VALORIZACION DE LA PRODUCCION DEL CONCENTRADO DE COBRE

Productos Peso Ensayes Contenido Metalico Distribucin


TMS % Cu Ag oz/TM %As TM Cu Oz Ag TM As Zn% Cu% As%
Cabeza 4,800,000 0.95 0.40 0.0185 45,600 1,920,000 888 100.00 100.00 100.00
Conc. Cu 217,941 19.11 6.15 0.0041 41,648 1,340,334 9 91.33 72.67 1.04
Relave 4,582,059 0.09 0.11 0.0185 3,952 504,027 848 8.67 27.33 98.96
Total 4,800,000 0.95 0.38 0.0178 45,600 1,844,361 857 100.00 100.00 100.00
RC Cu 22.0

VALORIZACION DEL CONCENTRADO DE COBRE Base: 1 TM


Cotizaciones: $/TM $/lb $/oz $/gr
Cu 9,127.00 4.14 Ag 36.16 1.16
As
Pagos. $
Por Cont. Cu 1,686.61
Por Cont. Ag 187.51 2019.97
Total Pagos 1,874.12

Deducciones $
Cu 30.55 Gastos de refinacin
Ag 1.84 Gastos de refinacin

$/lb
Cu Pagable 0.90

Escalador Cu Si Precio oficial>Precio base


Increm Deduc 714.28
Si Precio oficial<Precio base
0
% As Libre 0.30
As 0
Total Deducc 746.68
Valor Final 1127.44 US$ / TM de Concentrado de Cobre
Venta Neta 245,714 Miles de $

CALCULO DEL VALOR DE 01 TM DE MINERAL

Valor de 01 TM de Mineral= Precio de 1TM de conc Cu = 1127.44 = 51.19 US$


Ratio de concentracin 22.0244

Comentario: Por su puesto que los costos de produccin + gastos generales y administrativos deben ser
bastante menores a este valor para que la mina sea rentable.
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 22 Cu 9.00 Cu
H20 1.79% Ag(Oz/Tc) 31.00 Ag(Oz/Tc)
TMS 21.606 Au 0.03 Au
MERMA % 0.44% As + Sb 2.00 As + Sb
TMNS 21.511 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 9.00 100 1.150 7.850 5467.46
Ag 31.00 90 1.800 26.100 15.19
Au 0.03 90 0.080 0.000 1122.66
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.9 0.2 0.1 5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.54
17.19
1222.6

VALOR
429.196
396.459 21.6062 7.85
0.000
825.655

135
0
0
0
135

20.625
40.555
0.636
165.000
40.000
0.000
0.000
266.816

423.84
9117.25 29.382
1641.10
10758.35
0

1075.84
9682.52
PRODUCTO
PROVEEDOR Z. Agreda
CONTRATO

PESOS COTIZACIONES
TMH 30.05 Cu 7.02 Cu
H20 1.79% Ag(Oz/Tc) 29.27 Ag(Oz/Tc)
TMS 29.512 Au 0.12 Au
MERMA % 0.44% As + Sb 2.00 As + Sb
TMNS 29.382 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 7.02 100 1.350 5.670 5467.46
Ag 32.263 90 2.000 27.037 15.19
Au 0.136 90 0.080 0.042 1122.66
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.9 0.2 0.1 6
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.54
17.19
1222.6

VALOR
310.005 97.60%
410.687 88.36% 27.0367
47.601 100%
768.293

162
0
0
0
162

20.625
40.555
0.636
200.000
45.000
0.000
0.000
306.816

299.48
8799.32 29.382
1583.88
10383.19
0

1038.32
9344.87
CONTRATO DE COMPRA VENTA DE CONCENTRADOS DE COBRE
Cantidad y duracin:
Tamao 100% del total de la produccin
Duracin 5 aos consecutivos
Calidad
Concentrados de flotacin con ensayes aproximados como se
indican a continuacin, libre de impurezas y materias nocivas
Cobre 22 %
Plata 4 Oz/TM
Arsenico 1.5 %
Humedad NE
Embarque
Tamao de lote Min. 100,000 TM durante la vigencia del contrato
Max. Ao 5 200,000
Ao 6 300,000
Ao 7 300,000
Ao 8 400,000
Ao 9 400,000
Variacin A opcin del vendedor, dentro del tamao del lote
Frecuencia Trimestral
CIFFO Puerto principal o paridad del flete

Metales pagables
Cobre Paguese el 96,7% del contenido de cobre a la cotizacin Settlement grado
"A" del London Metal Exchange, tal como es publicado en el London Metal
Bulletin durante el periodo de cotizacin correspondiente.

