Malaysian Civil Engineering Standard

Method of Measurement (MyCESMM)

CLASS D: SITE INVESTIGATION WORK

Measurement covered under other classes:

Excavation not carried out for the purpose of soil investigation work (included in Class F: Earthwork ).
Mobilisation and boring for piling (included in Class H: Piling Work ).
Survey and setting out (included in Class A: General Items )

FIRST DIVISION SECOND DIVISION THIRD DIVISION Unit

1 Mobilisation and demobilisation 1 Deep boring sum


2 Cone penetration tests sum
3 Miscellenous tests sum

2 Deep boring 1 Plant movement 1 Land nr


2 Miscellaneous plant 2 Hillslopes nr
3 Stable platform over water nr
4 Fixed platform nr
5 Swampy ground nr

2 Boring in soil 1 Water m


2 Water with additives m
3 Air/foam m

3 Drilling in rock 1 Water m


2 Air/foam m
3 Reaming casing m
4 Grouting m3

4 Test 1 Standard penetration test nr


2 Vane shear test nr
3 Pressure meter test nr
4 Field permeability test nr
5 Dynamic cone test m

5 Sampling 1 Disturbed samples nr


2 Undisturbed sample using thin wall tube nr
sampler
3 Undisturbed sample using mazier nr
sampler
4 Undisturbed sample using piston nr
sampler
5 Undisturbed sample using Denison nr
sampler
6 Water sample nr

6 Miscellaneous 1 Borehole marker nr

Page 44
Class D : Site Investigation Works

ADDITIONAL DESCRIPTION
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
RULES
M1 The depth of boring, drilling, D1 Plant movement is the shifting C1 Items for plant movement A1 Item description for water
sampling. and testing shall be of plant or equipment from one shall be deemed to include sample shall state the volume.
measured from the borehole/test position to the dismantling and erecting from
Commencing Surface as next position. one position to another.
follows: A2 Item description for disturbed
a) Not exceeding 10 m. D2 Hillslopes is an access with C2 Sampling shall be deemed to sample shall state the weight
b) 10 20 m. gradient greater than 15 include transportation and of samples.
c) 20 30 m. degrees. preservation.
d) 30 40 m. A3 Item description for block
e) 40 50 m. D3 Small disturbed samples is C3 All field explorations and tests sample shall state the size of
f) Stated exceeding 50 m. less than 5 kg. shall be deemed to include sample.
daily field records and sample
logging.
C4 Items for mobilisation and
demobilisation shall be
deemed to include provision of
all plant , equipment and
ancillaries transportation to the
Site and removal off the Site
upon the completion of the
operation.

C5 Deep boring shall be deemed A4 Item description for boring in


to include ground water soil shall state nominal
observation. diameter of boreholes,
inclination angle, boxes, type
C6 Boring in soil shall be deemed of boring plant, and depth, as
to include provision of casing per measurement rule M1.
where necessary.
A5 Item description for testing
C7 Drilling in rock shall be shall state the type of test,
deemed to include core boxes cycles where applicable,
and become the property of the nominal diameter, and the
Employer, unless otherwise depth, as per measurement rule
stated. M1.

C8 Movement on land, over water A6 Item description for sampling


water and swamp area shall be shall state the size, type, and
deemed to include stable depth, as per measurement rule
platform M1.

Page 45
Malaysian Civil Engineering Standard
Method of Measurement (MyCESMM)

FIRST DIVISION SECOND DIVISION THIRD DIVISION Unit


3 Cone penetration tests 1 Plant movement 1 Land nr
2 Hillslopes nr
3 Stable platform over water nr
4 Stable platform over swamp area nr
5 Swampy ground nr

2 Test 1 Mechanical cone m


2 Piezocone m
3 Dissipation test nr

3 Miscellaneous 1 Test location marker nr

4 Miscellaneous test 1 Hand auger 1 Augering in soil m


2 Disturbed sample nr
3 Undisturbed samples using thin wall nr
tube sampler
4 Water sample nr

2 Trial pit 1 Excavation nr


2 Small disturbed sample nr
3 Bulk sample nr
4 Block sample nr
5 Water sample nr

3 Testing 1 Mackintosh and JKR probe m


2 Vane shear nr
3 Plate bearing nr
4 In situ CBR nr
5 Pocket penetrometer nr
6 Field density nr

4 Sampling 1 Small disturbed sample nr


2 Bulk sample nr
3 Undisturbed samples using thin wall nr
tube sampler
4 Block sample nr
5 Water sample nr

Page 46
Class D : Site Investigation Works

ADDITIONAL DESCRIPTION
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
RULES
A7 Item description for cone
penetration test shall state the
type, capacity of cone, machine
capacity , and depth, as per
measurement rule M1.

A8 Item description for


dissipation test shall state the
maximum hours of test
required.

D4 Samples taken from location C8 Miscellaneous tests shall be A9 Item description for trial pit
other than borehole, hand auger deemed to include plant shall state the dimensions.
or trial pit shall be classed as movements on the Site.
sampling . A10 Item description for
C9 Hand auger shall be deemed micellaneous tests shall state
to include ground water the equipment used, setting up
observation. where applicable, method, and
depth.
C10 Trial pit shall be deemed to
include lateral support, ground A11 Item description for plate
water observation, logging and bearing test shall state the
mapping of site wall, and required plate size, test load or
backfilling, unless otherwise pressure, and number of cycles.
stated.

A12 Item description for sampling


shall state the location (which
is other than borehole, hand
auger, and trial pit).

