Professional Documents
Culture Documents
MO
ISSUED FOR BASE DESIGN
DESCRIPTION
29/2/2016
DATE:-
NO.
00
REVISIONS
DRAWN
BY:- MOHAMED
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY
DATE:- 29/2/2016
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
THIS DRAWING IS NOT
TO BE USED FOR DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
CONSTRUCTION OF
FOR ORDERING
CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
A MK500 WE-394102 1 OF 16 00
MATERIALS UNTIL
CERTIFIED AND
DATED
MAKKAH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG.CONT.SHT. WE-392417
Page 1 of 16
CERT'D
Saudi Electricity Company
APPR'D
CHK'D
Western Operating Area
MO
CONTENTS
SECTION DESCRIPTION
1. SCOPE
2. APPLICABLE STANDARDS AND CODES
3. SYSTEM DESCRIPTION
4. CABLE TUNNELS DRAINAGE SYSTEM
ISSUED FOR BASE DESIGN
SIEMENS
BY
29/2/2016
DATE
NO.
00
REVISIONS
BY:- MOHAMED
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY
DATE:- 29/2/2016
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING
CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
A MK500 WE-394102 2 OF 16 00
MATERIALS UNTIL
CERTIFIED AND
DATED MAKKAH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG. CONT. SHT. WE-392417
Page 2 of 16
CERT'D
Saudi Electricity Company
APPR'D
CHK'D
Western Operating Area
MO
DRAWINGS:
DWG. # DRAWING TITLE REV. SHTS.
00 29/2/2016 SIEMENS
BY
DATE
NO.
REVISIONS
DRAWN
BY:- MOHAMED
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY
DATE:- 29/2/2016
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
A MK500 WE-394102 00
CONSTRUCTION OF
FOR ORDERING 3 OF 16
MATERIALS UNTIL CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
CERTIFIED AND
DATED MAKKAH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG. CONT. SHT. WE-392417
Page 3 of 16
CERT'D
1 SCOPE :
CHK'D
MO
The scope of work covers Design, Engineering, Procurement of Material, Supply, Installation,
Testing & Commissioning of Plumbing Works for construction of HUNAYAN 380/110/13.8KV
BSP. as per the Contract and Scope of Work indicated in PTS - 13WN363
3 SYSTEM DESCRIPTION :
The Cable Tunnels are provided with proper drainage system, the floor slab
of the Cable Tunnels shall be sloped towards the drainage channel at 0.5% slope
with the use of cement screed. The drainage channel shall be sloped towards
the sump pit at 0.3% .The number of sump pits considered atleast one for
every 200 square meters of Cable Tunnel area as per specification requirement.
SIEMENS
The sump pits are equipped with Submersible Pump as per attached drawings
BY
(WA-394158). When the water level is raised in any sump pit to the adjusted level of electrical
float switch , the submersible pump shall turned on automatically to discharge water outside
29/2/2016
DATE
ground level through pipe network, When the water Level in sump pit is less than the adjusted
level of electrical float switch the submersible pump will turned off automatically.
NO.
00
REVISIONS
DRAWN
BY:- MOHAMED As per PTS, The capacity of submersible pump shall be 63.41 GPM. These pumps
DATE:- 29/2/2016 shall be provided with control panel (auto/manual operation) complete with float
CHECKED switch and other available pump motor protection.
BY:- M.ELSHAFEAY
DATE:- 29/2/2016 The pump shall be provided with control panel (auto/manual operation) complete with
OPRG. DEPT level switch and other available pump motor protection. The control panel shall be
BY mounted on the wall near the pump not less than 1.0 meter high from the finished
DATE:- floor level.
ENG'G. DEPT.
BY:-
DATE:-
As Per SEC Standard TES-P-119.19."start/stop/auto" Switch and indicator lamps for sump
CERTIFIED.
pumps shall be provided in three locations on the wall adjacent to the sump pit, at the entrance
BY:-
to the basements and at the main control panel located in the control room
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING
CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
A MK500 WE-394102 4 OF 16 00
MATERIALS UNTIL
CERTIFIED AND
DATED MAKKAH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG. CONT. SHT. WE-392417
Page 4 of 16
CERT'D
Saudi Electricity Company
APPR'D
CHK'D
Western Operating Area
MO
4. CABLETUNNELSDRAINAGESYSTEM:
The drainage system, herein, has been designed in order to serve the Cable Tunnels
for construction of HUNAYAN 380/110/13.8kV BSP; through the drainage pits located
inside a/m spaces for the Substation in subject.
