SILVERTOWN CENTRAL ARCADE Royal Docks, London


A Creative Industries and Business Center

Inspired by the fast growing 3D technology in design industry, the Silvertown Central Arcade is a workshop and
business center provides facilities and opportunities for independent artists and designers to create, test and introduce
their ideas directly to the users as well as investors. At the same time, the center will encourage the local community to
interact with the creative industries in order to gain skills and adapt to new changes happen in the area.

The traditional arcades with their defined urban forms, generous natural lighting from above and intimate interior
spaces connected by series of internal streets, all together create a unique experience for users and visitors. The
repetitiveness of exposed structure defined by small units creates a rhythm for the building. On top of that, the
remaining structure of Millennium Mills and the shipping industry of the Docklands give inspiration for a defined outer
form enclosing lightweight structure which occupied by self-contained units to develop which allow internal spaces to
expand in capacity and changes in functional use in the future. As a whole, the architectural language and building
arrangement, from in-side-out, is a link between the lost memories of the past with the present development which will
form a strong frame for future generation to grow and adapt to further chances.
Selected Academic Projects 4th Year

Renovation of Old Street Junction London, UK

Town centres and high streets have buildings and roads, but the spaces in-between
are what hold them together as a place the open spaces, streets, squares, green
spaces and the network of pavements and pedestrian thoroughfares that knit them
together. All too often, these spaces are used as no more than that thoroughfares
and we start to forget that they can be so much more.

Re-imagining urban spaces to help revitalise our high streets - Department for Communities and Local
Government - July 2012

The main concept is to turn the dull and inefficient Old Street Roundabout into an
exciting public area which not only provide more facilities for office workers and
visitors but also to create more spaces to promote public interaction for the local
community.

Main Section
Ground Floor Plan

Exploded Axonometric Main Entrance

Cross Section
Work Placement Project Surface To Air Architects, UK
GLOBAL UTC ACADEMY
Hillingdon, London, UK - Education

Client: Global Radio


Stage involved: Stage 3 to Stage 5
Project value: 14m

First University Technical College (UTC) to be built using modular


off-site methods, in partnership with Yorkon forming the central
feature of the Cathedral Groups Vinyl Factory masterplan.

Main Responsibilities:
Responsible for modelling, updating and overseeing main Revit
model since joining in June 2015.
Set up project collaboration and co-ordination processes in Revit.
Clash detection.
Set up drawings and drawing standards for Revit.
Key member in Stage 3 submission and supporting role in Stage 4.
Training Revit for other team members.

Main model with linked STR model


Work Placement Project Surface To Air Architects, UK
LONGFIELD CRESENT
Lewisham, London, UK - Residential

Client: Lewisham Homes


Stage involved: Stage 3 to Stage 4
Project value: 3.5m

Comprised of 14 apartments and 13 houses, built using offsite methods. Fully developed in Revit from Stage 3
following Level of Detail LOD300 (BIM Forum 2015 LOD specification) and suitable for trade contractor to
develop the LOD further to LOD400.

Main Responsibilities:
Taken full responsibility for modelling, updating and coordinating in BIM.
Delivered drawing packages from GA to Details throughout Stage 3 to Stage 4.
Involved in design process from Stage 3 onwards.

Site settings with world co-ordinates


issued to consultants

Apartment blocks main models CG Images are credited to Pollard Thomas Edwards Design & access Statement November 2014
Work Placement Project Wilkinson Eyre, UK
45 BAY TORONTO
Toronto, Canada Office, Retail and Bus Terminal

Developer: Ivanho Cambridge and Hines


Stage involved: Scheme Design & Design Development Stages
Involved time: from June to December 2014

Design Parameters:
Gross Floor Area (GFA) 132,000m2 No. of Stories 55 floors in total
Typ. Podium floor plate 5,500m2 Podium 5 floors
Typ. Office floor plate 2,500m2 Tower 45 floors
Max. Building Height 249.7m Plant 5 floors

Main Responsibilities:
Setting up Revit Model for whole building and keeping model up-to-date following design in Microstation.
Coordinating with Structure, MEP, Landscape and Revit team in Toronto during SD Stage.
In charge of Revit modelling and coordinating for the tower and above parts during DD Stage.
Assisting with towers faade, crown, plantroom and roof design.
Setting up and preparing drawings for tower and above parts.
Training Revit for other team members.

Top of Tower Section generated in Revit Towers faade configuration


Top of Tower and Crown Design
Work Placement Project DWP, Vietnam

SAIGON SOUTH RESIDENCES RIVERPARK RESIDENCES


Nha Be District, Ho Chi Minh City

Client: Saigon South Residences SJC.


