AFTER ENGINE BIRD STRIKE OR SLUSH INGESTION - INSPECTION/CHECK
_________________________________________________________________________

TASK 05-51-19-200-001

Inspection of the Engine after a Bird Strike or Slush Ingestion

R WARNING : THERE IS A POSSIBLE HEALTH RISK TO PERSONNEL WHO DO MAINTENANCE TASKS


_______
R AFTER A BIRD STRIKE. THE SAFETY MEASURES THAT FOLLOW ARE RECOMMENDED:
R - USE DISPOSABLE GLOVES.
R - USE A DISPOSABLE COVERALL IF THERE IS A RISK OF BODY CONTACT WITH
R THE BIRD REMAINS.
R - DO NOT USE PRESSURIZED AIR OR WATER TO CLEAN THE PARTS WHICH WERE
R IN CONTACT WITH THE BIRD.
R - REMOVE THE BIRD REMAINS AND PUT THEM IN A PLASTIC BAG.
R - DO NOT TOUCH YOUR FACE, EYES, NOSE, ETC. WITH YOUR GLOVES.
R - REMOVE THE GLOVES AND THE DISPOSABLE COVERALL AND PUT THEM IN THE
R SAME PLASTIC BAG AS THE REMAINS. SEAL THE BAG.
R - DISCARD THE BAG AS YOU DO FOR USUAL GARBAGE.
R - CAREFULLY WASH YOUR HANDS WITH SOAP AND WATER.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

72-00-00-200-010 Inspection of the Engine after Bird Strike, Foreign


Object or Slush Ingestion

3. __________
Job Set-up

Subtask 05-51-19-941-050

A. Not Applicable



EFF :

ALL  05-51-19

Page 601
Aug 01/06
 
JSA 
4. Procedure
_________

Subtask 05-51-19-210-068

R A. Inspection of the Engine (Ref. TASK 72-00-00-200-010)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Do the inspection for the engine after| X | | | | |
| | | bird strike or slush ingestion. | | | | | |
| A.| | (Ref. TASK 72-00-00-200-01000) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-19

Page 602
Aug 01/06
 
JSA 
INSPECTION AFTER TAIL RUNWAY IMPACT - INSPECTION/CHECK
______________________________________________________

TASK 05-51-21-200-001

Inspection after a Tail Runway Impact

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.55 m (11 ft. 8 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

49-16-00-200-002 Visual Inspection of the Air Intake System (131-9(A))


05-51-21-991-001 Fig. 601
05-51-21-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-51-21-010-050

A. Get Access

(1) Put the access platform in position.

(2) Open the access doors 312AR, 314AR, 315AL, 316AR.



EFF :

ALL  05-51-21

Page 601
Nov 01/04
 
JSA 
4. Procedure
_________

(Ref. Fig. 601/TASK 05-51-21-991-001, 602/TASK 05-51-21-991-002)

Subtask 05-51-21-210-050

A. Inspection of the Tail Area (Ref. TASK 49-16-00-200-002)

NOTE : You must do this inspection if:


____
- the tail hits the runway during the take-off,
- the tail hits the runway during the landing.

NOTE : All inspections are visual unless the text gives other
____
instructions.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels, the splices | X | | | | |
| | | and the rivets for distortion, cracks,| | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Internally examine the frames, the| | X | | | |
| | | cleats and the stringers for | | | | | |
| | | distortion, cracks, pulled and | | | | | |
| | | torn fasteners. | | | | | |
| | | (2) Internally examine the lower part | | X | | | |
| | | of the pressure bulkhead FR70, on | | | | | |
| | | the forward and the aft face, in | | | | | |
| | | the area below the | | | | | |
| | | passenger-compartment floor level,| | | | | |
| | | between the L STGR28 and R STGR28,| | | | | |
| | | the pressure dome, the frame | | | | | |
| | | segment and the vertical cross | | | | | |
| | | beam at the aircraft center line | | | | | |
| | | for: | | | | | |
| | | - distorsion, cracks and dents. | | | | | |
| | | | | | | | |
|2. | | APU Air Intake and Tail Cone | | | | | |
| | | Attachment Fittings | | | | | |
| | | | | | | | |
| A.| | Examine the APU diverter, intake flap,| X | | | | |
| | | intake nose and drain mast for | | | | | |



EFF :

ALL  05-51-21

Page 602
Nov 01/04
 
JSA 
Tailcone Equipment (L Side)
Figure 601/TASK 05-51-21-991-001



EFF :

ALL  05-51-21

Page 603
Nov 01/04
 
JSA 
APU Installation (R side)
Figure 602/TASK 05-51-21-991-002



EFF :

ALL  05-51-21

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork | | | | | |
| | | (Ref. TASK 49-16-00-200-002). | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Internally examine the diverter | | X | | | |
| | | system, the ball bearing control | | | | | |
| | | and the flap actuator for | | | | | |
| | | distortion. | | | | | |
| | | Make sure that they are correctly | | | | | |
| | | attached. | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-21-410-050

A. Close Access

(1) CLOSE THE ACCESS DOORS 312AR, 314AR, 315AL, 316AR.

Subtask 05-51-21-942-050

B. Put the aircraft back to the serviceable condition.

(1) Remove the access platform(s).

(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :

ALL  05-51-21

Page 605
Nov 01/04
 
JSA 
INSPECTION AFTER NLG TOWING OVERLOAD OR OVERRUN - INSPECTION/CHECK
__________________________________________________________________

TASK 05-51-22-200-001

Inspection After a NLG Towing Overload or Overrun

1. __________________
Reason for the Job

This inspection is necessary:


- when unwanted movements have occured after the shear pin of the tow bar
has broken during towing,
- or when you do towbarless towing without NLG steering disconnection.
This causes loads on the nose gear and its attachment structure.
After the failure of a towing shear pin (during forward or rearward
towing) with subsequent separation and overrun of the towbar by the
aircraft:
- do an inspection of the nose landing gear only.
If, during push-turn operations, the towbar arm touches the tow-vehicle
after failure of the turning shear pin only:
- do an inspection of the nose landing gear only.
Always use the correct shear pins. If the towing stops immediately after
the failure of the shear pin, the inspection is not necessary.
If the shear pins are incorrect (too strong), a full inspection is
necewith subs before the next flight.
If you do towbarless towing without NLG steering disconnection, a full
inspection is necessary before the next flight.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific access platform 1.80 m (5 ft. 11 in.)



EFF :

ALL  05-51-22

Page 601
Nov 01/04
 
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-56-00-200-001 Inspection/Check of the Leveling and Measurement


after Abnormal Operation of the Aircraft
07-11-00-581-001 Lifting for Aircraft Maintenance Operations
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-21-11-000-002 Removal of the NLG Leg Assy (2526GM)
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-30-00-867-001 Retraction of the Landing Gear for Maintenance
32-30-00-867-002 Extension of the Landing Gear after Maintenance
32-31-22-000-001 Removal of the NLG Actuating Cylinder (2527GM)
05-51-22-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-51-22-481-050

A. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

(2) Put the warning notices in position to tell persons not to operate
the nose landing gear.

Subtask 05-51-22-010-050

B. Get Access

(1) Open the nose gear doors (Ref. TASK 32-22-00-010-001).

(2) Put the access platform in position.



EFF :

ALL  05-51-22

Page 602
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-51-22-210-051

A. Inspection of the Fuselage (FR9 to FR20)


(Ref. Fig. 601/TASK 05-51-22-991-001)
(Ref. TASK 32-31-22-000-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Landing-Gear Well | | | | | |
| | | (FR 9 to FR20) | | | | | |
| | | | | | | | |
| A.| | Examine the attachment fittings of | X | | | | |
| | | the drag strut assembly and the | | | | | |
| | | bearings. Make sure that there are | | | | | |
| | | no distortion, cracks or damaged | | | | | |
| | | paint. | | | | | |
| | | | | | | | |
| B.| | Examine the attachment fittings of | X | | | | A |
| | | the lockstay assembly. Make sure that | | | | | |
| | | there are no distortion, cracks or | | | | | |
| | | damaged paint. | | | | | |
| | | | | | | | |
| C.| | Examine the attach fittings of the | X | | | | B |
| | | nose-gear actuating cylinder. Make | | | | | |
| | | sure that there are no distortion, | | | | | |
| | | cracks, pulled or torn fasteners or | | | | | |
| | | damaged paint. | | | | | |
| | | | | | | | |
| | | If you find damage: | | X | | | |
| | | - Remove the gear actuating cylinder. | | | | | |
| | | Obey the overhaul instructions of | | | | | |
| | | the manufacturer to make a strip | | | | | |
| | | down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001). | | | | | |
| | | | | | | | |
| D.| | Examine the attach fittings and | X | | | | C |
| | | the side plates of the nose gear. | | | | | |
| | | Make sure that there are no | | | | | |
| | | distortion, cracks or damaged paint. | | | | | |
| | | | | | | | |
|2. | | Avionics Compartment | | | | | |
| | | | | | | | |
| A.| | Examine the gear well roof, the | X | | | | |



EFF :

ALL  05-51-22

Page 603
Nov 01/04
 
JSA 
Nose Landing-Gear Well
Figure 601/TASK 05-51-22-991-001



EFF :

ALL  05-51-22

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | roof-to-sidewall joint and the attach | | | | | |
| | | fittings of the floor support strut. | | | | | |
| | | Make sure that there are no | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners or damaged paint. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-22-210-052

B. Inspection of the Nose Landing Gear (Ref. TASK 32-21-11-000-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| A.| | Examine the shock absorber, the | X | | | | |
| | | wheels, the tires and the torque link | | | | | |
| | | hinges. make sure that there is | | | | | |
| | | no damage caused by the towbar or the | | | | | |
| | | towbarless tractor. | | | | | |
| | | NOTE : Do a special inspection of the | | | | | |
| | | towing lug if you tow with a | | | | | |
| | | towbar. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Obey the overhaul instructions of | | X | | | |
| | | the manufacturer to repair or | | | | | |
| | | replace the damaged part. | | | | | |
| | | | | | | | |
| B.| | Examine the steering actuator. | X | | | | |
| | | Make sure that there is no hydraulic | | | | | |
| | | leaks or distortion on the actuator | | | | | |
| | | end caps. | | | | | |
| | | If you find damage: | | | | | |
| | | Remove the nose landing gear | | X | | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
------------------------------------------------------------------------------



EFF :

ALL  05-51-22

Page 605
Nov 01/04
 
JSA 
Subtask 05-51-22-210-053

C. Leveling and measurement


If you find phase 1 damage on the attachments or structure of the nose
gear, measure the nose gear.
Do a check of the angle to the aircraft (Ref. TASK 05-56-00-200-001).

Subtask 05-51-22-410-050

D. Close Access

(1) Remove the warning notice(s).

(2) Remove the access platform(s).

(3) Make sure that the work area is clean and clear of tool(s) and other
items.

(4) Close the NLG doors (Ref. TASK 32-22-00-410-001).

Subtask 05-51-22-720-050

E. Test of the Nose Landing Gear (Ref. TASK 07-11-00-581-001) (Ref. TASK 32-
30-00-867-001) (Ref. TASK 32-30-00-867-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Lift the aircraft with jacks | | | | | |
| | | (Ref. TASK 07-11-00-581-001). | | | | | |
| | | | | | | | |
|2. | | Retract/extend the nose landing gear | | X | | | |
| | | 3 times. Make sure that it moves | | | | | |
| | | smoothly. Make sure that the | | | | | |
| | | fittings and the structure do not | | | | | |
| | | prevent the movement of the parts | | | | | |
| | | that move. | | | | | |
| | | (Ref. TASK 32-30-00-867-001) | | | | | |
| | | (Ref. TASK 32-30-00-867-002). | | | | | |
| | | NOTE: This check is necessary only | | | | | |
| | | if you found damage on the | | | | | |
| | | attachments of the landing gear| | | | | |
| | | or the adjacent structure. | | | | | |
| | | | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-22

Page 606
Nov 01/04
 
JSA 
INSPECTION AFTER NLG STEERING ANGLE EXCEEDED - INSPECTION/CHECK
_______________________________________________________________

TASK 05-51-23-200-001

Inspection after NLG Steering Angle of more than 95 deg.

WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.

1. __________________
Reason for the Job

R NOTE : If the 95 deg. NLG steering angle was exceeded by a large value (a
____
R maximum of 180 deg. for example when tow vehicle control is not kept
R in icy conditions), it is possible that damage occurred not only to
R the NLG but also to its attachment structure. If this occurs, do the
R NLG well inspection after NLG towing overload or overrun (Ref. TASK
R 05-51-22-200-00100).

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific access platform 1.8 m (5 ft. 11 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

07-11-00-581-003 Lifting of the Aircraft at Forward Jacking Point, MLG


Wheels on the Ground
07-11-00-586-001 Lowering of the Aircraft at Forward Jacking Point,
MLG Wheels on the Ground
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
29-10-00-863-001 Pressurize the Green Hydraulic System
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-21-11-000-002 Removal of the NLG Leg Assy (2526GM)
32-21-27-000-001 Removal of the Torque Link Assy
32-21-27-400-001 Installation of the Torque Link Assy



EFF :

ALL  05-51-23

Page 601
Nov 01/06
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-22-00-010-001 Nose Gear Doors - Ground Doors Opening


32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-31-00-720-003 Functional Test of the Normal Extension and
Retraction of the Nose Landing Gear
32-51-00-720-003 Functional Test of the Nose Wheel Steering with the
Handwheel.
32-51-42-000-001 Removal of the Nose Wheel Steering Cylinder
R 32-51-42-400-001 Installation of the Nose Wheel Steering Cylinder
32-51-51-000-001 Removal of the Nose Wheel Steering Servo-Control
(6GC)
05-51-23-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-51-23-481-050

A. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-23-860-050

B. Aircraft Maintenance Configuration

(1) On the panel 400VU, make sure that the landing-gear control lever is
in the DOWN position.

(2) On the panel 110VU, make sure that the free-fall control handle is in
the usual position.

(3) On the nose gear leg, on the electrical box (5CG), make sure that the
towing lever is in the towing position (disengaged position).

(4) Lift the aircraft at the forward jacking point (Ref. TASK 07-11-00-
581-003).

(5) Make sure that the Green hydraulic system is depressurized (Ref. TASK
29-10-00-863-001).

(6) Release the remaining pressure from the servo-control (6CG)


(Ref. TASK 32-51-51-000-001).



EFF :

ALL  05-51-23

Page 602
Feb 01/07
 
JSA 
(7) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

Subtask 05-51-23-010-050

C. Get Access

(1) Open the NLG doors and install the safety devices (Ref. TASK 32-22-
00-010-001).

(2) Put the warning notices in position to tell persons not to close the
NLG doors.

(3) Put the access platform in position.

4. Procedure
_________

Subtask 05-51-23-210-050

A. Inspection of the Nose Landing Gear


(Ref. Fig. 601/TASK 05-51-23-991-001)
R (Ref. TASK 32-21-11-000-002) (Ref. TASK 32-51-42-000-001) (Ref. TASK 32-
R 51-42-400-001)
(Ref. TASK 32-21-27-000-001) (Ref. TASK 32-21-27-400-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| A.| | Examine the proximity sensors and | X | | | | |
| | | their electrical harnesses for impact | | | | | |
| | | damage (such as breaks). | | | | | |
| | | | | | | | |
| B. | |Examine the steering system | | | | | |
| | |NOTE: Remove the NLG | | | | | |
| | | (Ref. TASK 32-21-11-000-002) and | | | | | |
| | | send it to the overhaul shop at | | | | | |
| | | the first fault you find on the | | | | | |
| | | steering system. | | | | | |
| | | | | | | | |
| | |(1) Examine the steering actuator body | X | | | | |
| | | for damaged paint and deformation. | | | | | |
| | |(2) Measure the diameter of the | X | | | | |
| | | steering actuator body at its ends:| | | | | |
| | | - make sure that the diameter is | | | | | |



EFF :

ALL  05-51-23

Page 603
Feb 01/07
 
JSA 
Inspection of the Nose Landing Gear
Figure 601/TASK 05-51-23-991-001



EFF :

ALL  05-51-23

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | not more than 88.3 mm (3.476 in.)| | | | | |
| | |(3) Disconnect the torque link at its | X | | | | |
| | | apex point | | | | | |
| | | (Ref. TASK 32-21-27-000-001). | | | | | |
| | |(4) Manually move the upper torque link| X | | | | |
| | | to turn the rotating tube: | | | | | |
| | | - make sure that the rotating tube | | | | | |
| | | turns freely. | | | | | |
| | |(5) Connect the torque link | | | | | |
| | | (Ref. TASK 32-21-27-400-001). | | | | | |
| | |(6) Remove the NLG steering actuator | X | | | | |
| | | (Ref. TASK 32-51-42-000-001): | | | | | |
| | | (a) Examine the steering piston | X | | | | |
| | | seals, the cylinders and the | | | | | |
| | | piston attachment for: | | | | | |
| | | - cracks, damaged paint and | | | | | |
| | | deformation. | | | | | |
R | | |(7) Install the NLG Steering Actuator | | | | | |
R | | | (Ref. TASK 32-51-42-400-001) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-23-720-050

B. Test (Ref. TASK 32-31-00-720-003) (Ref. TASK 32-51-00-720-003) (Ref. TASK


32-21-11-000-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Do the test of normal extension and | X | | | | |
| | | retraction of the NLG. | | | | | |
| | | (Ref. TASK 32-31-00-720-003) | | | | | |
| | | | | | | | |
|2. | | Do a functional test of the nose wheel| X | | | | |
| | | steering | | | | | |
| | | (Ref. TASK 32-51-00-720-003). | | | | | |
| | | If you hear an unusual noise: | | | | | |
| | | - Remove the NLG leg for overhaul. | | X | | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-23

Page 605
Feb 01/07
 
JSA 
Subtask 05-51-23-410-052

C. Close Access

(1) Close the NLG doors (Ref. TASK 32-22-00-410-001).

R (2) Lower the aircraft (Ref. TASK 07-11-00-586-001).

(3) Remove the warning notice(s).

(4) Remove the access platform(s).

5. Close-up
________

Subtask 05-51-23-942-052

A. Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :

ALL  05-51-23

Page 606
Aug 01/06
 
JSA 
INSPECTION AFTER LEAVING RUNWAY OR TAXIWAY - INSPECTION/CHECK
_____________________________________________________________

TASK 05-51-24-200-001

Inspection after Leaving Runway or Taxiway

1. __________________
Reason for the Job

When an aircraft goes off a runway or taxiway, the loads on the landing gear
R and the structure can change. The inspection that is necessary must be a
function of all the different possible causes of these load changes:
- the speed of the aircraft,
- the weight of the aircraft,
- the type of the ground (soft or hard),
- the distance the landing gear goes into the ground.

NOTE : Recovery must obey the ARM requirement. If recovery is different to


____
the ARM requirement or if no recovery report is available, refer to
Airbus for special instructions.

Thus, when this incident occurs, you must always do this full inspection
before the aircraft can do more flights.
You must tell Airbus Industrie all the details of the incident immediately.
Airbus Industrie will give you the data and the aid to help you get the
aircraft safely back into operation.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific access platform 3 m (9 ft. 10 in.)



EFF :

ALL  05-51-24

Page 601
Feb 01/06
 
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-51-16-200-001 Inspection After Brake Overheat


05-56-00-200-001 Inspection/Check of the Leveling and Measurement
after Abnormal Operation of the Aircraft
07-11-00-581-001 Lifting for Aircraft Maintenance Operations
07-11-00-581-003 Lifting of the Aircraft at Forward Jacking Point, MLG
Wheels on the Ground
07-11-00-586-001 Lowering of the Aircraft at Forward Jacking Point,
MLG Wheels on the Ground
07-11-00-586-002 Lowering of the Aircraft for Maintenance Operations
12-14-32-614-004 Check Shock Absorber Charge Pressure
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-11-00-200-003 Check the Charge Pressure of the Main Landing Gear
Shock Absorber
32-11-00-200-005 Inspection of the MLG after the Aircraft has gone off
the Runway
32-11-00-200-006 Inspection of the MLG Axles after the Aircraft has
gone off the Runway
32-11-00-220-004 Inspection of the MLG Side Stay Attachment Lug(s)
after the Aircraft has gone off the Runway
32-11-11-000-001 Removal of the MLG Leg Assembly
32-11-11-400-001 Installation of the MLG Leg Assembly
32-11-13-000-001 Removal of the MLG Shock Absorber
32-11-13-400-001 Installation of the MLG Shock Absorber
32-11-16-000-001 Removal of the MLG Side-Stay Assembly 2505GM, 2506GM
32-11-16-400-001 Installation of the MLG Side-Stay Assembly 2505GM,
2506GM
32-11-17-000-001 Removal of the MLG Lock Stay
32-11-17-400-001 Installation of the MLG Lock Stay
32-11-21-000-001 Removal of the MLG Lockstay Actuating Cylinder
32-11-21-400-001 Installation of the MLG Lockstay Actuating Cylinder
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access



EFF :

ALL  05-51-24

Page 602
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-21-00-200-005 Detailed Inspection/Check of the NLG


32-21-00-200-006 Inspection/Check of the Barrel/Drag struct connection
32-21-11-000-002 Removal of the NLG Leg Assy (2526GM)
32-21-11-400-002 Installation of the NLG Leg Assy (2526GM)
32-21-13-000-001 Removal of the NLG Shock Absorber Assy
32-21-13-400-001 Installation of the NLG Shock Absorber Assy
32-21-16-000-002 Removal of the NLG Drag Strut Assy (2528GM)
32-21-16-400-002 Installation of the NLG Drag Strut Assy (2528GM)
32-21-17-000-001 Removal of the NLG Lockstay Assy
32-21-17-400-001 Installation of the NLG Lockstay Assy
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-31-00-720-002 Functional Test of the Normal Extension and
Retraction of the Landing Gear
32-31-00-720-003 Functional Test of the Normal Extension and
Retraction of the Nose Landing Gear
32-31-22-000-001 Removal of the NLG Actuating Cylinder (2527GM)
32-31-22-400-001 Installation of the NLG Actuating Cylinder (2527GM)
32-31-46-000-001 Removal of the MLG Actuating Cylinder
32-31-46-400-001 Installation of the MLG Actuating Cylinder
32-33-00-720-001 Functional Check of Free-Fall Extension
32-41-12-000-001 Removal of the NLG Wheel (2659GM,2660GM)
32-41-12-000-002 Removal of the Axle Sleeve
32-41-12-400-001 Installation of the NLG Wheel (2659GM,2660GM)
32-41-12-400-002 Installation of the Axle Sleeve
71-00-20-000-040 Removal of the Power Plant
71-00-20-400-040 Installation of the Power Plant
71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
71-13-00-410-010 Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
72-00-00-200-010 Inspection of the Engine after Bird Strike, Foreign
Object or Slush Ingestion
78-31-00-710-041 Operational Test of the Thrust Reverser System with
the CFDS
78-32-00-010-010 Opening of the Thrust Reverser Halves
78-32-00-410-010 Closing of the Thrust Reverser Halves
05-51-24-991-002 Fig. 601
05-51-24-991-003 Fig. 602
05-51-24-991-004 Fig. 603



EFF :

ALL  05-51-24

Page 603
May 01/05
R  
JSA 
3. __________
Job Set-up

Subtask 05-51-24-481-050

R A. Safety Precautions

R (1) Make sure that the safety devices are installed on the landing gears
R (Ref. TASK 32-00-00-481-001).

(2) Put the warning notices in the cockpit to tell persons not to operate
the aircraft systems.

Subtask 05-51-24-860-050

B. Aircraft Maintenance Configuration

(1) Make sure that the Hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

Subtask 05-51-24-010-050

C. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).

R (3) Put an access platform in position.

Subtask 05-51-24-866-050

D. Extension of the Flaps

(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).

4. Procedure
_________

Subtask 05-51-24-210-050

A. General

NOTE : You can do non-destructive tests (refer to the Aircraft


____
Non-destructive Testing Manual) if:
- You think it is necessary.
- The Airworthiness Authority tells you to.
- Airbus Industrie tell you to.
All the inspections are visual unless you get other instructions.



EFF :

ALL  05-51-24

Page 604
May 01/05
 
JSA 
Subtask 05-51-24-210-053

B. Inspection of the Fuselage

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Fuselage bottom-surface. This includes| | | | | |
R | | | cargo doors. | | | | | |
| | | | | | | | |
| A.| | Externally examine all the bottom- | X | | | | |
| | | surface of the fuselage for dents, | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Internally examine at and adjacent| | X | | | |
| | | to the damaged area, all the | | | | | |
| | | frames, stringers, joints and | | | | | |
| | | cleats for damage. | | | | | |
| | | (2) Inspect all the components, pipes,| | X | | | |
| | | ducts and cables adjacent to the | | | | | |
| | | damaged area for damage or | | | | | |
| | | leakage. | | | | | |
| | | | | | | | |
|2. | | NLG Doors | | | | | |
| | | | | | | | |
| A.| | Examine the NLG doors for holes, | X | | | | |
| | | delamination, cracked or flaking | | | | | |
| | | paint, loose fasteners and correct | | | | | |
| | | attachment. | | | | | |
| | | | | | | | |
|3. | | MLG Doors | | | | | |
| | | | | | | | |
| A.| | Examine the MLG doors for holes, | X | | | | |
| | | delamination, cracked or flaking | | | | | |
| | | paint, loose fasteners and correct | | | | | |
| | | attachment. | | | | | |
| | | | | | | | |
|4. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the belly fairing panels for | X | | | | |
| | | holes, delamination, cracked or | | | | | |
| | | flaking paint, loose fasteners and | | | | | |
| | | correct attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the panels and internally | | X | | | |



EFF :

ALL  05-51-24

Page 605
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | examine the belly fairing | | | | | |
R | | | structure for buckling, cracks | | | | | |
| | | and damaged paintwork. | | | | | |
| | | (2) Examine the pipes, ducts, | | X | | | |
| | | electrical looms and their | | | | | |
| | | supports for: | | | | | |
| | | - fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks, correct | | | | | |
| | | attachment and the condition of | | | | | |
| | | the safety devices. | | | | | |
| | | | | | | | |
| B.| | Examine the air-conditioning pack | X | | | | |
| | | intakes for unwanted material and | | | | | |
| | | damage from hits. | | | | | |
| | | | | | | | |
|5. | | APU Intake | | | | | |
| | | | | | | | |
| A.| | Examine the APU intake for unwanted | X | | | | |
| | | material and damage from hits. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-24-210-054

C. Inspection of the Landing Gears


(Ref. TASK 07-11-00-581-003) (Ref. TASK 07-11-00-586-001) (Ref. TASK 12-
14-32-614-004) (Ref. TASK 32-21-00-200-005) (Ref. TASK 32-31-00-720-003)
(Ref. TASK 32-21-11-000-002) (Ref. TASK 32-21-11-400-002) (Ref. TASK 32-
21-17-000-001) (Ref. TASK 32-21-17-400-001)
(Ref. TASK 32-21-16-000-002) (Ref. TASK 32-21-16-400-002) (Ref. TASK 32-
31-22-000-001) (Ref. TASK 32-31-22-400-001) (Ref. TASK 32-41-12-000-001)
(Ref. TASK 32-41-12-400-001) (Ref. TASK 32-41-12-000-002) (Ref. TASK 32-
41-12-400-002) (Ref. TASK 32-21-13-000-001)
(Ref. TASK 32-21-13-400-001) (Ref. TASK 32-21-00-200-006) (Ref. TASK 07-
11-00-581-001) (Ref. TASK 07-11-00-586-002) (Ref. TASK 32-11-00-200-003)
(Ref. TASK 32-11-00-200-005) (Ref. TASK 32-31-00-720-002) (Ref. TASK 32-
33-00-720-001) (Ref. TASK 32-11-11-000-001)
(Ref. TASK 32-11-11-400-001) (Ref. TASK 32-11-16-000-001) (Ref. TASK 32-
11-16-400-001) (Ref. TASK 32-11-17-000-001) (Ref. TASK 32-11-17-400-001)
(Ref. TASK 32-11-21-000-001) (Ref. TASK 32-11-21-400-001) (Ref. TASK 32-
31-46-000-001) (Ref. TASK 32-31-46-400-001)
(Ref. TASK 32-11-00-200-006) (Ref. TASK 05-51-16-200-001) (Ref. TASK 32-
11-13-000-001) (Ref. TASK 32-11-13-400-001) (Ref. TASK 32-11-00-220-004)



EFF :

ALL  05-51-24

Page 606
Feb 01/06
 
JSA 
R NOTE : You must do the inspection of the landing gear which went off the
____
R runway.
R This inspection contains four inspection procedures;
To know which inspections to do, you must know if:
- the landing gear wheels sank into the ground
- the landing gear found an obstacle on its path.
When you know this information, go directly to the necessary
inspections.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|1. | | Inspection of the NLG after the air- | | | | | |
R | | | craft went off the runway and the NLG | | | | | |
| | | wheels sank into the ground and/or the| | | | | |
| | | NLG found an obstacle on its path. | | | | | |
| | | | | | | | |
| A.| | Initial Inspection | | | | | |
| | | | | | | | |
| | | (1) Lift the aircraft at forward | X | | | | |
| | | jacking point: | | | | | |
| | | (Ref. TASK 07-11-00-581-003) | | | | | |
| | | - make sure that extension of the | X | | | | |
| | | shock absorber is smooth and | | | | | |
| | | full. | | | | | |
| | | - examine the sliding rod (the | X | | | | |
| | | part you can see) for blue | | | | | |
| | | color, signs of bronze or chrome| | | | | |
| | | damage. | | | | | |
| | | (2) Do a check of the pressure in the | X | | | | |
| | | NLG shock absorber. | | | | | |
| | | (Ref. TASK 12-14-32-614-004) | | | | | |
| | | (3) Examine the shock absorber for | X | | | | |
| | | external oil leakage. | | | | | |
| | | (4) Do the inspection of the NLG | X | | | | |
| | | (Ref. TASK 32-21-00-200-005) for: | | | | | |
| | | - out-of-roundness of the shock | | | | | |
| | | absorber sliding-rod. | | | | | |
| | | - cracks, damaged paintwork and | | | | | |
| | | deformation on the steering ac- | | | | | |
| | | tuator body (measure the bottom | | | | | |
| | | of actuator body). | | | | | |
| | | - free rotation of the rotating | | | | | |
| | | tube. | | | | | |
| | | (5) Do the functional test of the | X | | | | |



EFF :

ALL  05-51-24

Page 607
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | Extension/Retraction of the NLG | | | | | |
| | | (REF. TASK 32-31-00-720-003). | | | | | |
| | | | | | | | |
| B.| | Subsequent Inspection | | | | | |
| | | | | | | | |
| | | (1) If the initial inspection shows no| | | | | |
| | | unsatisfactory condition: | | | | | |
| | | (a) Do the inspection given in | X | | | | |
| | | item 2. (inspection of the | | | | | |
R | | | NLG after the aircraft went | | | | | |
| | | off the runway but the NLG | | | | | |
| | | wheels did not sink into the | | | | | |
| | | ground and the NLG did not | | | | | |
| | | find an obstacle on its path).| | | | | |
| | | (2) If the initial inspection shows | | | | | |
| | | unsatisfactory condition(s): | | | | | |
| | | (a) Remove the NLG, the lockstay | | X | | | |
| | | assembly and drag strut assem-| | | | | |
| | | bly for overhaul: | | | | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | (Ref. TASK 32-21-17-000-001) | | | | | |
| | | (Ref. TASK 32-21-16-000-002) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | | (b) On the aircraft, examine the | | X | | | |
| | | attachment fittings and the | | | | | |
| | | bearings of the drag strut | | | | | |
| | | assembly for distortion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (c) On the aircraft, examine the | | X | | | |
| | | attachment fittings of the | | | | | |
| | | NLG for distortion, cracks and| | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (d) Examine the NLG actuating | | X | | | |
| | | cylinder and its attachment | | | | | |
| | | fitting for distortion, cracks| | | | | |



EFF :

