You are on page 1of 1

Shallow water pipe lay barge

As the worlds foremost pipeline welding partner, we have the expertise to


Waterdepth 6 - 50 meter
deliver innovative, high quality welding solutions on land and sea. To make - shallow water pipe lay
- subsea rock installation Pipe diameter OD 18 - 60 inch
your welding solution smarter, faster and stronger, call us at +1 (832) 230 2700.
- GBS and SPM installation Crane capacity 500 tonnes*
Van Oord Offshore bv
- trenching and backfilling Dimension 120 x 40 meter T +31 183 642200

- seabed intervention works Accomodation 300 people F +31 183 642708


E area.off@vanoord.com
www.serimax.com
www.ApplusRTD.com - landfall construction
* 1,200 tonnes after modification I www.vanoord.com

Vallourec Group Offshore and EPC Contractors

EMAS_OSmaps_1111 1 10/25/11 9:53 AM Serim_OSmaps_1111 1 10/21/11 10:44 AM Applus_OSmaps_1111 1 10/18/11 11:39 AM


CONTRACTOR VESSEL CHARACTERISTICS WELDING LINE INSTALLATION CAPABILITY INSTALLATION METHODS BURIAL INFO. PIPE HANDLING WATER DEPTHS CONTRACTOR PIPELAY/BURY
VAnOord_OSmaps_1111 1 CAPABILITIES (BY WATER DEPTH) CONTRACTOR PIPELAY/BURY CAPABILITIES (BY PIPE DIAMETER) 10/18/11 11:42 AM

2011 SURVEY OF WORLDWIDE OFFSHORE PIPELINE


VESSEL BASE INFORMATION DIMENSIONS STATIONS METHOD TENSIONING PIPE TYPE MULTI LINES LAY DIA. S-LAY TOW INST. DIA. MAXIMUMS

MAX. NOMINAL PIPE JOINT LENGTH


VESSEL DRAFT (TOW/WORKING)
VESSELS BASE LOCATION

TOTAL TENSIONING CAPACITY

MAX. DIAMETER FOR BURIAL

PIPE ON REEL OR CAROUSAL


MIN. DIAMETER FOR BURIAL
SIMULTANEOUS LAY & BURY
1-North America

MAX QUARTERS CAPACITY

MANUAL (CONVENTIONAL)

EXT. or INT. BUNDLED PIPE


INSTALLATION & BURIAL CONTRACTORS & VESSELS

BEACH/TRANSITION ZONE

TOWED PIPELINE LENGTH


PERMANENT REEL S-LAY
REMOVABLE REEL S-LAY
NO. OF MULTI PIPELINES

MINIMAL WATER DEPTH


2-South America

EXPERIENCE TO DATE
MINIMUM DIAMETER

S-LAY (CENTER LAY)


3-Europe

WELDING STATIONS
RACK LENGTH FOR

STATION KEEPING

COILED LINE PIPE

ON-BOTTOM TOW
S-LAY (SIDE LAY)
MULTI PIPELINES
4-West Africa

MID-DEPTH TOW
PULL/FLOTATION
TOTAL STATIONS
LOGISTICS BASE

MAX. DIAMETER
PHOTO NUMBER

FLEXIBLE PIPE

SURFACE TOW
REELING PIPE
5-Middle East

PIPE-IN-PIPE
TENSIONERS
HULL DEPTH

AUTOMATIC

UMBILICAL
RIGID PIPE

BURY PIPE
6-Asia

HELIPORT

REEL LAY

PIPELAY

10,000'
LENGTH
B E A C H T O U LT R A - D E E P WAT E R

BURIAL
7-Other

1,000'

2,000'

3,000'

4,000'

5,000'

6,000'

7,000'

8,000'

9,000'
WIDTH

10-in.

12-in.

14-in.

16-in.

18-in.

20-in.

22-in.

24-in.

26-in.

28-in.

30-in.

32-in.

34-in.

36-in.

42-in.

48-in.

60-in.
J-LAY
TYPE

1-in.

2-in.

4-in.

6-in.

