Annexure-I

List of Products

Sr. Name of Product Quantity


No. (MTPM)
1 Vinyl sulphone 100
2 Acetanilide 50
Total 150
By Product
1 Acetic acid 22.1
2 Dilute sulphuric acid 390
3 HCl 120
4 Glauber salt 80

List of Raw Materials

Sr. Name of Raw Material Quantity (MTPM)


No.
Vinyl Sulphone-100 MTPM
1. Acetanilide 52.29
2. Chloro sulphonic acid 156.86
3. Thionyl chloride 47.06
4. SBS 12.29
5. Caustic lye 83.66
6. Ethylene oxide 27.58
7. Spent acid 65.36
8. Sulphuric acid 39.22
Acetanilide-50 MTPM
1. Aniline oil 39.00
2. Acetic acid 8.50
3. Acetic anhydride 2.50

Vini Industries 0
Annexure -II
Manufacturing Process
1. Vinyl Sulphone
Process Description
Stage 1: Acetylation
Charge acetic acid in jacketed vessel
Charge aniline in jacketed vessel
Heat reaction mass for reflux
Maintain reflux to obtain product acetanilide.
Excess acetic acid is recovered under vacuum distillation.
Product is flaked and packed as acetanilide
Stage 2: Sulphonation
Charge Chloro sulphonic acid in jacketed vessel.
Charge acetanilide slowly maintaining temperature parameters
Maintain temperature and recover hydrochloric acid in scrubber.
Charge Thionyl chloride slowly addition maintaining temperature.
Maintain temperature to obtain para sulphonyl chloride acetanilide.
Sulphur which is liberated is scrubbed in caustic soda solution to make
sodium bisulphite solution which is used in reation operation of product
vinyl sulphone.
Drown and isolate Chloro sulphonated mass in ace.
Isolated products ASC filtered, wash free of acid and charged for
reduction operation.
Stage 3: Coupling
Charge chilled water add sodium bisulphite in jacketed reactor.
Charge caustic lye to bring PH of sodium bisulphite solution.
Add product ASC maintaining temperature and PH parameter.
Reduced product is clarified in filter press and transferred to ethoxylation
reactor
Stage 4: Ethoxylation
Receive reduction material in jacketed reactor.
Add gradually at uniform rate ethylene oxide maintaining temperature
parameters. Dilute spent acid is added to maintain PH.

Vini Industries 1
Filter material in neutsch, washed, centrifuged and dried as condensate
product.
Dried product is weighed and charged in small lot of etherification
process.
Stage 5: Esterification
Charge ethoxylated (condensed) product.
Add required quantity of sulphuric acid under stirring.
Maintain temperature parameter till reaction is complete. Recover acetic
acid liberated by condensation method under vacuum.
Unload product vinyl sulphone in trollies.
Pulverize.
Charge in blender Mix for 2 hours.
Unload and pack as product vinyl sulphone.

Vini Industries 2
Chemical reaction

ClSO3H
SOCl2
NHCOCH3 NHCOCH3
SO2Cl

Dumpig
+ Ice
NHCOCH3 NHCOCH3
SO2Cl SO2Cl

NaHSO3
NaOH
NHCOCH3 Reduction NHCOCH3
SO2Cl SO2H

E.O.
NHCOCH3 H2SO4
NHCOCH3
SO2H SO2CH2CH2OH

Esterification
H2SO4
NHCOCH3 NHCOCH3
SO2CH2CH2OH SO2CH2CH2OH
(V.S.)

Vini Industries 3
Mass Balance
Mass Balance for Vinyl Sulphone

INPUT KG OUTPUT KG
Acetanilide 2000
Chloro sulphonic aci 6000 Sulphonation HCl 1150
Thinoyl chloride 1800 S.B.S. Slurry 1325

Ice 12500 Spent acid 15140


Water 2500 Drownings

SBS slurry 1325


SBS 470 Reduction
Caustic lye 3200

Ethylene oxide 1055 Ethoxylation/


Spent acid 2500 Condansation

Wash water 6100


Filtration ML for salt
recovery 13300

Centrifuge ML for salt


recovery 3310

Drying

Sulphuric acid 1500 Acetic acid 840


Esterification

Moiture 2050
Final Product 3835
Total 40950 40950

Vini Industries 4
2. Acetanilide:
Production of acetanilide is simply one stage process. Aniline is acetylated
by Acetic acid at high temperature. Excess acetic acid is recovered and then
it is flaked and packed in bags.
Process flow diagram:
Mass Balance of Acetanilide
INPUT KG OUTPUT KG
Acetylation
Aniline oil 780
Acetic Acid 570
Acetic Anhydride 50