Plata Deduzcase 30 gr/TM de concentrado y paguese el saldo a la cotizacin


London Spot Bullion Broker para plata, tal como es publicado en el London
Metal Bulletin durante el periodo de cotizacin correspondiente.
Deducciones
Gastos de refinacin de Cu 0.075 US$/lb de cobre pagable.
Gastos de refinacin de Ag 0.30 US$/oz de plata pagable

CIFFO = Cost, insurance and Freight; Free out. Incoterm


Costo, seguro y Flete; descarga por cuenta del comprador
Metal Pagable = Es el contenido que queda luego de aplicar los porcentajes de deduc -
ciones descritos en el contrato.

Clausula de participacin en el precio (Escalador)


El gasto de refinacin para el cobre, ser incrementado en 0,001US$/lib pagable de Cu
por cada 0,01US$/lb que el promedio oficial de precio Settlement para el cobre de grado
"A" durante el periodo de cotizacin exceda los 0,90US$/lb pagable de cobre, y ser
disminuido en 0,001US$/lb pagable de cobre por cada 0,01US$lb que l promedio oficial
del precio Settlement para el cobre de grado "A" durante el periodo de cotizacin se en-
cuentre por debajo de los 0,90 US$/lb pagable de cobre.
Penalidades por Arsnico.
Libre 0,3%; 2,00US$/TM de concentrado por cada 0,1% por encima de 0,3, fracciones
prorrata.
Periodo de cotizacin
Cobre: Segundo mes calendario siguiente al mes calendario del arribo del buque al puerto de
descarga.
Plata: Segundo mes calendario siguiente al mes calendario del arribo del buque al puerto de
descarga.
Pago: 100% contra presnetacin de la factura final de acuerdo a los pesos, leyes y cotizacio-
nes finales
VALORIZACION DE LA PRODUCCION DEL CONCENTRADO DE COBRE

Productos Peso Ensayes Contenido Metalico Distribucin


TMS % Cu Ag oz/TM %As TM Cu Oz Ag TM As Zn% Cu%
Cabeza 1,000 0.95 0.40 0.0185 10 400 0 100.00 100.00
Conc. Cu 45 19.11 6.15 0.0041 9 279 0 91.33 72.67
Relave 955 0.09 0.11 0.0185 1 105 0 8.67 27.33
Total 1,000 0.95 0.38 0.0178 10 384 0 100.00 100.00
RC Cu 22.0

VALORIZACION DEL CONCENTRADO DE COBRE Base: 1 TM


Cotizaciones: $/TM $/lb $/oz $/gr
Cu 9,127.00 4.14 Ag 36.16 1.16
As
Pagos. $
Por Cont. Cu 1,686.61
Por Cont. Ag 187.51 2019.97
Total Pagos 1,874.12

Deducciones $
Cu 30.55 Gastos de refinacin
Ag 1.84 Gastos de refinacin

$/lb
Cu Pagable 0.90

Escalador Cu Si Precio oficial>Precio base


Increm Deduc 714.28
Si Precio oficial<Precio base
0
% As Libre 0.30
As 0
Total Deducc 746.68
Valor Final 1127.44 US$ / TM de Concentrado de Cobre
Venta Neta 51 Miles de $

CALCULO DEL VALOR DE 01 TM DE MINERAL

Valor de 01 TM de Minera= Precio de 1TM de conc Cu = 1127.44 = 51.19


Ratio de concentracin 22.0244

Comentario: Por su puesto que los costos de produccin + gastos generales y administrativos deben ser
bastante menores a este valor para que la mina sea rentable.
bucin
As%
100.00
1.04
98.96
100.00

