You are on page 1of 42

BILL NO.

4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL)

NOTE:-

a) The Contractor shall be deemed to have visited


the site prior to tendering to ascertain for himself
the extent of the works to be executed as no
claims will later be entertained for lack of
knowledge of the conditions of the site. The
Contractor is also to take all safety precaution to
prevent any damages to the existing building and
services and he is to indemnify the Client of any
claims arising from such work.

b) The Contractor is strongly advised to familiarised


himself with the Conditions of the site with
regards to the type of works to be executed,
existing work done on site and the nature and
extent of work available on site, inspect any
remnants of building demolished, as no claims
will later be entertained on the grounds of lack of
knowledge on the type of the Works and shall be
held responsible for all charges, permits, etc.
payable to Local Authority.

c) The Contractor shall exercise such care and


attention as required to ensure that clearing
operation is confined within the areas to be
cleared. The Contractor shall be responsible and
pay at his own cost for any remedial works
required resulting from any clearing not
authorised by the P.D. or clearing beyond the
areas specified.

d) The breakdown of works given below to be used


as a guidance to the Tenderer for the preparation
of his tender and no responsibility is held for any
omissions and/or errors due to his negligence in
obtaining further information from the Drawings,
specification and existing site conditions and the
Tenderer is to allow for any further item and/or
descriptions which he feel necessary.

BBIM SCHOOL B4/1


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 0.00

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

NOTE:- (Cont'd)

e) The Tenderer is to note that this tender is based


on the Bills of Quantities and whatever rates
inserted by the Tenderer must be related to the
works to be executed. Whenever the works is
described as an item, the amount inserted for
the works is deemed to be the Lump Sum price
for the proper execution of the works.

f) All materials unless expressly specified


otherwise, arising out of the demolition work
shall become the property of the Contractor. The
Contractor shall be deemed to have allowed in
his prices for any salvage/resale value of the
same.

g) Demolition of existing structures shall including


all expenses to cut or seal-off and remove any
existing services.

h) All foundations of walls, footing, column, etc.


shall be grubbed out and removed and the
excavation backfilled with selected material to
the approval of the P.D. No broken up brickwork,
concrete and other hard material shall be
returned into the excavations.

i) All underground services pipes and cable


uncovered during the excavation for the grubbing
out of the structures shall be cut-off to the extent
of the excavations and removed.

j) Prior to commencement of works by the


Contractor, the Contractor shall liaise with the
P.D. to arrange that all services have been
disconnected.

BBIM SCHOOL B4/2


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 0.00

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

A. SITE CLEARANCE AND DEMOLITION

Note : Not withstanding the Standard Method


of Measurement Clause 2(a) and (b)
`Excavator', the Site Clearance is
measured as an `Item' for the area as
shown on plan. The Contractor shall
take into account of this when
preparing his tender. The cutting down
of trees shall be for all type of trees and
irrespective of girth or height.

A Clear the whole of the site (approximately 20,230


square metres) to the extent as shown on Drawing of
all rubbish, vegetation, lalang, shrubs, structures, etc.
as cut down all small and large trees irrespective of
girth or height including grubbing up roots, etc. as
described, demolish, dig out and break up all
foundation, premix road, pavement, light poles,
telephone poles, fencing, hydrants, structures or
other obstructions which interfere with the excution of
the Contract Works unless otherwise provided
elsewhere and clear away and remove all unwanted
materials from site to a tip to be provided by the
Contractor at his own expenses, including refilling
and compacting all voids with selected earth. ITEM - - 10,000.00

B Demolished existing SYABAS SUMP approximitely


6.00m x 4.00mm including dig out and break up all
fondation NO 1 3,500.00 3,500.00

BBIM SCHOOL B4/3


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 13,500.00

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

B. EARTHWORK

Notes:-

a) The Contractor is to take precaution that


earthfilling is to commence only on specific
approval of the P.D. when the site is completely
cleared of all rubbish, shrubs, bushes, trees, tree
roots, buildings, structures, foundation, debris
etc. as described.

b) The Contractor shall note that:

i) The measurement of excavation shall


be the nett volume of the voids formed
by the removal of the material
excavated as required and shown on
Drawings.

ii) The measurement of fill and compaction


shall be the nett content of the
embankment and other areas of fill
formed to the cross-sections as shown
in the Drawings measured from existing
ground level or the level of sub-soil
following the removal of topsoil, or such
lower level formed by excavation
directed by the P.D.

iii) The measurement of imported


earthfilling is the nett volume of
compacted fill formed measured in
accordance with the paragraph (b) (ii)
less the nett volume of the suitable
materials excavated from within the site
and other stated type of imported fill.
The Contractor shall allow in his rate for
the increase in bulk after excavation
and decrease in shrinkage after filling
BBIM SCHOOL and compacting or due to settlement,
B4/4
erosion and tolerance.
earthfilling is the nett volume of
compacted fill formed measured in
accordance with the paragraph (b) (ii)
less the nett volume of the suitable BILL NO. 4
materials excavated from within the site EXTERNAL WORKS
and other stated type of imported fill.
The Contractor shall allow in his rate for
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
the increase in bulk after excavation
and decrease in shrinkage after filling
and compacting or due to settlement,
erosion and tolerance.

TO COLLECTION : RM 0.00

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

B. EARTHWORK (Cont'd)

c) The Contractor shall verify that the dimensions


and levels of the existing ground are as shown
on the Drawings before the works commence.
Any discrepancy which may affect the works
shall be notified to the P.D. Failing such
verification and agreements, the dimensions and
levels shown on Drawings or as otherwise
determined by the P.D. shall be final and binding
on the Contractor.