ALL  05-51-24

Page 608
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove actuating cylinder | | | X | | |
| | | for a strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001)| | | | | |
| | | (refer to the manufacturers| | | | | |
| | | instructions for strip-down | | | | | |
| | | inspection procedure). | | | | | |
| | | - on the aircraft, continue | | | X | | |
| | | the inspection of the | | | | | |
| | | attachment fitting for da- | | | | | |
| | | mage | | | | | |
| | | If you find damage: | | | | | |
| | | . tell Airbus Industrie | | | | | |
| | | about the results. | | | | | |
| | | (e) In the avionics compartment, | | X | | | |
| | | examine: | | | | | |
| | | - the gear-well roof, | | | | | |
| | | - roof-to-sidewall joint | | | | | |
| | | - the floor support-strut | | | | | |
| | | attach-fitting for distor- | | | | | |
| | | tion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paint-| | | | | |
| | | work. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (f) If you removed components, | | X | | | |
| | | install serviceable compo- | | | | | |
| | | nents: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-22-400-001)| | | | | |
| | | - for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002)| | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001)| | | | | |
| | | - for the NLG | | | | | |
| | | (Ref. TASK 32-21-11-400-002)| | | | | |
| | | (g) Lower the aircraft on its | X | | | | |
| | | wheels | | | | | |
| | | (Ref. TASK 07-11-00-586-001) | | | | | |
| | | | | | | | |
|2. | | Inspection of the NLG after the air- | | | | | |



EFF :

ALL  05-51-24

Page 609
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | | | craft went off the runway and the | | | | | |
| | | NLG wheels did not sink into the | | | | | |
| | | ground and the NLG did not find an | | | | | |
| | | obstacle on its path. | | | | | |
| | | NOTE: You can do this inspection with | | | | | |
| | | the aircraft on its wheels. | | | | | |
| | | | | | | | |
| A.| | Inspection | | | | | |
| | | | | | | | |
| | | (1) Do a check of the pressure in the | X | | | | |
R | | | shock absorber. | | | | | |
| | | (Ref. TASK 12-14-32-614-004) | | | | | |
| | | (2) Do a visual inspection of the | X | | | | |
| | | wheels for distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | | (b) Remove the axle sleeve | | X | | | |
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | | (c) Do a visual inspection of the | | X | | | |
| | | axle and sleeve for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (3) Examine: | X | | | | |
| | | - the nose landing gear and all | | | | | |
| | | the components installed on it | | | | | |
| | | for cracks, scores, tears, rup- | | | | | |
| | | ture, leakage and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - the attachment fittings of the | | | | | |
| | | nose landing gear. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (4) Examine the shock absorber (the | X | | | | |
| | | part you can see) sliding rod for | | | | | |
| | | blue color, signs of bronze, | | | | | |
| | | chrome damage or external oil | | | | | |
| | | leak. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the shock absorber for | | X | | | |



EFF :

ALL  05-51-24

Page 610
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (5) Examine the drag strut assembly | X | | | | |
| | | and its attachment fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the drag strut assembly| | X | | | |
| | | for overhaul: | | | | | |
| | | (Ref. TASK 32-21-16-000-002) | | | | | |
| | | (refer to the manufactures | | | | | |
| | | instruction for the overhaul | | | | | |
| | | procedure) | | | | | |
| | | (b) On the aircraft, inspect the | | X | | | |
| | | attachment fitting for damage.| | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (c) Examine the drag strut | | X | | | |
| | | attachment-lugs on NLG leg and| | | | | |
| | | measure the distance between | | | | | |
| | | them: | | | | | |
| | | (Ref. TASK 32-21-00-200-006) | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the NLG | | | X | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | (6) Examine the lockstay assembly for | X | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the lockstay assembly | | X | | | |
| | | for overhaul. | | | | | |
| | | (Ref. TASK 32-21-17-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b) On the aircraft, inspect the | | X | | | |
| | | attachment fittings for damage| | | | | |
| | | if you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |



EFF :

ALL  05-51-24

Page 611
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (7) Examine the NLG actuating cylinder| X | | | | |
| | | and its attachment fittings for | | | | | |
| | | distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the actuating cylinder | | X | | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-21-22-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down inspection). | | | | | |
| | | (b) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (8) In the avionics compartment, | X | | | | |
| | | examine: | | | | | |
| | | - the gear-well roof, | | | | | |
| | | - the roof-to-sidewall joint, | | | | | |
| | | - the floor support-strut | | | | | |
| | | attach-fittings for distortion, | | | | | |
| | | cracks, pulled or torn fasteners| | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (9) If you removed components, install| X | | | | |
| | | serviceable components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-21-22-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001) | | | | | |
| | | - for the NLG | | | | | |
| | | (Ref. TASK 32-21-11-400-002) | | | | | |
| | | - for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002) | | | | | |
| | | - for the shock absorber | | | | | |
| | | (Ref. TASK 32-21-13-400-001) | | | | | |
| | | - for the axle sleeve | | | | | |
| | | (Ref. TASK 32-41-12-400-002) | | | | | |
| | | - for the wheels | | | | | |



EFF :

ALL  05-51-24

Page 612
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-41-12-400-001) | | | | | |
| | | | | | | | |
|3. | | Inspection of the MLG after the | | | | | |
| | | aircraft goes off the runway and the | | | | | |
| | | MLG wheels sank into the ground and/or| | | | | |
| | | the MLG found an obstacle on its path.| | | | | |
| | | NOTE: If the MLG followed the same | | | | | |
| | | path as the NLG (straigh line | | | | | |
| | | and/or same obstacles) and NLG | | | | | |
| | | inspection showed no damage, do | | | | | |
| | | directly the inspection given | | | | | |
| | | in item 4. | | | | | |
| | | | | | | | |
| | A.| Initial inspection | | | | | |
| | | | | | | | |
| | | (1) Lift the aircraft: | X | | | | |
| | | (Ref. TASK 07-11-00-581-001) | | | | | |
| | | - make sure that extension of the | X | | | | |
| | | shock absorber is smooth and | | | | | |
| | | full. | | | | | |
| | | - examine the sliding rod (the | X | | | | |
| | | (part you can see) for blue | | | | | |
| | | color, signs of bronze or chrome| | | | | |
| | | damage. | | | | | |
| | | (2) Do a check of the pressure in the | X | | | | |
| | | MLG shock absorber | | | | | |
| | | (Ref. TASK 12-14-32-614-003) | | | | | |
| | | (3) Examine the shock absorber for | X | | | | |
| | | external leakage. | | | | | |
| | | (4) Do the inspection of the MLG | X | | | | |
| | | (Ref. TASK 32-11-00-200-005) for: | | | | | |
| | | - out-of-roundness of shock | | | | | |
| | | absorber sliding-rod. | | | | | |
| | | - distortion of side-stay lower | | | | | |
| | | cardan pin-joint (side-stay | | | | | |
| | | disconnected). | | | | | |
| | | - distortion of torque link pin. | | | | | |
| | | - detailed visual inspection of | | | | | |
| | | the barrel in the drag stay | | | | | |
| | | blend area | | | | | |
| | | - detailed visual inspection of | | | | | |
| | | the barrel forward pintle-pin | | | | | |
| | | area | | | | | |



EFF :

ALL  05-51-24

Page 613
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - detailed visual inspection of | | | | | |
| | | the rear pintle pin mounting | | | | | |
| | | (5) Do the functional test of the | X | | | | |
| | | Normal Extension/Retraction of the| | | | | |
| | | landing gear | | | | | |
| | | (Ref. TASK 32-31-00-720-002) | | | | | |
| | | - with the MLG door open and the | | | | | |
| | | safety lock installed, make sure| | | | | |
| | | that the MLG is correctly | | | | | |
| | | engaged in the MLG uplock (MLG | | | | | |
| | | centered in uplock). | | | | | |
| | | (6) Do the functional test of the free| X | | | | |
| | | fall extension of the landing gear| | | | | |
| | | (Ref. TASK 32-33-00-720-001) | | | | | |
| | | | | | | | |
| B.| | Subsequent inspection | | | | | |
| | | | | | | | |
| | | (1) If the initial inspection shows no| | | | | |
| | | unsatisfactory condition: | | | | | |
| | | (a) Do the inspection given in | X | | | | |
| | | item 4. (inspection of the MLG| | | | | |
| | | after the aircraft goes off | | | | | |
| | | the runway but the MLG wheels | | | | | |
| | | did not sink into the ground | | | | | |
| | | and the MLG did not find an | | | | | |
| | | obstacle on its path). | | | | | |
| | | (2) If the initial inspection shows | X | | | | |
| | | unsatisfactory condition(s): | | | | | |
| | | (a) Remove the MLG, the side-stay,| | X | | | |
| | | lockstay assembly and lockstay| | | | | |
| | | actuator for overhaul: | | | | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | | (b) On the aircraft, examine the | | X | | | |
| | | attachment fittings and | | | | | |
| | | bearings of the side-stay for | | | | | |
| | | distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |



EFF :

ALL  05-51-24

Page 614
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (c) On the aircraft, examine the | | X | | | |
| | | attachment fittings of the MLG| | | | | |
| | | for distortion, cracks and | | | | | |
| | | damaged paintwork | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (d) Examine the MLG actuating | | X | | | |
| | | cylinder and its attachment | | | | | |
| | | fitting for distortion, cracks| | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the actuating | | | X | | |
| | | cylinder for strip-down | | | | | |
| | | inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001)| | | | | |
| | | (refer to the manufactures | | | | | |
| | | instructions for the | | | | | |
| | | strip-down inspection | | | | | |
| | | procedure) | | | | | |
| | | - on the aircraft, continue | | | X | | |
| | | the inspection of the | | | | | |
| | | attachment fitting for | | | | | |
| | | damage. | | | | | |
| | | If you found damage: | | | | | |
| | | . tell Airbus Industrie | | | | | |
| | | about the results. | | | | | |
| | | (e) Examine the gear-well (all the| | X | | | |
| | | items you can see) for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (f) If you removed components, | | X | | | |
| | | install serviceable | | | | | |
| | | components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-46-400-001)| | | | | |



EFF :

ALL  05-51-24

Page 615
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001)| | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001)| | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001)| | | | | |
| | | - for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001)| | | | | |
| | | (g) Lower the aircraft on its | X | | | | |
| | | wheels | | | | | |
| | | (Ref. TASK 07-11-00-586-002) | | | | | |
| | | | | | | | |
|4. | | Inspection of the MLG after the | | | | | |
| | | aircraft goes off the runway and the | | | | | |
| | | MLG wheels did not sink into the | | | | | |
| | | ground and the MLG did not find an | | | | | |
| | | obstacle on its path | | | | | |
| | | NOTE : You can do this inspection with| | | | | |
| | | the aircraft on its wheels. | | | | | |
| | | | | | | | |
| A.| | Inspection | | | | | |
| | | | | | | | |
| | | (1) Do a check of the pressure in the | X | | | | |
| | | MLG shock absorber | | | | | |
| | | (Ref. TASK 12-14-32-614-003) | | | | | |
| | | (2) Do a visual inspection of the | X | | | | |
| | | wheels for distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage. | | | | | |
| | | (a) Do the inspection of the axle | | X | | | |
| | | and the axle sleeve for damage| | | | | |
| | | and out-of-roundness. | | | | | |
| | | (Ref. TASK 32-11-00-200-006) | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (3) If a brake overheat occured: | X | | | | |
| | | - do the Inspection After Brake | | | | | |
| | | Overheat | | | | | |
| | | (Ref. TASK 05-51-16-200-001) | | | | | |
| | | (4) Examine: | X | | | | |
| | | - the MLG and all the components | | | | | |
| | | installed on it for cracks, | | | | | |



EFF :

ALL  05-51-24

Page 616
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | scores, tears, rupture, leakage | | | | | |
| | | and damaged paintwork (pay | | | | | |
| | | particular attention to the drag| | | | | |
| | | stay blend and the forward | | | | | |
| | | pintle pin areas) | | | | | |
| | | - the attachment fittings of the | | | | | |
| | | MLG | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (5) Examine the shock absorber sliding| X | | | | |
| | | rod (the part you can see) for | | | | | |
| | | blue color, signs of bronze, | | | | | |
| | | chrome damage or external oil | | | | | |
| | | leaks. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the shock absorber for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-11-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (6) Examine the side stay assembly and| X | | | | |
| | | its attachment fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the side-stay assembly | | X | | | |
| | | for overhaul. | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b) Do the dimensional inspection | | X | | | |
| | | of the side-stay cardan | | | | | |
| | | pin-joint lugs on MLG leg. | | | | | |
| | | (Ref. TASK 32-11-00-220-004) | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the MLG | | | X | | |
| | | (Ref. TASK 32-11-11-000-001)| | | | | |
| | | (c) On the aircraft, continue the | | X | | | |
| | | inspection of the side-stay | | | | | |
| | | attachment fitting. | | | | | |



EFF :

ALL  05-51-24

Page 617
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (7) Examine the lockstay assembly and | X | | | | |
| | | lockstay actuator for distortion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the lockstay assembly | | X | | | |
| | | and lockstay actuator for | | | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (8) Examine the MLG retraction | X | | | | |
| | | actuator and its attachment | | | | | |
| | | fittings for distortion, cracks, | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the retraction actuator| | X | | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down procedure). | | | | | |
| | | (b) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (9) Examine the MLG well (all the | X | | | | |
| | | items you can see) for distortion,| | | | | |
| | | cracks, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |



EFF :

ALL  05-51-24

Page 618
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | |(10) If you removed components, install| X | | | | |
| | | serviceable components: | | | | | |
| | | - for the retraction actuator | | | | | |
| | | (Ref. TASK 32-31-46-400-001) | | | | | |
| | | - for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | | - for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001) | | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001) | | | | | |
| | | - for the shock absorber | | | | | |
| | | (Ref. TASK 32-11-13-400-001) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-24-210-051

D. Inspection of the Wings (Ref. TASK 28-10-00-910-002) (Ref. TASK 28-25-00-


650-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Wings | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels for: | X | | | | |
| | | - damage to the paint, | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, tears or fuel leaks. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Defuel the tanks. | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Examine the front and rear spars, | | X | | | |
| | | the internal structure and the | | | | | |
| | | fasteners for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |



EFF :

ALL  05-51-24

Page 619
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the condition of the sealant | | | | | |
| | | beads, | | | | | |
| | | - pulled fasteners. | | | | | |
| | | (4) Close access to the wings tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (5) Examine the ducts, lines, pipes, | | X | | | |
| | | mechanical linkages and their | | | | | |
| | | supports for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks or leaks of fluid, | | | | | |
| | | - the correct attachment of | | | | | |
| | | components, | | | | | |
| | | - damage. | | | | | |
| | | | | | | | |
|2. | | Flaps and flap track fairings | | | | | |
| | | | | | | | |
| A.| | Examine the flaps and the bottom flap | X | | | | |
| | | track fairings for: | | | | | |
| | | - distortion, | | | | | |
| | | - dents, cracks, pulled or torn | | | | | |
| | | fasteners, | | | | | |
| | | - damage to the paint. | | | | | |
| | | | | | | | |
| B.| | At rib 6, examine the flap track | X | | | | |
| | | fairing and the adjacent structure | | | | | |
| | | for: | | | | | |
| | | - damage, | | | | | |
| | | - cracks, pulled or torn fasteners, | | | | | |
| | | - distortion. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the flap and carriages and| | X | | | |
| | | tracks/beams for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - damage. | | | | | |
| | | (2) Examine the adjacent structure | | X | | | |
| | | for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, pulled or torn fasteners, | | | | | |
| | | - damage. | | | | | |
| | | (3) Examine wing internal structure | | X | | | |
| | | adjacent to the front and aft | | | | | |
| | | mountings of the flap beams for: | | | | | |



EFF :

ALL  05-51-24

Page 620
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - damage to the sealant. | | | | | |
| | | (4) Examine the area where the MLG is | | X | | | |
| | | attached and the adjacent | | | | | |
| | | structure for: | | | | | |
| | | - cracks or leaks of fuel, | | | | | |
| | | - distortion. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-24-210-052

E. Inspection of the Nacelles, Engines and Pylons


(Ref. Fig. 601/TASK 05-51-24-991-002, 602/TASK 05-51-24-991-003, 603/TASK
05-51-24-991-004)
(Ref. TASK 71-00-20-000-040) (Ref. TASK 71-00-20-400-040) (Ref. TASK 71-
13-00-010-010) (Ref. TASK 71-13-00-410-010)
(Ref. TASK 72-00-00-200-010) (Ref. TASK 78-31-00-710-041) (Ref. TASK 78-
32-00-010-010) (Ref. TASK 78-32-00-410-010).

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nacelles | | | | | |
| | | | | | | | |
| A.| | Examine externally for distortion, | X | | | | |
| | | delamination, cracks, cracked or | | | | | |
| | | flaking paint, loose rivets and signs | | | | | |
| | | of shearing: | | | | | |
| | | - the air intake cowls, | | | | | |
| | | - the fan cowls, | | | | | |
| | | - the fan thrust-reverser cowls. | | | | | |
| | | | | | | | |
| B.| | Open the fan cowl doors and the thrust| X | | | | |
| | | reverser doors. | | | | | |
| | | (Ref. TASK 71-13-00-010-010) | | | | | |
| | | (Ref. TASK 78-32-00-010-010). | | | | | |
| | | | | | | | |
| | | (1)Examine them internally for cracks,| X | | | | |
| | | distortions, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-24

Page 621
Nov 01/04
 
JSA 
Engine Nacelle
Figure 601/TASK 05-51-24-991-002



EFF :

ALL  05-51-24

Page 622
Nov 01/04
 
JSA 
Engine Mounts
Figure 602/TASK 05-51-24-991-003



EFF :

ALL  05-51-24

Page 623
Nov 01/04
 
JSA 
Access Doors of the Pylon Box
Figure 603/TASK 05-51-24-991-004



EFF :

ALL  05-51-24

Page 624
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| C.| | Examine the primary nozzle for correct| X | | | | |
| | | attachment to the engine, distortion, | | | | | |
| | | delamination, cracks, loose rivets, | | | | | |
| | | and signs of shearing. | | | | | |
| | | | | | | | |
| D.| | Examine the attachment of the nose | X | | | | |
| | | cowl to the fan case for distortion, | | | | | |
| | | cracks, pulled or torn fasteners. | | | | | |
| | | | | | | | |
| E.| | Examine all the cowl attachment | X | | | | |
| | | points on the pylon and all the cowl | | | | | |
| | | hinge fittings. | | | | | |
| | | | | | | | |
| F.| | Examine all the cowl latches for | X | | | | |
| | | damage and make sure that operation is| | | | | |
| | | satisfactory. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) If the inspection has shown damage| | X | | | |
| | | to thrust reverser cowls, do an | | | | | |
| | | operational test of the thrust | | | | | |
| | | reverser system. | | | | | |
| | | Make sure that the movement is | | | | | |
| | | free of fouling or binding | | | | | |
| | | (Ref. TASK 78-31-00-710-041). | | | | | |
| | | | | | | | |
|2. | | Engines | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the engines | | | | | |
| | | | | | | | |
| | | (1) Examine the engines for possible | X | | | | |
| | | foreign object damage (FOD). | | | | | |
| | | (Ref. TASK 72-00-00-200-010) | | | | | |
| | | | | | | | |
| | | (1) Examine the engines and the engine| X | | | | |
| | | equipment for distortion, leakage,| | | | | |
| | | damage and signs of impact. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the engine | | X | | | |
| | | (Ref. TASK 71-00-20-000-040). | | | | | |
| | | (b) Examine the engine-to-pylon | | X | | | |
| | | attachment fittings. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | | X | | |



EFF :

ALL  05-51-24

Page 625
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | results | | | | | |
| | | (c) Install the engine | | X | | | |
| | | (Ref. TASK 71-00-20-400-040). | | | | | |
| | | | | | | | |
| B.| | Close the thrust reverser doors and | X | | | | |
| | | the fan cowl doors | | | | | |
| | | (Ref. TASK 78-32-00-410-010) | | | | | |
| | | (Ref. TASK 71-13-00-410-010). | | | | | |
| | | | | | | | |
|3. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Examine the pylons externally for | X | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the structure externally | | X | | | |
| | | for distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the components, pipes, | | X | | | |
| | | ducts, looms, cables, pulleys and | | | | | |
| | | mounts for distortion, cracks, | | | | | |
| | | rupture and fluid leakage. | | | | | |
| | | (3) Examine the pylon-to-wing | | X | | | |
| | | mountings, the skin and the wing | | | | | |
| | | internal structure adjacent to the| | | | | |
| | | pylon mounts for: | | | | | |
| | | - Distortion and cracks. | | | | | |
| | | If you find more damage: | | | X | | |
| | | - Airbus Industrie will give you more | | | | | |
| | | instructions for structural | | | | | |
| | | inspection. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-24-869-050

F. Measurement and Alignment Check

(1) If you find phase 1 damage to the attachment structure of the landing
gear or to the adjacent structure:
- do a measurement and alignment check of the landing gear (Ref. TASK
05-56-00-200-001).



EFF :

ALL  05-51-24

Page 626
Nov 01/04
 
JSA 
5. Close-up
________

Subtask 05-51-24-866-051

A. Retraction of the Flaps

(1) Retract the flaps (Ref. TASK 27-50-00-866-009).

Subtask 05-51-24-410-050

B. Close Access

(1) Close all the access panels which were open for the inspection.

(2) Close the doors of the main gear (Ref. TASK 32-12-00-410-001).

(3) Close the doors of the nose gear (Ref. TASK 32-22-00-410-001).

(4) Remove the warning notice(s).

(5) Remove the access platform(s).

(6) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.



EFF :

ALL  05-51-24

Page 627
Nov 01/04
 
JSA 
_______________________________________________________________________________
INSPECTION AFTER FLIGHT THROUGH DUST STORM/VOLCANIC ASH OR SEVERE CONDITIONS ON
GROUND - INSPECTION/CHECK
_________________________

TASK 05-51-25-200-002

Inspection after Flight through Dust Storm or Dust Contamination on Ground

1. __________________
Reason for the Job

Do this inspection after flight in a very bad dust storm or after dust
contamination on ground.

NOTE : If the dust contamination occurred when the aircraft was on ground
____
with applicable protection by covers and blankets (Ref. AMM
10-11-00), and if there is no dust behind the covers, the inspections
specified in para. 4.D.(Inspection of the probes and sensors) and in
para.4.F.(Inspection of the nacelles and engines) are not necessary.

NOTE : An adjustable access platform (2.5m to 12m/8.2ft to 39.4ft) is


____
necessary to get access to the different parts of the aircraft during
the inspection.

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

R 12-21-11-615-002 External Cleaning


12-24-34-600-001 Bleeding of the Standby Air Data System
12-32-28-281-003 Sample Fuel for Microbiological Contamination
Analysis
R 12-32-29-281-001 Hydraulic Fluid Sample of Green, Blue and Yellow
Systems for Analysis
21-00-00-615-005 Decontamination of the Environmental Control System
(ECS) after Dust or Volcanic Ash Contamination
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
26-21-00-720-003 Check Distribution Piping for Leakage and Obstruction
26-22-00-210-001 Inspection of the APU Fire-Extinguishing Distribution
Piping
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-80-00-866-004 Extending the Slats on the Ground



EFF :

ALL  05-51-25

Page 601
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-80-00-866-005 Retracting the Slats on the Ground


28-12-47-200-001 Visual Check of NACA Intake for Signs of Blockage
28-13-00-200-001 Check Drain Mast Outlet for Obstruction
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-10-00-200-004 Check of the Clogging Indicators of the Hydraulic
System Filters (Other than the two Case Drain Filters
of the Engine-Driven Pumps)
R 29-10-00-200-006 Check Clogging Indicator on Engine-Driven Pump (EDP)
R Case Drain Filter
30-11-00-710-001 Operational Test of the Wing Ice-Protection System
30-11-51-000-002 Removal of the Anti-Ice Valve Filter
30-11-51-400-002 Installation of the Anti-Ice Valve Filter
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
34-10-00-170-001 Flushing of the Principal Total Pressure Lines
34-10-00-170-002 Flushing of the Principal Static Pressure Lines
34-10-00-170-003 Draining and Flushing of Standby Pneumatic Circuits
35-12-41-100-001 Cleaning of the Mask-Full Face / Q.D, Oxygen
(5757HM,5758HM,5759HM,5760HM)
R 36-11-00-710-003 Operational Test of the Bleed Air System of the
R Engine 1 or 2
R 49-16-00-100-003 Cleaning of the APU Air Intake (131-9(A))
49-16-00-200-002 Detailed Inspection of APU Air Intake, Diffuser
Elbow, Seals and Felt Metal (131-9(A))
49-91-44-000-004 Removal of the Oil Cooler (8079KM) (131-9(A))
49-91-44-400-004 Installation of the Oil Cooler (8079KM) (131-9(A))
53-15-11-200-001 Detailed Inspection of the Radome
56-11-11-200-001 Inspection of the Windshields
56-11-12-200-001 Inspection of the Fixed Windows
56-12-11-200-001 Inspection of the Sliding Windows
56-21-13-200-001 Detailed Visual Inspection of the Cabin Window Panes,
including the Window Panes in Doors
56-31-00-210-001 Detailed Inspection of the Passenger/Crew Door
Windows
71-11-11-200-011 Visually Examine the Air Intake Cowl - Allowable
Damage Data
71-13-00-200-010 Detailed Inspection of the Fan Cowl Doors
72-00-00-200-020 Inspection after Flight Through Volcanic Ash



EFF :

ALL  05-51-25

Page 602
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

78-32-00-200-015 Visually Examine the Thrust Reverser - Allowable


Damage Data
AMM 122227 PB 301 (for corrective action)
AMM 122232 PB 301 (for corrective action)

3. __________
Job Set-up

Subtask 05-51-25-941-051

A. General

(1) Inspection requirements

R (a) The dust particles can be of different dimensions, they can go


R into all orifices and cause erosion, etching or shot peening on
R the surface.
The dust can stay:
- on all exposed lubricated surfaces
- in all corners
R - in bottom areas test
The dust can cause contamination on all filter elements.

(b) All the necessary inspections are visual unless the text gives
other instructions. Operators can refer to the Non-destructive
Testing Manual (NTM) and use non-destructive procedures.

R (c) If you find damage to the aircraft structure, refer to the


R Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

(d) If you find damage to paint/protection, refer to the Structural


Repair Manual (SRM). The SRM has the approved paint/protection
repair procedures.

(e) Examine the aircraft surfaces, structures, systems for


contamination, erosion/abrasion, dents, etching, delamination or
other damage.



EFF :

ALL  05-51-25

Page 603
May 01/05
 
JSA 
Subtask 05-51-25-210-063

B. Inspection Preparation

(1) If contamination occurs in flight or during landing or take off:

(a) Before you start, we recommend that you get information from the
crew about the flight conditions.

(b) Make sure that you have the related aircraft Post Flight Report
(PFR).

(c) Do a check of all the events reported by the crew or by the PFR
in addition/conjunction with this inspection.

(2) If contamination occurred with the aircraft in the parking


R configuration, it is not necessary to do a check of the systems which
R have the applicable protective covers/devices if you do not find dust
behind them.

Subtask 05-51-25-481-051

C. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-25-866-052

D. Extension of the Flight Control Surfaces

(1) Extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Extend the slats (Ref. TASK 27-80-00-866-004).

(3) Extend the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-25-010-051

E. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).



EFF :

ALL  05-51-25

Page 604
May 01/05
 
JSA 
Subtask 05-51-25-860-051

F. Aircraft Maintenance Configuration

(1) Make sure that hydraulic systems are depressurized


(Ref. TASK 29-00-00-864-001)

(2) De-energize the aircraft electrical circuits


(Ref. TASK 24-41-00-862-002).

(3) Put warning notices in the cockpit to tell persons not to operate the
systems.

(4) Put an adjustable access platform in position near the area you must
examine.

4. Procedure
_________

Subtask 05-51-25-160-051

A. Cleaning of the Aircraft

CAUTION : DO NOT RUB THE SURFACE WHEN YOU REMOVE THE DUST FROM THE
_______
AIRCRAFT. IF YOU RUB THE SURFACE, YOU CAN CAUSE EROSION/
ABRASION.

CAUTION : DO NOT USE FLUIDS TO REMOVE THE DUST. IF THERE IS A LAYER OF


_______
DUST ON THE AIRCRAFT SURFACES, REMOVE THE DUST WITH A VACUUM
CLEANER (OR, IF YOU CANNOT USE A VACUUM CLEANER, USE AN AIR
BLOWER, A SOFT CLOTH OR A HAND BRUSH). FLUIDS CAN MIX WITH THE
DUST AND MAKE A PASTE THAT CAN CAUSE EROSION/ABRASION. THIS
PASTE CAN GO INTO AREAS THAT ARE NOT EASY TO CLEAN.

(1) If there is a layer of dust on the aircraft surfaces, remove the dust
with a vacuum cleaner, an air blower, a soft cloth or a soft brush.

(2) Clean the aircraft internally.

R (3) Clean the aircraft externally (Ref. TASK 12-21-11-615-002).



EFF :

ALL  05-51-25

Page 605
Feb 01/07
 
JSA 
Subtask 05-51-25-210-064

B. Internal Inspection
(Ref. TASK 35-12-41-100-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the cabin area | | | | | |
| | | | | | | | |
| A.| |Examine the cabin area for dust | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination. | | | | | |
| | | | | | | | |
| B.| |Examine the cockpit for dust | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination. | | | | | |
| | |(2) Examine the oxygen full face | | X | | | |
| | | masks for contamination. | | | | | |
| | | If you find contamination : | | | | | |
| | | (a) Clean the oxygen full face | | | X | | |
| | | masks | | | | | |
| | | (Ref. TASK 35-12-41-100-001). | | | | | |
| | | | | | | | |
| C.| |Examine the avionics compartment (all | X | | | | |
| | |the items you can see), specially: | | | | | |
| | |- around the ventilated components | | | | | |
| | |- the plugs | | | | | |
| | |- the equipment | | | | | |
| | |for dust contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination. | | | | | |
| | | | | | | | |
| D.| |Examine the cargo compartments for dust| X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination | | | | | |
R | | | (specially the PDU sensors). | | | | | |
| | |(2) Examine the cargo drainage system | | X | | | |
| | | (if installed) for dust | | | | | |



EFF :

ALL  05-51-25

Page 606
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Replace the filters of the | | | X | | |
| | | drain funnels. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-065

C. Inspection of the Fuselage, the Wings and the Stabilizers


(Ref. TASK 53-15-11-200-001) (Ref. TASK 56-11-11-200-001)
(Ref. TASK 56-11-12-200-001) (Ref. TASK 56-12-11-200-001)
(Ref. TASK 56-21-13-200-001) (Ref. TASK 56-31-00-210-001)
(Ref. AMM 122227 PB 301)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the radome skin for damage | X | | | | |
| | | (Ref. TASK 53-15-11-200-001). | | | | | |
| | | | | | | | |
| B.| | Examine the windshield, the fixed | X | | | | |
| | | windows and the sliding windows for | | | | | |
| | | damage: | | | | | |
| | | - for the windshield | | | | | |
| | | (Ref. TASK 56-11-11-200-001) | | | | | |
| | | - for the fixed windows | | | | | |
| | | (Ref. TASK 56-11-12-200-001) | | | | | |
| | | - for the sliding windows | | | | | |
| | | (Ref. TASK 56-12-11-200-001) | | | | | |
| | | | | | | | |
| C.| | Examine the passenger cabin windows | X | | | | |
| | | the passenger/crew doors and | | | | | |
| | | the emergency exit windows for | | | | | |
| | | damage | | | | | |
| | | (Ref. TASK 56-21-13-200-001) | | | | | |
| | | (Ref. TASK 56-31-00-210-001). | | | | | |
| | | | | | | | |
| D.| | Examine all of the fuselage skin, the | X | | | | |
| | | belly fairing and the wing-to-fuselage| | | | | |
| | | fairings for damage. | | | | | |



EFF :

ALL  05-51-25

Page 607
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| E.| | Examine the ram air inlet and outlet, | X | | | | |
| | | the air inlet and outlet flaps for | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Wings | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the top and bottom skin of the| X | | | | |
| | | wings for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the flap track fairings for | X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| D.| | Examine the skin of all the control | X | | | | |
| | | surfaces (slats, flaps, ailerons | | | | | |
| | | and spoilers), specially the leading | | | | | |
| | | and the trailing edges, for damage. | | | | | |
| | | | | | | | |
| E.| | Examine the hinge areas of the | X | | | | |
| | | spoilers and the ailerons for | | | | | |
| | | contamination. | | | | | |
| | | | | | | | |
| F.| | Examine the flap tracks, flap inter | X | | | | |
| | | connecting strut, track 4 sensor, | | | | | |
| | | roller mechanisms, steady bearings and| | | | | |
| | | universal joints for contamination. | | | | | |
R | | | Make sure that there are no dust | | | | | |
R | | | particles on the roller stops. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean and lubricate the related | | X | | | |
| | | components | | | | | |
R | | | (Ref. AMM 12-22-27 PB 301). | | | | | |
| | | | | | | | |
| G.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the ailerons and the | | | | | |
| | | spoilers for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-25

Page 608
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|3. | | Inspection of the Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the vertical | X | | | | |
| | | stabilizer and the rudder, specially | | | | | |
| | | the leading and the trailing edges, | | | | | |
| | | for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the rudder | X | | | | |
| | | for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the rudder for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|4. | | Inspection of the Horizontal | | | | | |
| | | Stabilizers | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the horizontal | X | | | | |
| | | stabilizers and the elevators, | | | | | |
| | | specially the leading and the trailing| | | | | |
| | | edges, for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the | X | | | | |
| | | elevators for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the elevators for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|5. | | Inspection of the external lights | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-25

Page 609
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine all the external lights for | X | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
R | | | (1) Replace the related component(s). | | X | | | |
| | | | | | | | |
|6. | | Inspection of the antennas and the | | | | | |
| | | drain masts | | | | | |
| | | | | | | | |
| A.| | Examine all the antennas and the drain| X | | | | |
| | | masts for damage. | | | | | |
| | | If you find damage: | | | | | |
R | | | (1) Replace the related component(s). | | X | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-066

D. Inspection of the Probes and Sensors

NOTE : If the aircraft was on ground with the applicable protective


____
covers/devices installed (ref. AMM 10-11-00) when the dust
contamination occured, this inspection is not necessary if there
is no dust behind the covers.