US$

ativos deben ser


PRODUCTO
PROVEEDOR Z. Agreda
CONTRATO

PESOS COTIZACIONES
TMH 12.22 Cu 3.10 Cu
H20 5.11% Ag(Oz/Tc) 28.79 Ag(Oz/Tc)
TMS 11.596 Au 0.55 Au
MERMA % 0.06% As + Sb 0.00 As + Sb
TMNS 11.589 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 3.1 100 1.350 1.750 4872.55181
Ag 31.738 80 1.600 23.790 17.34384
Au 0.604 80 0.080 0.403 1272.9007
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 0.00 0.2 0.1 6
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.25
18.4
1303

VALOR
85.270 98.22%
412.617 94.56% 27.0367
513.234 97.69%
1011.120

-12
0
0
0
0

6.366
23.790
6.051
165.000
43.000
0.000
0.231
244.438

766.68
8884.95 11.5371
1599.29

0.00
0.00
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 29.9 Cu 6.14 Cu
H20 5.88% Ag(Oz/Tc) 14.99 Ag(Oz/Tc)
TMS 28.142 Au 0.11 Au
MERMA % 0.422% As + Sb 2.73 As + Sb
TMNS 27.720 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 6.14 100 1.150 4.990 5732.01
Ag 14.99 90 1.800 11.691 15.06
Au 0.168 90 0.080 0.017 1116.8
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.73 0.2 0.1 5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.66
17.06
1216.8

0.11875873 28.023

VALOR
286.027 97.74%
176.066 88.27% 27.0367
18.986 91.78%
481.079

126.5
0
0
0
126.5

16.515
20.306
0.254
165.000
40.000
0.000
0.000
242.075

112.50
3118.60
561.35
3679.95
0

367.99
3311.95
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 30.05 Cu 6.43 Cu
H20 1.79% Ag(Oz/Tc) 23.00 Ag(Oz/Tc)
TMS 29.512 Au 0.12 Au
MERMA % 0.44% As + Sb 2.00 As + Sb
TMNS 29.382 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 6.43 100 1.150 5.280 5473.13114
Ag 23.00 90 1.800 18.900 15.173613
Au 0 90 0.080 0.000 1122.66
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.9 0.2 0.1 5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.54
17.19
1222.6

VALOR
288.981 97.74%
286.781 88.27% 27.0367
0.000 91.78%
575.763

135
0
0
0
135

20.625
40.555
0.636
165.000
40.000
0.000
0.000
266.816

173.95
5110.94 29.382
919.97
6030.91
0

603.09
5427.82
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 30 Cu 2.30 Cu
H20 5.00% Ag(Oz/Tc) 7.97 Ag(Oz/Tc)
28.5 TMS 28.500 Au 0.12 Au
MERMA % 0.44% As + Sb 0.03 As + Sb
28.3746 TMNS 28.375 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 2.30 100 1.000 1.300 5467.46
Ag 7.97 90 1.800 5.373 15.19
Au 0 90 0.080 0.000 1122.66
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.6 0.2 0.1 2.5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.64
18.01
1222.6

VALOR
71.077 94% 5808
81.616 89.35%
0.000
152.693

60
0
0
0
60

10.913
16.112
0.254
150.000
40.000
0.000
0.000
217.279

-124.59
-3535.08 29.382
-636.31
-4171.40
0

-417.14
-3754.26
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 30 Cu 6.43 Cu
H20 5.88% Ag(Oz/Tc) 25.37 Ag(Oz/Tc)
TMS 28.236 Au 0.03 Au
MERMA % 0.44% As + Sb 2.00 As + Sb
TMNS 28.104 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 6.43 100 1.350 5.080 5473.13114
Ag 25.37 90 2.000 20.833 15.19
Au 0.03 90 0.080 0.000 1122.66
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.9 0.2 0.1 5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.54
17.19
1222.6

VALOR
278.035
316.453 29.463 5.08
0.000
594.488

135 CONT. 6%
0
0
0
135

20.625
40.555
0.636
200.000
45.000
0.000
0.000
306.816

152.67
4290.70 29.382
772.33
5063.03
0

506.30
4556.73 14809.36
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 30 Cu 3.66 Cu
H20 2.00% Ag(Oz/Tc) 23.82 Ag(Oz/Tc)
TMS 29.463 Au 1.71 Au
MERMA % 0.44% As + Sb 2.00 As + Sb
TMNS 29.333 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 3.66 100 1.350 2.310 5548.55
Ag 23.82 90 2.000 19.438 14.96
Au 1.71 90 0.080 1.459 39
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.00 0.2 0.1 5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.575
16.95
1200.45