A Excavation of earth to area of cutting and fill suitable


earth to area of filling to make up level within the site
including deposit, transporting, stock piling spreading
levelling and compacting in layers not exceeding
225mm thick with a 8 - ton roller to the approval of
the P.D. MC 2527 4.50 11,371.50

B Construct and maintain wash through size 9.0m x


5.0m x 0.60m Deep as per Drawing No. complete
with and including sum, foundation, steel bar, plate,
beam all necessary excavation, hardcore, water tap
and plumbing and remove and make good on
completion NO 1 12,000.00 12,000.00

C Construct and maintain 300mm wide temporary earth


drain as per drawing including all necessary
excavation, formwork, trimming excavated slides to
slope and remove and filled and compacted with
suitable earth on completion. M 240 6.00 1,440.00

D Construct and complete sedimention storage basin


overall size 5.00m x 5.00m x 2.30m high including
spillway pipe, emergency exit all as per Drawing No. NO 1 500.00 500.00

BBIM SCHOOL B4/5


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 25,311.50

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

C. SOIL TREATMENT/TERMITE PREVENTION

NOTE :

a) The Contractor shall control the subterranean


termites infestation to the proposed buildings as
shown on site plan by means of an approved
chemical executed from supply and lay to
maintenance, strictly in accordance to the
manufacturer's instruction and to the satisfaction
of the P.D.

b) Chemical used shall be that approved by the


local Pesticide Board of Malaysia and has an
effective residual period of not less than 20
years on normal soil.

c) All loose timbers, wood shavings and other


cellulose containing materials shall be removed
from the build on area before treatment.

d) Notice is to be given 24 hours prior to the


commencement of treatment.

e) Treatment Method and Coverage

The Contractor shall sustain uniform distribution


of chemical by the use of a motor pressure pump
with a sprayer gun with due consideration to the
following conditions :-

i) Power-spray surface at application rate


of 5 litres Termiticide at the correct
BBIM SCHOOL concentration for every metre square.
B4/6
BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT


Power-spray surface at application rate
of 5 litres Termiticide at the correct
concentration for every metre square.

ii) Power-spray to trench to 40mm soil


border around the ground beams and
columns at the application rate of 5
litres per metre square

iii) Power-spray soil surface at the


application rate of 5 litres Termiticide at
the correct concentration for avery
metre square.

TO COLLECTION : RM 0.00

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

C. SOIL TREATMENT/TERMITE PREVENTION

f) Warranty

Warranty to all works, shall abide by the


manufacturer's commitments and guarantees.

Supply and apply anti-termite soil treatment as


described in two (2) stages around and under all of
the proposed buildings and including all sub-structure
and perimeter of the buildings by Specialist including
obtaining a writtern warranty for ten (10) years from
the Specialist Applicator:

A Stage I - to be laid underneath lean concrete of


ground floor slab and beam MS 2760 4.80 13,248.00

B Stage II - to be laid before concreting of apron slab MS 360 4.80 1,728.00

BBIM SCHOOL B4/7


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 14,976.00

SECTION NO. 1 - SITE CLEARANCE, DEMOLITION


AND EARTHWORK (ALL PROVISIONAL) (CONT'D)

COLLECTION

From page No. B5/1 . . . 0.00

From page No. B5/2 . . . 0.00

From page No. B5/3 . . . 13,500.00

From page No. B5/4 . . . 0.00

From page No. B5/5 . . . 25,311.50

From page No. B5/6 . . . 0.00

From page No. B5/7 . . . 14,976.00

BBIM SCHOOL B4/8


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO SUMMARY RM 53,787.50

SECTION NO. 2 - ROAD, CARPARK, RAMP AND


PAVEMENT (ALL PROVISIONAL)

ROAD AND CARPARK

A Excavate oversite to reduce level from formation


level, average 515mm deep and get out, deposit and
spread in making up level where directed within the
site and remainder load and cart away including
grading to falls and cambers, rolled and compacted to
form sub-grade as described MS 4377 3.00 13,131.00

B 100mm (Consolidated) Thick sand as sub base


blinding, spread and levelled and well rolled and
compacted to required gradient as described with a
10 tons roller MS 4377 2.25 9,848.25

C 300mm (Consolidated) thick crusher run aggregate of


granite or lime stone of size 63.5mm and below base
course spread, levelled, well rammed and
consolidated in three equal layers to falls and
cambers as described all rolled with a 10 tons roller MS 4377 9.00 39,393.00

D 65mm (Consolidated) layer of premix binder course to


falls and chambers and well rolled as described MS 4377 8.00 35,016.00

BBIM SCHOOL B4/9


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E 50mm (Consolidated) layer of premix wearing course


ditto MS 4377 6.00 26,262.00

Kerb

Precast concrete 'Grade 20' (19mm aggregate) as


described including all necessary moulds, finishing
fair on exposed faces, hoisting, bedding and jointing
in cement mortar (1:3) as described:-

F 150mm (average) x 438mm high kerb with rounded


top edge cast in 600mm length and channel block
size 175mm x 100mm bedded on including 350mm x
100mm thick mass concrete `Grade 15' (19mm
aggregate) base and 400mm x 225mm similar
concrete haunching to one side splayed at top
including all ends, junction, curve length, intersection,
formwork and all necessary excavation M 648 22.00 14,256.00

TO COLLECTION : RM 137,906.25

SECTION NO. 2 - ROAD, CARPARK, RAMP AND


PAVEMENT (ALL PROVISIONAL) (CONT'D)

ROAD AND CARPARK (Cont'd)

Kerb (Cont'd)

Precast concrete 'Grade 20' (19mm aggregate) as


described including all necessary moulds, finishing
fair on exposed faces, hoisting, bedding and jointing
in cement mortar (1:3) as described:- (Cont'd)

A EXTRA FOR forming rectangular outlet size 200mm x


150mm high opening through 150mm average thick
kerb NO 64 12.00 768.00
_______________________

B Prepare and apply two coats of cement base paint on


exposed surfaces of kerb, 750mm girth in alternate
colours M 648 4.00 2,592.00

Road Marking

BBIM SCHOOL B4/10


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Road marking with two coats of approved road lining


paint as described including cleaning surfaces from
dirt, grease oil, laitance or other foreign matter :-

C 300mm Wide continuous stop line marking M 12 5 60.00

Road marking with two coats of approved road lining


paint as described including cleaning surfaces from
dirt, grease oil, laitance or other foreign matter :-