8-in.
0'
FEET FEET FEET FEET (PERSONS) QTY QTY KIPS IN. IN. IN. IN. MILES FEET FEET FEET FEET

NOVEMBER 2011 ALLSEAS GROUP, S.A. Contact: Frank Kluwen, Director; ALLSEAS USA, INC.; 333 N. Sam Houston Pkwy East, Suite 750; Houston, Texas 77060, Phone: (281) 999-3330, Fax: (281) 999-6363; Website: www.allseas.com
1 2 SOLITAIRE Varies DP pipelay vessel 984' 131' 79' 28' 420 H DP3 17 7 H H 3 2,316 H H H 2 2" 60" H 42' 50' >10,000' 9,100' (Lay Only 50' - >10,000') (S-Lay 2" - 60" Rigid Pipe)
Information Accuracy: Every attempt has been made to locate and contact all Offshore 2 2 AUDACIA Varies DP pipelay vessel 738' 106' 63' 27' 270 H DP3 11 7 H H 3 1,157 H H H 2 2" 60" H 42' 40' >10,000' 3,500' (Lay Only 40' - >10,000') (S-Lay 2" - 60" Rigid Pipe)
Pipeline Installation & Burial Contractors. No contractor was intentionally exluded from the 3 2 LORELAY Varies DP pipelay vessel 599' 85' 51' 22' 216 H DP2 7 6 H H 3 363 H H H 2 2" 36" H 42' 35' >10,000' 5,410' (Lay Only 35' - >10,000') (S-Lay 2" - 36" Rigid Pipe)
survey. In some cases, a pipelay or burial vessel was not included because information was
4 2 TOG MOR Varies Anchored pipelay barge 366' 90' 20' 7' 144 H 5 3 H H 1 221 H H H 2 2" 60" H H H 42' 10' 800' 100' (Lay Only 10' - 800')
not provided. We make no guarantee that this list is all inclusive. We have also been careful
Prepared By: 2 CALAMITY JANE Varies Bury vessel 427' 85 33' 15' 72 H DP2 H 4" 48" 30' 2,500' 1,345' (Bury Only 30' - 2,500')
M A G A Z I N E Jerry Greenberg / jerrygreenberg@earthlink.net
to summarize the capability and experience of each yard as best
ASCOT CONSTRUCTORS OFFSHORE LTD. Contact: businessdevelopment@ascotafrica.com; www.ascotfrica.com