Recovery of
Acetic Acid

Acetic Acid 400

Flaking

Packing

Product 1000

Total 1400 1400

Vini Industries 5
Annexure-III (A)
Water consumption & w/w generation details
Sr. Break up Water w/w
No. Consumption Generation
KLD KLD
I Domestic 3.5 3.0
II Gardening 4.0* --
III Industrial
(a) Process 09 15
(b) Water treatment 04 04
(c) Scrubber 05 --
(d) Washing 02* 02
(e) Cooling 7.5 2.5
(f) Boiler 2.5 0.5
Total Industrial 30.0 24.0
Total (I + II + III) 37.5 27.0
Recycle 6.0 --
Actual fresh water 31.5
requirement

* Recover water from RO


Note: Effluent generated from condensation process of VS will directly spray dried &
dilute stream of utility will be treated into primary effluent treatment plant,
treated water from ETP will sent to RO. Recovered water from RO will be
reused for washing & greenbelt development & RO reject will be spray dried.
Hence no industrial effluent will be disposed off anywhere.

Vini Industries 6
Annexure-III (B)
Water Balance Diagram
All units are in KLD

Total Raw Water consumption = 37.5 KLD


(31.5 Fresh + 6* recycle water)

Domestic Process Scrubber Washing Utilities Greenbelt


3.5 9 5.0 2* 14 4*

Soak pit Ice Retained with Water


Total volume Reject
3.0 13 by product treatment
22 4**
2 14
Water from
Drying loss 2.5 RM-11.35

Acetic acid VS condensate Dil. H2SO4 Cooling Boiler 4


0.85 15 15 7.5 2.5

Bleed off Blowdown


Sale to SD Sale to 2.5 0.5
actual 15 actual
user user

ETP
2+2.5+0.5+4 = 9
To G. Salt Eva. Loss
sale 3.0 12.0

Recovered RO Eva. loss


water 2.9
9
6*

Reject SD Salt
3 3 0.1

Vini Industries 7
Annexure -IV
Details of ETP
Primary Treatment & RO:
Estimated quantity of industrial effluent from process is nil and only source of
effluent is from plant/equipment washing & utilities and it is estimated 9.0
KLD. Industrial Effluent will be treated at own Effluent Treatment Plant
comprising of primary treatment followed by tertiary treatment and after RO
process.
The effluent generated is first collected in neutralization pits, where it is
neutralized, depending upon the acidity/alkalinity of raw influent. Alum &
Polyelectrolyte will be added as per requirement. Then neutralized industrial
effluent is taken to the primary settling tank, heavier particles then allow
retaining for certain time period for the settlement. Clear overflow taken
collect in treated water collection tank. Then it is pass though send filter and
finally pass though RO. Where permeate which ever will be reuse in greenbelt
development and pant washing and reject stream periodically sprayed dried
into spray dryer. Thus unit is achieving zero discharge of industrial effluent.
ETP Details
Sr. Name of Unit Size of Unit in Capacity
No. meter m3
1 Equalization/Neutralization 2.0 x 2.0 x 3.0 10
Tank (0.5 FD)
2 Primary Settling Tank 2.0 x 3.0 x 3.0 12
(1.5 FD)
3 Water collection Tank 2.0 x 2.0 x 3.0 10
(0.5 FD)
4 Sand Filter 0.450x1.8 mm 1.5 m3
Filtration rate
5 RO Treatment Standard supply 1.5 m3
Filtration rate
6 Sludge Drying Bed (2 Nos) 2.0 x 2.0 x 1.2 4 m2 surface
area

Vini Industries 8
Flow diagram of ETP

Effluent
from plant

Equalization/ Primary Treated RO


Neutralizatio Settling Tank water Sand Treatment
n Tank Filter
collection
Tank

Permeate Reject to
Reuse SD
Sludge Drying Bed

Vini Industries 9
Annexure -V
Details of Air Emissions

Sr. Stack Stack Fuel Fuel APC Pollutant


No. attached to Height Used consumption measure
in m rate
1 Steam Boiler 21 Bio 1.5/1.1 TPD Cyclone PM<150 mg/NM3
(600 kg/hr) fuel/coal SO2<100 ppm
2 Thermic fluid 21 HSD 1.5 TPD -- NOx<50 ppm
heater (5 lac
kilo C/hr)
3 DG Set (125 11 HSD 35 lit/hr --
kVA)

Vini Industries 10
Annexure-VI

Details of Hazardous Generation and Disposal

Sr. Type of Schedule Quantity Disposal method


No. Solid MTPM
Waste
1 ETP Waste 34.3 2.5 Collection, storage,
transportation and dispose to
TSDF
2 MEE Salt 34.3 2.5 Collection, storage,
transportation and dispose to
TSDF site
3 Used Oil 5.1 0.1 Collection, storage & reuse for
internal lubrication purpose.
In case of excess, sell to
registered re-processors.
4 Discarded 33.3 0.5 / Collection, storage and
Containers/ 200 disposal by selling to
Drums nos./month authorized dealers.

Vini Industries 11