D 150mm Wide continuous chanelising line marking M 579 3.00 1,737.00

E 100mm Wide continuous edge line marking M 1042 2.50 2,605.00

F 100mm Wide parking line marking M 931 2.50 2,327.50

G Directional arrow signs on finished premix surfaces NO 19 150.00 2,850.00

TO COLLECTION : RM 12,939.50

SECTION NO. 2 - ROAD, CARPARK, RAMP AND


PAVEMENT (ALL PROVISIONAL) (CONT'D)

ROAD AND CARPARK (Cont'd)

Signage

A Supply and install warning (Berhenti) sign including


sign, supplementary plate (if required) post, concrete
base, painting and lettering all as per Engineer detail
drawing No. NO 5 350.00 1,750.00

B Supply and install warning (No Entry) sign ditto NO 4 350.00 1,400.00

PAVEMENT

C Excavate oversite to reduce level average 205mm


deep and get out, deposit and spread in making up
level where directed within the site and remainder
load and cart away MS 440 2.10 924.00

BBIM SCHOOL B4/11


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

D 75mm Thick bed of hardcore of hard, dry, broken


bricks, or stone, spread and levelled, well rammed
and consolidated to receive sand bedding (measured
separately) MS 440 3.80 1,672.00

E 30mm Thick sand bedding spread and levelled, well


compacted and blinded on hardcore to receive
interlocking concrete paving (hardcore measured
separately) MS 440 2.10 924.00

F 100mm Thick approved interlocking concrete paving


block in approved colour and laid in selected pattern
on sand bedding (measured separately) including all
necessary edging blocks MS 440 37.50 16,500.00

G Layer of steel fabric reinforcement to B.S. 4483 (BRC


A7 - weighing not less than 3.02kg/ms) well lapped
at joint and embedded in ramp bed (measured nett -
no allowance made for laps) MS 440 9.60 4,224.00

TO COLLECTION : RM 27,394.00

SECTION NO. 2 - ROAD, CARPARK, RAMP AND


PAVEMENT (ALL PROVISIONAL) (CONT'D)

COLLECTION

From page No. B5/9 . . . 137,906.25

From page No. B5/10 . . . 12,939.50

From page No. B5/11 . . . 27,394.00

BBIM SCHOOL B4/12


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO SUMMARY RM 178,239.75

SECTION NO. 3 - WATER RETICULATION (ALL


PROVISIONAL)

Note:-

a) The works included in this section comprises the


laying of reticulation main within the site as per
Drawing and the specification attached hereto.

b) Specification for materials and workmanship


described in Specification shall also apply where
appropriate to this Section.

c)Notwithstanding anything to the contrary


contained in the Specification attached hereto,
all pipes, pipe specials, valves, hydrants and
BBIM SCHOOL B4/13
other materials required for the work in this
section shall be provided by the Contractor.
BILL NO. 4
EXTERNAL WORKS

Notwithstanding anything to the contrary


ITEM DESCRIPTION UNIT QTY RATE AMOUNT
contained in the Specification attached hereto,
all pipes, pipe specials, valves, hydrants and
other materials required for the work in this
section shall be provided by the Contractor.

d) Notwithstanding anything to the contrary


hereinbefore contained elsewhere in the
Contract Documents, the whole of the works in
this Section shall be carried out by an approved
Sub-Contractor who shall himself be a
Contractor registered with the Water Works
Department in the class of registration eligible for
similar work up to the value of the proposed sub-
contract work.
_______________________

A Excavate trench for 100mm diameter pipe (550mm


wide) and granular base not exceeding 1.50m deep
commencing from formation level, average 1065mm
deep, part return, fill in and ram, deposit and spread
in making up level within the site and remainder load
and cart away M 158 4.80 758.40

B Excavate trench for 150mm diameter pipe (600mm


wide) and granular base not exceeding 1.50m deep
commencing from formation level, average 1115mm
deep, part return, fill in and ram, deposit and spread
in making up level within the site and remainder load
and cart away M 599 4.80 2,875.20

C Well compacted earthfill as described filling laid in


trench surround water main pipe (measured
separately) MC 493 4.00 1,972.00

D Approved sand bedding as described well compacted


in trench ditto MC 67 40.00 2,680.00

TO COLLECTION : RM 8,285.60

SECTION NO. 3 - WATER RETICULATION (ALL


PROVISIONAL) (CONT'D)

Concrete `Grade 15' (19mm aggregate) as described:-

A Thrust block for 90 degrees for 100mm diameter pipe


horizontal bend overall size 650mm x 550mm x
500mm high including all necessary formwork,
excavation, backfill and disposal NO 6 35.00 210.00

B Ditto for 90 degrees for 150mm diameter pipe


horizontal bend NO 3 35.00 105.00

BBIM SCHOOL B4/14


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

C Thrust block for tee junction overall size 700mm x


600mm x 500mm high ditto NO 1 35.00 35.00

Mild steel pipe cement lining and fittings as


described:-

D 100mm Diameter pipe laid in trench M 158 0.00 0.00

E EXTRA FOR 90 degree bend NO 3 0.00 0.00

F 150mm Diameter pipe laid in trench M 599 90.00 53,910.00

G EXTRA FOR 90 degree bend NO 6 60.00 360.00

H EXTRA FOR 150mm x 150mm x 150mm tee NO 1 70.00 70.00

The following in 2 Nos. sluice valve

J 100mm Diameter double flanged sluice valve to B.S.