2011 Offshore
as possible, by acting as a neutral party and integrator of information.
POSTER

95
We have collected the data from contractor-supplied information, 5 4 ASCOT FORCADOS 1 Choba, Portharcourt Derrick/pipelay barge 300' 90' 20' 10/12' 152 H Anchors 6 4 H H 1 100 H H H H H 4" 24" H H H H H H 4" 24" 40' 15' 200' 100' 90' 100' 24"
1455 West Loop South, Suite 400; Houston, TX 77027 For additional paper copies or general comments personal interviews, phone interviews, and company brochures. Neither 6 4 ASCOT ESCRAVOS 1 Choba, Portharcourt Pipelay barge 200' 54' 14' 8/12' 120 H Anchors 6 5 H 1 40 H H H H H 4" 16" H H H H H H 4" 16" 40' 12' 100' 40' 60' 50' 16"
Tel: 713-621-9720; Fax: 713-963-6296 E-mail: posters@pennwell.com. PDF Downloads available Offshore Magazine nor Jerry Greenberg guarantees nor assumes any
responsibility or liability for any reliance on the information presented in BISSO MARINE Contact: Ray Buchler, Vice President, Business Development; BISSO MARINE; 11311 Neeshaw Dr., Houston, Texas 77065; Phone: 281-897-1500; Fax: 281-897-1501; Email: info@bissomarine.com; Website: www.bissomarine.com
www.offshore-mag.com at www.offshore-mag.com this spreadsheet poster. DLB BIG CHIEF Derrick/Pipelay/Bury 220' 74' 14' 56 7 Point 3 2 7
DLB MIGHTY CHIEF Delivery - 2nd Qtr 2011 Pipelay 196' 76' 12' 61 7 Point 3 2 7
CAL DIVE Contact: Steven Brazda, Sr. Vice President, Sales & Marketing; CAL DIVE INTERNATIONAL; 2500 CityWest Blvd, Suite 2200, Houston, Texas 77042; Phone: 877-361-2600; Website: www.caldive.com
1 2 3 BRAVE Pipelay/Bury 275' 70' 18' 11' 90 H 7 Point 3 3
RIDER Pipelay/Bury 260' 72' 16' 7' 88 H 7 Point 3 3
LONE STAR Pipelay/Bury 313' 90' 18' 12' 165 H 8 Point 4 4
PECOS Pipelay/Bury 256' 72' 16' 9' 84 H 8 Point 3 3
SEA HORIZON Derrick/Pipelay 361' 98.4' 25.6' 13.2' 255 H 8 Point 7 5
CHET MORRISON CONTRACTORS Contact: Brett Blanchard, Vice President of Subsea Operations - Chet Morrison Contractors; Houma, LA.; Phone: (985) 868-1950, Fax: (985) 868-1970; E-mail: bblanchard@chetm.com; Website: www.chetmorrison.com
7 1 CM 11 Houma, LA Lay/Bury Barge 195' 46' 13' 5' 40 Anchors & Spuds 4 2 H 1 50 H H H H H H H 3 1" 30" H H H H H H H 2" 48" 80' 7' 100' 200' 60' (Lay 7' - 100'; Bury 7' - 100') (Lay 1" - 30" and Bury 2" - 30")
8 1 CM 9 Houma, LA Lay/Bury Barge 180' 54' 12' 5' 44 H Anchors 4 2 H 1 40 H H H H H H H 3 1" 30" H H H H H H H 2" 48" 40' 7' 250' 200' 210' (Lay 7' - 210'; Bury 7' - 200') (Lay 1" - 30" and Bury 3-1/2" - 30")
9 1 CM 15 Houma, LA Lay/Bury Barge 220' 60' 14' 8' 65 H Anchors 5 3 H 1 80 H H H H H H H 3 1" 30" H H H H H H H H 2" 48" 40' 8' 400' 200' 400' (Lay 8' - 400'; Bury 8' - 200') (Lay 1" - 30" and Bury 3-1/2" - 30")
CNOOC Contact: 616# 1078 Danjiang Road, Tanggu District, Tianjin, China 300451 Ph: (86 22)66908018, Fax: (86 22)66908000, Web: www.cnoocengineering.com
6 HAI YANG SHI YOU 201 Tanggu,Tianjin,P.R.C. N/A 669' 128' 46' TBD 380 TBD TBD TBD 2x200tons TBD TBD 6" 60" TBD TBD N/A TBD 49' 5 km/day (48"x1") TBD UC TBD TBD
LANJIANG Heavy derrick/lay barge 517' 157' 41' 26' 26' 26' - 492'
BH109 Lift/ pipe laying barge 307' 93' 22' 14'
BH106 Lift/ pipe laying barge 262' 75' 16' 673'
EMAS AMC Contact: Alan Cordy, Senior Vice President, Business Development & Commercial, 2103 City West Blvd, Suite 500, Houston, Texas 77042; phone: 281-487-7245; Website: www.emas.com