Through the following sections; the detailed procedures for the design calculations
shall be executed; in order to finally reach the total dynamic head of each submersible
ISSUED FOR BASE DESIGN
CALCULATIONPROCEDURES
Where, sump pits and submersible pumps located inside the cable tunnels are used to
collect surface water drainage and then deliver it to the outside surface.where as per
PTS and SEC Standard, each pit shall cover 200 m.
CableTunnelsDrainageSystemSchedule:
Tunnel1A 426 3 3
BY
Tunnel1B 452 2 2
Tunnel1C 91 1 1
29/2/2016
DATE
Tunnel2 282 2 2
Tunnel3 166 1 1
Tunnel4 1 1
NO.
58
0
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING
CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
A MK500 WE-394102 5 OF 16 00
MATERIALS UNTIL
CERTIFIED AND
DATED
MAKKAH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG.CONT.SHT. WE-392417
Page 5 of 16
CERT'D
MO
Since the type of pump is submersible, therefore the suction pipe velocity is
redundant.
Diameter of the GS Pipe is = 50 mm or 2" dia. (outside dia.2.375", wall thickness 0.154"
BY
inside diameter=2.067")
= 2.067"/12 = 0.172 feet
29/2/2016
REVISIONS
DRAWN Velocity in discharge pipe Vd = 0.141/0.0233 = 6.051 FPS.
BY:- MOHAMED
DATE:- 29/2/2016 HEAD LOSS DUE TO FRICTION IN SUCTION SIDE (Hfs)
CHECKED
BY:- M.ELSHAFEAY
Since the type of pump is submersible, this is not applicable
DATE:- 29/2/2016 Head Loss due to friction in suction side (Hfs) = 0 PSI
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING A MK500 WE-394102 6 OF 16 00
MATERIALS UNTIL CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
CERTIFIED AND
DATED RIYADH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG WE-392417
Page 6 of 16
CERT'D
Saudi Electricity Company
Western Operating Area
APPR'D
MO
Friction factor from the chart A-6 of UPC code at 63.41 GPM
Vd = 6.051 fps and 2" dia pip dia = 3.5 PSI/100Foot
= 5.79 PSI
NO.
BY:- MOHAMED Since the type of pump is submersible, therefore, suction side (hs) is zero.
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY THE HEAD DUE TO DIFFERENCE IN ELEVATION AT DISCHARGE SIDE (hd)
DATE:- 29/2/2016
OPRG. DEPT The difference in elevation from center line of pump to top most discharge point =
BY = (-) 6.51 ( +) 0.20 = 6.71 Meter
DATE:- = 21.99 Feet
ENG'G. DEPT. = 9.57 PSI
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING A MK500 WE-394102 7 OF 16 00
MATERIALS UNTIL CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
CERTIFIED AND
DATED
RIYADH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG WE-392417
Page 7 of 16
CERT'D
Saudi Electricity Company
Western Operating Area
APPR'D
MO
TDH = Hfs+Hfd+hs+hd
0 + 5.79 + 0 + 9.57 = 15.36 PSI
= 10.76 M
Safety Factor 10% = 1.08 Metres.
TOTAL = 11.84 Metres.
SAY = 12.00 Metres.
ISSUED FOR APPROVAL
DESCRIPTION
SIEMEN
BY
29/2/2016
DATE
NO.
REVISIONS
DRAWN
BY:- MOHAMED
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY
DATE:- 29/2/2016
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING
CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
A MK500 WE-394102 8 OF 16 00
MATERIALS UNTIL
CERTIFIED AND
DATED RIYADH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG WE-392417
Page 8 of 16
CERT'D
MO
Since the type of pump is submersible, therefore the suction pipe velocity is
redundant.
Diameter of the GS Pipe is = 50 mm or 2" dia. (outside dia.2.375", wall thickness 0.154"
BY
inside diameter=2.067")
= 2.067"/12 = 0.172 feet
29/2/2016
REVISIONS
DRAWN Velocity in discharge pipe Vd = 0.141/0.0233 = 6.051 FPS.