5163 as described and jointed to steel pipe with
150mm extension piece and flanged adaptor cast iron
and as directed by P.D. NO 1 450.00 450.00

K 150mm Diameter ditto NO 1 480.00 480.00

TO COLLECTION : RM 55,620.00

SECTION NO. 3 - WATER RETICULATION (ALL


PROVISIONAL) (CONT'D)

Precast concrete `Grade 20' (20mm aggregate) as


decsribed:-

A Sluice valve chamber overall size 950mm x 650mm x


900mm high constructed of 4 Nos. box section cast to
varying profile reinforced with and including 6mm
diameter mild steel bar reinforcement as described
and jointed with cement and sand (1:3) mortar
BBIM SCHOOL with
B4/15
and including 16mm diameter high tensile steel as
described, pin 12mm thick cast iron chequered as
BILL NO. 4
EXTERNAL WORKS
Sluice valve chamber overall size 950mm x 650mm x
900mm high constructed of 4 Nos. box section cast to
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
varying profile reinforced with and including 6mm
diameter mild steel bar reinforcement as described
and jointed with cement and sand (1:3) mortar with
and including 16mm diameter high tensile steel as
described, pin 12mm thick cast iron chequered as
described cover plate to suit opening and all
necessary moulds, excavation, backfill and disposal
all in accordance with SYABAS's requirement and as
directed by P.D. NO 2 1,380.00 2,760.00

B Marker post to sluice valve overall size 150mm x


150mm x 1060mm high reinforced with and including
4 Nos. 10mm diameter bar reinforcement as
described and 6mm diameter bar reinforcement as
described links painting all required letters in red
colour including all necessary excavation, backfill and
disposal as directed by P.D. NO 2 110.00 220.00

(END OF 4 NOS. SLUICE VALVE)

The following in 7 Nos. Pillar Hydrant

C 150mm Diameter double flanged cast iron duckfoot


bend stood on concrete block including jointing to
hydrant and sluice valve (measured separately) NO 7 450.00 3,150.00

D 150mm Diameter double flanged sluice valve to MS


1021 : 1577 as described and jointed to main pipe or
cast iron fittings with 150mm diameter extension
piece and including all necessary spigot, flexible
coupling, joint fittings and all as directed by P.D. NO 7 480.00 3,360.00

E 150mm Diameter painted cast iron double outlet pillar


hydrant complete with outlet caps fastening chains
and all as directed by P.D. NO 7 1,500.00 10,500.00

TO COLLECTION : RM 19,990.00

SECTION NO. 3 - WATER RETICULATION (ALL


PROVISIONAL) (CONT'D)

Precast Concrete 'Grade 20' (20mm aggregate) as


described:-

BBIM SCHOOL B4/16


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

A Sluice valve chamber overall size 950mm x 650mm x


900mm high constructed of 4 Nos. box section cast to
varying profile reinforced with and including 12mm
diameter mild steel bar reinforcement as described
and jointed with cement and sand (1:3) mortar with
and including 16mm diameter high tensile steel as
described, pin 9mm thick cast iron chequered as
described cover plate to suit opening and all
necessary moulds, excavation, backfill and disposal
all in accordance with SYABAS's requirement and as
directed by P.D. NO 7 1,380.00 9,660.00

B Marker post to pillar hydrant overall size 150mm x


150mm x 1600mm high reinforced with and including
4 Nos. 10mm diameter bar reinforcement as
described and 6mm diameter bar reinforcement as
described and painting all required letters in red
colour including all necessary excavation, backfill and
disposal as directed by P.D. NO 7 110.00 770.00

(END OF 3 NO. PILLAR HYDRANT)

C 150mm Diameter bulk meter approved by SYABAS's


and jointing to mild steel pipe NO 1 1,500.00 1,500.00

D Allow for the supply of all labour and fittings such as


bends, elbows, tees, reducers, saddles, ferulles, etc.
as required by P.D. for the connection of 150mm
diameter mild steel pipe to existing water main pipe ITEM - - 5,000.00

E Allow for testing, cleaning and disinfecting all water


reticulation system and hydrant to the requirements of
the Local Authorities and make good all defects to the
entire satisfaction of the P.D. and Local Authority ITEM - - 1,852.48

TO COLLECTION : RM 18,782.48

SECTION NO. 3 - WATER RETICULATION (ALL


PROVISIONAL) (CONT'D)

BBIM SCHOOL B4/17


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

COLLECTION

From page No. B8/13 . . . 8,285.60

From page No. B8/14 . . . 55,620.00

From page No. B8/15 . . . 19,990.00

From page No. B8/16 . . . 18,782.48

TO SUMMARY RM 102,678.08

BBIM SCHOOL B4/18


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SECTION NO. 4 - SEWERAGE (ALL


PROVISIONAL)
A Excavate trench for 225mm diameter pipe and
525mm wide well compacted graded granular under
not exceeding 1.50m deep from formation level,
average 1200mm deep and get out, part return and
well compacted M 17 12.00 204.00

B Ditto average 1350mm deep ditto M 315 12.00 3,780.00

C Ditto average 1500mm deep ditto M 267 15.00 4,005.00

D Ditto exceeding 1.50m but not exceeding 3.00m deep


from formation level everage 1650mm deep ditto M 49 0.00 0.00

E Ditto average 1800mm deep ditto M 47 0.00 0.00

F 250mm Bed of crusher run (20mm aggregate) as


described 525mm wide, spread, levelled and well
compacted under 225mm diameter pipe, extending
half way up to sides of pipe including well
consolidation M 373 8.50 3,170.50

G Mass concrete 'Grade 20' (19mm aggregate as


described laid on trench) MC 81 0.00 0.00

H Formwork class F1 as described to sides of trench MS 307 0.00 0.00

J Back fill pipe trench with selected soil materials fill in


and well compacted as directed MC 106 10.50 1,113.00

Vitreous clay pipes and fittings to B.S. 65 with spigot


and socket joints with flexible rubber ring and bedded
on crusher run (measured separately)

K 225mm Diameter pipe as described laid and jointed


in trench (measured separately) M 373 85.00 31,705.00

L EXTRA OVER for jointing 225mm diameter vitrified


clay pipe to sewerage treatment plant (SSTS) NO 1 250.00 250.00

BBIM SCHOOL B4/19


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 44,227.50

SECTION NO. 4 - SEWERAGE (ALL


PROVISIONAL) (CONT'D)

THE FOLLOWING IN 9 NOS MANHOLE

Precast concrete manhole of approved type


constructed of vibrated reinforced concrete wall and
base with 225mm concrete 'Grade 20'(20mm
aggregate) excasement to a thickness of 150mm
externally and benching including working carefully to
shape of channel, rendered with 19mm thick high
alumina cement rendering on all exposed surfaces
including standard manhole cast iron ductile frame
and cover to B.S 497 and sealing cover in grease,
galvanised malleable cast iron step at 300mm centres
horizontally and vertically, all necessary inlets/outlets
excavation, blinding, formwork and reinforcement
complete :-