Page 47
Malaysian Civil Engineering Standard
Method of Measurement (MyCESMM)

FIRST DIVISION SECOND DIVISION THIRD DIVISION Unit


5 Laboratory tests 1 Classification test 1 Moisture content nr
2 Atterberg's limits. set
3 Specific gravity nr
4 Particle size distribution for fine grained nr
soils
5 Particle size distribution for coarse nr
grained soils

2 Soil strength tests 1 Unconfined compressive strength test set


2 Unconsolidated undrained triaxial set
compression test
3 Consolidated undrained triaxial set
compression test with pore water
pressure measurement
4 Consolidated drained triaxial set
compression test with pore water
pressure measurement
5 Direct shear box set
6 Multi reversal shear box set

3 Soil compaction related tests 1 Standard compaction (2.5 kg hammer) set


2 Heavy compaction (4.5 kg hammer) set
3 Vibrating hammer set
4 Unsoaked CBR nr
5 Soaked CBR nr

4 Chemical and electro-chemical tests 1 Organic matter content nr


2 Loss on ignition nr
3 Total sulphate content nr
4 Sulphate content nr
5 Chloride content nr
6 pH value nr
7 Resistivity test nr
8 Contaminants nr

5 Rock strength tests 1 Unconfined compressive strength test nr


2 Unconfined compressive strength with nr
Young's Modulus and Poisson's ratio
measurement test
3 Point load test nr
4 Petrographic examination test nr

6 Compressibility and permeability tests 1 One dimension consolidation nr


2 Variable head permeability nr
3 Fixed head permeability. nr

Page 48
Class D : Site Investigation Works

ADDITIONAL DESCRIPTION
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
RULES
D5 A set, for soil strength tests, C11 Laboratory tests shall be A13 Item description for laboratory
shall be defined as of three deemed to include preparation tests shall state the method of
specimens ; except for of specimens. testing and the standard
unconfined
unconfined compresssive test
compressive test requirements.
shall be defined as of two C12 CBR test shall be deemed to be
specimens carried out on both ends of A14 Item description for soil
each specimen, unless strength tests shall state the
D6 A set, for soil compaction otherwise stated. size of testing specimen and
related test, shall be defined as type of soil sample, i.e.
of five specimen tests from the C13 Special preparation for equipment undisturbed or remoulded.
sama bulk sample.
the same bulk sample shall be deemed to be
provided separately A15 Item description for direct
when expressly stated. shear box and multi reversal
shear box tests shall state the
size of the shear box.

A16 Item description for


contaminants shall state the
standard requirements, and the
contaminants to be analysed.

Page 49
Malaysian Civil Engineering Standard
Method of Measurement (MyCESMM)

FIRST DIVISION SECOND DIVISION THIRD DIVISION Unit


6 Instrumentation 1 Piezometer nr
2 Inclinometer nr

3 Settlement 1 Surface marker nr


2 Settlement plate nr
3 Displacement marker nr

4 Magnetic extensometer nr
5 Deep levelling datum nr
6 Monitoring nr

7 Geophysical survey and mapping 1 Seismic refraction survey 1 Setting out sum
2 Installation and readings spread
3 Preparation of bedrock and soil contour sum
maps

2 Resistivity profiling 1 Setting out sum


2 Installation and readings spread
3 Preparation of resistivity profiles sum

3 Geological terrain mapping m2

4 Utilities detection and mapping 1 Locate, detect, and map all utilities and
services sum
2 Verification with utilities provider sum
3 Conduct site verification sum

8 Report 1 Preliminary report 1 Soil investigation sum


2 Final report 2 Seismic refraction survey sum
3 Resistivity profiling sum
4 Geological terrain mapping sum
5 Utilities detection and mapping sum
6 Instrumentations sum

Page 50
Class D : Site Investigation Works

ADDITIONAL DESCRIPTION
MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
RULES
M3 Measurement of monitoring in C13 Items for piezometer and A17 Item descriptions for
number shall be based on the inclinometer shall be deemed piezometer and inclinometer
trips to the location of the to include pre-boring and shall state the type, depth, and
instrumentation. installation. material used.

C14 Items for monitoring shall be


deemed to include preparation A18 Item description for settlement
of monitoring report. plate shall state the dimensions
of plate, depth, and material
used.

A19 Item description for


monitoring shall state the
personnel and number of trips
required.

M4 Intervals of geophones for D7 A spread of installation and C15 Setting out for seismic A20 Item description for
seismic refraction survey shall readings for seismic refraction survey and installation and readings for
be measured along the slope. refraction survey shall include resistivity profiling shall be seismic refraction survey shall
a 24-channel seismograph with deemed to include survey state the interval of geophones,
geophones at not more than 5- coordinates, reduced levels, number of shots per set, and
metre intervals. and topographic profile for the type of shots required.
M5 Intervals of electrodes for
each set of installation and
resistivity profiling shall be
readings.
measured along the slope.
D8 Resistivity profiling shall be A21 Item description for
M6 Area measured for geological two-dimensional with C16 Items for verification with installation and readings for
terrain mapping shall be the electrodes at not more than 5- utilities provider shall be resistivity profiling shall state
plan area. metre intervals. deemed to include purchasing the type of configuration,
of necessary documents and number, and interval of
verification on the utilities electrodes required.
D9 Geological terrain mapping
shall be in accordance with detected, as compared with the
guidelines by the Minerals and records of the utilities provider.
Geoscience Department A22 Item descriptions for seismic
Malaysia. refraction survey and
geological terrain mapping
shall state the location and area
of the site to be investigated.

A23 Item description for geological


terrain mapping shall state the
requirement in the Minerals
and Geoscience Department
guidelines.

C17 Items for Soil Investigation A24 Item description for reports
Report shall be deemed to shall state the number of sets
include laboratory test results. and the format required.

C18 Items for seismic refraction


survey and resistivity
profiling report shall be
deemed to include geological
sections and interpretation of
data by specialists.

Page 51