10 LEWEK CHAMPION Asia DP2 Pipe Lay Barge 466' 131' 33' 21' 358 H DP 7 6 H H 2 441 H H H H H H H 6" 60" H H H H H H H H 39' H 21' 1,969' 476' 476' 28" x 312', 22" x 460'
4 5 6 ENTERPRISE 3 Asia Derrick/Lay 394' 104' 30' 20' 300 8 Point 7 4 H H 2 300 H H H H H H H 6" 36" H H H H H H H H 39' H 30' 350'
LEWEK CRUSADER Asia Construction/Lay (Optional) 439' 105' 30' 20' 500 DP3 N/A 2 330 H H H H H H H 2" 24" H H H H H N/A H 30'
11 AMC CONNECTOR Europe OSV/Lay 515' 105' 40' 21' 140 DP3 N/A 2 330 H H H H H H H 2" 24" H H H H H N/A H 30'
GLOBAL INDUSTRIES, LTD. Contact: Byron Baker; GLOBAL INDUSTRIES, LTD.; 8000 Global Drive; Carlyss, LA 70665; Phone: (337) 583-5000, Fax: (337) 583-5100; E-mail: byronb@globalind.com; Web Site: www.globalind.com
12 1200 Delivery - 2nd Qtr 2010 DP-2 Derrick/Lay Vessel 532.4' 105.6' 52.8' 20.4'/21.8' 264 H DP-2/8-Point 10 5 H H 3 827 H H H 2 4" 60" H H 42' 45' >8,000' 0' (Lay Only 45' - >8,000') (S-Lay 4" - 60" Pipe)
1201 Delivery - 2nd Qtr 2011 DP-2 Derrick/Lay Vessel 532.4' 105.6' 52.8' 20.4'/21.8' 264 H DP-2/8-Point 10 5 H H 3 827 H H H 2 4" 60" H H 42' 45' >8,000' 0' (Lay Only 45' - >8,000') (S-Lay 4" - 60" Pipe)
13 CHICKASAW Carlyss, LA 2,790' DP Derrick Barge 275' 80' 20' 9'/14' 73 H D2/4-Point 3 1 H 1 80 H H H H H H 3 4" 12" H H H H 42' H 25' 6,000' 5,325' (Reel Lay Only 25' - 6,000') Reel Lay: 4" - 240,000', 6" - 102,000', 8" - 62,000', 10" - 30,000', 12" - 20,000')
14 COMANCHE Derrick/Lay Barge 401' 100' 29' 14'/19' 243 H 8 2 264 H H H 4" 60" H 1,000'
15 DLB 264 Derrick/Lay Barge 400' 100' 30' 14'/20' 275 7 2 300 H H H H 6" 60" H 1,000'
16 HERCULES (Conventional Lay) Carlyss, LA DP Derrick/Lay Barge 486' 140' 25' 12'/18' 269 H DP2/8-Point 9 6 H H 2 1,200 H H H H 2 4" 60" H H 80' H 45' >8,000' 2,525' (Lay Only 45' - >8,000') (S-Lay 2" - 60" Pipe)
16 HERCULES (with Reel Lay Capability) Carlyss, LA 2,790' DP Derrick Barge 486' 140' 25' 12'/18' 269 H DP2/8-Point 9 6 H H 2 1,200 H H H H H 2 2" 18" H H H H H 45' >8,000' (Lay Only 45' - >8,000') (Lay 2"; Reel Lay: 4" - 950,000', 6" - 448,000', 8" - 253,000', 10" - 162,000', 12" - 115,000', 14" - 95,000', 16" - 68,000', 18" - 52,000')
17 IROQUOIS Carlyss, LA Derrick/Lay Barge 400' 100' 30' 14'/18' 261 H 10-Point 8 5 H H 2 440 H H H H H H 2 8" 60" H H 42' 20' 1,200' 700' (Lay Only 20' - 1,000') (Lay 2" - 60", rigid, flexible, or coiled line pipe)
HEEREMA MARINE CONTRACTORS U.S., INC. Contact: Bruce Gresham, Vice President North America, Heerema Marine Contractors Us, Inc.; 15600 JFK Boulevard, 3rd floor; Houston, Texas 77032, Phone: (281) 880-1600, Fax: (281) 893-8395, E-mail : bgresham@hmc-heerema.com; Web Site: www.heerema.com
18 1 DCV Balder Fourchon, LA DP Pipelay/Inst. Vessel 505' 282' 138' 36'/90' 400 H DP3/12-Point 2 1 H H 2,800 H H H H 2 4" 38" H 157' 300' 10,000' 10,000' (J-Lay only 50' - 10,000') (J-Lay Only, 4" - 30" Rigid Pipe)
HELIX ENERGY SOLUTIONS GROUP, INC. Contact: Paul Byington, Sr. VP Subsea Construction, or Jeremy Woulds, VP Commercial; Helix ESG; 400 N. Sam Houston Pkwy. E., Suite 400; Houston, Texas 77060; Phone: (281) 618-0400, Fax: (281) 618-0502; E-mail; pbyington@helixesg.com or jwoulds@helixesg.com; Website: www.helixesg.com
7 8 9 INTREPID
EXPRESS
Ingleside, TX or As Required 5,280' DP MSV
Ingleside, TX or As Required 5,280' DP MSV
384'
531'
105'
114'
25'
32'
18'
20'
89
49
H
H
DP2
DP2
1
1
H
H
2
1
268
353
H H H H H H H
H H H H H H H
2
2
2"
2"
10"
14"
H
H
H H H H
H H H H
H H
H H
3"
3"
12"
12"
H
H
40'
40'