VALOR
128.171
290.794 29.463 2.31
56.901
475.866

90
0
0
0
90 2640.00

20.625
40.555
0.636
165.000
45.000
0.000
0.000
271.816

114.05
3345.48 29.382
602.19
3947.67
0

394.77
3552.90 2664.67404
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 3.52 Cu 27.28 Cu
H20 1.79% Ag(Oz/Tc) 75.53 Ag(Oz/Tc)
TMS 3.457 Au 2.91 Au
MERMA % 0.44% As + Sb 9.00 As + Sb
TMNS 3.442 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 27.28 100 1.350 25.930 5548.55
Ag 75.53 90 2.000 65.977 14.96
Au 2.91 90 0.080 2.539 39
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 10.00 0.2 0.1 6
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES TMH ley Cu Con. Fino Rattio
2.575 Cabeza 30 3.66 109.8
16.95 Concentrado 3.52 27.28 96.0 8.52
1200.45 Relaves 26.48 0.52 13.8

TMH ley Ag Con. Fino Rattio


VALOR Cabeza 30 11.09 332.7
1438.739 Concentrado 3.52 75.52 265.8 8.52
987.021 Relaves 26.48 2.66 70.4
99.021
2524.780

588
0
0
0
588 2023.77

20.625
40.555
0.636
165.000
40.000
0.000
0.000
266.816

1669.96
5747.65 4.889
1034.58
6782.23
0

678.22
6104.01 3.442 6104.01
3626.89 Costos y Gastos
A favor 2477.12 26900 US TOT
Neto 1132.12 1345 US/20TM
% Recup Rattio

87.46 8.52

% Recup

79.90
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 30 Cu 7.01 Cu
H20 5.88% Ag(Oz/Tc) 19.38 Ag(Oz/Tc)
TMS 29.463 Au 0.10 Au
MERMA % 0.44% As + Sb 2.73 As + Sb
TMNS 27.814 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Cu 7.01 100 1.150 5.860 5548.5483
Ag 19.38 90 1.800 15.638 15.19
Au 0.10 90 0.080 0.009 1200.45
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 2.73 0.2 0.1 5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
2.575
16.95
1200.45

VALOR
325.145
237.534
10.924
573.603

126.5
0
0
0
126.5

20.625
40.555
0.636
165.000
40.000
0.000
0.000
266.816

180.29
5014.49 29.382
902.61
5917.10
0

591.71
5325.39 17307.52
PRODUCTO
PROVEEDOR
CONTRATO

PESOS COTIZACIONES
TMH 100 Zn 50.00 Zn
H20 10.00% Ag(Oz/Tc) 9.00 Ag(Oz/Tc)
TMS 90.000 Au 0.03 Au
MERMA % 0.50% As + Sb 0.50 As + Sb
TMNS 89.550 Pb + Zn 0.00 Pb + Zn

METALES PAGABLES
ELEMENTOS LEYES %PAGABLE DEDUCC. L.PAGABLE PREC. INT
Zn 50.00 85 1.350 41.150 1000
Ag 9.00 90 5.000 3.100 13
Au 0.03 90 0.080 0.000 1122.66
TOT. PAGABLE

PENALIDADES cont % More por cada penalida us


As%+Sb% 0.5 0.2 0.1 3 1.5
Hg ppm 0 20 10 5
Bi % 0.03 0.03 0.01 15
Pb + Zn 0 0 1 2
TOT. PENALIDADES

DUCCIONES
REFINACION Cu
REFINACION Ag
REFINACION Au
MAQUILA
FLETE
OTROS
ANALISIS Y ESTIBADORES
TOT. DEDUCC.

VALOR TNMS US
VALOR LOTE US
IGV 18%
PAGO TOT
ADELANTOS

DETRACCIONES 10%
PAGO NETO US
OTIZACIONES
1000 1000 US/TMS
13
1222.6

VALOR
411.500
40.300 98.21 48.65
0.000
451.800

4.5 CONT. 6%
0
0
0
4.5

20.625
40.555
0.636
140.000
45.000
0.000
0.000
246.816

200.48
17953.34 29.382
3231.60
21184.94
0

2118.49
19066.45 61965.96