NOTE : Flush all the pressure lines:


____
- If the crew report shows an important dust storm.
- If the maintenance crew reports an important dust storm with
probe covers in position.
R - If a general inspection shows signs of a heavy contamination
(Ref. TASK 12-24-34-600-001) (Ref. TASK 34-10-00-170-001)
(Ref. TASK 34-10-00-170-002) (Ref. TASK 34-10-00-170-003)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the sensors and probes | | | | | |
| | | | | | | | |
R | A.| | Examine all the probes and sensors | X | | | | |
| | | | | | | | |
| | |(1) Examine all the probes and sensors | | | | | |
| | | for damage and contamination (not | | | | | |
| | | clogged): | | | | | |
| | | - the pitot probes | | | | | |



EFF :

ALL  05-51-25

Page 610
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the static probes | | | | | |
| | | - the TAT sensors | | | | | |
| | | - the AOA sensors | | | | | |
| | | - the ice detector probes | | | | | |
| | | (if installed) | | | | | |
| | |NOTE: Make sure that the AOA sensors | | | | | |
| | | move freely and that the drain | | | | | |
| | | holes of the pitot probes are not| | | | | |
| | | clogged. | | | | | |
| | | | | | | | |
| | |(2) Drain the standby static pressure | X | | | | |
| | | lines and make sure that there | | | | | |
| | | are no signs of dust. | | | | | |
| | | (Ref. TASK 12-24-34-600-001) | | | | | |
| | | If you find contamination: | | | | | |
R | B.| | Flush all the pressure lines. | | X | | | |
| | | (Ref. TASK 34-10-00-170-001) | | | | | |
| | | (Ref. TASK 34-10-00-170-002) | | | | | |
| | | (Ref. TASK 34-10-00-170-003) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-067

E. Inspection of the Landing Gear Doors, the Landing Gears and the Landing
Gear Wells (Ref. AMM 122232 PB 301)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the landing gear doors, | | | | | |
| | |the landing gears and the landing gear | | | | | |
| | |wells. | | | | | |
| | |NOTE: If you find contamination, you | | | | | |
| | | must: | | | | | |
| | | (a) Remove the contamination from | | | | | |
| | | surface, the moving joints | | | | | |
| | | and the chromed areas of | | | | | |
| | | shock absorbers and actuators | | | | | |
R | | | before the subsequent flight. | | | | | |
| | | (b) Do a full lubrication of | | | | | |
| | | the landing gears before a | | | | | |
| | | maximum of 10 flight cycles. | | | | | |



EFF :

ALL  05-51-25

Page 611
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. AMM 12-22-32, PB 301) | | | | | |
| | | | | | | | |
| A.| |Inspection of the doors | | | | | |
| | |(1) Examine all the doors for damage | X | | | | |
| | | and/or contamination, specially on:| | | | | |
| | | - the door skin | | | | | |
| | | - the door hinges | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator bare rods. | | | | | |
| | | | | | | | |
| B.| |Inspection of the landing gears | | | | | |
| | |(1) Examine all the landing gear | X | | | | |
| | | structures and the components | | | | | |
| | | installed on them for damage and/or| | | | | |
| | | contamination, specially on: | | | | | |
| | | - the attachment points of the | | | | | |
| | | landing gears | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator rods | | | | | |
| | | - the chromed area of the shock | | | | | |
| | | absorbers | | | | | |
| | | - the mechanical linkages and the | | | | | |
| | | moving joints. | | | | | |
| | | | | | | | |
| C.| |Inspection of the landing gear wells | | | | | |
| | |(1) Examine all the landing gear wells | X | | | | |
| | | and the components installed in | | | | | |
| | | them for damage and/or | | | | | |
| | | contamination. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-068

F. Inspection of the Nacelles and the Engines

NOTE : If the aircraft was on the ground with the applicable protective
____
covers/devices installed when the volcanic ash contamination
occurred, this inspection is not necessary if there is no ash
behind the covers.

NOTE : If the aircraft was on the ground without the applicable


____
protective covers/devices installed, we recommend that after you
R start the engines, you let the engines operate some minutes before



EFF :

ALL  05-51-25

Page 612
May 01/05
 
JSA 
R you use the bleed air systems. This is to make sure that the
R engines blow out remaining particles.

(Ref. TASK 71-11-11-200-011) (Ref. TASK 71-13-00-200-010)


(Ref. TASK 78-32-00-200-015) (Ref. TASK 26-21-00-720-003)
(Ref. TASK 72-00-00-200-020)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nacelles and engines | | | | | |
| | | | | | | | |
| A.| |Inspection of the nacelles | | | | | |
| | |(1) Examine the air intake cowl for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-11-11-200-011) | | | | | |
| | |(2) Examine the fan cowl doors for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-13-00-200-010) | | | | | |
| | |(3) Examine the thrust reversers for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 78-32-00-200-015) | | | | | |
| | | | | | | | |
| B.| |Inspection of the engines | | | | | |
| | |(1) Examine the fire extinguisher | X | | | | |
| | | outlets for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Do a check of the | | X | | | |
| | | distribution piping for | | | | | |
R | | | blockage. | | | | | |
| | | (Ref. TASK 26-21-00-720-003) | | | | | |
| | |(2) Do the inspection/check of the | X | | | | |
R | | | engines after dust ingestion. | | | | | |
| | | (Ref. TASK 72-00-00-200-020) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 613
May 01/05
 
JSA 
Subtask 05-51-25-210-069

G. Inspection of the APU


(Ref. TASK 49-16-00-200-002) (Ref. TASK 49-16-00-100-003).
(Ref. TASK 49-91-44-000-004) (Ref. TASK 49-91-44-400-004)
(Ref. TASK 26-22-00-210-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the APU | | | | | |
| | | | | | | | |
| A.| |Examine the APU intake and exhaust for | X | | | | |
| | |contamination and/or damage | | | | | |
| | |(Ref. TASK 49-16-00-200-002) | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) If the APU was not in operation | | | | | |
| | | during dust contamination: | | | | | |
| | | (a) Clean the APU air intake and | | X | | | |
| | | exhaust | | | | | |
| | | (Ref. TASK 49-16-00-100-003) | | | | | |
| | |(2) If the APU was in operation during | | | | | |
| | | dust contamination: | | | | | |
| | | (a) Clean the APU air intake and | | X | | | |
| | | exhaust | | | | | |
| | | (Ref. TASK 49-16-00-100-003) | | | | | |
| | | (b) Examine the oil cooler for | | X | | | |
| | | contamination | | | | | |
| | | (Ref. TASK 49-91-44-000-004) | | | | | |
| | | (Ref. TASK 49-91-44-400-004) | | | | | |
| | | If you find contamination: | | | | | |
| | | - do an APU inspection/check | | | X | | |
| | | (Ref. TASK 49-20-00-200-003) | | | | | |
| | | NOTE: We recommend that you | | | | | |
| | | replace the APU if you | | | | | |
| | | find large contamination | | | | | |
| | | in the oil cooler. | | | | | |
| | | (c) Examine the fire extinguisher | | X | | | |
| | | outlets for contamination | | | | | |
| | | (Ref. TASK 26-22-00-210-001) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 614
Nov 01/04
 
JSA 
R Subtask 05-51-25-210-070-A

R H. Inspection of the Hydraulic System


R (Ref. TASK 29-10-00-200-004) (Ref. TASK 29-10-00-200-006)
R (Ref. TASK 12-32-29-281-001)

R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | |Inspection of the hydraulic system | | | | | |
R | | | | | | | | |
R | A.| |Examine the filters for contamination | X | | | | |
R | | |(clogging indicators and filter | | | | | |
R | | |elements). | | | | | |
R | | |(Ref. TASK 29-10-00-200-004) | | | | | |
R | | |(Ref. TASK 29-10-00-200-006) | | | | | |
R | | |If you find contamination: | | | | | |
R | | |(1) Replace the filter elements. | | X | | | |
R | | |(2) Get a sample of fluid and make | | X | | | |
R | | | sure that contamination is in | | | | | |
R | | | the permitted limits | | | | | |
R | | | (Ref. TASK 12-32-29-281-001) | | | | | |
R | | | | | | | | |
R | B.| |Examine the RAT for contamination | X | | | | |
R | | |and/or damage. | | | | | |
R | | | | | | | | |
R | C.| |Examine the compensated slides (1010GM | X | | | | |
R | | |and 3010GM) for contamination. | | | | | |
R | | |If you find contamination: | | | | | |
R | | |(1) Clean the compensated slides | | X | | | |
R -------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 615
Feb 01/07
 
JSA 
Subtask 05-51-25-210-071

J. Inspection of the Fuel System


(Ref. TASK 28-12-47-200-001) (Ref. TASK 12-32-28-281-003)
(Ref. TASK 28-13-00-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuel system | | | | | |
| | | | | | | | |
R | A.| | Examine the NACA vent intakes for | X | | | | |
| | | contamination | | | | | |
| | | (Ref. TASK 28-12-47-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Get a sample of fuel from the | X | | | | |
| | | water drain valves and do a check | | | | | |
| | | for particle contamination | | | | | |
| | | (Ref. TASK 12-32-28-281-003). | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Clean the fuel tanks. | | X | | | |
| | | | | | | | |
| B.| | Examine the Refuel/Defuel control | X | | | | |
| | | panel for contamination. | | | | | |
R | | | If you find contamination: | | | | | |
| | | (1) Clean the panel. | | X | | | |
| | | | | | | | |
| C.| | Examine the refuel/defuel coupling and| X | | | | |
| | | the refuel/defuel coupling cap for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the refuel/defuel coupling | | X | | | |
| | | and the refuel/defuel coupling | | | | | |
| | | cap. | | | | | |
| | | | | | | | |
| D.| | Examine the overwing refuel adaptor | X | | | | |
| | | /cap for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the adaptor/cap. | | X | | | |
| | | | | | | | |
| E.| | Examine the fuel drain mast for | X | | | | |
| | | contamination. | | | | | |
| | | (Ref. TASK 28-13-00-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the fuel drain mast. | | X | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 616
May 01/05
 
JSA 
Subtask 05-51-25-210-072

K. Inspection of the Anti-Ice System


(Ref. TASK 30-11-00-710-001) (Ref. TASK 30-11-51-000-002)
(Ref. TASK 30-11-51-400-002)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the anti-ice system | | | | | |
| | | | | | | | |
| A.| | Do an operational test of the wing | X | | | | |
| | | anti-ice system : | | | | | |
| | | (Ref. TASK 30-11-00-710-001). | | | | | |
| | | If the valve response time is | | | | | |
| | | incorrect : | | | | | |
| | | (1) Clean the valve and replace the | | X | | | |
| | | valve filter : | | | | | |
| | | (Ref. TASK 30-11-51-000-002) | | | | | |
| | | (Ref. TASK 30-11-51-400-002) | | | | | |
-------------------------------------------------------------------------------

R Subtask 05-51-25-210-089

R L. Inspection of the Bleed Air System


R (Ref. TASK 36-11-00-710-003)

R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Inspection of the bleed air system | | | | | |
R | | | | | | | | |
R | A.| | Do an operational test of the bleed | X | | | | |
R | | | air system : | | | | | |
R | | | (Ref. TASK 36-11-00-710-003). | | | | | |
R | | | If you find contamination: | | | | | |
R | | | (1) Clean the bleed air system. | | X | | | |
R -------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 617
May 01/05
 
JSA 
R Subtask 05-51-25-210-090

R M. Inspection of the Environmental Control System (ECS)


R (Ref. TASK 21-00-00-615-005)

R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Inspection of the ECS | | | | | |
R | | | | | | | | |
R | A.| | Examine the ECS for contamination. | X | | | | |
R | | | If you find contamination: | | | | | |
R | | | (1) Remove the contamination from | | X | | | |
R | | | the ECS: | | | | | |
R | | | (Ref. TASK 21-00-00-615-005). | | | | | |
R -------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-25-866-053

A. Retraction of the Flight Control Surfaces

(1) Retract the flaps (Ref. TASK 27-50-00-866-009).

(2) Retract the slats (Ref. TASK 27-80-00-866-005).

(3) Retract the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-25-410-052

B. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close the NLG doors (Ref. TASK 32-22-00-410-001).

(3) Close the MLG doors (Ref. TASK 32-12-00-410-001).

(4) Close all the access doors, and the access panels opened during the
inspection procedure.

(5) Remove the access platform(s).

(6) Remove the warning notice(s).



EFF :

ALL  05-51-25

Page 618
May 01/05
 
JSA 
Subtask 05-51-25-860-052

C. Put the aircraft back to its initial configuration.

(1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(2) Remove the access platform(s).

(3) Remove the warning notice(s).



EFF :

ALL  05-51-25

Page 619
May 01/05
R  
JSA 
TASK 05-51-25-200-003

Inspection after Flight through Volcanic Ash or Volcanic Ash Contamination on


Ground

1. __________________
Reason for the Job

Do this inpsection after flight in volcanic ash or after volcanic ash


contamination on ground.

NOTE : If the volcanic ash contamination occurred when the aircraft was on
____
ground with applicable protection by covers and blankets (Ref. AMM
10-11-00), and if there is no ash behind the covers, the inpections
specified in para. 4.D. (Inspection of the probes and sensors) and in
para. 4.F. (Inspection of the nacelles and engines ) are not
necessary.

NOTE : An adjustable access platform (2.5m to 17m/8ft.2in to 55ft.9in) is


____
necessary to get access to the different parts of the aircraft during
this inspection.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific adjustable access platform


No specific air blower
No specific soft brush
No specific soft cloth
No specific vacuum cleaner
No specific warning notices



EFF :

ALL  05-51-25

Page 620
May 01/05
R  
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-15-38-613-002 Fill the Potable Water Tank System (Aircraft


Electrical Power not Available)
R 12-21-11-615-002 External Cleaning
12-24-34-600-001 Bleeding of the Standby Air Data System
12-24-38-680-002 Draining of the Potable Water System (without
Electrical Power)
12-32-28-281-003 Sample Fuel for Microbiological Contamination
Analysis
R 12-32-29-281-001 Hydraulic Fluid Sample of Green, Blue and Yellow
Systems for Analysis
21-21-41-000-001 Removal of the Recirculation Filter 4012HM (4013HM)
21-21-41-400-001 Installation of the Recirculation Filter 4012HM
(4013HM)
R 21-51-51-000-001 Removal of the Pack Flow-Control Valve/ Pack
R Flow-Control Unit
R 21-51-51-400-001 Installation of the Pack Flow-Control Valve/ Pack
R Flow-Control Unit
21-63-52-000-001 Removal of the Pressure Regulating Valve 14HK
21-63-52-400-001 Installation of the Pressure Regulating Valve 14HK
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
26-21-00-720-003 Check Distribution Piping for Leakage and Obstruction
26-22-00-210-001 Inspection of the APU Fire-Extinguishing Distribution
Piping
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-80-00-866-004 Extending the Slats on the Ground
27-80-00-866-005 Retracting the Slats on the Ground
27-84-63-000-001 Removal of the No. 1 Slat
27-84-63-400-002 Installation of the No. 1 Slat
27-84-64-000-001 Removal of the No. 2 Slat
27-84-64-400-002 Installation of the No. 2 Slat
27-84-65-000-001 Removal of the No. 3 Slat
27-84-65-400-002 Installation of the No. 3 Slat
27-84-66-000-001 Removal of the No. 4 Slat
27-84-66-400-002 Installation of the No. 4 Slat
27-84-67-000-001 Removal of the No. 5 Slat
27-84-67-400-002 Installation of the No. 5 Slat
28-12-47-200-001 Visual Check of NACA Intake for Signs of Blockage
28-13-00-200-001 Check Drain Mast Outlet for Obstruction



EFF :

ALL  05-51-25

Page 621
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

29-00-00-864-001 Put the Related Hydraulic System in the Depressurized


Configuration before Maintenance Action
29-10-00-200-004 Check of the Clogging Indicators of the Hydraulic
System Filters (Other than the two Case Drain Filters
of the Engine-Driven Pumps)
29-10-00-200-006 Check Clogging Indicator on Engine-Driven Pump (EDP)
Case Drain Filter
30-11-41-000-001 Removal of the Telescopic Duct
30-11-41-400-001 Installation of the Telescopic Duct
30-11-51-000-001 Removal of the Wing Anti-Ice Control Valve
30-11-51-000-002 Removal of the Anti-Ice Valve Filter
30-11-51-400-001 Installation of the Wing Anti-Ice Control Valve
30-11-51-400-002 Installation of the Anti-Ice Valve Filter
30-21-51-000-010 Removal of the Engine Air Intake Anti-ice Valve
(4000DN)
30-21-51-000-010 Removal of the Engine Air Intake Anti-ice Valve
(4000DN)
30-21-51-000-040 Removal of the Engine Air-Intake Anti-Ice Valve
(4000DN)
30-21-51-400-010 Installation of the Engine Air Intake Anti-ice Valve
(4000DN)
30-21-51-400-010 Installation of the Engine Air Intake Anti-ice Valve
(4000DN)
30-21-51-400-041 Installation of the Engine Air-Intake Anti-Ice Valve
(4000DN)
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
34-10-00-170-001 Flushing of the Principal Total Pressure Lines
34-10-00-170-002 Flushing of the Principal Static Pressure Lines
34-10-00-170-003 Draining and Flushing of Standby Pneumatic Circuits
35-12-41-100-001 Cleaning of the Mask-Full Face / Q.D, Oxygen
(5757HM,5758HM,5759HM,5760HM)
36-11-51-000-040 Removal of the High Pressure Bleed Valve (4000HA)
36-11-51-400-040 Installation of the High Pressure Bleed Valve
(4000HA)
36-11-52-000-040 Removal of the Bleed Pressure-Regulator Valve
(4001HA)
36-11-52-000-041 Removal of the Filters of the Bleed
Pressure-Regulator Valve



EFF :

ALL  05-51-25

Page 622
Feb 01/07
R  
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

36-11-52-400-040 Installation of the Bleed Pressure-Regulator Valve


(4001HA)
36-11-52-400-041 Installation of the Filters of the Bleed
Pressure-Regulator Valve
36-12-52-000-001 Removal of the Crossbleed Valve (6HV)
36-12-52-400-001 Installation of the Crossbleed Valve (6HV)
R 49-16-00-100-003 Cleaning of the APU Air Intake (131-9(A))
49-16-00-200-002 Detailed Inspection of APU Air Intake, Diffuser
Elbow, Seals and Felt Metal (131-9(A))
49-91-44-000-004 Removal of the Oil Cooler (8079KM) (131-9(A))
49-91-44-400-004 Installation of the Oil Cooler (8079KM) (131-9(A))
53-15-11-200-001 Detailed Inspection of the Radome
56-11-11-200-001 Inspection of the Windshields
56-11-12-200-001 Inspection of the Fixed Windows
56-12-11-200-001 Inspection of the Sliding Windows
56-21-13-200-001 Detailed Visual Inspection of the Cabin Window Panes,
including the Window Panes in Doors
56-31-00-210-001 Detailed Inspection of the Passenger/Crew Door
Windows
71-11-11-200-011 Visually Examine the Air Intake Cowl - Allowable
Damage Data
71-13-00-200-010 Detailed Inspection of the Fan Cowl Doors
72-00-00-200-020 Inspection after Flight Through Volcanic Ash
78-32-00-200-015 Visually Examine the Thrust Reverser - Allowable
Damage Data
AMM 122227 PB 301 (for corrective action)
AMM 122232 PB 301 (for corrective action)

3. __________
Job Set-up

Subtask 05-51-25-210-074

A. General

WARNING : DO NOT BREATHE VOLCANIC ASH. DO NOT GET VOLCANIC ASH IN YOUR
_______
EYES. PUT ON PROTECTIVE CLOTHES, EYE GOGGLES AND A RESPIRATOR
MASK. MAKE SURE THAT THE RESPIRATOR MASK CAN REMOVE VOLCANIC
ASH FROM THE AIR. VOLCANIC ASH CAN CAUSE EYE IRRITATION AND
INJURY TO THE RESPIRATORY SYSTEM.



EFF :

ALL  05-51-25

Page 623
Feb 01/07
 
JSA 
(1) Volcanic ash

(a) Volcanic ash is hard, very abrasive and acid (pH between 2 and
neutral).
It can cause erosion/abrasion, etching or shot-peening on the
surfaces and can remove the finishes/protection and thus cause
damage/corrosion.

(b) The ash particles can be of different sizes but the texture of
volcanic ash is almost the same as talcum powder and can enter
all orifices and go through many seals. Volcanic ash will stay:
- on bare and lubricated surfaces
- in all corners
- in bottom places.
It can cause unusual wear and contamination of many aircraft
systems and filter elements.

(c) The volcanic ash will melt when it goes through the combustion
chamber of the engines.
The melted ash has very high adhesive qualities and bonds to
engine parts and thus decreases engine performance. It may
obstruct the fuel injectors and can cause an engine shutdown.

(2) Inspection requirements

(a) Volcanic ash can cause severe damage/contamination on the


structure/systems of the aircraft.
It is not possible to estimate the quantity and the type of
damage after volcanic ash contamination. Therefore, it is
necessary to do a full inspection of the aircraft to know the
damage and make a decision about the necessary repair/action.

(b) All the necessary inspections are visual unless the text gives
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.

(c) If you find damage to the aircraft structure, refer to the


Structural Repair Manual (SRM). The SRM has the approved damage
limits and repair procedures.

(d) If you find damage to paint/protection, refer to the Structural


Repair Manual (SRM). The SRM has the approved paint/protection
repair procedures.



EFF :

ALL  05-51-25

Page 624
May 01/05
R  
JSA 
(e) Examine the aircraft surfaces, structures, systems for
contamination, erosion/abrasion, dents, etching, delamination or
other damage.

Subtask 05-51-25-210-075

B. Inspection Preparation

(1) If contamination occured in flight or during landing or take off:

(a) Before you start, we recommend that you get information from the
crew about the flight conditions.

(b) Make sure that you have the related aircraft Post Flight Report
(PFR).

(c) Do a check of all the events reported by the crew or by the PFR
in addition/conjunction with this inspection.

(2) If contamination occurred with the aircraft in the parking


configuration, it is not necessary to do a check of the systems which
are protected by the applicable protective covers/devices if you do
not find ash behind them.

Subtask 05-51-25-481-052

C. Safety Precautions

(1) Install the safety devices on the landing gears (Ref. TASK 32-00-00-
481-001).

Subtask 05-51-25-866-054

D. Extension of the Flight Control Surfaces

(1) Extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Extend the slats (Ref. TASK 27-80-00-866-004).

(3) Extend the spoilers (Ref. TASK 27-60-00-866-002).



EFF :

ALL  05-51-25

Page 625
May 01/05
R  
JSA 
Subtask 05-51-25-010-052

E. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).

Subtask 05-51-25-860-053

F. Aircraft Maintenance Configuration

(1) Make sure that hydraulic systems are depressurized


(Ref. TASK 29-00-00-864-001)

(2) De-energize the aircraft electrical circuits


(Ref. TASK 24-41-00-862-002).

(3) Put warning notices in the cockpit to tell persons not to operate the
systems.

(4) Put an adjustable access platform in position near the area you must
inspect.

4. Procedure
_________

Subtask 05-51-25-160-052

A. Cleaning of the Aircraft

CAUTION : DO NOT RUB THE SURFACE WHEN YOU REMOVE THE ASH FROM THE
_______
AIRCRAFT. IF YOU RUB THE SURFACE, YOU CAN CAUSE
EROSION/ABRASION.

CAUTION : DO NOT USE FLUIDS TO REMOVE THE ASH. IF THERE IS A LAYER OF ASH
_______
ON THE AIRCRAFT SURFACES, REMOVE THE ASH WITH A VACUUM CLEANER
(OR, IF YOU CANNOT USE A VACUUM CLEANER, USE AN AIR BLOWER, A
SOFT CLOTH OR A HAND BRUSH). FLUIDS CAN MIX WITH THE ASH AND
MAKE A PASTE THAT CAN CAUSE EROSION/ABRASION. THIS PASTE CAN GO
INTO AREAS THAT ARE NOT EASY TO CLEAN.

(1) If there is a layer of ash on the aircraft surfaces, remove the ash
with a vacuum cleaner, an air blower, a soft cloth or a soft brush.

(2) Clean the aircraft internally.



EFF :

ALL  05-51-25

Page 626
May 01/05
R  
JSA 
R (3) Clean the aircraft externally (Ref. TASK 12-21-11-615-002).

Subtask 05-51-25-210-076

B. Internal Inspection
(Ref. TASK 35-12-41-100-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the cabin area | | | | | |
| | | | | | | | |
| A.| |Examine the cabin area for ash | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | | | | | | | |
| B.| |Examine the cockpit for ash | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | |(2) Examine the oxygen full face | | X | | | |
| | | masks for contamination. | | | | | |
| | | If you find contamination : | | | | | |
| | | (a) Clean the oxygen full face | | | X | | |
| | | masks | | | | | |
| | | (Ref.TASK 35-12-41-100-001) | | | | | |
| | | | | | | | |
| C.| |Examine the avionics compartment (all | X | | | | |
| | |the items you can see), specially: | | | | | |
| | |- around the ventilated components | | | | | |
| | |- the plugs | | | | | |
| | |- the equipment | | | | | |
| | |for ash contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | |NOTE : If the crew report shows a very | | | | | |
| | | dense cloud of volcanic ashes, | | | | | |
| | | clean the computers in the | | | | | |
| | | workshop. | | | | | |
| | | | | | | | |
| D.| |Examine the cargo compartments for ash | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | | (specially the PDU sensors). | | | | | |



EFF :

ALL  05-51-25

Page 627
Feb 01/07
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(2) Examine the cargo drainage system | | X | | | |
| | | (if installed) for ash | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Replace the filters of the | | | X | | |
| | | drain funnels. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-077

C. Inspection of the Fuselage, the Wings and the Stabilizers


(Ref. TASK 53-15-11-200-001) (Ref. TASK 56-11-11-200-001)
(Ref. TASK 56-11-12-200-001) (Ref. TASK 56-12-11-200-001)
(Ref. TASK 56-21-13-200-001) (Ref. AMM 122227 PB 301)
(Ref. TASK 56-31-00-210-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the radome skin for damage | X | | | | |
| | | (Ref. TASK 53-15-11-200-001). | | | | | |
| | | | | | | | |
| B.| | Examine the windshield, the fixed | X | | | | |
| | | windows and the sliding windows for | | | | | |
| | | damage : | | | | | |
| | | - for the windshield | | | | | |
| | | (Ref. TASK 56-11-11-200-001) | | | | | |
| | | - for the fixed windows | | | | | |
| | | (Ref. TASK 56-11-12-200-001) | | | | | |
| | | - for the sliding windows | | | | | |
| | | (Ref. TASK 56-12-11-200-001) | | | | | |
| | | | | | | | |
| C.| | Examine the passenger cabin windows, | X | | | | |
| | | the passenger/crew doors and | | | | | |
| | | the emergency exit windows for damage | | | | | |
| | | (Ref. TASK 56-21-13-200-001) | | | | | |
| | | (Ref. TASK 56-31-00-210-001). | | | | | |
| | | | | | | | |
| D.| | Examine all of the fuselage skin, the | X | | | | |
| | | belly fairing and the wing-to-fuselage| | | | | |



EFF :

ALL  05-51-25

Page 628
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | fairings for damage. | | | | | |
| | | | | | | | |
| E.| | Examine the ram air inlet and outlet, | X | | | | |
| | | the air inlet and outlet flaps for | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Wings | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the top and bottom skin of the| X | | | | |
| | | wings for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the flap track fairings for | X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| D.| | Examine the skin of all the control | X | | | | |
| | | surfaces (slats, flaps, ailerons and | | | | | |
| | | spoilers), specially the leading and | | | | | |
| | | the trailing edges, for damage. | | | | | |
| | | | | | | | |
| E.| | Examine the hinge areas of the | X | | | | |
| | | spoilers and the ailerons for | | | | | |
| | | contamination. | | | | | |
| | | | | | | | |
| F.| | Examine the flap tracks, flap inter | X | | | | |
| | | connecting strut, track 4 sensor, | | | | | |
| | | roller mechanisms, steady bearings and| | | | | |
| | | universal joints for contamination. | | | | | |
| | | Make sure that there is no ash deposit| | | | | |
| | | on the roller stops. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean and lubricate the related | | X | | | |
| | | components | | | | | |
| | | (Ref. AMM 12-22-27 PB 301). | | | | | |
| | | | | | | | |
| G.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the ailerons and the | | | | | |
| | | spoilers for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |



EFF :

ALL  05-51-25

Page 629
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|3. | | Inspection of the Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the vertical | X | | | | |
| | | stabilizer and the rudder, specially | | | | | |
| | | the leading and the trailing edges, | | | | | |
| | | for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the rudder | X | | | | |
| | | for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the rudder for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|4. | | Inspection of the Horizontal | | | | | |
| | | Stabilizers | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the horizontal | X | | | | |
| | | stabilizers and the elevators, | | | | | |
| | | specially the leading and the trailing| | | | | |
| | | edges, for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the | X | | | | |
| | | elevators for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the elevators for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|5. | | Inspection of the external lights | | | | | |



EFF :

ALL  05-51-25

Page 630
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| A.| | Examine all the external lights for | X | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Replace the related component(s). | | X | | | |
| | | | | | | | |
|6. | | Inspection of the antennas and the | | | | | |
| | | drain masts | | | | | |
| | | | | | | | |
| A.| | Examine all the antennas and the drain| X | | | | |
| | | masts for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Replace the related component(s). | | X | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-078

D. Inspection of the Probes and Sensors

NOTE : If the aircraft was on ground with the applicable protective


____
covers/devices installed (Ref.AMM 10-11-00) when the volcanic ash
contamination occurred, this inspection is not necessary if there
is no ash behind the covers.