Stage involved: Concept Design &
1/500 Master Plan Authority Submission
Submission date: 20th December 2011
TRAN THAI
Design Parameters:
Site Area (m2) 32,816m2
Site Coverage 31.2%
No. of Stories 30
Max. Building Height 99.8m
Gross Floor Area (GFA) 193,353m2 KIM
Efficiency 83.4% LONG
VILLAS TAN AN HUY
No. of Apartment 1,686 units CONDOMINIUM
No. of Town House 19 units
No. of Car Parking 730
No. of M.bike Parking 2,400 PVGAS
SCHOOL GRAND VIEW
TOWER

NGAN
CLINIC / Main site access
LONG
HEALTHCARE Crossing (bridge / underpass)
VILLAS
School

Healthcare / clinic

Primary roads

Connection point
Future water taxi route

Waterfront park
Proposed green corridor

OPTION C1 OPTION C2 OPTION C3 OPTION C4


Tower heights ( from right to left ): 20,30,27,24,21,18 Tower heights ( from right to left ): 24, 28,28,26,24,22 Tower heights: all 28 Tower heights: all 28. With increased podium heights
+0 +5 +10
-> Landscape connectivity and project -> Podium semi-public space (pool, -> Modular approach
pedestrian access deck, )

Cross section diagram Long section diagram

OPTION C1 OPTION C2 OPTION C3 OPTION C4


Tower heights ( from right to left ): 20,30,27,24,21,18 Tower heights ( from right to left ): 24, 28,28,26,24,22 Tower heights: all 28 Tower heights: all 28. With increased podium heights
Work Placement Project DWP, Vietnam
BEST WESTERN PLUS Hotel
District 1, Ho Chi Minh City

Client: Diplomat JSC. ( Hai Van Nam JSC.)


Stage involved: Competition Submission (2nd place)
Submission date: 05th November 2011

Design Parameters: Max. Building Height 75m


Site Area (m2) 1,112.4m2 Gross Floor Area (GFA) 10,759m2
Building Foot Print 528m2 Floor Area Ratio 9.7
Site Coverage 50% No. of keys 140 keys
No. of Stories 20

Sky Lobby Club Pub Toilet


Restaurant Auditorium
Lobby Bar Gym Club Toilet

Reception Food & Restro Exercise Welfare Business

Public Private Service Technical


ibis HOTEL
Tan Binh District, Ho Chi Minh City

Client: Ha Do Group
Stage involved: Competition Submission
Submission date: 2nd March 2012

Design Parameters:
Site Area (m2) 3,455m2 Max. Building Height 50m
Building Foot Print 528m2 Gross Floor Area (GFA) 19,003m2
Site Coverage 50% Plot Ratio 5.5:1
No. of Stories 10 No. of Hotel Keys 297 keys
No. of Apartment Keys 108 keys

Faade study
Work Placement Project DWP, Vietnam

PHU THUAN APARTMENT (EVERRICH II)


District 7, Ho Chi Minh City

Client: Phat Dat Real Estate Company


Stage involved: Construction Documentation
Submission date: 7th June 2011

Design Parameters:
Site Area (m2) 112,585m2
Site Coverage 24%
No. of Stories 37
Max. Building Height 130m
Gross Floor Area (GFA) 553,203m2
Plot Ratio 4.9
Total No. of Apartment 3,125 units
FRIESLAND CAMPINA Headquarter
Binh Duong Province

Client: Friesland Campina Vietnam Company Limited


Stage involved: Design Development Submission
Submission date: 21st June 2012

Design Parameters:
Site Area (m2) 18,631m2
Site Coverage 20.6%
No. of Stories 3
Max. Building Height 11.7m
Gross Floor Area (GFA) 6,562m2
Plot Ratio 0.35
Work Placement Project DWP, Vietnam
CAY OI Kindergarten Maximise natural daylighting

Tap Ngai, Tra Vinh Roof with reflecting material

Client: Sai Gon Children Charity


Stage involve: Concept to Design
Development Stage
(Individual Concept Winner)
Submission Date: 26th August 2011 Rainwater harvest
Completion Date: 4th October 2012
Spare land for future expansion
Design Parameters:
Site Area 1,827m2
Site Coverage 24%
No. of Stories 1 Water efficient toilet fixtures
Max. Building Height 6m
Gross Floor Area (GFA) 444m2
Gap for natural ventilation

ACC block wall


Section 1

Ramp for disables

Local plants and trees

Section 2

Front Facade Central Corridor Classroom


Sun path
Wind direction harsh (Jan-Apr)
Wind direction humid (May-Jun)
Wind direction humid (Jul-Dec)

SUNSET SUNRISE

Section 1

Storage

Toilet

Direct sunlight

Diffuse sunlight

Natural ventilation

NOON
Site Conditions

1. Classroom 7. Playing area


2. Class Storage 8. Private garden Planting area
3. Common Toilets 9. Back yard Preserved area
4. Common Storage 10. Front yard Communal Centre
5. Hand washing area Main Entrance
6. Food Preparing area
Section 2
Secondary Entrance
7

4
3
8 7
3 6
3 9
2
5
1

2 1

2
10 1
8

General Layout
Perspective View
Thank you
NHU THI YEN LE
nhuyenle@gmail.com
Mobile: 07885674659

You might also like