10,000'
10,000'
10,000'
10,000'
7,000'
10,000'
(Lay >40 - 10,000; Bury > 800 - 10,000)
(Lay >40 - 10,000; Bury > 800 - 10,000)
(Lay 2" - 10"; Bury 3" - 12")
(Lay 2" - 14"; Bury 3" - 12")
CAESAR Ingleside, TX or As Required DP PLV 480' 98' 56' 19'/25' 115 H DP2 9 7 H H 3 893 H H H H H H H 3 2" 36" H H H H H H 3" 12" 43' 50' 10,000' 10,000' (Lay >50 - 10,000; Bury > 800 - 10,000) (Lay 2" - 36"; Bury 3" - 12")
INTERNATIONAL CONSTRUCTION GROUP Contact: Ed Moorman VP Pipeline Division Ph: 985-798-7269, Fax 985-798-7286, Email: emoorman@intloffshore.com
19 1 IOS Pipeliner Larose, LA Lay/Bury 250' 72' 16' 40159 64 n/a 8 point 5 3 H H 50 H H H H H 3 2" 20" H H H H H 2" 20" 16' 300' 200' 240' (Lay 12" to 300') (Bury 12" to 200')
J. RAY McDERMOTT Contact: Bruce LeGros, GM Atlantic Basin Sales & Business Development; McDermott; 757 N. Eldridge; Houston, TX 77079; Phone: (281) 870-5000; E-mail: blegros@mcdermott.com; Website: www.mcdermott.com
20 DB 50 Morgan City, LA NA DP Derrick/Lay Barge 497' 151 41' 31' 234 H DP2/8-Pt. 8 NA H H NA 775/200 H H H H H H H 2+ 2" 20" H H H H 165' H 400' >10,000' 4,400' (J-Lay or Reel Lay 400' - >10,000') (J- or Reel Lay 2" - 20" Only, 3 portable reels)
21 DB 16 Morgan City, LA NA DP Derrick/Lay Barge 400' 100' 28.5' 16' 184 H DP2/8-Pt. 8 5 H H 3 300/100 H H H H H H H 2+ 2"/4" 10"/48" H H H H 42' H 20' >10,000' 3,500' (S-Lay or Reel Lay 20' - >10,000') (Reel Lay Rigid Pipe 2" - 10"; S-Lay 4" - 48")
22 DB26 Batam Island, Indonesia NA Derrick/Lay Barge 400' 105' 29' 16' 293 H 12-pt 12 5 H H 2 250 H H H 2+ 4" 48" H H 42' 20' case by case 2,600' 2,600' S-Lay 4" - 48" >1,000' (S-Lay 4" - 48")
23 DB27 Dubai, UAE NA Derrick/Lay Barge 420' 128' 28' 15.5' 270 H 12-pt 12 5 H H 2 540 H H H 2+ 4" 72" H H 42' 20' case by case 3,000' 3,000' S-Lay 4" - 72" >1,000' (S-Lay 4" - 72")
24 DB30 Batam Island, Indonesia NA Derrick/Lay Barge 420' 158' 28' 15' 303 H 12-pt 12 5 H H 2 550 H H H 2+ 4" 60" H H 42' 20' case by case 3,000' 3,000' S-Lay 4" - 60" >1,000' (S-Lay 4" - 60")
25 KP1 Dubai, UAE NA Derrick/Lay Barge 456' 99' 30' 15' 295 H 10-pt 10 5 H H 2 300 H H H 2+ 4" 60" H H 60' 20' case by case 2,600' 2,600' S-Lay 4" - 60" >1,000' (S-Lay 4" - 60")
26 LB32 Dubai, UAE NA Lay Barge 366' 104' 29.5' 15.7' 292 H 8-pt 8 H H 2 240 H H H 2+ 6" 60" H H 42' 10' case by case S-Lay 4" - 60" >1,000' (S-Lay 6" - 60")
27 3 Emerald Sea Dartmouth, Nova Scotia NA DP SCV Vessel 307 64' 36.5' 28' 109 H DP2 H H H H 2" 8" H H 6" 40" 25' 3,000' 3,000' (Flexible pipe Reel Lay / Pipeline Jetting 25' - 3,000') (Reel Lay flexible pipe 2" - 8"; burial 6" - 40")
3 Bold Endurance Dartmouth, Nova Scotia NA DP SCV Vessel 441' 64.6' 43.5' 27.8' 60 H DP2 H H H H 2" 8" H H 6" 40" 25' 3,000' 3,000' (Flexible pipe Reel Lay / Pipeline Jetting 25' - 3,000') (Reel Lay flexible pipe 2" - 8"; burial 6" - 40")
28 3 Agile Dartmouth, Nova Scotia NA DP SCV Vessel 441' 64.6' 43.5' 27.8' 199 H DP2 H H H H 2" 8" H H 6" 40" 25' 3,000' 3,000' (Flexible pipe Reel Lay / Pipeline Jetting 25' - 3,000') (Reel Lay flexible pipe 2" - 8"; burial 6" - 40")
10 11 12 29 NO102 NA DP SCVessel 451' 89' 32' 22.5' 199 H
LEIGHTON INTERNATIONAL Contact: Russell Waugh, General Manager-Offshore Oil & Gas, 302-303, 3F, Windsor Building, CST Road, Kalina, Santa Cruz (East), Mumbai-400098
DP2 2 240 H H 4" 16" H H 600 (Flexible pipe Reel Lay / Pipeline Jetting 25' - 3,000') (Reel Lay flexible pipe 4" - 15"; burial 6" - 40")