NOTE : Flush all the pressure line :


____
- If the crew report shows a very dense cloud of volcanic ashes
- If the maintenance reports a very dense cloud of volcanic ashes
with probe covers not in position
- If a general inspection shows evidence of heavy contamination.
(Ref. TASK 12-24-34-600-001) (Ref. TASK 34-10-00-170-001)
(Ref. TASK 34-10-00-170-002) (Ref. TASK 34-10-00-170-003)



EFF :

ALL  05-51-25

Page 631
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the sensors and probes | | | | | |
| | | | | | | | |
| A.| | Inspect all the probes and sensors | X | | | | |
| | | | | | | | |
| | |(1) Examine all the probes and sensors | | | | | |
| | | for damage and contamination (not | | | | | |
| | | clogged): | | | | | |
| | | - the pitot probes | | | | | |
| | | - the static probes | | | | | |
| | | - the TAT sensors | | | | | |
| | | - the AOA sensors | | | | | |
| | | - the ice detector probes | | | | | |
| | | (if installed) | | | | | |
| | |NOTE: Make sure that the AOA sensors | | | | | |
| | | move freely and that the drain | | | | | |
| | | holes of the pitot probes are not| | | | | |
| | | clogged. | | | | | |
| | | | | | | | |
| | |(2) Drain the standby static pressure | X | | | | |
| | | lines and make sure that there are | | | | | |
| | | no signs of ash. | | | | | |
| | | (Ref. TASK 12-24-34-600-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Flush all the pressure lines | | X | | | |
| | | (Ref. TASK 34-10-00-170-001) | | | | | |
| | | (Ref. TASK 34-10-00-170-002) | | | | | |
| | | (Ref. TASK 34-10-00-170-003) | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 632
May 01/05
R  
JSA 
Subtask 05-51-25-210-079

E. Inspection of the Landing Gear Doors, the Landing Gears and the Landing
Gear Wells (Ref. AMM 122232 PB 301)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the landing gear doors, | | | | | |
| | |the landing gears and the landing gear | | | | | |
| | |wells. | | | | | |
| | |NOTE: If you find contamination, you | | | | | |
| | | must: | | | | | |
| | | (a) Remove the contamination from| | | | | |
| | | surface, the moving joints | | | | | |
| | | and the chromed areas of | | | | | |
| | | shock absorbers and actuators| | | | | |
| | | before the next flight. | | | | | |
| | | (b) Do a full lubrication of the | | | | | |
| | | landing gears before a | | | | | |
| | | maximum of 10 flight cycles. | | | | | |
| | | (Ref. AMM 12-22-32, PB 301) | | | | | |
| | | | | | | | |
| A.| |Inspection of the doors | | | | | |
| | |(1) Examine all the doors for damage | X | | | | |
| | | and/or contamination, specially on:| | | | | |
| | | - the door skin | | | | | |
| | | - the door hinges | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator bare rods. | | | | | |
| | | | | | | | |
| B.| |Inspection of the landing gears | | | | | |
| | |(1) Examine all the landing gear | X | | | | |
| | | structures and the components | | | | | |
| | | installed on them for damage and/or| | | | | |
| | | contamination, specially on: | | | | | |
| | | - the attachment points of the | | | | | |
| | | landing gears | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator rods | | | | | |
| | | - the chromed area of the shock | | | | | |
| | | absorbers | | | | | |
| | | - the mechanical linkages and the | | | | | |
| | | moving joints. | | | | | |
| | | | | | | | |
| C.| |Inspection of the landing gear wells | | | | | |



EFF :

ALL  05-51-25

Page 633
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(1) Examine all the landing gear wells | X | | | | |
| | | and the components installed in | | | | | |
| | | them for damage and/or | | | | | |
| | | contamination. | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-080

F. Inspection of the Nacelles and the Engines

NOTE : If the aircraft was on the ground with the applicable protective
____
covers/devices installed when the volcanic ash contamination
occurred, this inspection is not necessary if there is no ash
behind the covers.

NOTE : If the aircraft was on the ground without the applicable


____
protective covers/devices installed, we recommend that after you
start the engines, you let the engines run a few minutes before
you use the bleed air systems. This is to make sure that the
engines blow out remaining particles.

(Ref. TASK 71-11-11-200-011) (Ref. TASK 71-13-00-200-010)


(Ref. TASK 78-32-00-200-015) (Ref. TASK 26-21-00-720-003)
(Ref. TASK 72-00-00-200-020)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nacelles and engines | | | | | |
| | | | | | | | |
| A.| |Inspection of the nacelles | | | | | |
| | |(1) Examine the air intake cowl for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-11-11-200-011) | | | | | |
| | |(2) Examine the fan cowl doors for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-13-00-200-010) | | | | | |
| | |(3) Examine the thrust reversers for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 78-32-00-200-015) | | | | | |
| | | | | | | | |
| B.| |Inspection of the engines | | | | | |



EFF :

ALL  05-51-25

Page 634
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(1) Examine the fire extinguisher | X | | | | |
| | | outlets for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Do a check of the | | X | | | |
| | | distribution piping for | | | | | |
| | | obstruction | | | | | |
| | | (Ref. TASK 26-21-00-720-003) | | | | | |
| | |(2) Do the inspection/check of the | X | | | | |
| | | engines after flight through | | | | | |
| | | volcanic ash | | | | | |
| | | (Ref. TASK 72-00-00-200-020) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-087

G. Inspection of the APU


(Ref. TASK 49-16-00-200-002) (Ref. TASK 49-16-00-100-003).
(Ref. TASK 49-91-44-000-004) (Ref. TASK 49-91-44-400-004)
(Ref. TASK 26-22-00-210-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the APU | | | | | |
| | | | | | | | |
| A.| |Examine the APU intake and exhaust for | X | | | | |
| | |contamination and/or damage | | | | | |
| | |(Ref. TASK 49-16-00-200-002) | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) If the APU was not in operation | | | | | |
| | | during volcanic ash | | | | | |
| | | contamination: | | | | | |
| | | (a) Clean the APU air intake and | | X | | | |
| | | exhaust | | | | | |
| | | (Ref. TASK 49-16-00-100-003) | | | | | |
| | |(2) If the APU was in operation during | | | | | |
| | | volcanic ash contamination: | | | | | |
| | | (a) Clean the APU air intake and | | X | | | |
| | | exhaust | | | | | |
| | | (Ref. TASK 49-16-00-100-003) | | | | | |
| | | (b) Examine the oil cooler for | | X | | | |
| | | contamination | | | | | |



EFF :

ALL  05-51-25

Page 635
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 49-91-44-000-004) | | | | | |
| | | (Ref. TASK 49-91-44-400-004) | | | | | |
| | | If you find contamination: | | | | | |
| | | - do an APU inspection/check | | | X | | |
| | | (Ref. TASK 49-20-00-200-003) | | | | | |
| | | NOTE: We recommend that you | | | | | |
| | | replace the APU if you | | | | | |
| | | find large contamination | | | | | |
| | | in the oil cooler. | | | | | |
| | | (c) Examine the fire extinguisher | | X | | | |
| | | outlets for contamination | | | | | |
| | | (Ref. TASK 26-22-00-210-001) | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-082

H. Inspection of the Fuel System


(Ref. TASK 28-12-47-200-001) (Ref. TASK 12-32-28-281-003)
(Ref. TASK 28-13-00-200-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuel system | | | | | |
| | | | | | | | |
| A.| | Inspect the NACA vent intakes for | X | | | | |
| | | contamination | | | | | |
| | | (Ref. TASK 28-12-47-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Get a sample of fuel from the | X | | | | |
| | | water drain valves and do a check | | | | | |
| | | for particle contamination | | | | | |
| | | (Ref. TASK 12-32-28-281-003). | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Clean the fuel tanks. | | X | | | |
| | | | | | | | |
| B.| | Examine the Refuel/Defuel control | X | | | | |
| | | panel for contamination. | | | | | |
| | | If you find contamination : | | | | | |
| | | (1) Clean the panel. | | X | | | |
| | | | | | | | |
| C.| | Examine the refuel/defuel coupling and| X | | | | |



EFF :

ALL  05-51-25

Page 636
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the refuel/defuel coupling cap for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the refuel/defuel coupling | | X | | | |
| | | and the refuel/defuel coupling | | | | | |
| | | cap. | | | | | |
| | | | | | | | |
| D.| | Examine the overwing refuel adaptor | X | | | | |
| | | /cap for contamination | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the adaptor/cap | | X | | | |
| | | | | | | | |
| E.| | Examine the fuel drain mast for | X | | | | |
| | | contamination. | | | | | |
| | | (Ref. TASK 28-13-00-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the fuel drain mast. | | X | | | |
-------------------------------------------------------------------------------

Subtask 05-51-25-210-088

J. Inspection of the Anti-Ice System


(Ref. TASK 30-11-51-000-001) (Ref. TASK 30-11-51-400-001)
(Ref. TASK 30-11-51-000-002) (Ref. TASK 30-11-51-400-002)
(Ref. TASK 27-84-63-000-001) (Ref. TASK 27-84-63-400-002)
(Ref. TASK 27-84-64-000-001) (Ref. TASK 27-84-64-400-002)
(Ref. TASK 27-84-65-000-001) (Ref. TASK 27-84-65-400-002)
(Ref. TASK 27-84-66-000-001) (Ref. TASK 27-84-66-400-002)
(Ref. TASK 27-84-67-000-001) (Ref. TASK 27-84-67-400-002)
(Ref. TASK 30-11-41-000-001) (Ref. TASK 30-11-41-400-001)
(Ref. TASK 30-21-51-000-010) (Ref. TASK 30-21-51-400-010)
(Ref. TASK 30-21-51-000-010) (Ref. TASK 30-21-51-400-010)



EFF :

ALL  05-51-25

Page 637
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the anti-ice system | | | | | |
| | | | | | | | |
| A.| | Examine the air inlet and the outlet | X | | | | |
| | | of the pre-cooler for contamination. | | | | | |
| | | | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) If the anti-ice system was not in | | | | | |
| | | operation during or after | | | | | |
| | | volcanic ash contamination: | | | | | |
| | | (a) Disconnect and remove the | | X | | | |
| | | duct immediately upstream | | | | | |
| | | of the wing anti-ice valve. | | | | | |
| | | (b) Examine the valve for | | X | | | |
| | | contamination. | | | | | |
| | | if you find contamination: | | | | | |
| | | - Clean the ducts upstream of | | | X | | |
| | | the wing anti-ice valve. | | | | | |
| | | - Clean the valve and replace | | | X | | |
| | | the valve filter | | | | | |
| | | (Ref. TASK 30-11-51-000-001)| | | | | |
| | | (Ref. TASK 30-11-51-400-001)| | | | | |
| | | (Ref. TASK 30-11-51-000-002)| | | | | |
| | | (Ref. TASK 30-11-51-400-002)| | | | | |
| | | | | | | | |
| | | (2) If the anti-ice system was in | | | | | |
| | | operation during or immediately | | | | | |
| | | after volcanic ash | | | | | |
| | | contamination: | | | | | |
| | | (a) Remove the valve filter and | | X | | | |
| | | install a clean filter | | | | | |
| | | (Ref. TASK 30-11-51-000-001) | | | | | |
| | | (Ref. TASK 30-11-51-400-001) | | | | | |
| | | (Ref. TASK 30-11-51-000-002) | | | | | |
| | | (Ref. TASK 30-11-51-400-002) | | | | | |
| | | (b) Disconnect the anti-ice duct | | X | | | |
| | | from the telescopic duct and | | | | | |
| | | do a check for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | - Clean all the anti-ice | | | X | | |
| | | ducts from the pylon | | | | | |
| | | interface to the | | | | | |
| | | telescopic duct outlet. | | | | | |
| | | - Clean the wing anti-ice. | | | X | | |



EFF :

ALL  05-51-25

Page 638
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | valve | | | | | |
| | | - Do a check for | | | X | | |
| | | contamination at the slat | | | | | |
| | | anti-ice duct outlets. | | | | | |
| | | Clean them if necessary. | | | | | |
| | | | | | | | |
| | | (c) Disconnect the slat inter- | | X | | | |
| | | connecting ducts and do | | | | | |
| | | a check for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | - Remove the slats for | | | X | | |
| | | component maintenance | | | | | |
| | | (Ref. TASK 27-84-63-000-001)| | | | | |
| | | (Ref. TASK 27-84-63-400-002)| | | | | |
| | | (Ref. TASK 27-84-64-000-001)| | | | | |
| | | (Ref. TASK 27-84-64-400-002)| | | | | |
| | | (Ref. TASK 27-84-65-000-001)| | | | | |
| | | (Ref. TASK 27-84-65-400-002)| | | | | |
| | | (Ref. TASK 27-84-66-000-001)| | | | | |
| | | (Ref. TASK 27-84-66-400-002)| | | | | |
| | | (Ref. TASK 27-84-67-000-001)| | | | | |
| | | (Ref. TASK 27-84-67-400-002)| | | | | |
| | | | | | | | |
| | | (d) Make sure that the telescopic | | X | | | |
| | | duct operates correctly and | | | | | |
| | | do a check for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | - Remove the telescopic | | | X | | |
| | | duct for component | | | | | |
| | | maintenance | | | | | |
| | | (Ref. TASK 30-11-41-000-001)| | | | | |
| | | (Ref. TASK 30-11-41-400-001)| | | | | |
| | | | | | | | |
| B.| | Examine the nacelle anti-ice valves | X | | | | |
| | | for contamination | | | | | |
| | | (Ref. TASK 30-21-51-000-010) | | | | | |
| | | (Ref. TASK 30-21-51-400-010) | | | | | |
| | | or | | | | | |
| | | (Ref. TASK 30-21-51-000-01010) | | | | | |
| | | (Ref. TASK 30-21-51-400-01010) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the ducts. | | X | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 639
May 01/05
R  
JSA 
Subtask 05-51-25-210-085

K. Inspection of the Air Conditioning System


(Ref. TASK 36-11-51-000-040) (Ref. TASK 36-11-51-400-040)
(Ref. TASK 36-11-52-000-040) (Ref. TASK 36-11-52-400-040)
(Ref. TASK 36-11-52-000-041) (Ref. TASK 36-11-52-400-041)
(Ref. TASK 30-21-51-000-040) (Ref. TASK 30-21-51-400-041)
(Ref. TASK 36-12-52-000-001) (Ref. TASK 36-12-52-400-001)
(Ref. TASK 21-51-51-000-001) (Ref. TASK 21-51-51-400-001)
(Ref. TASK 21-63-52-000-001) (Ref. TASK 21-63-52-400-001) (Ref. TASK 21-
21-41-000-001) (Ref. TASK 21-21-41-400-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the air conditioning | | | | | |
| | |system | | | | | |
| | | | | | | | |
| A.| |Examine the high pressure bleed valves | X | | | | |
| | |for contamination | | | | | |
| | |(Ref. TASK 36-11-51-000-040) | | | | | |
| | |(Ref. TASK 36-11-51-400-040) | | | | | |
| | |If you find contamination : | | | | | |
| | |(1) Clean the ducts. | | X | | | |
| | | | | | | | |
| B.| |Examine the bleed valves for | X | | | | |
| | |contamination. | | | | | |
| | |(Ref. TASK 36-11-52-000-040) | | | | | |
| | |(Ref. TASK 36-11-52-400-040) | | | | | |
| | |If you find contamination : | | | | | |
| | |(1) Clean the ducts. | | X | | | |
| | |(2) Replace the filters | | X | | | |
| | | (Ref. TASK 36-11-52-000-041) | | | | | |
| | | (Ref. TASK 36-11-52-400-041) | | | | | |
| | | | | | | | |
| C.| |Examine the cross-bleed valves for | X | | | | |
| | |contamination | | | | | |
| | |(Ref. TASK 36-12-52-000-001) | | | | | |
| | |(Ref. TASK 36-12-52-400-001) | | | | | |
| | |If you find contamination : | | | | | |
| | |(1) Clean the ducts. | | X | | | |
| | |(2) Replace the cross-bleed valve. | | X | | | |
| | | | | | | | |
| D.| |Examine the flow control valves for | X | | | | |
| | |contamination | | | | | |
| | |(Ref. TASK 21-51-51-000-001) | | | | | |



EFF :

ALL  05-51-25

Page 640
May 01/05
R  
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(Ref. TASK 21-51-51-400-001) | | | | | |
| | |If you find contamination : | | | | | |
| | |(1) Clean the ducts. | | X | | | |
| | | | | | | | |
| E.| |Examine the primary heat exchangers, | X | | | | |
| | |main heat exchangers, condensers, | | | | | |
| | |reheaters and water extractors for | | | | | |
| | |contamination | | | | | |
| | |If you find contamination : | | | | | |
| | |(1) Clean the related component (refer | | X | | | |
| | | to the manufacturers instructions | | | | | |
| | | for the cleaning procedure). | | | | | |
| | | | | | | | |
| F.| |Examine the trim air pressure | X | | | | |
| | |regulating valves for contamination | | | | | |
| | |(Ref. TASK 21-63-52-000-001) | | | | | |
| | |(Ref. TASK 21-63-52-400-001) | | | | | |
| | |If you find contamination : | | | | | |
| | |(1) Clean the ducts. | | X | | | |
| | |(2) Replace the filter. | | X | | | |
| | | | | | | | |
| G.| |Examine the recirculation filters for | X | | | | |
| | |contamination | | | | | |
| | |(Ref. TASK 21-21-41-000-001) | | | | | |
| | |(Ref. TASK 21-21-41-400-001) | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Replace the recirculation filters. | | X | | | |
| | | | | | | | |
| H.| |Examine the water extractor drain lines| X | | | | |
| | |for contamination and blockage. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 641
May 01/05
R  
JSA 
Subtask 05-51-25-210-084

L. Inspection of the Hydraulic System


(Ref. TASK 29-10-00-200-004) (Ref. TASK 29-10-00-200-006)
(Ref. TASK 12-32-29-281-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the hydraulic system | | | | | |
| | | | | | | | |
| A.| |Examine the filters for contamination | X | | | | |
| | |(clogging indicators and filter | | | | | |
| | |elements). | | | | | |
| | |(Ref. TASK 29-10-00-200-004) | | | | | |
| | |(Ref. TASK 29-10-00-200-006) | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Replace the filter elements. | | X | | | |
| | |(2) Take a sample of fluid and make | | X | | | |
| | | sure that contamination is in the | | | | | |
| | | permitted limits | | | | | |
| | | (Ref. TASK 12-32-29-281-001) | | | | | |
| | | | | | | | |
| B.| |Examine the RAT for contamination | X | | | | |
| | |and/or damage. | | | | | |
| | | | | | | | |
| C.| |Examine the compensated slides (1010GM | X | | | | |
| | |and 3010GM) for contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean the compensated slides. | | X | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-25

Page 642
May 01/05
R  
JSA 
Subtask 05-51-25-210-086

M. Inspection of the Potable Water System


(Ref. TASK 12-24-38-680-002) (Ref. TASK 12-15-38-613-002).

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the potable water system | | | | | |
| | | | | | | | |
| A.| |Drain the potable water system, flush | X | | | | |
| | |and refill with potable water | | | | | |
| | |(Ref. TASK 12-24-38-680-002) | | | | | |
| | |(Ref. TASK 12-15-38-613-002) | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-25-866-055

A. Retraction of the Flight Control Surfaces

(1) Retract the flaps (Ref. TASK 27-50-00-866-009).

(2) Retract the slats (Ref. TASK 27-80-00-866-005).

(3) Retract the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-25-410-053

B. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close the NLG doors (Ref. TASK 32-22-00-410-001).

(3) Close the MLG doors (Ref. TASK 32-12-00-410-001).

(4) Close all the access doors, and the access panels opened during the
inspection procedure.

(5) Remove the access platform(s).

(6) Remove the warning notice(s).



EFF :

ALL  05-51-25

Page 643
May 01/05
R  
JSA 
Subtask 05-51-25-860-054

C. Put the aircraft back to its initial configuration.

(1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(2) Remove the access platform(s).

(3) Remove the warning notice(s).



EFF :

ALL  05-51-25

Page 644
May 01/05
 
JSA 
INSPECTION AFTER ENGINE FAILURE - INSPECTION/CHECK
__________________________________________________

TASK 05-51-26-200-001

INSPECTION AFTER ENGINE FAILURE

1. __________________
Reason for the Job

You must do this inspection after an engine failure:


R - the engine is not balanced after one or several blades (fan or other
R blades) is/are damaged/missing.
- the engine is seized.
You must remove the engines for these failures.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific access platform 0.62 m (2 ft.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

05-56-00-200-001 Inspection/Check of the Leveling and Measurement


after Abnormal Operation of the Aircraft
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
28-10-00-910-002 Access to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
71-00-20-000-040 Removal of the Power Plant
71-00-20-400-040 Installation of the Power Plant
71-13-00-200-010 Detailed Inspection of the Fan Cowl Doors
78-32-00-200-010 Detailed Check of the Thrust Reverser Blocker Door
Assemblies



EFF :

ALL  05-51-26

Page 601
Nov 01/06
 
JSA 
3. __________
Job Set-up

Subtask 05-51-26-481-050

A. Safety Precautions

(1) Make sure the the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

(2) Put the warning notices in position in the cockpit to tell persons
not to operate the aircraft systems.

Subtask 05-51-26-860-050

B. Aircraft Maintenance Configuration

(1) Make sure that the hydraulics systems are depressurized (Ref. TASK
29-00-00-864-001).

(2) Make sure that the electrical systems are de-energized (Ref. TASK 24-
41-00-862-002).

(3) Put the access platform in position.

Subtask 05-51-26-020-050

C. Removal of the Power Plant

(1) Remove the power plant (Ref. TASK 71-00-20-000-040).



EFF :

ALL  05-51-26

Page 602
Nov 01/04
 
JSA 
4. Procedure
_________

Subtask 05-51-26-210-050

A. Inspection of the Engine Pylon

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Engine Pylon | | | | | |
| | | | | | | | |
| A.| | Examine the pylon panels, the doors | X | | | | |
| | | and the auxiliary structure. Make | | | | | |
| | | sure that there are no buckles, | | | | | |
| | | cracks, or pulled or missing | | | | | |
| | | fasteners. | | | | | |
| | | | | | | | |
| B.| | Examine the main frame. Make sure that| X | | | | |
| | | there are no distortion, cracks, | | | | | |
| | | cracked or flaked paint, loose | | | | | |
| | | rivets, or signs of shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove or open the access doors | | X | | | |
| | | and the inspection panels and | | | | | |
| | | examine the panels and the | | | | | |
| | | adjacent structure. Make sure that| | | | | |
| | | there is no distorsion, wrinkles, | | | | | |
| | | buckles, or tearing of plates at | | | | | |
| | | the rivets. | | | | | |
| | | (2) Examine the pylon main frame. Make| | X | | | |
| | | sure that the parts that follow | | | | | |
| | | are in the correct condition: | | | | | |
| | | - the spars connected to the side | | | | | |
| | | panels, | | | | | |
| | | - the attachments between the | | | | | |
| | | ribs, the side panels and the | | | | | |
| | | upper and lower spars, | | | | | |
| | | - the electrical cables, the | | | | | |
| | | hydraulic pipes and the | | | | | |
| | | components of the engine air | | | | | |
| | | bleed system, | | | | | |
| | | - the different components | | | | | |
| | | mounted on the main frame, | | | | | |
| | | - the fire protection systems | | | | | |
| | | and specially the attachments of| | | | | |
| | | the fire extinguisher bottles. | | | | | |



EFF :

ALL  05-51-26

Page 603
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| C.| | Examine the cowl attachment fittings. | X | | | | |
| | | | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-26-210-052

B. Inspection of the Nacelles (Ref. TASK 71-13-00-200-010) (Ref. TASK 78-32-


00-200-010)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the fan cowl | X | | | | |
| | | (Ref. TASK 71-13-00-200-010). | | | | | |
| | | | | | | | |
|2. | | Examine the thrust reverser cowl | X | | | | |
| | | (Ref. TASK 78-32-00-200-010). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-26-210-053

C. Inspection of the Engine-to-Pylon and Pylon-to-Wing Attach Fittings


(Ref. TASK 28-25-00-650-001) (Ref. TASK 05-56-00-200-001) (Ref. TASK 28-
10-00-910-002)

NOTE : Only do this inspection if you find damage during the Phase 1
____
inspection of the pylon and the nacelle.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Engine-to-Pylon Attach Fittings | | | | | |
| | | | | | | | |
| A.| | Do a detailed inspection of the attach| | X | | | |
| | | fittings below the main ribs. | | | | | |
| | | (1) Make sure that there is no: | | | | | |
| | | - distortion, damage to the | | | | | |
| | | structure (cracks, rupture etc.) | | | | | |
| | | or signs of oxidation or burns. | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-26

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|2. | | Pylon-to-Wing Attach Fittings | | | | | |
| | | | | | | | |
| A.| | Remove the fillets. | | X | | | |
| | | | | | | | |
| B.| | Detailed inspection of the front | | X | | | |
| | | and rear pylon-to-wing attach | | | | | |
| | | fittings of the adjacent structure. | | | | | |
| | | | | | | | |
| C.| | If you find damage during Phase 2: | | | | | |
| | | (1) Examine the area adjacent to the | | | | | |
| | | pylon forward and aft | | | | | |
| | | attachment for: | | | | | |
| | | - cracks, | | | | | |
| | | - the correct condition of all | | | | | |
| | | fasteners and safety devices. | | | | | |
| | | (2) Examine the area adjacent to the | | | X | | |
| | | thrust-spigot attachment fitting | | | | | |
| | | for: | | | | | |
| | | - cracks, | | | | | |
| | | - damaged sealant, | | | | | |
| | | - the correct condition of all | | | | | |
| | | fasteners and safety devices. | | | | | |
| | | (3) Examine the wing bottom skin | | | X | | |
| | | adjacent to the pylon forward and | | | | | |
| | | aft attachments and the thrust | | | | | |
| | | spigot for: | | | | | |
| | | - cracks, | | | | | |
| | | - the correct condition of all | | | | | |
| | | fasteners and safety devices, | | | | | |
| | | - fluid leaks. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | X | | |
| | | (1) Defuel the wing | | | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the internal | | | | | |
| | | structure adjacent to rib 7 and | | | | | |
| | | rib 8 | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | Do a full inspection for: | | | | | |
| | | - cracks, damage, damage paint and | | | | | |
| | | sealant and the correct condition| | | | | |
| | | of all fasteners and safety | | | | | |
| | | devices | | | | | |



EFF :

ALL  05-51-26

Page 605
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | in the following areas: | | | | | |
| | | - the rear face of the front spar, | | | | | |
| | | inboard of rib 7 and outboard of | | | | | |
| | | rib 8, | | | | | |
| | | - the front face of the rear spar | | | | | |
| | | inboard of rib 7 and outboard of | | | | | |
| | | rib 8, | | | | | |
| | | - the pylon rear attachment, | | | | | |
| | | - rib 7 and rib 8, | | | | | |
| | | - the stringers and the brackets. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | X | | |
| | | - do an alignment check | | | | | |
| | | (Ref. TASK 05-56-00-200-001). | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-26-420-050

A. Installation of the Power Plant

(1) Install the power plant (Ref. TASK 71-00-20-400-040).

Subtask 05-51-26-942-050

B. Put the aircraft back to the serviceable condition.

(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.

(2) Remove the warning notice(s).

(3) Remove the access platform(s).



EFF :

ALL  05-51-26

Page 606
Nov 01/04
 
JSA 
R INSPECTION AFTER IMPACT ON ENGINE COWLS - INSPECTION/CHECK
__________________________________________________________

TASK 05-51-27-200-001

R Inspection after Impact on Engine Cowls

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific adjustable access platform


No specific warning notices

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

71-00-20-000-040 Removal of the Power Plant


71-00-20-400-040 Installation of the Power Plant
71-13-00-010-010 Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
71-13-00-410-010 Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
78-32-00-010-010 Opening of the Thrust Reverser Halves
78-32-00-410-010 Closing of the Thrust Reverser Halves

3. __________
Job Set-up

Subtask 05-51-27-941-050

A. Safety Precautions

(1) Put the warning notices in the cockpit to tell persons not to operate
the systems related to the engines.



EFF :

ALL  05-51-27

Page 601
May 01/05
 
JSA 
Subtask 05-51-27-010-050

B. Get Access

(1) Open the fan cowl doors (Ref. TASK 71-13-00-010-010).

(2) Open the thrust reverser doors (Ref. TASK 78-32-00-010-010).

(3) Put an adjustable access platform near the damaged area.

4. Procedure
_________

Subtask 05-51-27-210-050

A. Inspection of the Engine

NOTE : All the necessary inspections are visual unless the text gives
____
other instructions. Operators can refer to the Non-destructive
Testing Manual (NTM) and use non-destructive procedures.

R (Ref. TASK 71-00-20-000-040) (Ref. TASK 71-00-20-400-040)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the cowls after a side | | | | | |
| | | impact and damage only to the cowls. | | | | | |
| | | | | | | | |
| A.| | Externally examine the fitting related| X | | | | |
| | | to the cowl with the adjacent area of | | | | | |
| | | the pylon: | | | | | |
| | | (1) Pylon lateral panels when damage | | | | | |
| | | is on the thrust reverser or core | | | | | |
| | | cowl. | | | | | |
| | | (2) Cantilever structure when damage | | | | | |
| | | is on the inlet cowl, fan cowl or | | | | | |
| | | thrust reverser. | | | | | |
| | | | | | | | |
|2. | | Inspection after a side impact and | | | | | |
| | | subsequent damage to the engine or the| | | | | |
| | | equipment/accessories attached to it. | | | | | |
| | | | | | | | |
| A.| | Examine the pylon panels, doors and | X | | | | |
R | | | auxiliary structure for distortion, | | | | | |
R | | | wrinkles, buckles, tearing of plates | | | | | |
R | | | at the rivets and stringers attached | | | | | |



EFF :

ALL  05-51-27

Page 602
May 01/05
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | | | to the panels. | | | | | |
| | | | | | | | |
| B.| | Examine the pylon main frame for | X | | | | |
R | | | distortion, cracks, cracked or flaking| | | | | |
R | | | paint, loose rivets and signs of | | | | | |
| | | shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the panels and adjacent | | X | | | |
| | | structure for distortion, | | | | | |
R | | | wrinkles, buckles, tearing of | | | | | |
| | | plates at the rivets and stringers| | | | | |
| | | attached to the panels. | | | | | |
| | | (2) Examine the pylon main frame for | | X | | | |
| | | distortion and condition of spars | | | | | |
| | | and ribs connected to the lateral | | | | | |
| | | panels. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-20-000-040). | | | | | |
R | | | (b) Examine the FWD and Aft engine | | | X | | |
| | | pylon attachments for distortion | | | | | |
| | | or cracks. | | | | | |
| | | (c) Remove the pylon-to-wing center | | | X | | |
| | | fillets. | | | | | |
| | | (d) Examine the pylon-to-wing attach | | | X | | |
| | | fittings for distortion or cracks.| | | | | |
| | | (e) Install the engine | | | X | | |
| | | (Ref. TASK 71-00-20-400-040). | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-27-410-050

A. Close Access

(1) Close the thrust reverser doors (Ref. TASK 78-32-00-410-010).

(2) Close the fan cowl doors (Ref. TASK 71-13-00-410-010).



EFF :

ALL  05-51-27

Page 603
May 01/05
 
JSA 
Subtask 05-51-27-942-050

B. Put the aircraft back to its initial configuration.

(1) Remove the warning notice(s).

(2) Remove the access platform(s).