A Precast reinforced concrete manhole internal size


1200mm diameter x 1500mm (average deep) with
high alumina cement and 150mm thick concrete
surround (Grade 20) NO 4 3,000.00 12,000.00

B Ditto internall size 1500mm diameter x 1650mm


(average deep) ditto NO 2 3,750.00 7,500.00

C Ditto internal size 1500mm diameter x 1800mm


(average deep) ditto NO 1 4,125.00 4,125.00

D Ditto internal size 1500mm diameter x 1950mm


(average deep) ditto NO 1 4,500.00 4,500.00

END OF 10 NOS MANHOLE

E Allow for testing, cleaning and dis-infecting the whole


of the sewerage works including providing testing
apparatus such as CCTV, etc. to the requirement of
JPP and/or the Local Authorities and make good any
defects and leave the whole in perfect working order
to entire satisfaction of the S.O. and JPP/Local
Authority ITEM - - 0.00

F Ditto internal size 1200mm diameter x 2100mm


(average deep) ditto NO 1 0.00 0.00

G Ditto internal size 1200mm diameter x 2250mm


(average deep) ditto NO 1 0.00 0.00

BBIM SCHOOL B4/20


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO COLLECTION : RM 28,125.00

SECTION NO. 4 - SEWERAGE (ALL


PROVISIONAL) (CONT'D)

COLLECTION

From page No. B5/18 . . . 44,227.50

From page No. B5/19 . . . 28,125.00

BBIM SCHOOL B4/21


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO SUMMARY RM 72,352.50

SECTION NO. 5 - FOOTBALL FIELD (ALL


PROVISIONAL)

FOOTBALL FIELD AND SOIL SYSTEM

A Tenderer to design, supply and construct a football


field including sub soil system at the site as shown in
the drawing and to fullfills the design criteria required
by the S.O. and shall comply to Majlis Sukan
Malaysia (MSM) requirements and specification.
Tenderer's to allow for all necessary design and
drawing charges, by a specialist to be approved by
S.O. including setting endorsent by a Professional
Engineer (P.E) material cost, fabrication, supply,
delivery and installation of the whole system. All
required equipment, sub-soil and drainage works for
full functioning of the football field and sub soil
drainage shall be included in their pricing ITEM - - 70,000.00

The works involve shall include but not limited to :-

a. Preparation of design by a specialist and


endorsed by a P.E and submission of drawings
for S.O's pproval.
b. Preparation of side works and platform including
all necessary excavation, levelling spread,
levelled and compaction to level as required
c. according to
Approved the black
black spefication.
vegetable soil spread and
level to approval construction of football field
including close turfing with approved turf.
d. Excavate trench for sub-soil drainage.

e. Sub-soil system to the approval of the S.O.

B The tenderer shall make connection for the full


functioning of the soil system from the sub soil pipes.
The tenderer shall be responsible for the full testing
and commissioning of the football field and sub soil
drainage system to the satisfaction of the S.O. and
Local Authority. ITEM - - 10,000.00

SUNDRIES

C Supply and erect standard football goal post overall


size 7320mm width x 3425mm high constructed of
125mm diameter galvanised iron pipe vertical,
horizontal and diagonal posts, mitred and welded
together, and cast bottom end into and including post
BBIM SCHOOL B4/22
footing, excavation, formwork and all necessary
netting and other accessories
BILL NO. 4
Supply and erect standard football goal post overall EXTERNAL WORKS
size 7320mm width x 3425mm high constructed of
125mm diameter galvanised iron pipe vertical,
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
horizontal and diagonal posts, mitred and welded
together, and cast bottom end into and including post
footing, excavation, formwork and all necessary
netting and other accessories NO 2 3,500.00 7,000.00

D Two coats of white paint for football lines 100mm


wide unbroken straight line to form 1 no. standard
football field ITEM - - 5,000.00

TO SUMMARY RM 92,000.00

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL)

300MM HALF ROUND PRECAST DRAIN (A1)

A Excavate trench for surface water drain 750mm wide


not exceeding 1.00m deep average 850mm deep, get
out, part return, fill in and ram, deposit spread in
making up level where directed within the site and
remainder load and cart away off site M3 88

Concrete 'Grade 15' (19mm aggregate) as


described :-
B Lean concrete under concrete base M2 122

Reinforced concrete 'Grade 20' (19mm aggregate) as


described :-

C Concrete base M2 56
____________________

D Layer of steel fabric reinforcement to B.S 4483 as


described (BRC Ref. No. A8 weighing not less than
3.95kg/ms well lapped at joint with 230mm minimum
sides and end laps and embedded in concrete bed
(measured nett - no allowance made for laps) M2 113

Formwork Class F1 as described:-

E To sides of base exceeding 250mm high not M 191


exceeding 500mm high
____________________

F 300mm Diameter half round precast concrete drain in


600mm long as described beddd jointed in cement
mortar (1:3) including ends angle junction, curve
length and setting in position to falls on concrete base
(measured separately) M 96

Well-burnt clay bricks in cement mortar (1:3) as


described :-
BBIM SCHOOL B4/23
BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT


Well-burnt clay bricks in cement mortar (1:3) as
described :-

G 225mm thick brickwall as drain side wall M2 52

H EXTRA OVER forming 75mm diameter weepholes


through one brickwall including 75mm diameter
earthenware pipe 300mm long with and including
300mm x 300mm x 300mm crusher run packing
wrapped in with wire netting NO 74

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

Cement and sand (1:3) rendering trowelled hard and


smooth with a steel trowel :-

A 20mm Thick rendering to top and sides of brickwall M2 94


__________________

B 700mm long x 125mm wide x 125mm high concrete


'Grade 20' (19mm aggregate) as described concrete
strut reinforced with and including 4 nos. 10mm
diameter high tensile steel rod reinforcement hooked
at as main bar and 6mm diameter mild steel rod
reinforcement NO 37

C Allow for connection new surface water drainage to


existing drain including all additional labour and
materials, break-up, jointing, construction and make
good to the satisfaction of the S.O ITEM -