STEALTH A1 Barge: Accomodation, Pipelay, Work Barge 330' 100' 20' 15' 232 S92 Anchored 7 5 H H 2 220 H H H H N/A N/A 8" 60" H H H H H H N/A 40' 8.2' 328' N/A 328' N/A ( 0 to 150 mtrs) ((6"
6 to
to 60")
60)
ECLIPSE A1, Pipelay/Accommodation/Work Barge 427' 105' 28' 19' 260 S92 Anchored 8 4 H H 2 264 H H H H N/A N/A 6" 60" H H H H H H N/A 40' 11.48' 492' N/A 492' N/A ( 0 to 150 mtrs) (6" to 60")
NORCE OFFSHORE PTE LTD Contact: Stewart Massey, 29 International Business Park #05-06 Acer Building Tower B, Singapore 609923, Tel: + 65 6319 8787, Fax: + 65 6319 8783, www.norceoffshore.com
30 DLB NORCE ENDEAVOUR Singapore N/A Derrick/Lay Barge 480' 138' 33' 17'/20.3' 280 H 8-point 7 4 2 330 H EXT H H 2 4" 48" H H H 42' 18' 492'
SAIPEM AMERICA INC. Contact: Brian Fine - President; Bubba Guarino Business Development, SAIPEM AMERICA INC.; 15950 Park Row; Houston, TX 77084; Phone: (281) 552-5700 Fax: (281) 552-5915; e-mail: brian.fine@saipemamerica.com; bubba.guarino@saipemamerica.com
3 SAIPEM 3000 As req'd by Project Needs Heavy Lift DP Vessel 531.5' 126.7' 29.5' 22' 195 H DP3 H H H H H H H H H H H H 52' 10,000' 5,000' (Lay Only 40' - 10,000') (Lay Only 6" - 60")
31 3 CASTORO SEI As req'd by Project Needs Semi-sub Lay Barge 498.7' 213.3' 98.4' 47.6' 330 H 12 Point 6DJ 3DJ H H 3 859 H H H 6" 60" H H H 84' 40' 3,500' 4,100'' (Lay Only 35' - 3,500') (Reel Lay Only 4" - 8")
32 3 CASTORO OTTO As req'd by Project Needs Derrick/Lay Barge 629.9' 114.8' 49.2' 32.8 339 H 12 Point 9 5-6 H H 3 595 H H 6" 60" H H H 84' 29' 1,200' 1,200' (Lay Only 22' - 1,200') (Lay Only 6" - 60")
33 3 SAIPEM 7000 As req'd by Project Needs Derrick/J-Lay Barge 649.6' 285.4' 142.7' 88.6' 850 H DP3/14-Point 2QJ 1QJ H H 3/3+clamps 1,160/2,200 H H H H 4" 32" H H H H 168' H 108' 10,000' 7,500' (J-Lay Only 350' - >10,000') (J-Lay Only 4" - 32")
34 3 CASTORO 10 As req'd by Project Needs Lay / Trenching Barge 370' 120' 30' 14'8"/17'1" 168 H 8 Point 6 3 H H 2 400 H H H 4" 40" H H H H 4" 60" 42' 21' 800' 800' (Lay or Bury 20' - 800') (Lay Only 4" - 40" or Bury 4" - 60")
35 3 SEMAC I As req'd by Project Needs Semi-sub Lay Barge 487.3' 180.1' 91.3' 23'/44'3" 362 H 12 Point 7DJ 4DJ H H 3 600 H H H H 2 6" 60" H H H 84' 32' 2,000' (Lay Only 30' - 2,000') (Lay Only 6" - 60")
36 3 SAIPEM FDS As req'd by Project Needs Field Development Ship 536' 99' 41' 24.3'/26.2' 213 H DP-Class III 1QJ 1QJ H H Clamps 1,210/1,650 H H H H H H 2 4" 20" H H H H H H 168' H 10,000' 52' 10,000' (Lay Only 50' - 10,000') (Lay Only 4" - 20")
37 3 CASTORO 7 As req'd by Project Needs Semi-sub Lay Barge 549' 192' 65' 37.7'/65.6' 401 H 14 Points 7DJ 4DJ H H 5 750 H H H H 3 8" 60" H H H 84' 50' 1,500' (Lay Only 30' - 1,350') (Lay Only 8" - 60")
38 3 CASTORONE As req'd by Project Needs DP Lay Vessel 1082' 128' 78' 26.24'/34.77' 702 H DP3/8-Points 7TJ 3TJ-4TJ H H 3 1,650/3,306 H H H H 2 8" 60" H H H H H H H 126' H 37.7' 10,000' (Lay Only 43' - 10,000') (Lay Only 8" - 60")
13 14 15 39 3 SAIPEM FDS 2 As req'd by Project Needs Field Development Ship 600.4' 105.6' 47.6' 26.24'/31.16' 325 H DP-Class III 2QJ 1QJ H H Clamps 3,306/4,400 H H H H H 4" 36" H H H H H H 168' H 52' 10,000' (Lay Only 50' - 10,000') (Lay Only 4" - 32")