EFF :

ALL  05-51-27

Page 604
Nov 01/04
 
JSA 
PROCEDURE AFTER FLUID SPILLAGE - INSPECTION/CHECK
_________________________________________________

TASK 05-51-28-200-002

Procedure after Fluid Spillage

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

51-78-00-200-001 Inspection after Mercury Spillage


51-78-00-615-001 Aircraft Cleaning after a Sewage Leakage
51-78-00-615-002 Aircraft Cleaning after a Hydraulic Fluid Leakage
51-78-00-615-003 Aircraft Cleaning after Leakage from a Fish Shipment
51-78-00-615-004 Aircraft Cleaning after an Acid or Alkali Leakage

3. __________
Job Set-up

Subtask 05-51-28-869-051

A. Not Applicable

4. Procedure
_________

Subtask 05-51-28-210-051

A. Refer to the applicable procedure(s) :


- For aircraft cleaning after a sewage leakage (Ref. TASK 51-78-00-615-
001)
- For aircraft cleaning after a hydraulic fluid leakage (Ref. TASK 51-78-
00-615-002)
- For aicraft cleaning after leakage from a fish shipment (Ref. TASK 51-
78-00-615-003)
- For aircraft cleaning after an acid or alkali leakage (Ref. TASK 51-78-
00-615-004)
- For Inspection after mercury spillage (Ref. TASK 51-78-00-200-001)



EFF :

ALL  05-51-28

Page 601
Nov 01/04
 
JSA 
INSPECTION AFTER ABNORMAL PAX/CREW DOOR MOVEMENT - INSPECTION/CHECK
___________________________________________________________________

TASK 05-51-29-200-001

Inspection after Abnormal Movement of the Pax/Crew Door

1. __________________
Reason for the Job

You must do this inspection in case of abnormal pax/crew door movement like
when it is lifted or pushed down by a loader or a jetway.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 3.50 m (11 ft. 6 in.)


98D52103501000 1 BALLAST WEIGHT - PASSENGER CREW DOOR

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-45-000-002 Removal of the Door Frame Linings at the Right FWD


Passenger/Crew Door
25-23-45-000-003 Removal of the Door Frame Linings at the Left AFT
Passenger/Crew Door
25-23-45-000-004 Removal of the Door Frame Linings at the Right AFT
Passenger/Crew Door
25-23-45-000-005 Removal of the Door Frame Linings at the Left FWD
Passenger/Crew Door
25-23-45-400-005 Installation of the Door Frame Linings at the Right
AFT Passenger/Crew Door
25-23-45-400-006 Installation of the Door Frame Linings at the Left
FWD Passenger/Crew Door
25-23-45-400-007 Installation of the Door Frame Linings at the Right
FWD Passenger/Crew Door
25-23-45-400-008 Installation of the Door Frame Linings at the Left
AFT Passenger/Crew Door
25-23-46-000-001 Removal of the Door Linings at the FWD Passenger/Crew
Doors



EFF :

ALL  05-51-29

Page 601
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

25-23-46-000-002 Removal of the Door Linings at the AFT Passenger/Crew


Doors
25-23-46-400-001 Installation of the Door Linings at the FWD
Passenger/Crew Doors
25-23-46-400-002 Installation of the Door Linings at the AFT
Passenger/Crew Doors
25-62-44-000-002 Removal of the Escape-Slide Pack-Assembly
R 25-62-44-000-012 Removal of the Escape-Slide Raft Pack-Assembly
R 25-62-44-400-006 Installation of the Escape-Slide Pack-Assembly
R 25-62-44-400-007 Installation of the Escape-Slide Raft Pack-Assembly
52-10-00-010-001 Opening of the Passenger/Crew Door
52-10-00-080-001 Removal of the Passenger/Crew Door Ballast Weight
(98D52103501000) for Escape Slide/Raft
52-10-00-410-001 Closing of the Passenger/Crew Door
52-10-00-480-001 Installation of the Passenger/Crew Door Ballast
Weight (98D52103501000) for Escape Slide/Raft
52-10-00-860-001 Special Precautions before Work on the Passenger/Crew
Door
52-10-00-860-002 Special Precautions after Work on the Passenger/Crew
Door
52-11-00-820-001 Adjustment of the FWD Passenger/Crew Door
52-11-11-000-001 Removal of the FWD Passenger/Crew Door
52-11-11-400-001 Installation of the FWD Passenger/Crew Door
52-11-12-000-001 Removal of the Door Support Arm, the Door Buffer, the
Door Unlocking Handle and the Door Stay Mechanism
52-11-12-000-003 Removal of the Guide Arms
52-11-12-400-001 Installation of the Door Support Arm, the Door
Buffer, the Door Unlocking Handle and the Door Stay
Mechanism
52-11-12-400-003 Installation of the Guide Arms
52-11-31-000-002 Removal of the Stop Fittings, Buffer, Guide Fittings,
Rollers, Door Stop Fittings, Roller Fittings and
Guide Arm Fittings
52-11-31-400-002 Installation of the Stop Fittings, the Buffer, the
Guide Fittings, the Rollers, the Door Stop Fittings,
the Roller Fittings and the Guide Arm Fittings
52-13-00-820-001 Adjustment of the AFT Passenger/Crew Door
52-13-11-000-001 Removal of the Aft Passenger/Crew Door
52-13-11-000-002 Removal of the Acoustic Insulation of the Aft
Passenger/Crew Door
52-13-11-400-001 Installation of the Aft Passenger/Crew Door
52-13-11-400-002 Installation of the Acoustic Insulation of the Aft
Passenger/Crew Door



EFF :

ALL  05-51-29

Page 602
Nov 01/06
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

52-13-12-000-001 Removal of the Support Arm, Door Buffer, Door


Pushbutton Switch and Door Stay Mechanism
52-13-12-400-001 Installation of the Support Arm, Door Buffer, Door
Pushbutton Switch and Door Stay Mechanism
52-13-31-000-002 Removal of the Stop Fittings, the Buffer, the Guide
Fittings, the Rollers, the Door Stop Fittings, the
Roller Fittings and Guide Arm Fittings
52-13-31-400-002 Installation of the Stop Fittings, the Buffer, the
Guide Fittings, the Rollers, the Door Stop Fittings,
the Roller Fittings and the Guide Arm Fittings
05-51-29-991-001 Fig. 601

3. __________
Job Set-up

Subtask 05-51-29-010-051

A. Get Access

(1) Put the access platform in position at the related passenger/crew


door.

(2) Open the related passenger/crew door (Ref. TASK 52-10-00-010-001).

Subtask 05-51-29-481-051

B. Safety Precautions

(1) Obey the special precautions before you start work on the door
(Ref. TASK 52-10-00-860-001).

Subtask 05-51-29-020-050

C. Removal of the Components

(1) Remove the door frame lining panels of the related door.

(a) For the left FWD passenger/crew door (Ref. TASK 25-23-45-000-
005).

(b) For the right FWD passenger/crew door (Ref. TASK 25-23-45-000-
002).

(c) For the left aft passenger/crew door (Ref. TASK 25-23-45-000-
003).

(d) For the right aft passenger/crew door (Ref. TASK 25-23-45-000-
004).



EFF :

ALL  05-51-29

Page 603
Nov 01/06
R  
JSA 
(2) Remove the door lining panels of the related door.

(a) For the FWD passenger/crew doors (Ref. TASK 25-23-46-000-001).

(b) For the aft passenger/crew doors (Ref. TASK 25-23-46-000-002).

R (3) Remove the escape slide (Ref. TASK 25-62-44-000-002) or escape


R slide/raft (Ref. TASK 25-62-44-000-012) container of the related
R passenger/crew door.

Subtask 05-51-29-420-050

D. Installation of the Ballast on the Related Door

(1) Install BALLAST WEIGHT - PASSENGER CREW DOOR (98D52103501000)


(Ref. TASK 52-10-00-480-001).

4. Procedure
_________

Subtask 05-51-29-210-050

A. Inspection of the related door (Ref. TASK 52-11-00-820-001) (Ref. TASK


52-13-00-820-001) (Ref. TASK 52-11-11-000-001) (Ref. TASK 52-11-11-400-
001) (Ref. TASK 52-13-11-000-001) (Ref. TASK 52-13-11-400-001) (Ref. TASK
52-11-12-000-001) (Ref. TASK 52-11-12-400-001) (Ref. TASK 52-13-12-000-
001). (Ref. TASK 52-13-12-400-001) (Ref. TASK 52-11-12-000-003)
(Ref. TASK 52-11-12-400-003) (Ref. TASK 52-13-11-000-002) (Ref. TASK 52-
13-11-400-002) (Ref. TASK 52-11-31-000-002) (Ref. TASK 52-11-31-400-002)
(Ref. TASK 52-13-31-000-002) (Ref. TASK 52-13-31-400-002).
(Ref. Fig. 601/TASK 05-51-29-991-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Visual Inspection of the Door | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the door: | X | | | | |
| | | - skin in upper and lower areas for | | | | | |
| | | distortion, cracks or tearing, | | | | | |
| | | - door seal retainer, | | | | | |
| | | - girt bar. | | | | | |
| | | | | | | | |
| B.| | Check of the opening and closing of | X | | | | |
| | | the door. | | | | | |



EFF :

ALL  05-51-29

Page 604
Nov 01/06
 
JSA 
Passenger/Crew Doors
Figure 601/TASK 05-51-29-991-001



EFF :

ALL  05-51-29

Page 605
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (1) Make sure that there are no | | | | | |
| | | unusual noises or hard points. | | | | | |
| | | (2) Make sure that the guide arms | | | | | |
| | | move freely. | | | | | |
| | | | | | | | |
| C.| | Check of the peripheral clearance and | X | | | | |
| | | out-of-flushness between the door edge| | | | | |
| | | and the frame panel: | | | | | |
| | | (1) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-00-820-001) | | | | | |
| | | (2) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-00-820-001). | | | | | |
| | | | | | | | |
| D.| | Check of the escape-slide release | X | | | | |
| | | mechanism for absence of unsual noises| | | | | |
| | | or hard points and for free movement | | | | | |
| | | of the handle. | | | | | |
| | | | | | | | |
|2. | | Detailed Inspection Without Removal | | | | | |
| | | | | | | | |
| A.| | Examine the support arm. | | X | | | |
| | | (1) Make sure that there are no | | | | | |
| | | cracks, distortion or damaged | | | | | |
| | | paint. | | | | | |
| | | (2) Examine the fittings that attach | | | | | |
| | | the support arm to the door frame.| | | | | |
| | | Make sure that there is no | | | | | |
| | | distortion, damaged fasteners or | | | | | |
| | | bearing migration. | | | | | |
| | | (3) Examine the condition of the | | | | | |
| | | connection links on the door side,| | | | | |
| | | for distortion or damaged paint. | | | | | |
| | | | | | | | |
| B.| | Examine the guide arms. | | X | | | |
| | | (1) Make sure that there is no wrink- | | | | | |
| | | ling on the upper and lower guide | | | | | |
| | | arms. | | | | | |
| | | (2) Examine the fitting that attaches | | | | | |
| | | the guide arm on the frame side | | | | | |
| | | for distortion or damaged | | | | | |
| | | fasteners. | | | | | |
| | | (3) On the door side, examine the | | | | | |
| | | guide-arm attach fitting for | | | | | |



EFF :

ALL  05-51-29

Page 606
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | tearing. | | | | | |
| | | | | | | | |
|3. | | Detailed Inspection with Removal | | | | | |
| | | | | | | | |
| A.| | Remove the door. | | | X | | |
| | | (1) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-11-000-001). | | | | | |
| | | (2) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-000-001). | | | | | |
| | | | | | | | |
| B.| | Door Inspection. | | | X | | |
| | | Do a visual inspection of the door | | | | | |
| | | inner structure (especially at the | | | | | |
| | | frame and beam which attach the | | | | | |
| | | support arm, the support arm and the | | | | | |
| | | guide arm fittings. | | | | | |
| | | Do a visual inspection of the | | | | | |
| | | mechanism. | | | | | |
| | | | | | | | |
| C.| | Inspection of the door suspension | | | X | | |
| | | comportment. | | | | | |
| | | (1) Remove the door suspension | | | | | |
| | | compartment. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-000-001). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-12-000-001). | | | | | |
| | | (2) Examine the support arm for | | | | | |
| | | distortion, cracks, damaged paint.| | | | | |
| | | | | | | | |
| D.| | Guide Arms Inspection. | | | | | |
| | | (1) Remove the guide arms | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-000-003). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-000-002). | | | | | |
| | | (2) Examine the guide arms for | | | X | | |
| | | buckling. | | | | | |
| | | (3) Remove the guide arm attachment | | | | | |
| | | fitting on the frame side | | | | | |
| | | (a) for the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-31-000-002). | | | | | |
| | | (b) for the aft passenger/crew door | | | | | |



EFF :

ALL  05-51-29

Page 607
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 52-13-31-000-002). | | | | | |
| | | (4) Examine the frame area under the | | | X | | |
| | | fitting for cracks or distortion, | | | | | |
| | | and elongated holes in the beam | | | | | |
| | | web. | | | | | |
| | | | | | | | |
| E.| | Install/Replace the Components. | | | | | |
| | | (1) Install the guide arm attachment | | | | | |
| | | fitting on the frame side. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-31-400-002). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | - (Ref. TASK 52-13-31-400-002). | | | | | |
| | | (2) Install the guide arms. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-400-003). | | | | | |
| | | (b) for the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-400-002). | | | | | |
| | | (3) Install the suspension-door. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-400-001). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-12-400-001). | | | | | |
| | | (4) Install the door. | | | | | |
| | | (1) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-11-400-001). | | | | | |
| | | (2) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-400-001). | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-29-020-053

A. Removal of the Ballast Weight

(1) Remove BALLAST WEIGHT - PASSENGER CREW DOOR (98D52103501000)


(Ref. TASK 52-10-00-080-001).



EFF :

ALL  05-51-29

Page 608
Nov 01/04
 
JSA 
Subtask 05-51-29-420-051

B. Installation of the Components

R (1) Install the escape slide (Ref. TASK 25-62-44-400-006) or escape


R slide/raft (Ref. TASK 25-62-44-400-007) container of the related
R door.

(2) Install the door lining panels of the related door.

(a) For the FWD passenger/crew doors (Ref. TASK 25-23-46-400-001).

(b) For the aft passenger/crew doors (Ref. TASK 25-23-46-400-002).

(3) Install the door frame lining panels of the related door.

(a) For the left FWD passenger/crew door (Ref. TASK 25-23-45-400-
006).

(b) For the right FWD passenger/crew door (Ref. TASK 25-23-45-400-
007).

(c) For the left aft passenger/crew door (Ref. TASK 25-23-45-400-
008).

(d) For the right aft passenger/crew door (Ref. TASK 25-23-45-400-
005).

Subtask 05-51-29-410-050

C. Close Access

(1) Obey the special precautions after the work on the door (Ref. TASK
52-10-00-860-002).

(2) Close the related passenger/crew door (Ref. TASK 52-10-00-410-001).

Subtask 05-51-29-942-050

D. Put the aircraft back to its initial configuration

(1) Remove all the tools and equipment from the work area.

(2) Remove the access platform(s).



EFF :

ALL  05-51-29

Page 609
Nov 01/06
 
JSA 
INSPECTION AFTER SIGNIFICANT MLG VIBRATION AT TOUCH-DOWN - INSPECTION/CHECK
___________________________________________________________________________

TASK 05-51-31-200-001

Inspection after Significant MLG Vibration at Touch-Down

1. __________________
Reason for the Job

This inspection is recommended to make sure that the bottom cardan joint and
the torque link installation are in a serviceable condition if significant
MLG vibration occurs at touchdown.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific feeler gauge


No specific safety barriers
No specific warning notice
No specific access platform 1.5 m (4 ft. 11 in.)
460005834 1 TUBE SPANNER

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

Material No. 09-004 D DA-2-657-4


SEALANT, AERODYNAMIC SMOOTHING-OBSOLETE USE 09016
(Ref. 20-31-00)
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819
LINT-FREE COTTON CLOTH (Ref. 20-31-00)



EFF :

ALL  05-51-31

Page 601
Nov 01/04
 
JSA 
C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

07-11-00-581-001 Lifting for Aircraft Maintenance Operations


07-11-00-586-002 Lowering of the Aircraft for Maintenance Operations
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-11-16-000-001 Removal of the MLG Side-Stay Assembly 2505GM, 2506GM
32-11-16-400-001 Installation of the MLG Side-Stay Assembly 2505GM,
2506GM
32-11-27-200-001 Check Torque Links for Excessive Play
32-11-27-210-001 Detailed Inspection of the Torque-Link
Damper-Assemblies
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-31-00-720-002 Functional Test of the Normal Extension and
Retraction of the Landing Gear
32-33-00-720-001 Functional Check of Free-Fall Extension
05-51-31-991-001 Fig. 601
05-51-31-991-002 Fig. 602

3. __________
Job Set-up

Subtask 05-51-31-860-050

A. Aircraft Maintenance Configuration

(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).



EFF :

ALL  05-51-31

Page 602
Nov 01/04
 
JSA 
Subtask 05-51-31-481-050

B. Safety Precautions

(1) Put the safety barriers in position.

(2) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

(3) Put a warning notice in the cockpit to tell persons not to operate
the aircraft systems.

Subtask 05-51-31-581-050

C. Jacking of the Aircraft

(1) Jack-up the aircraft (Ref. TASK 07-11-00-581-001).

Subtask 05-51-31-010-050

D. Get Access

(1) Open and safety the main gear doors (Ref. TASK 32-12-00-010-001).

(2) Put an access platform in position near the damaged landing gear.

Subtask 05-51-31-110-050

E. Cleaning

(1) Remove the sealant from the Stalock nut on the MLG side stay bottom
cardan joints with MISCELLANEOUS (Material No. 19-003) soaked in
CLEANING AGENTS (Material No. 11-004).

4. Procedure
_________

Subtask 05-51-31-220-050

A. Inspection of the MLG Side Stay


(Ref. Fig. 601/TASK 05-51-31-991-001, 602/TASK 05-51-31-991-002)
(Ref. TASK 32-11-16-000-001) (Ref. TASK 32-11-16-400-001).

NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-Destructive Testing Manual and use
non-destructive procedures.



EFF :

ALL  05-51-31

Page 603
Nov 01/04
 
JSA 
Bottom Cardan Joint - Clearances
Figure 601/TASK 05-51-31-991-001



EFF :

ALL  05-51-31

Page 604
Nov 01/04
 
JSA 
Botton Cardan Joint- Clearences
Figure 602/TASK 05-51-31-991-002



EFF :

ALL  05-51-31

Page 605
Nov 01/04
 
JSA 
NOTE : Use a feeler gauge to measure the gaps. Use a TUBE SPANNER
____
(460005834) to torque the nut.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the MLG Side Stay Bottom| | | | | |
| | | Cardan Joint | | | | | |
| | | (Ref. TASK 05-51-31-991-001). | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the flanges | X | | | | |
| | | of the bottom cardan joint bushes as | | | | | |
| | | far as possible for cracks, | | | | | A |
| | | distorsion. Do not remove the cardan | | | | | |
| | | joint pins. | | | | | |
| | | Pay particular attention to the lower | | | | | |
| | | flange of the lower cardan joint | | | | | |
| | | bushes at the outboard position | | | | | |
| | | nearest the leg. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Gaps of the MLG Side| | | | | |
| | | Stay | | | | | |
| | | (Ref. TASK 05-51-31-991-001) | | | | | |
| | | | | | | | |
| A.| | Compress the MLG side stay. To do this| X | | | | |
| | | manually push the gear inboard as far | | | | | |
| | | as possible to make a correct measure-| | | | | |
| | | ment of the total gap. | | | | | |
| | | | | | | | |
| B.| | Use feeler gauges to measure the | X | | | | |
| | | maximum gaps C and D at the side stay | | | | | |
| | | cardan joint installations. Make a | | | | | A |
| | | record of the values. The total | | | | | |
| | | clearance must be between 0.043 mm | | | | | |
| | | (0.001 in.) and 0.50 mm (0.0196 in.) | | | | | |
| | | NOTE: The gaps may vary around the | | | | | |
| | | pin/bush circumference. This is | | | | | |
| | | acceptable provided the sum of | | | | | |
| | | the maximum gaps is not more | | | | | |
| | | than 0.5 mm (0.0196 in.). | | | | | |
| | | If the clearance is outside the | | | | | |
| | | limits: | | | | | |
| | | (1) Measure the load on the bottom | | X | | | |
| | | Stalock nut as follows: | | | | | B |
| | | (a) Remove the circlips as follows: | | | | | |
| | | - use an applicable tool to | | | | | |



EFF :

ALL  05-51-31

Page 606
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | release the tail of the circlip | | | | | |
| | | from the key slot of the locking| | | | | |
| | | washer, | | | | | |
| | | - hold the tail of the circlip, | | | | | |
| | | - carefully pull the circlip | | | | | |
| | | (clockwise) until it is | | | | | |
| | | released from the chamfered slot| | | | | |
| | | in the nut. | | | | | |
| | | (b) Remove the locking washer from the| | | | | |
| | | nut. | | | | | |
| | | (c) Mark the position of the nut with | | | | | |
| | | a pencil line. | | | | | |
| | | (d) Loosen the nut and install the | | | | | |
| | | nut at the initial position and | | | | | |
| | | tighten with the TUBE SPANNER | | | | | |
| | | (460008834). | | | | | |
| | | (e) Make sure that the torque value is| | | | | |
| | | 18 m.daN (132.74 lbf. ft). | | | | | |
| | | (2) Remove the bottom cardan joint | | X | | | |
| | | and check of the following | | | | | A |
| | | dimensions: | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (Ref. TASK 05-51-31-991-002) | | | | | |
| | | - dimension A between 137.917 mm | | | | | C |
| | | (5.429 in.) and 137.957 mm | | | | | |
| | | (5.431 in.), | | | | | |
| | | - dimension B between 138 mm | | | | | B |
| | | (5.433 in.) and 138.06 mm | | | | | |
| | | (5.435 in.). | | | | | |
| | | (3) Install the bottom cardan joint | | X | | | |
| | | (Ref. TASK 32-11-16-400-001). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-31-210-051

B. Inspection of the MLG Torque Links (Ref. TASK 32-11-27-200-001)

NOTE : All the necessary inspections are visual unless specified


____
differently in the text.
Operators can refer to the Non-destructive Testing Manual and use
non-destructive procedures.



EFF :

ALL  05-51-31

Page 607
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the MLG Torque Links | | | | | |
| | | | | | | | |
| A.| | Visual Inspection of the MLG torque | X | | | | |
| | | links for cracks, distortion. | | | | | |
| | | Do a Magnetic Particle NDT check for | | | | | |
| | | cracks at the apex lug of the MLG | | | | | |
| | | torque links. | | | | | |
| | | Do a check of the torque link gaps | | | | | |
| | | (Ref. TASK 32-11-27-200-001). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-31-210-052

C. Inspection of the MLG Torque Link Damper (Ref. TASK 32-11-27-210-001)

NOTE : All the necessary inspections are visual unless specified


____
differently in the test.
Operators can refer to the Non-destructive Testing Manual and use
non-destructive test procedures.

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the MLG Torque Link | | | | | |
| | | Damper | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the torque | X | | | | |
| | | link damper | | | | | |
| | | (Ref. TASK 32-11-27-200-001). | | | | | |
-------------------------------------------------------------------------------

Subtask 05-51-31-410-050

D. Close Access

(1) Close the main landing gear doors (Ref. TASK 32-12-00-410-001).

(2) Remove the access platform(s).



EFF :

ALL  05-51-31

Page 608
Nov 01/04
 
JSA 
Subtask 05-51-31-720-050

E. Do the following tests.

(1) Do a functional test of the extension and retraction of the main


landing gear (Ref. TASK 32-31-00-720-002).

(2) Do a functional test of the free-fall extension system (Ref. TASK 32-
33-00-720-001).

5. Close-up
________

Subtask 05-51-31-586-050

A. Lowering of the Aircraft

(1) Lower the aircraft onto its wheels (Ref. TASK 07-11-00-586-002).

Subtask 05-51-31-914-051

B. Protection

(1) Apply SEALANTS (Material No. 09-004) on the end of the cardan joint.

Subtask 05-51-31-942-050

C. Put the aircraft back to its initial configuration.

(1) Remove the warning notice(s).

(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.

(3) Make sure that the work area is clean and clear of tool(s) and other
items.



EFF :

ALL  05-51-31

Page 609
Nov 01/04
 
JSA 
______________________________________________________________________
INSPECTION AFTER ENGINE WINDMILLING (AFTER ENGINE IN-FLIGHT SHUT-DOWN)
________________
INSPECTION/CHECK

TASK 05-51-34-200-001

Inspection after Engine Windmilling (After Engine In-Flight Shut-Down)

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

72-00-00-200-021 Inspection after Engine Windmilling

3. __________
Job Set-up

Subtask 05-51-34-860-050

A. Not Applicable

4. Procedure
_________

Subtask 05-51-34-210-050

A. Do the inspection after engine windmilling (Ref. TASK 72-00-00-200-021)



EFF :

ALL  05-51-34

Page 601
Nov 01/04
 
JSA 
INSPECTION AFTER OVERWEIGHT TAXIING - INSPECTION/CHECK
______________________________________________________

TASK 05-51-41-200-001

Inspection after Overweight Taxiing

1. __________________
Reason for the Job

Overweight taxiing is defined as taxiing at a weight that is more than the


Maximum design Taxi Weight (MTW).

NOTE : Before flight, you must decrease aircraft weight to that specified in
____
the Aircraft Flight Manual for takeoff.
You must do this inspection if you taxi the aircraft at an overweight
of more than 2% of the Maximum design Taxi Weight (MTW).
You must do this inspection if you taxi an overweight aircraft
(regardless of percentage over MTW) and have one of these conditions
(or more):
- high speed ground turn
- sharp radius turn
- heavy braking
- taxi over rough pavement
- pivot (sharp radius turn with brake on)
- deflated tire.

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-00-00-481-001 Installation of the Safety Devices on the Landing


Gears
32-11-00-200-006 Inspection of the MLG Axles after the Aircraft has
gone off the Runway
32-11-13-000-003 Removal of the MLG Shock-Absorber Gland-Seals
32-11-13-400-003 Installation of the MLG Shock-Absorber Gland-Seals
32-11-16-000-001 Removal of the MLG Side-Stay Assembly 2505GM, 2506GM
32-11-16-400-001 Installation of the MLG Side-Stay Assembly 2505GM,
2506GM
32-11-17-000-001 Removal of the MLG Lock Stay
32-11-17-400-001 Installation of the MLG Lock Stay
32-11-21-000-001 Removal of the MLG Lockstay Actuating Cylinder
32-11-21-400-001 Installation of the MLG Lockstay Actuating Cylinder
32-12-00-010-001 Open the Main Gear Doors for Access



EFF :

ALL  05-51-41

Page 601
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

32-12-00-410-001 Close the Main Gear Doors after Access


32-21-13-000-001 Removal of the NLG Shock Absorber Assy
32-21-13-400-001 Installation of the NLG Shock Absorber Assy
32-21-16-000-002 Removal of the NLG Drag Strut Assy (2528GM)
32-21-16-400-002 Installation of the NLG Drag Strut Assy (2528GM)
32-21-17-000-001 Removal of the NLG Lockstay Assy
32-21-17-400-001 Installation of the NLG Lockstay Assy
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
32-31-22-000-001 Removal of the NLG Actuating Cylinder (2527GM)
32-31-22-400-001 Installation of the NLG Actuating Cylinder (2527GM)
32-41-12-000-001 Removal of the NLG Wheel (2659GM,2660GM)
32-41-12-000-002 Removal of the Axle Sleeve
32-41-12-400-001 Installation of the NLG Wheel (2659GM,2660GM)
32-41-12-400-002 Installation of the Axle Sleeve

3. __________
Job Set-up

Subtask 05-51-41-481-050

A. Safety Precautions

(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-41-010-050

B. Get Access

(1) Open and safety the main gears doors (Ref. TASK 32-12-00-010-001).

(2) Open and safety the nose gear doors (Ref. TASK 32-22-00-010-001).

4. Procedure
_________

Subtask 05-51-41-210-050

A. Inspection (Ref. TASK 32-41-12-000-001) (Ref. TASK 32-41-12-400-001)


(Ref. TASK 32-41-12-000-002) (Ref. TASK 32-41-12-400-002) (Ref. TASK 32-
21-13-000-001) (Ref. TASK 32-21-13-400-001) (Ref. TASK 32-21-16-000-002)
(Ref. TASK 32-21-16-400-002) (Ref. TASK 32-21-17-000-001)
(Ref. TASK 32-21-17-400-001) (Ref. TASK 32-31-22-000-001) (Ref. TASK 32-
31-22-400-001) (Ref. TASK 32-11-00-200-006) (Ref. TASK 32-11-13-000-003)



EFF :

ALL  05-51-41

Page 602
Nov 01/04
 
JSA 
(Ref. TASK 32-11-13-400-003) (Ref. TASK 32-11-16-000-001) (Ref. TASK 32-
11-16-400-001) (Ref. TASK 32-11-17-000-001)
(Ref. TASK 32-11-17-400-001) (Ref. TASK 32-11-21-000-001) (Ref. TASK 32-
11-21-400-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A. | | Inspection of the NLG | | | | | |
| | | | | | | | |
| | | (1)Do a visual inspection of the | X | | | | |
| | | wheels for distorsion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | | (b)Remove the axle sleeve | | X | | | |
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | | (c)Do a visual inspection of the | | X | | | |
| | | axle and the axle sleeve for | | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (2)Examine: | X | | | | |
| | | - the nose landing gear and all | | | | | |
| | | the components installed on it | | | | | |
| | | for cracks, scores, tears, | | | | | |
| | | rupture, leakage and damaged | | | | | |
| | | paintwork. | | | | | |
| | | - the attachment fittings of the | | | | | |
| | | nose landing gear. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (b)In the avionics compartment, | | X | | | |
| | | examine: | | | | | |
| | | - the gear well roof, | | | | | |
| | | - the roof-to-sidewall joint, | | | | | |
| | | - the floor support-strut | | | | | |
| | | attach-fittings for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |



EFF :

ALL  05-51-41

Page 603
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the results. | | | | | |
| | | (3)Examine the shock absorber for | X | | | | |
| | | external oil leaks. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the shock absorber for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (4)Examine the drag strut assembly | X | | | | |
| | | and its attachment fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the drag strut assembly | | X | | | |
| | | for overhaul: | | | | | |
| | | (Ref. TASK 32-21-16-000-002) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | | (b)On the aircraft, inspect the | | X | | | |
| | | attachment fitting for | | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (5)Examine the lockstay assembly for | X | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork: | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the lockstay assembly | | X | | | |
| | | for overhaul. | | | | | |
| | | (Ref. TASK 32-21-17-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b)On the aircraft, inspect the | | X | | | |
| | | attachment fittings for damage | | | | | |
| | | if you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (6)Examine the NLG actuating cylinder | X | | | | |



EFF :

ALL  05-51-41

Page 604
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | and its attachment fittings for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the actuating cylinder | | X | | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the strip-down | | | | | |
| | | inspection). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings and the gear well (all | | | | | |
| | | the items you can see) for | | | | | |
| | | distortion, pulled or torn | | | | | |
| | | fasteners and damaged paintwork.| | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (7)If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-22-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001) | | | | | |
| | | - for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002) | | | | | |
| | | - for the shock absorber | | | | | |
| | | (Ref. TASK 32-21-13-400-001) | | | | | |
| | | - for the axle sleeve | | | | | |
| | | (Ref. TASK 32-41-12-400-002) | | | | | |
| | | - for the wheels | | | | | |
| | | (Ref. TASK 32-41-12-400-001). | | | | | |
| | | | | | | | |
| B. | | Inspection of the MLG | | | | | |
| | | | | | | | |
| | | (1)Do a visual inspection of the | X | | | | |
| | | wheels for distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Do the inspection of the axle | | X | | | |
| | | and the axle sleeve for damage | | | | | |



EFF :

ALL  05-51-41

Page 605
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | and out-of-roundness | | | | | |
| | | (Ref. TASK 32-11-00-200-006) | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (2)Examine: | X | | | | |
| | | - the MLG and all the components | | | | | |
| | | installed on it for cracks, | | | | | |
| | | distortion, scores, tears, | | | | | |
| | | rupture, leakage and damaged | | | | | |
| | | paintwork (specially the drag | | | | | |
| | | stay blend area and the forward | | | | | |
| | | pintle pin area) | | | | | |
| | | - the attachment fittings of the | | | | | |
| | | MLG (on the gear rib 5 and rear | | | | | |
| | | spar) | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (b)Examine the MLG well (all the | | X | | | |
| | | items you can see) for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (3)Examine the shock absorber | X | | | | |
| | | sliding rod for external oil | | | | | |
| | | leaks. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Replace the shock absorber | | X | | | |
| | | seals: | | | | | |
| | | (Ref. TASK 32-11-13-000-003) | | | | | |
| | | (Ref. TASK 32-11-13-400-003). | | | | | |
| | | (4)Examine the side stay assembly and | X | | | | |
| | | its attachment fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the side-stay assembly | | X | | | |
| | | for overhaul. | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |



EFF :

ALL  05-51-41

Page 606
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the side-stay | | | | | |
| | | attachment fitting. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (5)Examine the lockstay assembly, the | X | | | | |
| | | lockstay actuator and their | | | | | |
| | | attachment fittings for | | | | | |
| | | distortion, cracks, damaged | | | | | |
| | | paintwork and hydraulic leakage. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the lockstay assembly | | X | | | |
| | | and lockstay actuator for | | | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (6)If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
| | | - for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001). | | | | | |
| | | | | | | | |
| C. | | Inspection of the fuselage | | | | | |
| | | | | | | | |
| | | (1)If damage are found during the | X | | | | |
| | | inspections of the landing gears | | | | | |
| | | in phase one: | | | | | |



EFF :

ALL  05-51-41

Page 607
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (a)Examine the top of the | | X | | | |
| | | fuselage, from frame 31 to 35 | | | | | |
| | | between stringer 18 LH and | | | | | |
| | | 18 RH, for distortion, cracks, | | | | | |
| | | pulled or torn fasteners and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-41-410-050

A. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.