450MM HALF ROUND PRECAST DRAIN (A3)

D Excavate trench for surface water drain 750mm wide


not exceeding 1.00m deep average 850mm deep, get
out, part return, fill in and ram, deposit spread in
making up level where directed within the site and
remainder load and cart away off site M3 300

E Ditto exceeding 1.00m but not exceeding 2.00m deep


ditto M3 474

Concrete 'Grade 15' (19mm aggregate) as


described :-
F Lean concrete under concrete base M2 768

Reinforced concrete 'Grade 20' (19mm aggregate) as


described :-
BBIM SCHOOL B4/24
BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT


Reinforced concrete 'Grade 20' (19mm aggregate) as
described :-

G Concrete base M3 429

H Layer of steel fabric reinforcement to B.S 4483 as


described (BRC Ref. No. A8 weighing not less than
3.95kg/ms well lapped at joint with 230mm minimum
sides and end laps and embedded in concrete bed
(measured nett - no allowance made for laps) M2 714

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

Formwork Class F1 as described:-

A To sides of base exceeding 500mm high and not M 1073


exceeding 1.00m high
____________________

B 450mm Diameter half round precast concrete drain in


600mm long as described beddd jointed in cement
mortar (1:3) including ends angle junction, curve
length and setting in position to falls on concrete base
(measured separately) M 537

Well-burnt clay bricks in cement mortar (1:3) as


described :-

C 225mm thick brickwall as drain side wall M2 437

D EXTRA OVER forming 75mm diameter weepholes


through one brickwall including 75mm diameter
earthenware pipe 300mm long with and including
300mm x 300mm x 300mm crusher run packing
wrapped in with wire netting NO 404

Cement and sand (1:3) rendering trowelled hard and


smooth with a steel trowel :-

E 20mm Thick rendering to top and sides of brickwall M2 679


__________________

F 900mm long x 125mm wide x 125mm high concrete


'Grade 20' (19mm aggregate) as described concrete
strut reinforced with and including 4 nos. 10mm
diameter high tensile steel rod reinforcement B4/25
BBIM SCHOOL hooked
at as main bar and 6mm diameter mild steel rod
reinforcement
BILL NO. 4
EXTERNAL WORKS

900mm long x 125mm wide x 125mm high concrete


ITEM DESCRIPTION UNIT QTY RATE AMOUNT
'Grade 20' (19mm aggregate) as described concrete
strut reinforced with and including 4 nos. 10mm
diameter high tensile steel rod reinforcement hooked
at as main bar and 6mm diameter mild steel rod
reinforcement NO 202

G Allow for connection new surface water drainage to


existing drain including all additional labour and
materials, break-up, jointing, construction and make
good to the satisfaction of the S.O ITEM -

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

SUMP

The following in 38 Nos. Sump

A Excavate pit for sump not exceeding 1.00m deep


commencing from ground level and get out, part
return, fill in and ram and deposit, spread and levelled
where directed on site and remainder load and cart
away M3 11

B Ditto not exceeding 2.00m deep ditto M3 36

Concrete 'Grade 15' (20mm aggregate) as


described:-
C Blinding screed spread and levelled under concrete
base M2 42

Reinforced concrete 'Grade 20' (20mm aggregate) as


described :-

D Concrete base M3 7

E Concrete cover slab M3 5

F Layer of steel fabric reinforcement to B.S.4483 (BRC


A6-weighing not less than 2.22kg/ms) well lapped at
joints and embedded in concrete base (measured
nett-no allowance made for laps) M2 42

BBIM SCHOOL B4/26


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Formwork Class F1 as described:-

G To edge of concrete not exceeding 250mm high M 179

Well -burnt clay bricks in cement mortar (1:3) as


described :-

H 225mm Thick brickwall M2 133

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

SUMP (CONT'D)

Cement and sand (1:2) with an approved plasticiser


as described :-

A 20mm Thick rendering to bottom of sump M2 15

B 20mm Ditto to top and sides of brickwall M2 97

C Mild steel grating (heavy duty) overall size 300mm x


300mm constructed of 51mm x 51mm x 10mm thick
mild steel 'L' frame all round with 40mm x 10mm thick
mild steel plate infill at 35mm centers all welded to
frame fix with hinge to and including mild steel fish tail
anchor welded to frame 75mm x 75mm x 8mm angle
frame all and with mild steel lifting ring and painting
with one coat of metalic primer and two coats of
bituminious paint and including forming rebated edge
of brickwall and other related works NO 1

D Ditto overall size 450mm x 450mm ditto NO 15

E Ditto overall size 600mm x 600mm ditto NO 19

F Ditto overall size 1200mm x 1200mm ditto NO 3

BBIM SCHOOL B4/27


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

(END OF 38 NOS. SUMP)

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

600MM DIAMETER PIPE CULVERT

Excavate and get out, part return, fill and ram, deposit

and spread in making up levels where directed within

the site and remainder load and cart away :-

A Trench for pipe culvert 1200mm wide not exceeding


1.00m deep average 900mm deep M3 36

B Ditto exceeding 1.00m but not exceeding 2.00m deep


average 1200mm deep M3 217
___________________

C Back fill trench with selected soil materials fill in and


well compacted as directed M3 191

Concrete 'Grade 10' (19mm aggregate) as


described :-
D Blinding screed spread and levelled under concrete
base M2 211

BBIM SCHOOL B4/28


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Vibrated reinforced concrete 'Grade 20' (20mm


aggregate) as described :-

E Concrete bedding M3 148

Layer of steel fabric reinforcement to B.S. 4483 (BRC


A8 - weighing not less than 3.95kg/ms) well lapped at
joints and embedded in concrete (measured nett - no
allowance made for laps) :-

F Concrete bedding M2 194

Formwork Class F1 as described :-

G To concrete bedding M2 319


___________________

H Precast concrete pipe culvert class ' X ' as describe


"Hume" or other equal and approved overall size
600mm diameter laid in trench on concrete bed
including anti seepage collar all as per manufacturer's
instruction M 172