3 CASTORO II As req'd by Project Needs Derrick/Lay Barge 442.9' 106.9' 29.5' 8'/18' 248 H 11 point 8 5 H H 2 400 H H H H 2 8" 72" H H H 42' 22' 800' (Lay Only 22' - 800') (Lay Only 8" - 72")
3 S 355 As req'd by Project Needs Derrick/Lay Barge 354.3' 98.4' 24.6' 8.6'/15.2' 206 H 12 point 6 4 H H 2 220 H H H H 3 3" 48" H H H 42' 20' 600' (Lay Only 20' - 550') (Lay Only 3" - 48")
40 3 CRAWLER As req'd by Project Needs Derrick/Lay Barge 493.7' 112.4' 46.6' 23'/34.56' 230 H 12 point 8 4 H H 2 160 H H H H 3 4" 48" H H H 42' 32' 400' (Lay Only 32' - 400') (Lay Only 4" - 48")
3 S230 As req'd by Project Needs Lay Barge 230' 74.8' 14.9' 8.2'/10.56' 120 H 10 point 5 2 H H 1 55 H H H H 3 4" 30" H H H 42' 20' 160' (Lay Only 20' - 160') (Lay Only 4" - 30")
SEA TRUCKS GROUP Contact: Corrie van Kessel at corrievankessel@seatrucksgroup.com
41 JASCON 18 worldwide DP Lay Crane Accom 492' 120' 50' 20' 400 H DP3 7 5+1 H H 3 1,322 H H H H H H H H 4" 60" H H H H Shallow / ultra deep
42 JASCON 25 worldwide DP Lay Crane Accom 390' 100' 27' 16' 355 H DP3 6 3+1 H H 2 265 H H H H H H H H 4" 60" H H H H Shallow / medium
43 JASCON 30 worldwide DP Lay Crane Accom 365' 100' 20' 15' 298 H DP 3/10-Point 6 3+1 H H 3 220 H H H H H H H H 4" 60" H H H H Shallow / medium
44 JASCON 34 worldwide DP Lay Crane Accom 390' 100' 27' 16' 355 H DP3 6 3+1 H H 2 265 H H H H H H H H 4" 60" H H H H Shallow / medium
45 JASCON 35 worldwide DP Lay Crane Accom 492' 130' 50' 20' 400 H DP3 7 5+1 H H 2 882 H H H H H H H H 4" 60" H H H H Shallow / ultra deep
JASCON 2 West Africa DP Lay Accom 260' 116' 14' 10' 220 H 8-Point 5 3+1 H H 1 55 H H H H H H H H 4" 32" H H H H Shallow
SUBSEA 7 Contact: Julie Gauld, Global Corporate Communications Manager; SUBSEA 7 (US) LLC; 2101 CityWest Blvd, Building 1, Suite 200; Houston, Texas 77042-3021; E-mail: Julie.Gauld@Subsea7.com; Website: subsea7.com
NORMAND SEVEN Project Driven 2,900' DP Pipelay Vessel 426' 92' 28' 100 H DP3 600 H H 6,560'
SEVEN OCEANS Project Driven 2,900' DP Pipelay Vessel 516' 93' 24' 120 H DP2 800 H H 6" 16" H H 9,842' (Lay Only 30' - >9,500') (Reel Lay 16" Rigid, 19" Flexible)
46 SEVEN NAVICA Project Driven 2,900' DP Pipelay Vessel 356' 72' 29' 24.6' 72 H DP2 1 1 H H 1 500 H H H H H H 2 2" 19" H 42' H 30' 9,500'+ 6,600' (Lay Only 30' - 3,280') (Flexible only 2.5" - 12")
16 17 18 KOMMANDOR 3000 Project Driven 2,900' DP Pipelay Vessel 388' 69' 33' 16' 70 H DP2 6 440 H H H H 3 2.5" 12" H H H H 30' 3,280' 3,280' (Lay Only 30' - 4,920') (Flexible only 2.5" - 12")
47 LOCHNAGAR Project Driven 2,900' DP Pipelay Vessel 349' 75' 35' 18.3' 70 H DP2 6 440 H H H H 3 2.5" 12" H H H H 30' 4,920' 4,920'
SEVEN SEAS Project Driven 2,900' DP Multi-Purpose Vessel 503' 93' 25' 120 H DP2 2 860 H H 9,842' (Lay Only 50' - 2,000') (Flexible only 3" - 16")
48 ROCKWATER 1 Project Driven 2,900' DP Multi-Purpose Vessel 323' 59' 17' 97 H DP2/4-Point H H H 3" 16" H H H H H 50' 2,000'
SEVEN PACIFIC Project Driven 2,900' DP Multi-Purpose Vessel 437' 79' 33' 21' 100 H DP2 520 H H 9,842'