(3) Close the Main Gears Doors (Ref. TASK 32-12-00-410-001).

(4) Close the Nose Gear Doors (Ref. TASK 32-22-00-410-001).



EFF :

ALL  05-51-41

Page 608
Nov 01/04
 
JSA 
INSPECTION AFTER VERY HIGH WINDS ON GROUND - INSPECTION/CHECK
_____________________________________________________________

TASK 05-51-42-200-001

Inspection after Very High Winds on Ground

WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.

WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific warning notices


No specific adjustable access platform 11 m (36 ft. 1 in.)

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied


from the External Power
27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation
27-34-00-710-001 Operational Test of the Elevator and Hydraulic
Actuation
27-50-00-866-008 Extension of the Flaps on the Ground
27-54-00-710-001 Operational Test of the Flap System
27-60-00-866-002 Extension-Retraction of the Spoilers for Maintenance
27-64-00-710-001 Operational Test of the Spoiler Hydraulic Actuation
27-80-00-866-004 Extending the Slats on the Ground



EFF :

ALL  05-51-42

Page 601
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-84-00-710-001 Operational Test of the Slat System


29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
32-00-00-481-001 Installation of the Safety Devices on the Landing
Gears
32-12-00-010-001 Open the Main Gear Doors for Access
32-12-00-410-001 Close the Main Gear Doors after Access
32-22-00-010-001 Nose Gear Doors - Ground Doors Opening
32-22-00-410-001 Nose Gear Doors - Ground Doors Closing
55-16-00-200-004 Detailed Inspection of Horizontal Stabilizer Hinge
Fittings and Support Ribs and Actuator Fittings for
the Elevator, LH/RH
55-20-00-200-003 Detailed Inspection of Elevator Hinge Fittings and
Actuator Fittings, LH/RH
55-30-00-210-001 Detailed Visual inspection of the Hinge Arm 1, 2, 3,
4, and 5 and the Fin Actuator Fittings 1, 2 and 3

3. __________
Job Set-up

Subtask 05-51-42-941-050

A. General

(1) You must do this inspection if the aircraft was in very high winds on
the ground (wind speed of more than 80 knots (150 KM/H)).

NOTE : This procedure is for an aircraft that was in the moored


____
configuration before it was in very high winds.

Subtask 05-51-42-481-050

B. Safety Precautions
Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).

Subtask 05-51-42-866-050

C. Extension of the Flight Control Surfaces

(1) Extend the flaps (Ref. TASK 27-50-00-866-008).

(2) Extend the slats (Ref. TASK 27-80-00-866-004).



EFF :

ALL  05-51-42

Page 602
Nov 01/04
 
JSA 
(3) Extend the spoilers (Ref. TASK 27-60-00-866-002).

Subtask 05-51-42-010-050

D. Get Access

(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).

(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).

Subtask 05-51-42-860-050

E. Aircraft Maintenance Configuration

(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).

(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).

(3) Put warning notices in the cockpit to tell persons not to operate the
flight control surfaces.

(4) Put the adjustable access platform in position near the area you must
examine.

4. Procedure
_________

Subtask 05-51-42-210-050

A. General External Inspection

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | General External Inspection | | | | | |
| | | | | | | | |
| A.| | Do a general visual inspection of the | X | | | | |
| | | aircraft from the ground for | | | | | |
| | | distortion, damage and fluid leakage | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-42

Page 603
Nov 01/04
 
JSA 
Subtask 05-51-42-210-051

B. Inspection of the Landing Gear

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the Landing Gear | | | | | |
| | | | | | | | |
| A.| | Nose Landing Gear | | | | | |
| | | | | | | | |
| | | (1) Examine the NLG, its attachment | X | | | | |
| | | fittings on the structure and all | | | | | |
| | | the components installed on the | | | | | |
| | | NLG for: | | | | | |
| | | - distortion, | | | | | |
| | | - leakage, | | | | | |
| | | - defective attachment, | | | | | |
| | | - other damage. | | | | | |
| | | NOTE: Carefully examine the | | | | | |
| | | hydraulic and electrical | | | | | |
| | | connections and the mooring | | | | | |
| | | fitting. | | | | | |
| | | | | | | | |
| B.| | Main Landing Gear | | | | | |
| | | | | | | | |
| | | (1) Examine the MLG, its attachment | X | | | | |
| | | fittings on structure, the side | | | | | |
| | | stay, the forward and aft pintle | | | | | |
| | | fittings and all the components | | | | | |
| | | installed on the MLG for: | | | | | |
| | | - distortion, | | | | | |
| | | - leakage, | | | | | |
| | | - defective attachment, | | | | | |
| | | - other damage. | | | | | |
| | | NOTE: Carefully examine the | | | | | |
| | | hydraulic and electrical | | | | | |
| | | connections. | | | | | |
-------------------------------------------------------------------------------



EFF :

ALL  05-51-42

Page 604
Nov 01/04
 
JSA 
Subtask 05-51-42-210-052

C. Inspection of the Flight Control Surfaces (Ref. TASK 55-16-00-200-004)


(Ref. TASK 55-20-00-200-003)
(Ref. TASK 55-30-00-210-001) (Ref. TASK 27-24-00-710-001)
(Ref. TASK 27-34-00-710-001) (Ref. TASK 27-54-00-710-001)
(Ref. TASK 27-64-00-710-001) (Ref. TASK 27-84-00-710-001)

-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the Flight Control | | | | | |
| | | Surfaces | | | | | |
| | | | | | | | |
| A.| | Rudder | | | | | |
| | | | | | | | |
| | | (1) Examine the rudder external | X | | | | |
| | | surface for distortion and damage | | | | | |
| | | | | | | | |
| | | (2) Do a detailed visual inspection | X | | | | |
| | | (Ref. TASK 55-30-00-210-001) | | | | | |
| | | of the actuator fittings 1, 2 and | | | | | |
| | | 3 at: | | | | | |
| | | - the vertical stabilizer | | | | | |
| | | center-box, | | | | | |
| | | - the rudder front spar. | | | | | |
| | | NOTE: Carefully examine the | | | | | |
| | | actuator fitting lugs and | | | | | |
| | | the areas of the fitting | | | | | |
| | | around the fasteners. | | | | | |
| | | | | | | | |
| B.| | Elevators | | | | | |
| | | | | | | | |
| | | (1) Examine the elevator external | X | | | | |
| | | surface for distortion and damage | | | | | |
| | | | | | | | |
| | | (2) Do a detailed visual inspection | X | | | | |
| | | (Ref. TASK 55-16-00-200-004) | | | | | |
| | | (Ref. TASK 55-20-00-200-003) of | | | | | |
| | | these parts in the actuator areas:| | | | | |
| | | - the actuator fittings 1 and 2 | | | | | |
| | | and their attachments, | | | | | |
| | | - the hinge fittings 2, 3 and 4 | | | | | |
| | | and their attachments, | | | | | |
| | | - the hinge arms 2, 3 and 4 and | | | | | |
| | | their attachments | | | | | |



EFF :

ALL  05-51-42

Page 605
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | at the horizontal stabilizer | | | | | |
| | | rear-spar and at the elevator | | | | | |
| | | front spar. | | | | | |
| | | | | | | | |
| C.| | Flaps | | | | | |
| | | | | | | | |
| | | (1) Do a general visual inspection of | X | | | | |
| | | each control surface and its | | | | | |
| | | attachments for distortion and | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| | | (2) Do a visual inspection of: | X | | | | |
| | | - the flap track fairings, | | | | | |
| | | - the pylon aft movable-fairings | | | | | |
| | | and their attachments | | | | | |
| | | for distortion and damage. | | | | | |
| | | | | | | | |
| | | (1) Examine the external surface and | X | | | | |
| | | the attachments of each control | | | | | |
| | | surface for distortion and damage.| | | | | |
| | | | | | | | |
|2. | | Operational Test of the Flight Control| | | | | |
| | | Surfaces | | | | | |
| | | | | | | | |
| A.| | Make sure that the work area is clean | X | | | | |
| | | and clear of tool(s) and other items. | | | | | |
| | | | | | | | |
| B.| | Do an operational test of each control| X | | | | |
| | | surface and make sure that the related| | | | | |
| | | surface(s) move(s) smoothly and freely| | | | | |
| | | | | | | | |
| | | (1) For the rudder: | | | | | |
| | | (Ref. TASK 27-24-00-710-001) | | | | | |
| | | | | | | | |
| | | (2) For the elevators: | | | | | |
| | | (Ref. TASK 27-34-00-710-001) | | | | | |
| | | | | | | | |
| | | (3) For the flaps: | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | | | | | | |
| | | (4) For the slats: | | | | | |
| | | (Ref. TASK 27-84-00-710-001) | | | | | |
| | | | | | | | |



EFF :

ALL  05-51-42

Page 606
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (5) For the spoilers: | | | | | |
| | | (Ref. TASK 27-64-00-710-001) | | | | | |
-------------------------------------------------------------------------------

5. Close-up
________

Subtask 05-51-42-410-050

A. Close Access

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

(2) Close the nose gear doors (Ref. TASK 32-22-00-410-001).

(3) Close the main gear doors (Ref. TASK 32-12-00-410-001).

(4) Remove the access platform(s).

(5) Remove the warning notice(s).



EFF :

ALL  05-51-42

Page 607
Nov 01/04
 
JSA 
INSPECTIONS AFTER WORK ON SYSTEM ELECTRICAL INSTALLATION - ADJUSTMENT/TEST
__________________________________________________________________________

TASK 05-51-43-700-001

Inspection after Work on System Electrical Installation

1. __________________
Reason for the Job

To give the list of all the inspections to do after work on the aircraft
electrical installation (wiring, connectors, etc.). The purpose of this
inspection is not to do a check of all the aircraft functions but to make
sure that:
- basic functions of the aircraft systems operate correctly,
- there are no unwanted effects on the main functions of the systems not
directly related to the work done.

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

22-10-00-710-002 Operational Test of Autopilot Disengagement and


Locking Devices of the Side Stick Controller and
Rudder Pedals
22-30-00-710-003 Operational Test of the Engine / Autothrust System
Isolation (with AIDS)
22-30-00-720-002 Operational Test of the Engine / Autothrust System
Isolation (without AIDS)
22-61-00-710-001 Operational Test of the Rudder Travel Limiting
Function
22-62-00-710-001 Operational Test of the Rudder Trim Function
22-63-00-710-001 Operational Test of the Yaw Damper Function
22-96-00-710-001 Operational Test of the AFS
22-97-00-710-001 Operational Test of the LAND CAT III Capability
24-00-00-710-003 Integrity Test of the Electrical Power
24-24-00-710-001 Operational Test of the Emergency Generation System
24-24-00-710-002 Operational Test of the Emergency Generator Control
Unit (GCU) from Centralized Fault Display System
(CFDS)
24-38-00-710-001 Operational Test of the Battery Charge Limiter (BCL),
(with the CFDS)
24-41-00-740-002 Operational Check of GAPCU via CFDS
26-12-00-710-001 Operational Check of Loop/Squib
27-54-00-710-002 Operational Test of the Flap and Slat Systems



EFF :

ALL  05-51-43

Page 501
Nov 01/04
 
JSA 
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

27-96-00-710-023 Integrity Test of the Flight Control System


29-00-00-710-001 Integrity Test of the Hydraulic Power
32-42-00-710-006 Integrity Test of the Braking System
32-51-00-710-002 Integrity Test of the Nose Wheel Steering System
34-10-00-710-007 Test of the Angle of Attack Warning
34-13-00-710-006 Operational Test of the AOA SENSOR TEST
34-13-00-740-002 INTERFACE TEST of the ADR
34-13-00-740-003 SYSTEM TEST of the ADR
34-13-00-740-004 Read the CFDIU for the ADR CURRENT STATUS
34-13-00-740-005 Read the CFDIU for the ADR INPUT STATUS
34-14-00-740-001 Interface Test of the IR
34-14-00-740-002 Read CFDIU for IR CURRENT STATUS
34-14-00-740-003 Read CFDIU for IR INPUT STATUS
71-00-00-710-045 Test No.1 : Dry Motor Leak Check
73-22-34-710-040 Operational Test of the EEC
73-25-34-710-042 Operational Test of the EIU with the CFDS
74-00-00-710-041 Operational Test of the Ignition System with the CFDS
77-32-34-710-040 Operational Check of EVMU through CFDS
78-31-00-710-041 Operational Test of the Thrust Reverser System with
the CFDS

3. __________
Job Set-up

Subtask 05-51-43-869-050

A. Not Applicable

4. Procedure
_________

Subtask 05-51-43-710-051

A. Do these inspections to make sure that the basic functions of the AUTO
FLIGHT system operate correctly :

(1) Operational test of autopilot disengagement and locking devices of


the side stick controller and rudder pedals (Ref. TASK 22-10-00-710-
002).

(2) Operational test of the engine/autothrust system isolation.


- With AIDS installed : (Ref. TASK 22-30-00-710-003)
- With AIDS not installed : (Ref. TASK 22-30-00-720-002)



EFF :

ALL  05-51-43

Page 502
Nov 01/04
 
JSA 
(3) Operational test of the rudder travel limiting function (Ref. TASK
22-61-00-710-001).

(4) Operational test of the rudder trim function (Ref. TASK 22-62-00-710-
001).

(5) Operational test of the yaw damper function (Ref. TASK 22-63-00-710-
001).

(6) Operational test of the AFS (Ref. TASK 22-96-00-710-001).

(7) Operational test of the LAND CAT III capability (Ref. TASK 22-97-00-
710-001).

Subtask 05-51-43-710-052

B. Do these inspections make sure that the basic functions of the ELECTRICAL
POWER system operate correctly :

(1) Integrity test of the electrical power (Ref. TASK 24-00-00-710-003).

(2) Operational test of the emergency generation system (Ref. TASK 24-24-
00-710-001).

(3) Operational test of the Emergency Generator Control Unit (GCU) from
Centralized Fault Display System (CFDS) (Ref. TASK 24-24-00-710-002).

(4) Operational test of the Battery Charge Limiter (BCL), (with the CFDS)
(Ref. TASK 24-38-00-710-001).

(5) Operational test of the Ground Auxiliary Power Control Unit (GAPCU)
(Ref. TASK 24-41-00-740-002).

Subtask 05-51-43-710-053

C. Do these inspections to make sure that the basic functions of the FIRE
PROTECTION system operate correctly :

(1) Operational test of the engine fire and overheat detection (Ref. TASK
26-12-00-710-001).



EFF :

ALL  05-51-43

Page 503
Nov 01/04
 
JSA 
Subtask 05-51-43-710-054

D. Do these inspections to make sure that the basic functions of the FLIGHT
CONTROLS system operate correctly :

(1) Operational test of the flap and slat systems (Ref. TASK 27-54-00-
710-002).

(2) Integrity test of the flight control system (Ref. TASK 27-96-00-710-
023).

Subtask 05-51-43-710-055

E. Do these inspections to make sure that the basic functions of the


HYDRAULIC POWER system operate correctly :

(1) Integrity test of the hydraulic power (Ref. TASK 29-00-00-710-001).

Subtask 05-51-43-710-056

F. Do these inspections to make sure that the basic functions of the LANDING
GEAR system operate correctly :

(1) Integrity test of the braking system (Ref. TASK 32-42-00-710-006).

(2) Integrity test of the nose wheel steering system (Ref. TASK 32-51-00-
710-002).

Subtask 05-51-43-710-057

G. Do these inspections to make sure that the basic functions of the


NAVIGATION system operate correctly :

(1) Test of the angle of attack warning (Ref. TASK 34-10-00-710-007).

(2) Operational test of the AOA SENSOR TEST (Ref. TASK 34-13-00-710-006).

(3) INTERFACE TEST of the ADR (Ref. TASK 34-13-00-740-002).

(4) SYSTEM TEST of the ADR (Ref. TASK 34-13-00-740-003).

(5) Read the CFDIU for ADR CURRENT STATUS (Ref. TASK 34-13-00-740-004).

(6) Read the CFDIU for ADR INPUT STATUS (Ref. TASK 34-13-00-740-005).

(7) Interface test of the IR (Ref. TASK 34-14-00-740-001).



EFF :

ALL  05-51-43

Page 504
Nov 01/04
 
JSA 
(8) Read the CFDIU for IR CURRENT STATUS (Ref. TASK 34-14-00-740-002).

(9) Read the CFDIU for IR INPUT STATUS (Ref. TASK 34-14-00-740-003).

Subtask 05-51-43-710-058

H. Do these inspections to make sure that the basic functions of the ENGINE
systems operate correctly :

(1) Operational test of the thrust reverser system with the CFDS
(Ref. TASK 78-31-00-710-041).

(2) Operational test of the ignition system with the CFDS (Ref. TASK 74-
00-00-710-041).

(3) Operational test of the EIU with the CFDS (Ref. TASK 73-25-34-710-
042).

(4) Operational test of the EEC (Ref. TASK 73-22-34-710-040).

(5) Operational test of the Engine Vibration Monitoring Unit (EVMU)


through Centralized Fault Display System (CFDS) (Ref. TASK 77-32-34-
710-040).

(6) Test No.1 : dry motor leak check (Ref. TASK 71-00-00-710-045).



EFF :

ALL  05-51-43

Page 505
Nov 01/04
 
JSA 
_____________________________________________________________________________
PRESSURIZATION TEST OF FUSELAGE (LEAKAGE CHECKS) AFTER A/C ABNORMAL OPERATION
OR REPAIR - ADJUSTMENT/TEST
___________________________

TASK 05-53-00-780-001

Test for Leakage in the Repair Area at a Differential Pressure of 280 mbar
(4.06 psi)

WARNING : MAKE SURE THAT:


_______
- ONLY THE PERSONS NECESSARY FOR THE PRESSURIZATION TEST ARE IN THE
AIRCRAFT DURING THE TEST.
R - THE PERSONS IN THE AIRCRAFT HAVE MEDICAL APPROVAL TO DO THIS TYPE
R OF TEST (REFER TO YOUR LOCAL REGULATION).
BE CAREFUL WHEN YOU CONTROL THE PRESSURE. SUDDEN CHANGES IN PRESSURE
CAN CAUSE PAIN AND INJURY.

WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.

WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS


_______
PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
- WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE
AIRCRAFT/EQUIPMENT.

WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.

1. __________________
Reason for the Job

To find possible leaks in the repair area after small structural repairs.

NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.



EFF :

ALL  05-53-00

Page 501
Aug 01/05
 
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific absolute pressure indicator/digital


indication/sensitivity 1mbar(0.01PSI)
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific safety plug - ref MS21913-4
No specific safety streamer
No specific vertical speed indicator
No specific warning notices
No specific O-ring - ref NAS1612-4

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

No specific leak-detection soap solution

C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-33-21-618-001 Pre-conditioning through the HP Ground Connection


12-33-21-618-001 Pre-conditioning with the APU
23-44-00-700-001 Operational Test of the Service Interphone
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure



EFF :

ALL  05-53-00

Page 502
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-53-00-865-060

A. Open, safety and tag this(these) circuit breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

**ON A/C 001-002,

Subtask 05-53-00-860-050-A

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Put the absolute pressure indicator/digital indication/sensitivity


1mbar(0.01PSI) and the vertical speed indicator in position in the
cockpit.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

NOTE : If during this test, the avionics equipment ventilation stops,


____
you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.



EFF :

ALL  05-53-00

Page 503
Feb 01/06
 
JSA 
(6) On the AIR COND panel 30VU:
- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(7) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(8) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(9) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(10) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(11) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(12) On the CARGO HEAT section of the panel 22VU:


- make sure that the AFT ISOL VALVE pushbutton switch is released
(the OFF legend is on).

(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(14) Close and lock the sliding windows and all access doors to the
pressurized area.

(15) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).

(16) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____


R

EFF :

001-002,  05-53-00

Page 504
Feb 01/06
 
JSA 
**ON A/C 003-100,

Subtask 05-53-00-860-050

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Put the absolute pressure indicator/digital indication/sensitivity


1mbar(0.01PSI) and the vertical speed indicator in position in the
cockpit.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

NOTE : If during this test, the avionics equipment ventilation stops,


____
you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

(6) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(7) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(8) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(9) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(10) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.



EFF :

003-100,  05-53-00

Page 505
Feb 01/06
R  
JSA 
(11) On the VENTILATION section of the panel 22VU:
- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(12) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(13) Close and lock the sliding windows and all access doors to the
pressurized area.

(14) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).

(15) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____

**ON A/C ALL

Subtask 05-53-00-970-052

C. Calculation of the Pressure

(1) Use the pressure indicator to measure the ambient pressure (Pamb).

(2) Calculate and write the value below:


- value A = Pamb + 280 mbar (4.06 psi)

4. Procedure
_________

Subtask 05-53-00-780-050

R A. Test at a Differential Pressure of 280 mbar (4.06 psi)

WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.

WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.



EFF :

ALL  05-53-00

Page 506
Feb 01/06
 
JSA 
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.

NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.

-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------

1. On the AIR COND panel 30VU:


- adjust the cabin temperature
control as necessary.

On the AIR COND panel 30VU:


- make sure that the FAULT legend of
the PACK 1 and PACK 2 pushbutton
switches is off.
Air blows into the fuselage.

2. On the CABIN PRESS section of the


panel 25VU:
- set the MAN V/S CTL switch to
DN and release, the switch
moves to the neutral position.
Do this operation several



EFF :

ALL  05-53-00

Page 507
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
times. This closes the outflow
valve.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min).

- stop when you get a cabin


pressure of value A (Pamb + 280
mbar (4.06 psi)).

On the vertical speed indicator:


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the pressure indicator:
- the cabin pressure increases to value
A (Pamb + 280 mbar (4.06 psi)).

3. With the MAN/V/S CTL switch in


the UP or DN position, keep the
pressure stable at a pressure of
value A (Pamb + 280 mbar (4.06
psi)).

On the vertical speed indicator:


- the cabin vertical speed is 0.
On the pressure indicator:
- the cabin pressure is value A (Pamb +
280 mbar (4.06 psi)).

4. Apply the leak-detection soap


solution to find leaks.

Record possible leaks.

5. On the CABIN PRESS section of the


panel 25VU:
- With the MAN V/S CTL switch,
decrease the cabin pressure
until you get a differential
pressure of 0 psi.



EFF :

ALL  05-53-00

Page 508
Feb 01/06
R  
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
NOTE : The cabin vertical speed
____
must not be more than 500
ft.min (152.39 m.min).

On the vertical speed indicator:


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the pressure indicator:
- the cabin pressure decreases to the
external ambient pressure.

6. After the cabin is fully


depressurized, fully open the
outflow valve.

5. Close-up
________

Subtask 05-53-00-865-061

A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

R **ON A/C ALL

Subtask 05-53-00-860-054

B. Put the aircraft back to its initial configuration.

(1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

(2) On the EXT LT section of the panel 25VU:


- set the BEACON switch to OFF position.



EFF :

ALL  05-53-00

Page 509
Feb 01/06
 
JSA 
(3) Remove the pressure indicator and the vertical speed indicator.

(4) Remove the safety plug from the pressure switch 16WR.

(a) In the avionics compartment:


- remove the safety streamer from the safety plug.
- remove the safety plug with its O-ring from the air inlet of
the pressure switch 16WR.

(5) Put the system and the aircraft back to the serviceable
configuration.

(6) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(7) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(8) Remove the warning notices and the safety barriers.



EFF :

ALL  05-53-00

Page 510
Feb 01/06
R  
JSA 
TASK 05-53-00-780-001- 01

Test for Leakage in the Repair Area at a Differential Pressure of 280 mbar
(4.06 psi) (with AIDS)

WARNING : MAKE SURE THAT:


_______
- ONLY THE PERSONS NECESSARY FOR THE PRESSURIZATION TEST ARE IN THE
AIRCRAFT DURING THE TEST.
- THE PERSONS IN THE AIRCRAFT HAVE MEDICAL APPROVAL TO DO THIS TYPE
OF TEST (REFER TO YOUR LOCAL REGULATION).
BE CAREFUL WHEN YOU CONTROL THE PRESSURE. SUDDEN CHANGES IN PRESSURE
CAN CAUSE PAIN AND INJURY.

WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.

WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS


_______
PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
- WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE
AIRCRAFT/EQUIPMENT.

WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.

1. __________________
Reason for the Job

To find possible leaks in the repair area after small structural repairs.

NOTE : The pressure test that follows is only necessary after the repair if
____
the repair procedure in the SRM or in the repair instruction directly
tells you to do it.



EFF :

ALL  05-53-00

Page 511
Feb 01/06
R  
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific circuit breaker(s) safety clip(s)


No specific safety barriers
No specific safety plug - ref MS21913-4
No specific safety streamer
No specific warning notices
No specific O-ring - ref NAS1612-4

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

No specific leak-detection soap solution

C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-33-21-618-001 Pre-conditioning through the HP Ground Connection


12-33-21-618-001 Pre-conditioning with the APU
23-44-00-700-001 Operational Test of the Service Interphone
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
31-36-00-740-008 Access to the Parameter Call-Up Menus
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
34-10-00-860-002 ADIRS Start Procedure
34-10-00-860-005 ADIRS Stop Procedure



EFF :

ALL  05-53-00

Page 512
Feb 01/06
R  
JSA 
3. __________
Job Set-up

Subtask 05-53-00-865-070

A. Open, safety and tag this(these) circuit breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

**ON A/C 001-002,

Subtask 05-53-00-860-053-A

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Make sure that the static probe covers are not installed.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

NOTE : If during this test, the avionics equipment ventilation stops,


____
you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

(6) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).


R

EFF :

ALL  05-53-00

Page 513
Feb 01/06
 
JSA 
(7) On the CABIN PRESS section of the panel 25VU:
- release the MODE SEL pushbutton switch (the MAN legend is on).

(8) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(9) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(10) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(11) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(12) On the CARGO HEAT section of the panel 22VU:


- make sure that the AFT ISOL VALVE pushbutton switch is released
(the OFF legend is on).

(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(14) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

(15) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.

(16) Close and lock the sliding windows and all access doors to the
pressurized area.

(17) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).

(18) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____


R

EFF :

001-002,  05-53-00

Page 514
Feb 01/06
 
JSA 
**ON A/C 003-100,

Subtask 05-53-00-860-053

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Make sure that the static probe covers are not installed.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

NOTE : If during this test, the avionics equipment ventilation stops,


____
you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

(6) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(7) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(8) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(9) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(10) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(11) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).


R

EFF :

003-100,  05-53-00

Page 515
Feb 01/06
 
JSA 
(12) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(13) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

(14) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.

(15) Close and lock the sliding windows and all access doors to the
pressurized area.

(16) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).

(17) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____

**ON A/C ALL

4. Procedure
_________

Subtask 05-53-00-780-053

A. Test at a Differential Pressure of 280 mbar (4.06 psi)

WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.

WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.



EFF :

ALL  05-53-00

Page 516
Feb 01/06
R  
JSA 
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.

NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.

-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------

1. On the AIR COND panel 30VU:


- adjust the cabin temperature
control as necessary.

On the AIR COND panel 30VU:


- make sure that the FAULT legend of
the PACK 1 and PACK 2 pushbutton
switches is off.
Air blows into the fuselage.

2. On the CABIN PRESS section of the


panel 25VU:
- set the MAN V/S CTL switch to
DN and release, the switch
moves to the neutral position.
Do this operation several



EFF :

ALL  05-53-00

Page 517
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
times. This closes the outflow
valve (OVP indication on the
MCDU).

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on the
MCDU).

- Stop when you get a cabin


differential pressure of 280
mbar (4.06 psi) (PDC indication
on the MCDU).

On the MCDU (VSCB indication):


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the MCDU (PDC indication):
- the cabin differential pressure
increases to 280 mbar (4.06 psi).

3. With the MAN/V/S CTL switch in


the UP or DN position, keep the
differential pressure stable at
280 mbar (4.06 psi).

On the MCDU (VSCB indication):


- the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
280 mbar (4.06 psi).

4. Apply the leak-detection soap


solution to find leaks.

Record possible leaks.

5. On the CABIN PRESS section of the


panel 25VU:
- with the MAN V/S CTL switch,
decrease the cabin differential
pressure until you get a
differential pressure of 0 psi.



EFF :

ALL  05-53-00

Page 518
Feb 01/06
R  
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
NOTE : The cabin vertical speed
____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on the
MCDU).

On the MCDU (VSCB indication):


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the MCDU (PDC indication):
- the cabin differential pressure
decreases to 0.

6. After the cabin is fully


depressurized, fully open the
outflow valve (OVP indication on
the MCDU).

5. Close-up
________

Subtask 05-53-00-865-071

A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23



EFF :

ALL  05-53-00

Page 519
Feb 01/06
 
JSA 
R **ON A/C ALL

Subtask 05-53-00-860-055

B. Put the aircraft back to its initial configuration.

(1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

(2) On the EXT LT section of the panel 25VU:


- set the BEACON switch to OFF position.

(3) Remove the safety plug from the pressure switch 16WR.

(a) In the avionics compartment:


- remove the safety streamer from the safety plug.
- remove the safety plug with its O-ring from the air inlet of
the pressure switch 16WR.

(4) Put the system and the aircraft back to the serviceable
configuration.

(5) Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).

(6) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(7) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(8) Remove the warning notices and the safety barriers.



EFF :

ALL  05-53-00

Page 520
Feb 01/06
 
JSA 
TASK 05-53-00-780-002

Test for Leakage in the Repair Area at a Differential Pressure of 550 mbar
(7.97 psi)

WARNING : MAKE SURE THAT:


_______
- ONLY THE PERSONS NECESSARY FOR THE PRESSURIZATION TEST ARE IN THE
AIRCRAFT DURING THE TEST.
- THE PERSONS IN THE AIRCRAFT HAVE MEDICAL APPROVAL TO DO THIS TYPE
OF TEST (REFER TO YOUR LOCAL REGULATION).
BE CAREFUL WHEN YOU CONTROL THE PRESSURE. SUDDEN CHANGES IN PRESSURE
CAN CAUSE PAIN AND INJURY.

WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.

WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS


_______
PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
- WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE
AIRCRAFT/EQUIPMENT.

WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.

1. __________________
Reason for the Job

To find possible leaks in the repair area after large structural repairs.

NOTE : The pressure test that follows is only necessary after the repair if
____
the repair procedure in the SRM or in the repair instruction directly
tells you to do it.