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

1200mm x 1200mm BOX CULVERT OSD

Excavate and get out, part return, fill and ram, deposit

and spread in making up levels where directed within

the site and remainder load and cart away :-

A Trench for pipe culvert 1200mm wide not exceeding


2.00m deep M3 99
___________________

B Approved 20mm crusher run aggregate bedding


spread levelled in trench and well compected under M3 10
precast concrete box culvert including well
consolidation

C Back fill trench with selected soil materials fill in and


well compacted as directed M3 84

BBIM SCHOOL B4/29


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Concrete 'Grade 15' (20mm aggregate) as


described :-
D Lean concrete under concrete base M2 61
___________________

E Approval precast concrete box culvert overall size


900mm x 900mm high with and including precast
concrete cover slab laid in trench on concrete bed all
as per manufacturer's instruction and Engineer's
drawing No. EES/CS 25408(DTL)/C/DR/06 M 34

TRASH SCREEN

F Galvanised mild steel trash screen overall size


1200mm x 1200mm constructed of 60mm x 60mm x
10mm thick galvanised mild steel frame all round with
50mm x 12mm thick mild steel plate infill at 50mm
centers all welded to frame fix with fish tail anchor in
concrete and including mild steel lifting ring and
painting with one coat of metalic primer an two coats
of bituminious paint and other related works NO 1

TO COLLECTION : RM #REF!

ELEMENT NO. 5 - SURFACE WATER DRAINAGE


(ALL PROVISIONAL) (CONT'D)

COLLECTION

From page No. B5/22

From page No. B5/23

From page No. B5/24

From page No. B5/25

From page No. B5/26

From page No. B5/27

BBIM SCHOOL B4/30


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

From page No. B5/28

TO SUMMARY RM

ELEMENT NO. 6 - LANDSCAPE

PRELIMINARIES AND GENERAL

MAINTAINING SITE CLEANLINESS

A Allow for clearing of rubbish, debris and unused


construction materials during and upon completion of
works and also allow for maintaining cleanliness to
site including the temporary toilet and septic tank,
dewatering, removal of sludge/earth for disposal at
Contractor's EXTERNAL APPROVED DUMPING
GROUND as and when instructed by Engineer to
conform to hygiene requirements of the Employer
and maintaining site cleaniness during the Contract
period and any approved extension of time thereof.
Rate shall also include maintaining the hoarding and
including and fees and obtaining the necessary
permits from respective local Authorities. The
BBIM SCHOOL B4/31
employer reserves the right to engage cleaners
and/or other Contractor if the contractor does not
site including the temporary toilet and septic tank,
dewatering, removal of sludge/earth for disposal at
Contractor's EXTERNAL APPROVED DUMPING
GROUND as and when instructed by Engineer to
BILL NO. 4
conform to hygiene requirements of the Employer EXTERNAL WORKS
and maintaining site cleaniness during the Contract
period and any approved extension of time thereof.
ITEM Rate shall also include maintaining the hoarding and
DESCRIPTION UNIT QTY RATE AMOUNT
including and fees and obtaining the necessary
permits from respective local Authorities. The
employer reserves the right to engage cleaners
and/or other Contractor if the contractor does not
comply with the above after notice being issued and
all costs shall be deducted from the contract sum. LS - -

CLEARING OF SITE UPON COMPLETION

B Allow for clearing the site from all surplus materials


and rubbish and keeping the clean and tidy upon
completion LS - -

AS-BUILT DRAWING

C The contractor shall allow for the preparation of any


as-built drawings required by the Contract Document.
During the course of the contract, prepare and keep
up to date the as-built drawing to show each change
from the Contract Drawing. The drawing shall kept on
the site and used only for record purposes. The
contractor shall provide four (4) sets of quality as-built
binded drawing not later than one (1) month after
completion of the works. LS - -

SHOP DRAWING

D The contractor shall allow for the preparation of any


shop drawing and submit to the Engineer for approval
before proceed the works during the course of the
contract, prepare and keep up to date. LS - -

Note:

(Contractors are required to visit the site to fully


understand the scope of works, site conditions and
fully responsible to liase with Relevant Local
Authority)

TO COLLECTION : RM

ELEMENT NO. 6 - LANDSCAPE (CONT'D)

PLANT MATERIALS

To supply and deliver the following planting materials


from contractors nursery to the site including
unloading and placing in position :

TREES

A Pteleocarpa lamponga - Tembusu Tikus


T.H: 2m. T.D:50mm. NO 34

B Bucida molineti - Spiny Black Olive


BBIM SCHOOL B4/32
BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

T.H:2.0m. T.D:40mm-50mm NO 12

C Nephelium lappaceum - Rambutan


T.H:1.5m. T.D:40mm. NO 13

D Mangifera indica - Mangga


T.H:1.5m. T.D:40mm. NO 12

E Delonix regia - Semarak Api


T.H: 1.5m. T.D:40-50mm. NO 12

F Caesalpinia sappan - Sepang


T.H:1m. T.D:40mm. NO 13

G Garcinia mangostana - Manggis


T.H:1.5m T.D:40mm NO 18

PALMS & CYCAD

H Carpentaria acuminata - Carpenter's palm


C.T.H: 2.5m. NO 31

J Cycas revoluta - Cycas


Ov.H: 1m. NO 7

BAMBOO

K Bambusa textilis gracilis -Hedges bamboo


Ov. H: 1.5m NO 5

TO COLLECTION : RM #REF!