SKANDI NEPTUNE Project Driven 2,900' DP Multi-Purpose Vessel 342' 79' 34' 18' 106 H DP2 2 200 H H 3" 16" 8,842' (Lay Only 50' - 2,000') (Flexible only 3" - 16")
49 SEISRANGER Project Driven 2,900' DP Multi-Purpose Vessel H DP2 H H H 3" 16" H H H H H 50' 2,000'
50 ACERGY DISCOVERY Project Driven Flexible Pipelay/Construction Ship 409' 64' 21' 97 H DP2 H H
51 ACERGY POLARIS Project Driven Derrick Lay Barge 449' 128' 30' 16' 263 H DP3 7 4 H H 2 250/1,680 H H H 4" 48"/24" H H 25'
52 ACERGY EAGLE Project Driven Flexible Pipelay/Construction Ship 467' 64' 22' 101 H DP2 200 H H H 2" 24" H 30'
53 SEVEN MAR Project Driven Flexible Pipelay/Construction Ship 485' 89' 44' 26' 121 H DP2 760 H H 3" 20" H 50'
54 SKANDI ACERGY Project Driven Heavy Construction Ship 515' 89' 40' 28' 140 H DP3 280 H H 2" 14" H 25'
55 SAPURA 3000 Project Driven Heavy Lift and Pipelay Ship 496' 124' 49' 21' 330 H DP2 10 6 H H 3 540/800 H H H H H H H 1 6" 36"/20" H H H H 30'
SKANDI SEVEN Project Driven Flexible Pipelay/Consruction Ship 396' 75' 30' 20' 120 H DP3
SEVEN BOREALIS Project Driven Pipelay/Heavy Lift 598' 151.5' 53' 23'-38' 231 H DP3 13
SWIBER HOLDINGS Contact: Silvia Heng, Singapore, +65 6505 0800, silvia@august.com.sg, +65 6733 8873
19 20 21 6 SWIBER CHAI China Derrick pipelay barge 393.7' 125' 19.7' 36' 300 H
6 SWIBER CONCORDE South-East Asia Pipelay barge 371' 93.5' 24' 13.1' 248 H
56 6 SWIBER CONQUEST South-East Asia Accommodation/pipelay barge 354.3' 100.1' 13.5' 280 H
6 SWIBER GLORIOUS South-East Asia Accommodation/pipelay barge 370.7' 92' 16.4' 15.7' 300 H
6 SWIBER MAGNIFICENT South-East Asia Derrick Lay Barge 508.5' 164' 39.4' 7' 320 H
6 AZIZ South-East Asia Derrick Lay Barge 366' 104' 14' 14.7' 300 H
1 MAS 300 Pipelay/Accommodation 366' 104' 24' 14.8' 300 H
PJW 3000 Derrick Pipelay/Accommodation 554' 151' 44' 30' 310 H
SWIBER RESOLUTE Derrick Pipelay/Accommodation 416' 128' 29' 20' 300 H
TECHNIP Contact: Brennan Roy, Business Development Manager, Mike Songer, Business Development Manager, Technip, Energy Tower 1 - Suite 150, 11700 Katy Road, Houston, Texas 77079, USA. Tel: (281) 870-1111 or (281)-249-7500; Email: BRRoy@technip.com, MSonger@technip.com or Web Site: www.technip.com
57 3 CONSTRUCTOR Theodore, AL when in GOM DP MSV 416' 67' 27' 27' 109 H DP3 1 1 H 2 440 H H H H H H H 2 2" 14" H H H H 2" 12" 84' H 200' 5,000' (Modular J-Lay or S-Lay 200' - 5,000') (Modular J-Lay Rigid Pipe 2" - 14", Flexible 2" - 14" & Lay Coiled Line Pipe 1" - 4-1/2", Bury 2" - 12")
58 3 Apache II Theodore, AL when in GOM 4,800' DP Reel Ship 450' 89' 38' 22' 120 H DP3 1 1 H 1 411 H H H H H H H 2 2" 18" H H 50' 5,000' (Lay only 50' - 5,000') (Reel Lay Only 2" - 16")
59 1 DEEP BLUE Theodore, AL 4,800' DP Reel Ship 677' 105' 58' 33' 120 H DP3 1 1 H 2 1,697 H H H H H H H 3 2" 28" H H H 160' H 246' 10,000' (Lay 246' - 8,200') (Reel Lay 2" - 18", J-Lay 2" - 28")
60 1 DEEP ENERGY Theodore, AL 4,800' DP Reel Ship 636' 101' 50' 27' 140 H DP3 1 1 H H 2 1000 H H H H H H H 3 2" 18" H H 50' 10,000' (Reel Lay 2" - 18")

22 23 24 25 26 27 28 29 30 31 32 33 34

35 36 37 38 39 40 41 42 43 44 45 46 47

48 49 50 51 52 53 54 55 56 57 58 59 60

You might also like