EFF :

ALL  05-53-00

Page 521
Feb 01/06
R  
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific absolute pressure indicator/digital


indication/sensitivity 1mbar(0.01PSI)
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific safety plug - ref MS21913-4
No specific safety streamer
No specific vertical speed indicator
No specific warning notices
No specific O-ring - ref NAS1612-4

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

No specific leak-detection soap solution

C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-33-21-618-001 Pre-conditioning through the HP Ground Connection


12-33-21-618-001 Pre-conditioning with the APU
23-44-00-700-001 Operational Test of the Service Interphone
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
35-12-41-000-002 Removal of the Full-Face/Quick-Donning Oxygen-Mask
35-12-41-400-002 Installation of the Full-Face/Quick-donning
Oxygen-Mask
52-51-00-040-006 Deactivation of the Door Locking System (CDLS)



EFF :

ALL  05-53-00

Page 522
Feb 01/06
R  
JSA 
3. __________
Job Set-up

Subtask 05-53-00-865-062

A. Open, safety and tag this(these) circuit breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

**ON A/C 001-002,

Subtask 05-53-00-860-051-A

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Put the vertical speed indicator and the absolute pressure
indicator/digital indication/sensitivity 1mbar(0.01PSI) in position
in the cockpit.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

R NOTE : If during this test, the avionics equipment ventilation stops,


____
R you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.


R

EFF :

ALL  05-53-00

Page 523
Feb 01/06
 
JSA 
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(7) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the CARGO HEAT section of the panel 22VU:


- make sure that the AFT ISOL VALVE pushbutton switch is released
(the OFF legend is on).

(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(15) Close and lock the sliding windows and all access doors to the
pressurized area.

(16) Do an interphone communication test between the cockpit and the


ground service personnel (Ref. TASK 23-44-00-700-001).


R

EFF :

001-002,  05-53-00

Page 524
Feb 01/06
 
JSA 
(17) Pressurize the pneumatic system:
- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____

**ON A/C 003-100,

Subtask 05-53-00-860-051

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Put the vertical speed indicator and the absolute pressure
indicator/digital indication/sensitivity 1mbar(0.01PSI) in position
in the cockpit.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) With Cockpit Door Locking System (CDLS) installed:


- Do the deactivation of the Cockpit Door Locking System (Ref. TASK
52-51-00-040-006).

(5) Make sure that the avionics equipment ventilation operates correctly.

R NOTE : If during this test, the avionics equipment ventilation stops,


____
R you must stop the test.

(6) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

R (7) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.



EFF :

ALL  05-53-00

Page 525
Feb 01/06
 
JSA 
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(8) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(9) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(10) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(11) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(12) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(13) On the VENTILATION section of the panel 22 VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(15) Close and lock the sliding windows and all access doors to the
pressurized area.

(16) Do an interphone communication test between the cockpit and the


ground service personnel (Ref. TASK 23-44-00-700-001).

(17) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____


R

EFF :

003-100,  05-53-00

Page 526
Feb 01/06
 
JSA 
**ON A/C ALL

Subtask 05-53-00-970-051

C. Calculation of the Pressure.

(1) Use the pressure indicator to measure the ambient pressure (Pamb).

(2) Calculate and write the values below:


- Value A = Pamb + 300 mbar (4.35 psi)
- Value B = Pamb + 550 mbar (7.97 psi)

4. Procedure
_________

Subtask 05-53-00-780-051

A. Test at a Differential Pressure of 550 mbar (7.97 psi)

WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.

WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.

WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.

NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:



EFF :

ALL  05-53-00

Page 527
Feb 01/06
 
JSA 
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.

-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------

1. On the AIR COND panel 30VU:


- adjust the cabin temperature
control as necessary.

On the AIR COND panel 30VU:


R - make sure that the FAULT legend of
R the PACK 1 and PACK 2 pushbutton
R switches is off.
Air blows into the fuselage.

2. On the CABIN PRESS section of the


panel 25VU:
- set the MAN V/S CTL switch to
DN and release, the switch
moves to the neutral position.
Do this operation several
times. This closes the outflow
valve.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min).

- stop when you get a cabin


pressure of Value A (Pamb + 300
mbar (4.35 psi)).

On the vertical speed indicator:


R - the cabin vertical speed must not be
R more than 500 ft.min (152.39 m.min).
On the pressure indicator:
- the cabin pressure increases to value
A (Pamb + 300 mbar (4.35 psi)).

3. With the MAN/V/S CTL switch in


the UP or DN position, keep the
pressure stable at value A (Pamb



EFF :

ALL  05-53-00

Page 528
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
+ 300 mbar (4.35 psi)) for 15
minutes.

Tell ground personnel to do a precheck


of the repaired area.
On the vertical speed indicator:
- the cabin vertical speed is 0.
On the pressure indicator:
- the cabin pressure is value A (Pamb +
300 mbar (4.35 psi)).

R 4. Use the same procedure as in step


R 2 to increase cabin pressure to
R value B (Pamb + 550 mbar (7.97
psi)).

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min).

On the vertical speed indicator:


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the pressure indicator:
- the cabin pressure increases to value
B (Pamb + 550 mbar (7.97 psi)).

5. With the MAN/V/S CTL switch in


the UP or DN position, keep the
pressure stable at value B (Pamb
+ 550 mbar (7.97 psi)).

On the vertical speed indicator:


- the cabin vertical speed is 0.
On the pressure indicator:
- the cabin pressure is value B (Pamb +
550 mbar (7.97 psi)).

6. Apply the leak-detection soap


solution to find leaks.

Record possible leaks.



EFF :

ALL  05-53-00

Page 529
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
7. On the CABIN PRESS section of the
panel 25VU:
- with the MAN V/S CTL switch,
decrease the cabin pressure
until you get a differential
pressure of 0 psi.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min).

On the vertical speed indicator:


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the pressure indicator:
- the cabin pressure indication
decreases to the external ambient
pressure.

R 8. After the cabin is fully


R depressurized, fully open the
R outflow valve.

5. Close-up
________

Subtask 05-53-00-865-063

A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23



EFF :

ALL  05-53-00

Page 530
Feb 01/06
 
JSA 
R **ON A/C ALL

Subtask 05-53-00-860-056

B. Put the aircraft back to its initial configuration.

R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).

(2) On the EXT LT section of the panel 25VU:


- set the BEACON switch to OFF position.

R (3) Remove the pressure indicator and the vertical speed indicator.

R (4) Remove the safety plug from the pressure switch 16WR.

(a) In the avionics compartment:


- Remove the safety streamer from the safety plug.
- Remove the safety plug with its O-ring from the air inlet of
the pressure switch 16WR.

R (5) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).

(6) Put the system and the aircraft back to the serviceable
configuration.

(7) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(8) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(9) Remove the warning notices and the safety barriers.



EFF :

ALL  05-53-00

Page 531
Feb 01/06
 
JSA 
TASK 05-53-00-780-002- 01

Test for Leakage in the Repair Area at a Differential Pressure of 550 mbar
(7.97 psi) (with AIDS)

WARNING : MAKE SURE THAT:


_______
- ONLY THE PERSONS NECESSARY FOR THE PRESSURIZATION TEST ARE IN THE
AIRCRAFT DURING THE TEST.
- THE PERSONS IN THE AIRCRAFT HAVE MEDICAL APPROVAL TO DO THIS TYPE
OF TEST (REFER TO YOUR LOCAL REGULATION).
BE CAREFUL WHEN YOU CONTROL THE PRESSURE. SUDDEN CHANGES IN PRESSURE
CAN CAUSE PAIN AND INJURY.

WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.

WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS


_______
PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
- WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE
AIRCRAFT/EQUIPMENT.

WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.

1. __________________
Reason for the Job

To find possible leaks in the repair area after large structural repairs.

NOTE : The pressure test that follows is only necessary after the repair if
____
the repair procedure in the SRM or in the repair instruction directly
tells you to do it.



EFF :

ALL  05-53-00

Page 532
Feb 01/06
R  
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific circuit breaker(s) safety clip(s)


No specific safety barriers
No specific safety plug - ref MS21913-4
No specific safety streamer
No specific warning notices
No specific O-ring - ref NAS1612-4

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

No specific leak-detection soap solution

C. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-33-21-618-001 Pre-conditioning through the HP Ground Connection


12-33-21-618-001 Pre-conditioning with the APU
23-44-00-700-001 Operational Test of the Service Interphone
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
31-36-00-740-008 Access to the Parameter Call-Up Menus
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
34-10-00-860-002 ADIRS Start Procedure
34-10-00-860-005 ADIRS Stop Procedure
35-12-41-000-002 Removal of the Full-Face/Quick-Donning Oxygen-Mask
35-12-41-400-002 Installation of the Full-Face/Quick-donning
Oxygen-Mask



EFF :

ALL  05-53-00

Page 533
Feb 01/06
R  
JSA 
3. __________
Job Set-up

Subtask 05-53-00-865-072

A. Open, safety and tag this(these) circuit breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

**ON A/C 001-002,

Subtask 05-53-00-860-057-A

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Make sure that the static probe covers are not installed.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

R NOTE : If during this test, the avionics equipment ventilation stops,


____
R you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.


R

EFF :

ALL  05-53-00

Page 534
Feb 01/06
 
JSA 
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(7) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

R (10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the CARGO HEAT section of the panel 22VU:


- make sure that the AFT ISOL VALVE pushbutton switch is released
(the OFF legend is on).

(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

R (15) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

(16) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.


R

EFF :

001-002,  05-53-00

Page 535
Feb 01/06
 
JSA 
(17) Close and lock the sliding windows and all access doors to the
pressurized area.

(18) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).

(19) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

R NOTE : You must close the access door 811 for this procedure.
____

**ON A/C 003-100,

Subtask 05-53-00-860-057

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Make sure that the static probe covers are not installed.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

R NOTE : If during this test, the avionics equipment ventilation stops,


____
R you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.


R

EFF :

ALL  05-53-00

Page 536
Feb 01/06
 
JSA 
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(7) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

R (10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

R (14) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

(15) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.

(16) Close and lock the sliding windows and all access doors to the
pressurized area.

(17) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).


R

EFF :

003-100,  05-53-00

Page 537
Feb 01/06
 
JSA 
(18) Pressurize the pneumatic system:
- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

R NOTE : You must close the access door 811 for this procedure.
____

**ON A/C ALL

4. Procedure
_________

Subtask 05-53-00-780-054

A. Test at a Differential Pressure of 550 mbar (7.97 psi)

WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.

WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.

WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.

NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.



EFF :

ALL  05-53-00

Page 538
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------

1. On the AIR COND panel 30VU:


- adjust the cabin temperature
control as necessary.

On the AIR COND panel 30VU:


R - make sure that the FAULT legend of
R the PACK 1 and PACK 2 pushbutton
R switches is off.
Air blows into the fuselage.

2. On the CABIN PRESS section of the


panel 25VU:
- set the MAN V/S CTL switch to
DN and release, the switch
moves to the neutral position.
Do this operation several
times. This closes the outflow
valve (OVP indication on the
MCDU).

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on the
MCDU).

- Stop when you get a cabin


differential pressure of 300
mbar (4.35 psi) (PDC indication
on the MCDU).

On the MCDU (VSCB indication):


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the MCDU (PDC indication):
- the cabin differential pressure
increases to 300 mbar (4.35 psi).

3. With the MAN/V/S CTL switch in


the UP or DN position, keep the
differential pressure stable at
300 mbar (4.35 psi) for 15
minutes.



EFF :

ALL  05-53-00

Page 539
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
Tell ground personnel to do a precheck
of the repaired area.
On the MCDU (VSCB indication):
- the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
300 mbar (4.35 psi).

R 4. Use the same procedure as in step


R 2 to increase the cabin
R differential pressure to 550 mbar
(7.97 psi).

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on MCDU).

On the MCDU (VSCB indication):


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the MCDU (PDC indication):
- the cabin differential pressure
increases to 550 mbar (7.97 psi).

5. With the MAN/V/S CTL switch in


the UP or DN position, keep the
differential pressure stable at
550 mbar (7.97 psi).

On the MCDU (VSCB indication):


- the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
550 mbar (7.97 psi).

6. Apply the leak-detection soap


solution to find leaks.

Record possible leaks.

7. On the CABIN PRESS panel 25VU:


- with the MAN V/S CTL switch,
decrease the cabin differential



EFF :

ALL  05-53-00

Page 540
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
pressure until you get a
differential pressure of 0 psi.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on the
MCDU).

On the MCDU (VSCB indication):


- the cabin vertical speed must not be
more than 500 ft.min (152.39 m.min).
On the MCDU (PDC indication):
- the cabin differential pressure
decreases to 0.

R 8. After the cabin is fully


R depressurized, fully open the
R outflow valve (OVP indication on
the MCDU).

5. Close-up
________

Subtask 05-53-00-865-073

A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23



EFF :

ALL  05-53-00

Page 541
Feb 01/06
 
JSA 
R **ON A/C ALL

Subtask 05-53-00-860-058

B. Put the aircraft back to its initial configuration.

R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).

(2) On the EXT LT section of the panel 25VU:


- set the BEACON switch to OFF position.

(3) Remove the safety plug from the pressure switch 16WR.

(a) In the avionics compartment:


- Remove the safety streamer from the safety plug.
- Remove the safety plug with its O-ring from the air inlet of
the pressure switch 16WR.

R (4) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).

(5) Put the system and the aircraft back to the serviceable
configuration.

(6) Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).

(7) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(8) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(9) Remove the warning notices and the safety barriers.



EFF :

ALL  05-53-00

Page 542
Feb 01/06
 
JSA 
TASK 05-53-00-780-003

Test to Measure the Structural Leakage

WARNING : MAKE SURE THAT:


_______
- ONLY THE PERSONS NECESSARY FOR THE PRESSURIZATION TEST ARE IN THE
AIRCRAFT DURING THE TEST.
- THE PERSONS IN THE AIRCRAFT HAVE MEDICAL APPROVAL TO DO THIS TYPE
OF TEST (REFER TO YOUR LOCAL REGULATION).
BE CAREFUL WHEN YOU CONTROL THE PRESSURE. SUDDEN CHANGES IN PRESSURE
CAN CAUSE PAIN AND INJURY.

WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.

WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS


_______
PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
- WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE
AIRCRAFT/EQUIPMENT.

WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.

1. __________________
Reason for the Job

To measure the structural leakage.

NOTE : The pressure test that follows is only necessary after the repair if
____
the repair procedure in the SRM or in the repair instruction directly
tells you to do it.



EFF :

ALL  05-53-00

Page 543
Feb 01/06
R  
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific absolute pressure indicator/digital


indication/sensitivity 1mbar(0.01PSI)
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific safety plug - ref MS21913-4
No specific safety streamer
No specific stop-watch
No specific vertical speed indicator
No specific warning notices
No specific O-ring - ref NAS1612-4

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-33-21-618-001 Pre-conditioning through the HP Ground Connection


12-33-21-618-001 Pre-conditioning with the APU
23-44-00-700-001 Operational Test of the Service Interphone
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
35-12-41-000-002 Removal of the Full-Face/Quick-Donning Oxygen-Mask
35-12-41-400-002 Installation of the Full-Face/Quick-donning
Oxygen-Mask



EFF :

ALL  05-53-00

Page 544
Feb 01/06
R  
JSA 
3. __________
Job Set-up

Subtask 05-53-00-865-068

A. Open, safety and tag this(these) circuit breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

**ON A/C 001-002,

Subtask 05-53-00-860-052-A

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Put the vertical speed indicator, the absolute pressure


indicator/digital indication/sensitivity 1mbar(0.01PSI) and the stop-
watch in position in the cockpit.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

NOTE : If during this test, the avionics equipment ventilation stops,


____
you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.


R

EFF :

ALL  05-53-00

Page 545
Feb 01/06
 
JSA 
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(7) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the CARGO HEAT section of the panel 22VU:


- make sure that the AFT ISOL VALVE pushbutton switch is released
(the OFF legend is on).

(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(15) Close and lock the sliding windows and all access doors to the
pressurized area.

(16) Do an interphone communication test between the cockpit and the


ground service personnel (Ref. TASK 23-44-00-700-001).


R

EFF :

001-002,  05-53-00

Page 546
Feb 01/06
 
JSA 
(17) Pressurize the pneumatic system:
- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____

**ON A/C 003-100,

Subtask 05-53-00-860-052

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Put the vertical speed indicator, the absolute pressure


indicator/digital indication/sensitivity 1mbar(0.01PSI) and the stop-
watch in position in the cockpit.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

NOTE : If during this test, the avionics equipment ventilation stops,


____
you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.



EFF :

ALL  05-53-00

Page 547
Feb 01/06
 
JSA 
(7) On the AIR COND panel 30VU:
- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

(10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

(14) Close and lock the sliding windows and all access doors to the
pressurized area.

(15) Do an interphone communication test between the cockpit and the


ground service personnel (Ref. TASK 23-44-00-700-001).

(16) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

NOTE : You must close the access door 811 for this procedure.
____


R

EFF :

003-100,  05-53-00

Page 548
Feb 01/06
 
JSA 
**ON A/C ALL

Subtask 05-53-00-970-050

C. Calculation of the Pressure.

(1) Use the pressure indicator to measure the ambient pressure (Pamb).

(2) Calculate and write the values below:


- Value A = Pamb + 280 mbar (4.06 psi)
- Value B = Pamb + 580 mbar (8.41 psi)
- Value C = Pamb + 560 mbar (8.12 psi)
- Value D = Pamb + 550 mbar (7.97 psi)
The values A and B are necessary to monitor the system.
The values C and D are necessary to measure the leakage rate.

4. Procedure
_________

Subtask 05-53-00-780-052

A. Procedure to Measure the Leakage Rate

WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.

WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.

WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.

NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:



EFF :

ALL  05-53-00

Page 549
Feb 01/06
 
JSA 
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.

-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------

1. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- adjust the cabin temperature - make sure that the FAULT legend of
control as necessary. the PACK 1 and PACK 2 pushbutton
switches is off.
Air blows into the fuselage.

2. On the CABIN PRESS section of the On the vertical speed indicator:


panel 25VU: - the cabin vertical speed must not be
- set the MAN V/S CTL switch to more than 500 ft.min (152.39 m.min).
DN and release, the switch On the pressure indicator:
moves to the neutral position. - the cabin pressure increases to value
Do this operation several A (Pamb + 280 mbar (4.06 psi)).
times. This closes the outflow
valve.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min).

- stop when you get a cabin


pressure of value A (Pamb + 280
mbar (4.06 psi)).

3. With the MAN/V/S CTL switch in Tell ground personnel to walk around
the UP or DN position, keep the the aircraft and do a check for
pressure stable at value A (Pamb leakage.
+ 280 mbar (4.06 psi)) for 5 On the vertical speed indicator:
minutes. - the cabin vertical speed is 0.
On the pressure indicator:
- the cabin pressure is value A (Pamb +
280 mbar (4.06 psi)).



EFF :

ALL  05-53-00

Page 550
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
R 4. Use the same procedure as in step On the pressure indicator:
R 2 to increase cabin pressure to - the cabin pressure increases to value
R value B (Pamb + 580 mbar (8.41 B (Pamb + 580 mbar (8.41 psi)).
psi)). On the vertical speed indicator:
- the cabin vertical speed must not be
R NOTE : The cabin vertical speed
____ more than 500 ft.min (152.39 m.min).
R must not be more than 500
ft.min (152.39 m.min).

5. With the MAN/V/S CTL switch in On the vertical speed indicator:


the UP or DN position, keep the - the cabin vertical speed is 0.
pressure stable at value B (Pamb On the pressure indicator:
+ 580 mbar (8.41 psi)). - the cabin pressure is value B (Pamb +
580 mbar (8.41 psi)).

6. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- release the PACK 1 pushbutton - the OFF legend of the PACK 1
switch. pushbutton switch comes on.
On the CABIN PRESS section of the On the vertical speed indicator:
panel 25VU: - the cabin vertical speed is 0.
- with the MAN/V/S CTL switch, On the pressure indicator:
keep the pressure stable at - the cabin pressure is value B (Pamb +
value B (Pamb + 580 mbar (8.41 580 mbar (8.41 psi)).
psi)).

7. On the CABIN PRESS section of the On the lower ECAM display unit, on the
panel 25VU: CAB PRESS page:
R - with the MAN/V/S CTL switch in - the outflow valve is in the fully
R DN position, fully close the closed position.
R outflow valve. On the AIR COND panel 30VU:
On the AIR COND panel 30VU: - the OFF legend of the PACK 2
- release the PACK 2 pushbutton pushbutton switch comes on.
switch when the outflow valve On the pressure indicator:
is closed. - the cabin pressure indication
decreases.

8. Monitor the pressure decrease:


- at value C (Pamb + 560 mbar
(8.12 psi)), start the
stop-watch.
- at value D (Pamb + 550 mbar
(7.97 psi)), stop the
stop-watch and write the time.



EFF :

ALL  05-53-00

Page 551
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
9. Calculate the leakage rate:
- leakage rate = (value C) -
(value D) / time
The leakage rate is permitted
if less than 0.8 mbar/s (0.7
PSI/min)

On the AIR COND panel 30VU: On the vertical speed indicator:


- push the PACK 1 and PACK 2 - the cabin vertical speed must not be
pushbutton switches (the OFF more than 500 ft.min (152.39 m.min).
legend is off). On the pressure indicator:
On the CABIN PRESS section of the - the cabin pressure indication
panel 25VU: decreases to the external ambient
- with the MAN V/S CTL switch, pressure.
decrease the cabin pressure
until you get a differential
pressure of 0 psi.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min).

R 10. After the cabin is fully


R depressurized, fully open the
R outflow valve.

5. Close-up
________

Subtask 05-53-00-865-069

A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23



EFF :

ALL  05-53-00

Page 552
Feb 01/06
 
JSA 
R **ON A/C ALL

Subtask 05-53-00-860-061

B. Put the aircraft back to its initial configuration.

R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).

(2) On the EXT LT section of the panel 25VU:


- set the BEACON switch to OFF position.

R (3) Remove the pressure indicator, the vertical speed indicator and the
R stop-watch.

R (4) Remove the safety plug from the pressure switch 16WR.

(a) In the avionics compartment:


- Remove the safety streamer from the safety plug.
- Remove the safety plug with its O-ring from the air inlet of
the pressure switch 16WR.

R (5) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).

(6) Put the system and the aircraft back to the serviceable
configuration.

(7) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(8) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(9) Remove the warning notices and the safety barriers.



EFF :

ALL  05-53-00

Page 553
Feb 01/06
 
JSA 
TASK 05-53-00-780-003- 01

Test to Measure the Structural Leakage (with AIDS)

WARNING : MAKE SURE THAT:


_______
- ONLY THE PERSONS NECESSARY FOR THE PRESSURIZATION TEST ARE IN THE
AIRCRAFT DURING THE TEST.
- THE PERSONS IN THE AIRCRAFT HAVE MEDICAL APPROVAL TO DO THIS TYPE
OF TEST (REFER TO YOUR LOCAL REGULATION).
BE CAREFUL WHEN YOU CONTROL THE PRESSURE. SUDDEN CHANGES IN PRESSURE
CAN CAUSE PAIN AND INJURY.

WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.

WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT IS


_______
PRESSURIZED.
A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
- WILL CAUSE EXPLOSIVE DECOMPRESSION.
- CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE
AIRCRAFT/EQUIPMENT.

WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.

1. __________________
Reason for the Job

To measure the structural leakage.

NOTE : The pressure test that follows is only necessary after the repair if
____
the repair procedure in the SRM or in the repair instruction directly
tells you to do it.



EFF :

ALL  05-53-00

Page 554
Feb 01/06
R  
JSA 
2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific circuit breaker(s) safety clip(s)


No specific safety barriers
No specific safety plug - ref MS21913-4
No specific safety streamer
No specific warning notices
No specific O-ring - ref NAS1612-4

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

12-33-21-618-001 Pre-conditioning through the HP Ground Connection


12-33-21-618-001 Pre-conditioning with the APU
23-44-00-700-001 Operational Test of the Service Interphone
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
31-36-00-740-008 Access to the Parameter Call-Up Menus
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
34-10-00-860-002 ADIRS Start Procedure
34-10-00-860-005 ADIRS Stop Procedure
35-12-41-000-002 Removal of the Full-Face/Quick-Donning Oxygen-Mask
35-12-41-400-002 Installation of the Full-Face/Quick-donning
Oxygen-Mask


R

EFF :

ALL  05-53-00

Page 555
Feb 01/06
 
JSA 
3. __________
Job Set-up

Subtask 05-53-00-865-054

A. Open, safety and tag this(these) circuit breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23

**ON A/C 001-002,

Subtask 05-53-00-860-059-A

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Make sure that the static probe covers are not installed.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

R NOTE : If during this test, the avionics equipment ventilation stops,


____
R you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.


R

EFF :

ALL  05-53-00

Page 556
Feb 01/06
 
JSA 
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(7) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

R (10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the CARGO HEAT section of the panel 22VU:


- make sure that the AFT ISOL VALVE pushbutton switch is released
(the OFF legend is on).

(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

R (15) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

(16) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.


R

EFF :

001-002,  05-53-00

Page 557
Feb 01/06
 
JSA 
(17) Close and lock the sliding windows and all access doors to the
pressurized area.

(18) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).

(19) Pressurize the pneumatic system:


- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

R NOTE : You must close the access door 811 for this procedure.
____

**ON A/C 003-100,

Subtask 05-53-00-860-059

B. Aircraft configuration

(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.

(2) Make sure that the static probe covers are not installed.

(3) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-


002).

(4) Make sure that the avionics equipment ventilation operates correctly.

R NOTE : If during this test, the avionics equipment ventilation stops,


____
R you must stop the test.

(5) In the avionics compartment:

(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.

(b) Put a safety streamer on the safety plug.

R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).

R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.


R

EFF :

ALL  05-53-00

Page 558
Feb 01/06
 
JSA 
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.

(7) On the AIR COND panel 30VU:


- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).

(8) On the CABIN PRESS section of the panel 25VU:


- release the MODE SEL pushbutton switch (the MAN legend is on).

(9) On the EXT LT section of the panel 25VU:


- set the BEACON switch to ON.

R (10) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).

(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.

(12) On the VENTILATION section of the panel 22VU:


- release the EXTRACT pushbutton switch (the OVRD legend comes on).
- release the CAB FANS pushbutton switch (the OFF legend comes on).

(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.

R (14) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

(15) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.

(16) Close and lock the sliding windows and all access doors to the
pressurized area.

(17) Do an interphone communication test between the cockpit and the


ground service personnel out of the closed area (Ref. TASK 23-44-00-
700-001).


R

EFF :

003-100,  05-53-00

Page 559
Feb 01/06
 
JSA 
(18) Pressurize the pneumatic system:
- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).

R NOTE : You must close the access door 811 for this procedure.
____

**ON A/C ALL

4. Procedure
_________

Subtask 05-53-00-780-055

A. Procedure to Measure the Leakage Rate

WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.

WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.

WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.

NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.



EFF :

ALL  05-53-00

Page 560
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------

1. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- adjust the cabin temperature - make sure that the FAULT legend of
control as necessary. the PACK 1 and PACK 2 pushbutton
switches is off.
Air blows into the fuselage.

2. On the CABIN PRESS section of the On the MCDU (VSCB indication):


panel 25VU: - the cabin vertical speed must not be
- set the MAN V/S CTL switch to more than 500 ft.min (152.39 m.min).
DN and release, the switch On the MCDU (PDC indication):
moves to the neutral position. - the cabin differential pressure
Do this operation several increases to 280 mbar (4.06 psi).
times. This closes the outflow
valve (OVP indication on MCDU).

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on MCDU).

- stop when you get a cabin


differential pressure of 280
mbar (4.06 psi) (PDC indication
on the MCDU).

3. With the MAN/V/S CTL switch in Tell ground personnel to walk around
the UP or DN position, keep the the aircraft and do a check for
differential pressure stable at leakage.
280 mbar (4.06 psi) for 5 On the MCDU (VSCB indication):
minutes. - the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
280 mbar (4.06 psi).

R 4. Use the same procedure as in step On the MCDU (PDC indication):


R 2 to increase cabin differential - the cabin differential pressure
R pressure to 580 mbar (8.41 psi). increases to 580 mbar (8.41 psi).
On the MCDU (VSCB indication):
R NOTE : The cabin vertical speed
____ - the cabin vertical speed must not be
R must not be more than 500 more than 500 ft.min (152.39 m.min).
ft.min (152.39 m.min)
R (VSCB indication on the
MCDU).



EFF :

ALL  05-53-00

Page 561
Feb 01/06
 
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. With the MAN/V/S CTL switch in On the MCDU (VSCB indication):
the UP or DN position, keep the - the cabin vertical speed is 0.
differential pressure stable at On the MCDU (PDC indication):
580 mbar (8.41 psi). - the cabin differential pressure is
580 mbar (8.41 psi).

6. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- release the PACK 1 pushbutton - the OFF legend of the PACK 1
switch. pushbutton switch comes on.
On the CABIN PRESS section of the On the MCDU (VSCB indication):
panel 25VU: - the cabin vertical speed is 0.
- with the MAN/V/S CTL switch, On the MCDU (PDC indication):
keep the differential pressure - the cabin differential pressure is
stable at 580 mbar (8.41 psi). 580 mbar (8.41 psi).

7. On the CABIN PRESS section of the On the lower ECAM display unit, on the
panel 25VU: CAB PRESS page:
- with the MAN/V/S CTL switch in - the outflow valve is in the fully
DN position, fully close the closed position.
outflow valve (OVP indication On the AIR COND panel 30VU:
on MCDU). - the OFF legend of the PACK 2
On the AIR COND panel 30VU: pushbutton switch comes on.
- release the PACK 2 pushbutton On the MCDU (PDC indication):
switch when the outflow valve - the cabin differential pressure
is closed. indication decreases.

8. Monitor the differential pressure


decrease on the MCDU (PDC
indication):
- at 560 mbar (8.12 psi), record
the cabin vertical speed (VSCB
indication on the MCDU).
The leakage rate is permitted
if the VSCB value (VSCB
indication on MCDU) is less
than 1300 ft.min (396.23
m.min).

On the AIR COND panel 30VU: On the MCDU (VSCB indication):


- push the PACK 1 and PACK 2 - the cabin vertical speed must not be
pushbutton switches (the OFF more than 500 ft.min (152.39 m.min).
legend is off). On the MCDU (PDC indication):
On the CABIN PRESS section of the - the cabin differential pressure
panel 25VU: decreases to 0.



EFF :

ALL  05-53-00

Page 562
Feb 01/06
R  
JSA 
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- with the MAN V/S CTL switch,
decrease the cabin differential
pressure until you get a
differential pressure of 0 psi.

NOTE : The cabin vertical speed


____
must not be more than 500
ft.min (152.39 m.min)
(VSCB indication on the
MCDU).

R 9. After the cabin is fully


R depressurized, fully open the
R outflow valve (OVP indication on
MCDU).

5. Close-up
________

Subtask 05-53-00-865-055

A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13

R **ON A/C 008-100,

R 122VU RPCU 4HL X23



EFF :

ALL  05-53-00

Page 563
Feb 01/06
 
JSA 
R **ON A/C ALL

Subtask 05-53-00-860-060

B. Put the aircraft back to its initial configuration.

R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).

R (2) On the EXT LT section of the panel 25VU:


- set the BEACON switch to OFF position.

(3) Remove the safety plug from the pressure switch 16WR.

(a) In the avionics compartment:


- Remove the safety streamer from the safety plug.
- Remove the safety plug with its O-ring from the air inlet of
the pressure switch 16WR.

R (4) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).

(5) Put the system and the aircraft back to the serviceable
configuration.

(6) Do the ADIRS stop procedure (Ref. TASK 34-10-00-860-005).

(7) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002).

(8) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-


002).

(9) Remove the warning notices and the safety barriers.



EFF :

ALL  05-53-00

Page 564
Feb 01/06
 
JSA 
DEMAGNETIZATION - MAINTENANCE PRACTICES
_______________________________________

TASK 05-54-00-860-001

Demagnetization of the External Parts of the Frames of the Windshield and


Sliding Windows

1. __________________
Reason for the Job

The demagnetization procedure is applicable to the external parts of the


frames of the windshield and sliding windows.

Use this procedure if you are sure that incorrect deviation of the standby
compass occurs after adjustment on the compensation base.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

DM05275A 1 DEMAGNETIZER - 110V/60HZ


DM05275B 1 DEMAGNETIZER - 220V/50HZ
MGM50 1 GAUSSMETER

B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

34-22-00-730-001 Compensation Adjustment/Test of the Standby Compass


34-22-23-000-001 Removal of the Standby Compass (2FN)
34-22-23-400-001 Installation of the Standby Compass (2FN)

3. __________
Job Set-up

Subtask 05-54-00-860-050

A. Aircraft Configuration

(1) Make sure that the A/C is not energized (batteries, engines or
external power supply).



