Version
Risk Assessment No.
Name of Department / division/ Section/ Mapa Construction & Trade / Design & # of
Build of 4 water reservoirs in Makkah Al
Site Pages
Mukarramah of Total Capacity 560,000cu.mtr
LIKELIHOOD
LIKELIHOOD
LIKELIHOOD
RISK LEVEL
RISK LEVEL
RISK LEVEL
SEVERITY
SEVERITY
SEVERITY
ADDITIONAL CONTROLS
Identify Hazards (Hierarchy of controls to be
EXISTING CONTROLS TARGET DATE
S.N (Give necessary followed as described in sp-
o Activity 005)
description of
hazard)
L S R1 L S R2 L S R2
LIKELIHOOD
LIKELIHOOD
LIKELIHOOD
RISK LEVEL
RISK LEVEL
RISK LEVEL
SEVERITY
SEVERITY
SEVERITY
ADDITIONAL CONTROLS
Identify Hazards (Hierarchy of controls to be
EXISTING CONTROLS TARGET DATE
S.N (Give necessary followed as described in sp-
o Activity 005)
description of
hazard)
L S R1 L S R2 L S R2
Signatu
Name Date
re
Abraham Asanji
FORM Doc No.
Version
Risk Assessment No.
Name of Department / division/ Section/ Mapa Construction & Trade / Design & # of
Build of 4 water reservoirs in Makkah Al
Site Pages
Mukarramah of Total Capacity 560,000cu.mtr
LIKELIHOOD
LIKELIHOOD
LIKELIHOOD
RISK LEVEL
RISK LEVEL
RISK LEVEL
SEVERITY
SEVERITY
SEVERITY
ADDITIONAL CONTROLS
Identify Hazards (Hierarchy of controls to be
EXISTING CONTROLS TARGET DATE
S.N (Give necessary followed as described in sp-
o Activity 005)
description of
hazard)
L S R1 L S R2 L S R2
Nuri Kayserili