ELEMENT NO. 6 - LANDSCAPE (CONT'D)

SHRUBS

A Hibiscus rosa sinensis - Bunga raya daun merah


( 450mm Ov.Ht) NO 165

B Wrightia religiosa - Jeliti


( 600mm Ov.Ht) NO 1,000

C Pachystachys lutea - Golden shrimp plant

BBIM SCHOOL B4/33


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

( 450mm Ov.Ht) NO 220

D Codiaeum variegatum 'Mummy' - Puding merah


( 450mm Ov.Ht) NO 100

E Codiaeum variegatum 'Gold Dust' - Puding kuning


( 450mm Ov.Ht) NO 80

F Loropetalum chinense - Fringe flower


( 600mm Ov.Ht) NO 900

GROUNDCOVERS

G Ophiopogon japonicus 'Kyoto Dwarf' - Mondo grass


( 150mm Ov.Ht) NO 1,920

TURFING

H Axonopus compressus (Cow grass) - Other area


To supply and lay quality Axonopus compressus (Cow
Grass) Grade A (90% purity) to all levelled ground. All
turfed area should be compacted and rolled.
Including top soil 150mm thk. M2 6,780

J Axonopus compressus (Cow grass) - Field


To supply and lay quality Axonopus compressus (Cow
Grass) Grade A (90% purity) to all levelled ground. All
turfed area should be compacted and rolled.
Including top soil 150mm thk plus river sand. M2 4,386

TO COLLECTION : RM

ELEMENT NO. 6 - LANDSCAPE (CONT'D)

HOLE EXCAVATION

TREES
A Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 1.0 m x 1.0 m x 1.0 m
and cart away excavated materials. NO 114

BBIM SCHOOL B4/34


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PALMS
B Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 1.2 m x 1.2 m x 1.0 m
and cart away excavated materials. NO 31

CYCAD
C Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 0.6 m x 0.6 m x 0.6m
and cart away excavated materials. NO 7

BAMBOO
D Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 0.6 m x 0.6 m x 0.6m
and cart away excavated materials. NO 5

SHRUBS (Large)
E Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 0.6 m x 0.6 m x 0.6m
and cart away excavated materials. NO 1,900

SHRUBS (Small)
F Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 0.3 m x 0.3 m x 0.3m
and cart away excavated materials. NO 565

GROUNDCOVERS
G Supply all labours, equipment, tools, transport, etc.
and excavate hole overall size 0.15 m x 0.15 m x 0.15
m and cart away excavated materials. NO 1,920

TO COLLECTION : RM

ELEMENT NO. 6 - LANDSCAPE (CONT'D)

SOIL MIXTURE

Supply all labours, equipment, tools, transport, etc.


and mix properly 3 parts rich topsoil, 3 parts organic
manure (rotted chicken manure) and 1/2 parts
BBIM SCHOOL
approved slow release N.P.K. fertilizer B4/35 to fill
excavated holes and lightly ram to a height of 150
BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT


Supply all labours, equipment, tools, transport, etc.
and mix properly 3 parts rich topsoil, 3 parts organic
manure (rotted chicken manure) and 1/2 parts
approved slow release N.P.K. fertilizer to fill
excavated holes and lightly ram to a height of 150
mm above surrounding area for the following planting
hole.

A TREES - 1.25 m X 1.0 m X 0.8 m X 114 nos M3 114

B PALMS - 1.2 m X 1.2 m X 1.0 m X 31 nos M3 45

C CYCAD - 0.6 m x 0.6 m x 0.6m X 7 nos M3 2

D BAMBOO - 0.6 m x 0.6 m x 0.6m X 5 nos M3 1

E SHRUBS (Large) - 0.6 m X 0.6 m X 0.6 m X 1900 nos M3 415

F SHRUBS (Small) - 0.3 m X 0.3 m X 0.3 m X 565 nos M3 15

G GROUNDCOVERS - 0.15 m X 0.15 m X 0.15 m X


1920 nos M3 6

STAKING

Supply all labours, materials, equipment, tools,


transport, etc. to provide approved method of stakes
and ties for the following

TREES

H Minimum staking size : 50 mm X 50 mm X 2500 mm


(2 number to each tree) NO 228

PALM

J Minimum staking size : 50 mm X 50 mm X 2500 mm


(3 number to each tree) NO 93

Note :

Preparation of the soil mixture should be


accompanied by soil treatment for termites, using an
appropriate anti-termite and approved by the L.A.

TO COLLECTION : RM #REF!

ELEMENT NO. 6 - LANDSCAPE (CONT'D)

BBIM SCHOOL B4/36


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

COLLECTION

From page No. B5/30

From page No. B5/31

From page No. B5/32

From page No. B5/33

From page No. B5/34

TO SUMMARY RM 0.00

BBIM SCHOOL B4/37


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

SECTION NO. 7 - TURFING (ALL PROVISIONAL)

TURFING

A Close turfing with 300mm x 300mm turves as


described to levelled surfaces with and including
50mm layer of approved vegetable soil, treating with
fertiliser and tending, watering, rolling and weeding
until firmly established and replacing badly grown
patches MS 4006 3.00 12,018.00

BBIM SCHOOL B4/38


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO SUMMARY RM 12,018.00

SECTION NO. 8 - GUARD HOUSE

A Construct and complete Guard House overall size


3.80m x 2.15m x 5.80m including of 2.00m x 1.20m x
7.18m high main pier,skylight roofing system with
metal structure, boom gate and everything else to
complete the entire guard house constructed of
reinforecd concrete footing and column, ground floor
slab with hardcore and lean concrete including of
115mm thick brickwall, plaster and paint finish with
feature wall brick facing of SAU 762 SEB effect,
expended metal, door and glass panel, counter and
everything else to complete the works as per
Architect drawings and P.D.'s approval NO 2

BBIM SCHOOL B4/39


BILL NO. 4
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TO SUMMARY RM 0.00

BBIM SCHOOL B4/40


BILL NO. 8
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

BILL NO. 8 - EXTERNAL WORKS

SUMMARY

ELEMENT FROM
NO. DESCRIPTION PAGE

1. SITE CLEARANCE, DEMOLITION AND


EARTHWORK (ALL PROVISIONAL) B8/8 53,787.50

2. ROAD, CARPARK, RAMP AND PEVEMENT


(ALL PROVISIONAL) B8/12 #REF!

3. WATER RETICULATION
(ALL PROVISIONAL) B8/17 #REF!

4. SEWERAGE (ALL PROFISIONAL) B8/20 #REF!

5. FOOTBALL FIELD (ALL PROVISIONAL) B8/21 #REF!

6. SURFACE WATER DRAINAGE


(ALL PROVISIONAL) B8/28 #REF!

7. TURFING (ALL PROVISIONAL) B8/29 #REF!

B8/30
BILL NO. 8
EXTERNAL WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

TOTAL CARRIED TO SUMMARY OF TENDER : RM #REF!

B8/31