EFF :

ALL  05-54-00

Page 201
Nov 01/04
 
JSA 
Subtask 05-54-00-010-050

B. Removal of the Standby Compass

(1) Remove the standby compass (Ref. TASK 34-22-23-000-001) from the
cockpit and keep it away from magnetic sources.

4. Procedure
_________

Subtask 05-54-00-280-050

A. Find the Magnetic Zones:

(1) Obey the instructions from the manufacturer for the GAUSSMETER
(MGM50).

(2) Make sure that the Gaussmeter operates correctly:


- the pointer must move when you put the instrument near the shaft of
the windshield wiper motors.

(3) With the Gaussmeter, find the magnetic zones of the external parts of
the frames of the windshield and sliding windows. Record the value
for each zone.

NOTE : Ignore the magnetization on the shaft of the windshield wiper


____
motors.

Subtask 05-54-00-869-050

B. Demagnetize:

(1) Obey the instructions from the manufacturer for the DEMAGNETIZER -
110V/60HZ (DM05275A) or the DEMAGNETIZER - 220V/50HZ (DM05275B).

(2) Energize the demagnetizer.

(3) Put the demagnetizer at a very small distance (1 cm approx.) from the
part it is necessary to demagnetize. This position gives the
reference plane.

(4) Push the power supply button (indicator light on) and keep the
demagnetizer above the magnetic zone during 2 to 3 seconds.
Then move the demagnetizer away slowly at a constant speed and at
right angles to the reference plane. You must move the demagnetizer
to a minimum distance of 50 cm approx. before you release the button.

(5) Do the step (4) again for each zone that you must demagnetize.



EFF :

ALL  05-54-00

Page 202
Nov 01/04
 
JSA 
(6) De-energize the demagnetizer.

(7) For each demagnetized zone, read the value shown on the Gaussmeter.
Make sure that this value is near zero.

(8) If you find zones that are not fully demagnetized, do again the step
(4) until the value read on the Gaussmeter is near zero.

5. Close-up
________

Subtask 05-54-00-410-050

A. Installation of the Standby Compass

(1) Install the standby compass (Ref. TASK 34-22-23-400-001).

Subtask 05-54-00-730-050

B. Compensation of the Standby Compass

(1) Do the compensation of the standby compass (Ref. TASK 34-22-00-730-


001).



EFF :

ALL  05-54-00

Page 203
Nov 01/04
 
JSA 
LEVELING AND MEASUREMENT AFTER A/C ABNORMAL OPERATION - INSPECTION/CHECK
________________________________________________________________________

TASK 05-56-00-200-001

Inspection/Check of the Leveling and Measurement after Abnormal Operation of


the Aircraft

1. __________________
Reason for the Job

This topic gives the instructions for the leveling, measurement and
alignment operations of the aircraft.
You can compare these checks with subsequent measurements to find possible
structural deformations after hard landings, too much turbulence, etc.
Do these checks after the replacement or major repair of a part of the
structure.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.65 m (5 ft. 5 in.)


No specific access platform 11.91 m (39 ft. 1 in.)
No specific access platform 3.55 m (11 ft. 8 in.)
98A08001004000 1 SET - PLUMBS BOBS
98A08001005000 1 HOLDING SET - MEASURING CORD
98A08001006000 1 COLUMN-GRADUATED
98D08003000000 1 SET-PLUMB BOBS MLG NLG WHEELS
98D08103000000 1 LANDING GEAR WHEEL TOE-IN LINE BAR
98D08103000001 1 LANDING GEAR WHEEL TOE-IN LINE BAR
98D08103500000 1 SIGHTING RODS SET
98D08103501000 1 PLUMB LINE PYLON



EFF :

ALL  05-56-00

Page 601
Nov 01/04
 
JSA 
B. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

07-11-00-581-001 Lifting for Aircraft Maintenance Operations


07-11-00-586-002 Lowering of the Aircraft for Maintenance Operations
28-25-00-650-001 Pressure Defuel
05-56-00-991-001 Fig. 601
05-56-00-991-002 Fig. 602
05-56-00-991-003 Fig. 603
05-56-00-991-005 Fig. 604
05-56-00-991-007 Fig. 605
05-56-00-991-008 Fig. 606
05-56-00-991-009 Fig. 607
05-56-00-991-010 Fig. 608
05-56-00-991-011 Fig. 609
05-56-00-991-012 Fig. 610
05-56-00-991-013 Fig. 611
05-56-00-991-014 Fig. 612
05-56-00-991-015 Fig. 613
05-56-00-991-016 Fig. 614

3. __________
Job Set-up

Subtask 05-56-00-860-050

A. Aircraft Maintenance Configuration

(1) You must do the measurement operations:


- when there is no air movement,
- at an almost constant temperature,
- in a closed hangar.

(2) Do the checks at least one hour after:


- the shutdown of the engine,
- the aircraft is in the sun for a long time.

(3) Write down the ambient temperature during the checks.

(4) Make sure that the control surfaces are in the zero position.



EFF :

ALL  05-56-00

Page 602
Nov 01/04
 
JSA 
Subtask 05-56-00-650-050

B. Defueling of the Aircraft

(1) Fully defuel the aircraft (Ref. TASK 28-25-00-650-001).

Subtask 05-56-00-581-050

C. Lifting of the Aircraft

(1) Lift the aircraft with jacks (Ref. TASK 07-11-00-581-001) and lift
the wheels off the ground.

Subtask 05-56-00-941-052

D. Get Access

(1) Put the access platform in position (Zone 100-200).

(2) Put the access platform in position (Zone 500-600-330-340).

(3) Put the access platform in position (Zone 320).

Subtask 05-56-00-941-053

E. Datum Lines and Datum Points Necessary for the Measurements

(1) Datum lines


(Ref. Fig. 601/TASK 05-56-00-991-001)

(a) Longitudinal axis XX = the line through the points 11 and 12
along the horizontal datum line of the fuselage point 22R, Z = 0.

(b) Vertical axis ZZ = the vertical line through the point 11.

(c) Transversal axis YY = perpendicular to XX and ZZ.

(2) Datum points of the fuselage


(Ref. Fig. 602/TASK 05-56-00-991-002)

(3) Table of measurements

(a) Table 1
(Ref. Fig. 603/TASK 05-56-00-991-003)

(b) Table 2
(Ref. Fig. 604/TASK 05-56-00-991-005)



EFF :

ALL  05-56-00

Page 603
Nov 01/04
 
JSA 
Datum
Figure 601/TASK 05-56-00-991-001



EFF :

ALL  05-56-00

Page 604
Nov 01/04
 
JSA 
Position of the Datum Points on the Fuselage
Figure 602/TASK 05-56-00-991-002



EFF :

ALL  05-56-00

Page 605
Nov 01/04
 
JSA 
Table 1 (Dimensions in Millimeters / Inches)
Figure 603/TASK 05-56-00-991-003



EFF :

ALL  05-56-00

Page 606
Nov 01/04
 
JSA 
Table 2 (Dimensions in Millimeters / Inches)
Figure 604/TASK 05-56-00-991-005



EFF :

ALL  05-56-00

Page 607
Nov 01/04
 
JSA 
Subtask 05-56-00-941-054

F. Procedure for the Z Measurements on Different Points of the Aircraft

NOTE : Do the Z measurements with the COLUMN-GRADUATED (98A08001006000).


____

(1) Operation of the column

(a) The column is installed on a tripod. It is set in the vertical


plane with a level.

(b) Use the thermometer installed on the column to measure the


ambient temperature.

(c) Adjust the height of the column with a rack system to align it
with the Z datum of the aircraft.

4. Procedure
_________

Subtask 05-56-00-220-050

A. Position of the Bottom Fuselage Points in the X, Y and Z Axes


(Ref. Fig. 605/TASK 05-56-00-991-007, 606/TASK 05-56-00-991-008)

NOTE : For the check of the point 10, measure the radome.
____

(1) Datum lines

(a) Make a projection of the points 10, 11, 12 and 13 to the floor
with the SET - PLUMBS BOBS (98A08001004000).

(b) Move the points 11 and 12 to the left by the dimension Y = 47.36
mm (1.8645 in.).

NOTE : The dimension 47.36 mm (1.8645 in.) at the points 11 and


____
12 is due to the angular position of the tool. You only
use this dimension when you measure with the SIGHTING RODS
SET (98D08103500000) installed on these points.
(Ref. Fig. 606/TASK 05-56-00-991-008)

(c) Move the points 10 and 13 to the left by the dimension Y = 45 mm


(1.7716 in.).

(d) Align a cord through the points 11 and 12 with the HOLDING SET -
MEASURING CORD (98A08001005000).



EFF :

ALL  05-56-00

Page 608
Nov 01/04
 
JSA 
Check of the Z Variations of the Bottom Wing Points and the Bottom Fuselage
Points
Figure 605/TASK 05-56-00-991-007



EFF :

ALL 

05-56-00 Page 609
Nov 01/04
 
JSA 
Measurement of the X, Y and Z Position of the Bottom Fuselage Points
Figure 606/TASK 05-56-00-991-008



EFF :

ALL  05-56-00

Page 610
Nov 01/04
 
JSA 
(2) Y measurement
Measure the right and left variations of the points 10 and 13 from
the cord.
(Ref. Fig. 606/TASK 05-56-00-991-008)

(3) X measurement
Write down the X position of the bottom fuselage points in relation
to the point 11.

(4) Z measurement
Adjust a sight tube at Z = -3500 mm (137.7953 in.) from the
horizontal datum of the fuselage.
Write down the variations between:
- the datum of the rods of the points 10 and 13,
- the scanning plane of the sight tube.

Subtask 05-56-00-220-051

B. Twist Check
(Ref. Fig. 607/TASK 05-56-00-991-009)

(1) Write down the height of the horizontal datum points of the fuselage.
Use two sight tubes on each side of the fuselage.

(2) Calculate the twist of the fuselage from the Z variations of the
horizontal datum points of the fuselage.

Subtask 05-56-00-220-052

C. Position of the Wing Points

(1) Z values
(Ref. Fig. 605/TASK 05-56-00-991-007)

(a) Install the SIGHTING RODS SET (98D08103500000) on the left and
right points 1, 2, 3, 4, 5 and 6.

(b) Set the sight tube at Z = -3500 mm (137.7953 in.) from the
horizontal datum of the fuselage.

(c) Write down the variations between the reading on the sight rods
at points 1, 2, 3, 4, 5 and 6 L and R and the sight tube scanning
plane.



EFF :

ALL  05-56-00

Page 611
Nov 01/04
 
JSA 
Z Values of the Horizontal Datum Points of the Fuselage
Figure 607/TASK 05-56-00-991-009



EFF :

ALL  05-56-00

Page 612
Nov 01/04
 
JSA 
(2) Measure the distance between the points 5L/5R and the points 10/13.
(Ref. Fig. 608/TASK 05-56-00-991-010)

(a) Make a projection to the floor of the points 10 and 13, 5L and 5R
with the SET - PLUMBS BOBS (98A08001004000).

(b) Make a mark at the dimension 45 mm (1.7716 in.) on the floor for
the points 10 and 13.

(c) Measure the distance between the points 5L/5R and 10/13.

(3) Angular values


(Ref. Fig. 609/TASK 05-56-00-991-011)

(a) Make a projection to the floor of the points 11 and 12 with the
SET - PLUMBS BOBS (98A08001004000). Put the theodolites in
position on these points.

(b) Make a mark at the dimension 47.36 mm (1.8645 in.) on the floor.

(c) Write down the angles of the points 2, 4, and 6 in relation to


the aircraft centerline from the points 11 and 13 for the left
and right wing.

Subtask 05-56-00-220-053

D. Position of the Points of the Trimmable Horizontal Stabilizer (THS)

NOTE : Make sure that the THS in the neutral position.


____

(1) Z values
(Ref. Fig. 605/TASK 05-56-00-991-007)

(a) Install the SIGHTING RODS SET (98D08103500000) on the points 35,
36, 37 and 38 L and R.

(b) Adjust a sight tube in a plane through Z = -3500 mm (137.7953


in.) of the horizontal datum of the of the fuselage.

(c) Write down the variations between the datum indications on the
rods and the scanning plane of the sight tube.

(2) Angle value of the point 37


(Ref. Fig. 608/TASK 05-56-00-991-010)

(a) Make a projection to the floor of the points 13 and 37 L and R


with the SET - PLUMBS BOBS (98A08001004000).



EFF :

ALL  05-56-00

Page 613
Nov 01/04
 
JSA 
Measurement of the Wing Points and the Horizontal Stabilizer Points
Figure 608/TASK 05-56-00-991-010



EFF :

ALL  05-56-00

Page 614
Nov 01/04
 
JSA 
Angular Values of the Wing Points and the Horizontal Stabilizer Points
Figure 609/TASK 05-56-00-991-011



EFF :

ALL  05-56-00

Page 615
Nov 01/04
 
JSA 
(b) Make a mark at the dimension 45 mm (1.7716 in.) on the floor for
the point 13.

(c) Measure the distance between the points 13 and 37L and the points
13 and 37R.

(3) Angle value


(Ref. Fig. 609/TASK 05-56-00-991-011)

(a) Make a projection to the floor of the points 12 and 13.

(b) Make a mark at the dimension 45 mm (1.7716 in.) on the floor for
the point 13.

(c) Make a mark at the dimension 47.36 mm (1.8645 in.) on the floor
for the point 12. Put the theodolites in position on these
points.

(d) Write down the angles of the points 35 and 37 with relation to
the centerline of the aircraft from the points 12 and 13 for the
left and right horizontal stabilizer.

Subtask 05-56-00-220-054

E. Position of the Points of the Vertical Stabilizer

(1) Verticality check


(Ref. Fig. 610/TASK 05-56-00-991-012)

(a) Install the SIGHTING RODS SET (98D08103500000) on the points 30,
31, 32 and 33 L.

(b) Align a theodolite at the dimension of 642.5 mm (25.2952 in.) to


the left of the aircraft centerline.

(c) Write down the variations in relation to the optical axis.

(2) X position of the point 32 L


(Ref. Fig. 611/TASK 05-56-00-991-013)

(a) Install the tool.

(b) Align the 0 mark of the tool with the two theodolites on each
side of the vertical stabilizer.

(c) Make a mark the two sight lines on the floor and the intersection
point.



EFF :

ALL  05-56-00

Page 616
Nov 01/04
 
JSA 
Verticality Check of the Vertical Stabilizer
Figure 610/TASK 05-56-00-991-012



EFF :

ALL  05-56-00

Page 617
Nov 01/04
 
JSA 
X Position of the Point 32L
Figure 611/TASK 05-56-00-991-013



EFF :

ALL  05-56-00

Page 618
Nov 01/04
 
JSA 
(d) Write down the X dimension in relation to the point 11.

Subtask 05-56-00-220-055

F. Position of the Engine Pylon

(1) X position of the points 40 and 41 of the pylon


(Ref. Fig. 612/TASK 05-56-00-991-014)

(a) Make a projection to the floor of the points of the tool with the
PLUMB LINE PYLON (98D08103501000). Measure the X dimension of
these points in relation to the point 11.

(2) Y position of the points 40 and 41 of the pylon


(Ref. Fig. 612/TASK 05-56-00-991-014)

(a) Make a projection to the floor of the points of the tool with the
PLUMB LINE PYLON (98D08103501000). Measure the Y dimension of
these points in relation to the aircraft centerline.

(b) Calculate the Y dimensions of the points 40 and 41 : -1100 mm


(43.3071 in.)

(3) Calculate the angle of the pylons


(Ref. Fig. 612/TASK 05-56-00-991-014)

(a) Enter the Ya and Yb values for the pylon measurements on the
measurement table.
YA : in relation to the pylon centerline for the forward external
point
YB : aft external point
YA = Y 40 - Ya
YB = Y 41 - Yb
YB - YA
tg Alpha = -----------
(X41 - X40)

(b) Calculate Alpha (Refer to the applicable table).

(4) Z value of the points 40 and 41


(Ref. Fig. 605/TASK 05-56-00-991-007)

(a) Measure the height of the points 40 and 41. Use a sight tube set
at -3500 mm (137.7953 in.) from the horizontal datum of the
fuselage.



EFF :

ALL  05-56-00

Page 619
Nov 01/04
 
JSA 
XY Values of the Engine Pylons
Figure 612/TASK 05-56-00-991-014



EFF :

ALL  05-56-00

Page 620
Nov 01/04
 
JSA 
Subtask 05-56-00-220-056

G. Position of the Landing Gear

(1) Nose landing gear (NLG)

(a) X position
(Ref. Fig. 613/TASK 05-56-00-991-015)

1
_ Make a projection to the floor of the centerline of the NLG
jacking point with SET-PLUMB BOBS MLG NLG WHEELS
(98D08003000000)

2
_ Align a cord with HOLDING SET - MEASURING CORD
(98A08001005000) along the centerline of the aircraft through
the points 11 and 12.

3
_ Write down the X position of the jacking point in relation to
the point 11 (dimension XC).

4
_ Calculate the position of the axis of the shock strut of the
landing gear.

(b) Y position
(Ref. Fig. 613/TASK 05-56-00-991-015)

1
_ Measure the variation between the axis of the NLG shock strut
and the aircraft centerline.

2
_ The sign of the deviation is + if the offset of the axis of
the shock strut is to the right. It is - if the offset is to
the left.

(c) Verticality of the axis of the shock strut


(Ref. Fig. 613/TASK 05-56-00-991-015)

1
_ Write down the angle Alpha (left side) (in a plane
perpendicular to the aircraft centerline). Write down the
angle Beta (in a plane parallel to the aircraft centerline).
Do these measurements with a clinometer.

(2) Main landing gear (MLG)

(a) X position
(Ref. Fig. 613/TASK 05-56-00-991-015)
For each landing gear :



EFF :

ALL  05-56-00

Page 621
Nov 01/04
 
JSA 
X and Y Positions of the Landing Gears
Figure 613/TASK 05-56-00-991-015



EFF :

ALL  05-56-00

Page 622
Nov 01/04
 
JSA 
1
_ Align a cord with HOLDING SET - MEASURING CORD
(98A08001005000) along the centerline of the aircraft through
the points 11 and 12.

2
_ Write down a perpendicular line to the aircraft centerline in
relation to the point 11.

3
_ Make a projection to the floor of the axis of the MLG jacking
points with the tool SET-PLUMB BOBS MLG NLG WHEELS
(98D08003000000).

4
_ Write down the X position of the axis of the shock strut in
relation to the point 11.

(b) Y position and symmetry of the landing gears


(Ref. Fig. 614/TASK 05-56-00-991-016)

1
_ Put the LANDING GEAR WHEEL TOE-IN LINE BAR (98D08103000000) or
LANDING GEAR WHEEL TOE-IN LINE BAR (98D08103000001) in
horizontal position on outboard side of the main landing gear
wheel.

2
_ Make a projection of the two ends to the floor with the plumb
line.

3
_ Measure the distance of the projections of the points to the
aircraft centerline. Subtract the forward and aft dimensions
and calculate the toe-in of the landing gears.

(c) Angles of the axis of the shock strut


(Ref. Fig. 613/TASK 05-56-00-991-015)

1
_ Write down the angle Alpha (left side) (in a plane
perpendicular to the centerline of the aircraft). Write down
the angle Beta (in a plane parallel to the centerline of the
aircraft). Do these measurements with a clinometer.

Subtask 05-56-00-220-057

H. Analysis of the measurements


(Ref. Fig. 603/TASK 05-56-00-991-003, 604/TASK 05-56-00-991-005)
The values specified in the tables 1 and 2 are the measurements from the
first aircraft at zero flight hour. You can use them as a guide to make
an analysis of the structural and aerodynamic condition of an aircraft:
- after repairs
- after aircraft maneuvers which make an alignment check necessary.



EFF :

ALL  05-56-00

Page 623
Nov 01/04
 
JSA 
Symmetry of the Main Landing Gears
Figure 614/TASK 05-56-00-991-016



EFF :

ALL  05-56-00

Page 624
Nov 01/04
 
JSA 
The deviations in relation to the specified measurements do not
automatically make the aircraft unserviceable .
You must:
- make an analysis of these deviations in relation to the structure and
the aerodynamics of the aircraft,
- make an estimate of their effect on flight safety.
If there are large deviations, do a visual inspection for these
failures :

(1) Local structural failures :


- buckled skin plates, cracked stiffeners, machined parts, peeling
paint
- torn or twisted fasteners.

(2) Structural failures that cause :


- fuel leaks in the tank areas
- air leaks in the pressurized areas
- blockages on parts that move
- leaks in the air conditioning, hydraulic or fuel systems
- short-circuits in the electrical system
- doors and access panels that you can not close because of the
distortion of the adjacent structure
- trim values of the control surface that are too high and decrease
the control range.

5. Close-up
________

Subtask 05-56-00-942-050

A. Put the aircraft back to its initial configuration

(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.

(2) Remove the access platform(s).

(3) Remove the warning notice(s).

Subtask 05-56-00-586-050

B. Lowering of the Aircraft

(1) Lower the aircraft on its wheels (Ref. TASK 07-11-00-586-002).



EFF :

ALL  05-56-00

Page 625
Nov 01/04
 
JSA 
AIRCRAFT STABILITY - MAINTENANCE PRACTICES
__________________________________________

TASK 05-57-00-200-001

Aircraft Stability

1. __________________
Reason for the Job

Use the method that follows to do graphical checks of the aircraft


stability.

NOTE : The stability graphs for aircraft on wheels (on dry or wet ground) in
____
this procedure are applicable to a parked or towed aircraft.

NOTE : With the stability graphs (A/C on wheels) in this procedure, you can
____
do a check of shifting or tipping stability limits. Do this if it is
necessary to know only one such limit (towing, for example).

You can also calculate the ballast necessary for aircraft stability in
unfavorable conditions in the configurations that follow:
- aircraft with 2 engines
- 1 or the 2 engines removed
- engine re-installation.

2. ______________________
Job Set-up Information

A. Referenced Information

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

WBM 1-10-00
05-57-00-991-001 Fig. 201
05-57-00-991-002 Fig. 202
05-57-00-991-003 Fig. 203
05-57-00-991-010 Fig. 204
05-57-00-991-011 Fig. 205
05-57-00-991-012 Fig. 206



EFF :

ALL  05-57-00

Page 201
Nov 01/04
 
JSA 
3. __________
Job Set-up

Subtask 05-57-00-860-050

A. Aircraft Maintenance Configuration

(1) Make sure that the flaps, the slats, the spoilers, the speed brakes
and the thrust reversers are retracted.

(2) Make sure that the THS is set to neutral.

4. Procedure
_________

Subtask 05-57-00-210-050

A. Stability of the Aircraft

(1) If necessary, install the ballast:


- in the forward compartment
- at the pax/crew door No 1.

(2) You can also refuel two wing tanks to put the aircraft back into
balance. In this case, add the weight of the fuel to the aircraft
weight.

NOTE : Before you put ballasts on the aircraft, make sure that you
____
obey the limits below (Ref. WBM 1-10-00):
- maximum weight of section 11
- maximum loads on cabin floor
- maximum load on jacking points.

(3) This procedure is applicable to these aircraft configurations, each


of which has a related diagram:
- diagram for aircraft on wheels, on dry ground,
(Ref. Fig. 201/TASK 05-57-00-991-001)
- diagram for aircraft on wheels, on wet ground,
(Ref. Fig. 202/TASK 05-57-00-991-002)
- diagram for aircraft on jacks,
(Ref. Fig. 203/TASK 05-57-00-991-003)
- diagram for aircraft on forward jack or on nose wheel jack,
(Ref. Fig. 204/TASK 05-57-00-991-010)
- diagram for aircraft on one main gear wheel jack,
(Ref. Fig. 205/TASK 05-57-00-991-011)
- diagram for aircraft jacked at main and nose gears for wheel
change.
(Ref. Fig. 206/TASK 05-57-00-991-012)



EFF :

ALL  05-57-00

Page 202
Nov 01/04
 
JSA 
Aircraft on its Wheels (on Dry Ground)
(applicable to a parked or towed aircraft)
Figure 201/TASK 05-57-00-991-001



EFF :

ALL 

05-57-00 Page 203
Nov 01/04
 
JSA 
Aircraft on its Wheels (on Wet Ground)
(applicable to a parked or towed aircraft)
Figure 202/TASK 05-57-00-991-002



EFF :

ALL 

05-57-00 Page 204
Nov 01/04
 
JSA 
Aircraft on Jacks
Figure 203/TASK 05-57-00-991-003



EFF :

ALL  05-57-00

Page 205
Nov 01/04
 
JSA 
Aircraft on Forward Jack or on Nose Wheel Jack
Figure 204/TASK 05-57-00-991-010



EFF :

ALL  05-57-00

Page 206
Nov 01/04
 
JSA 
Aircraft on one Main Gear Wheel Jack
Figure 205/TASK 05-57-00-991-011



EFF :

ALL  05-57-00

Page 207
Nov 01/04
 
JSA 
Aircraft Jacked at Main and Nose Gears for Wheel Change
Figure 206/TASK 05-57-00-991-012



EFF :

ALL  05-57-00

Page 208
Nov 01/04
 
JSA 
Subtask 05-57-00-210-052

B. Check of the Aircraft Stability

NOTE : The same procedure is applicable in all the above configurations.


____
The diagram related to aircraft on wheels on dry ground is an
example.
(Ref. Fig. 201/TASK 05-57-00-991-001)

(1) Check the aircraft stability, aircraft with two engines installed:
- without crew
- without galleys
- without pallets and containers.
For example, make a plot of point A on the chart from these
coordinates:
- weight: 46600 kg (102735.3852 lb)
- CG: 24%.

NOTE : In these conditions, the aircraft will be safe in winds up to


____
55 kts (102 km/h).

(2) Check the aircraft stability after removal of two engines.

(a) From point A, make a horizontal line: this cuts across the weight
axis at point B.

(b) From this point B, subtract the weight of the two removed engines
7000 kg (15432.3540 lb) approx. to get point B.

(c) From point A, make a vertical line: this cuts across one division
of the removed engine scale at point C.

(d) Make a line across two divisions on this scale (1 division for
each engine) to get point C.

(e) From point C, make a vertical line and from point B, make a
horizontal line: these two lines cut at point D. For this point,
the diagram gives these values:
- aircraft weight: 39600 kg (87303.0312 lb)
- CG: 35.5%
- permitted wind: 35 kts (65 km/h).

(3) Check the aircraft stability during engine installation with a


hydraulic lift.
For this example, we calculate that the hydraulic lift puts a 800 kg
(1763.6976 lb) contact force on the pylon.



EFF :

ALL  05-57-00

Page 209
Nov 01/04
 
JSA 
(a) Continue vertical line DC until it cuts across the contact
force scale to get point E.

(b) From this point, make a line across one division (0.8
ton/division) to get point E.

(c) From this point E, make a vertical line until it cuts across the
horizontal line DB to get point F.
The diagram shows that in these conditions, engine installation
is possible in the open air in winds of less than 35 kts (65
km/h).

(4) Calculate the quantity of ballast necessary for engine installation.


The engines are installed in the open air with a maximum windspeed of
45 kts (83 km/h).
If necessary, you will install the ballast in the forward
cargo-compartment at position 11.

(a) Continue line BF until it cuts across the 45 kts (83 km/h)
average windspeed line at point H.

(b) Continue vertical line FE until it cuts across the ballast on
section 11 scale at point G.

(c) From point G, make a horizontal line which cuts across the
vertical line from H at point J.

(d) Count the number of divisions on the scale between point G and J
(in the example, 2.3 divisions).
The weight of ballast necessary is thus:
2.3 x 500 kg (1102.3110 lb) = 1150 kg (2535.3153 lb)
In the example given, use the same procedure to calculate the
quantity of ballast necessary at cabin door No 1:
1.6 x 500 kg (1102.3110 lb) = 800 kg (1763.6976 lb)

NOTE : As the ballast only increases the aircraft weight by a


____
small quantity, this is ignored.



EFF :

ALL  05-57-00

Page 210
Nov 01/04
 
JSA 
_______________________________________________________________
NON-REVENUE FLIGHT - REQUIREMENTS FOLLOWING MAINTENANCE ACTIONS
DESCRIPTION AND OPERATION
_________________________

1. General
_______
R
R Non-revenue flight following maintenance actions are not required by AIRBUS
R except for actions involving items that cannot be properly ground tested to
R verify that the aircrafts operational characteristics have not been
R adversly affected. Service experience has shown that a non-revenue flight is
R good practice following actions or repairs which could affect the aircrafts
R inherent aerodynamic characteristics.

R NOTE : Operators Regulatory Authority may require non-revenue flights


____
R following certain maintenance actions.

R 2. Engine
__________________
Replacement
R Replacement or reinstallation of both engines does not require a non-revenue
R flight providing the engines have been successfully shop tested prior to
R installation, properly installed and successfully ground tested in
R accordance with all applicable maintenance instructions. However, owing to
R the number of different interfaces concerned, AIRBUS recommends that a
R non-revenue flight be carried out after changing or installing both engines
R to check that no double maintenance induced faults have been introduced.



EFF :

ALL  05-59-00

Page 1
Feb 01/06
 
JSA 
FERRY FLIGHT WITH GEAR DOWN - MAINTENANCE PRACTICES
___________________________________________________

TASK 05-59-32-869-001

Preparation for Ferry Flight with Gear Down

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.5 m (4 ft. 11 in.)

3. __________
Job Set-up

Subtask 05-59-32-941-050

A. General

(1) You must put the aircraft systems in the ferry flight with gear
down configuration before you can do such a flight.

4. Procedure
_________

Subtask 05-59-32-860-050

A. Put the Aircraft Systems in the Ferry Flight with Gear Down
Configuration

(1) Get access to the Avionics Compartment

R (a) Put an access platform in position at the access door 824.

R (b) Open the access door 824.

(2) In the avionics compartment, on the panel 188VU:

WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK.
_______
LOOSE LOCKWIRE CAN CUT OR BLIND YOU.



EFF :

ALL  05-59-32

Page 201
Nov 01/06
 
JSA 
(a) Remove the lockwire from the safety cover of the L/G DOWN VMO/MMO
SELECTION switch 22FP.

(b) Set the L/G DOWN VMO/MMO SELECTION switch 22FP to L/G DOWN.

5. Close-up
________

Subtask 05-59-32-942-050

A. Close-Up

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R (2) Close the access door 824.

(3) Remove the access platform(s).

(4) Make an entry in the log book to tell the crew that :
- the L/G DOWN VMO/MMO SELECTION switch is at L/G DOWN.



EFF :

ALL  05-59-32

Page 202
Nov 01/06
 
JSA 
TASK 05-59-32-869-002

Return to Normal Operation after a Ferry Flight with Gear Down

1. __________________
Reason for the Job

Self Explanatory

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------

No specific access platform 1.5 m (4 ft. 11 in.)

B. Consumable Materials

-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------

Material No. 19-010 USA AMS 5687


LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA
(Ref. 20-31-00)

3. __________
Job Set-up

Subtask 05-59-32-941-051

A. Not Applicable

4. Procedure
_________

Subtask 05-59-32-860-051

A. Put the Aircraft Systems in the Normal Configuration after a Ferry


Flight with Gear Down

(1) Get access to the Avionics Compartment

R (a) Put an access platform in position at the access door 824.

R (b) Open the access door 824.



EFF :

ALL  05-59-32

Page 203
Nov 01/06
 
JSA 
(2) In the avionics compartment, on the panel 188VU:

(a) Set the L/G DOWN VMO/MMO SELECTION switch 22FP to L/G NORM.

(b) Lock the safety cover and safety it with lockwire MISCELLANEOUS
(Material No. 19-010).

5. Close-up
________

Subtask 05-59-32-942-051

A. Close-Up

(1) Make sure that the work area is clean and clear of tool(s) and other
items.

R (2) Close the access door 824.

(3) Remove the access platform(s).

(4) Make an entry in the log book to tell the crew that :
- the L/G DOWN VMO/MMO SELECTION switch is at L/G NORM.



EFF :

ALL  05-59-32

Page 204
Nov 01/06
 
JSA 

You might also like