BY:- MOHAMED
DATE:- 29/2/2016 HEAD LOSS DUE TO FRICTION IN SUCTION SIDE (Hfs)
CHECKED
BY:- M.ELSHAFEAY
Since the type of pump is submersible, this is not applicable
DATE:- 29/2/2016 Head Loss due to friction in suction side (Hfs) = 0 PSI
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING A MK500 WE-394102 9 OF 16 00
MATERIALS UNTIL CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
CERTIFIED AND
DATED RIYADH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG WE-392417
Page 9 of 16
CERT'D
Saudi Electricity Company
Western Operating Area
APPR'D
MO
Friction factor from the chart A-6 of UPC code at 63.41 GPM
Vd = 6.051 fps and 2" dia pip dia = 3.5 PSI/100Foot
= 6.11 PSI
NO.
BY:- MOHAMED Since the type of pump is submersible, therefore, suction side (hs) is zero.
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY THE HEAD DUE TO DIFFERENCE IN ELEVATION AT DISCHARGE SIDE (hd)
DATE:- 29/2/2016
OPRG. DEPT The difference in elevation from center line of pump to top most discharge point =
BY = (-) 7.09 ( +) 0.20 = 7.29 Meter
DATE:- = 23.90 Feet
ENG'G. DEPT. = 10.40 PSI
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING A MK500 WE-394102 10 OF 16 00
MATERIALS UNTIL CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
CERTIFIED AND
DATED
RIYADH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG WE-392417
Page 10 of 16
CERT'D
Saudi Electricity Company
Western Operating Area
APPR'D
MO
TDH = Hfs+Hfd+hs+hd
0 + 6.11 + 0 + 10.40 = 16.50 PSI
= 11.57 M
Safety Factor 10% = 1.16 Metres.
TOTAL = 12.72 Metres.
SAY = 13.00 Metres.
Selected model details: Will Be Provided In a Separate Submittal By Contractor
Pump Make : GRUNDFOS OR APPROVED EQUAL
Pump Model No. :Will Be Provided In a Separate Submittal By Contractor
ISSUED FOR APPROVAL
TDH : 13.00 M
Motor Rating : 1.8
Speed :3450 RPM
Voltage : 230 V
Phase : 1 Phase
Frequency : 60 Hz
Location : Cable Tunnels
Qty. : 24 Nos
NOTE:
SIEMEN
BY
All the above calculation based on the biggest pump head (longest piping path &
piping fittings), based on the levels illustrated in (Section-J) in drawing WA-394158
29/2/2016
DATE
REVISIONS
DRAWN
BY:- MOHAMED
DATE:- 29/2/2016
CHECKED
BY:- M.ELSHAFEAY
DATE:- 29/2/2016
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:-
THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF DESIGN OF DRAINAGE SYSTEM FOR CABLE TUNNELS
FOR ORDERING
CONSTRUCTION OF HUNAYAN 380/110/13.8KV BSP MAKKAH
A MK500 WE-394102 11 OF 16 00
MATERIALS UNTIL
CERTIFIED AND
DATED RIYADH SAUDI ARABIA JOB ORDER NO. 4400005755 DWG WE-392417
Page 11 of 16
Carbon Steel Pipes for Ordinary Piping Conforming to SASO standard
SSA 1011- Heavy Equivalent to ASTM A53 G-A SCH 40, E.R.W. steel ~J~I -::.~I~I ~
Pipes Black & Hot Dipped Zinc Coated. '~..J-4~1 -::.l...i.....::ll~ 4JJWI 9 ~I ~ll~ '\0 - I II ~)
wgJl ~1)4:->1
J~
15 1/2 21.3 0.840 2.77 0.109 1.27 0.85 1.35 0.90 700 50 120
20 3/4 26.7 1.050 2.87 0.113 1.69 1.13 1.81 1.21 700 50 84
40 1-1/2 48.3 1.900 3.68 0.145 4.05 2.72 4.36 2.91 1.200 85 36
50 60.3 2.375 3.91 0.154 5.44 3.65 5.93 3.95 2.300 160 26
65 2-1/2 73.0 2.875 5.16 0.203 8.63 5.79 9.55 6.37 2.500 175 18
80 3 88.9 3.500 5.49 0.216 11.29 7.58 12.82 8.55 2.220 155 14
90 3-1/2 101.6 4.000 5.74 0.226 13.57 9.11 15.66 10.45 2.030 142 12
100 4 114.3 4.500 6.02 0.237 16.07 10.79 18.25 12.18 1.900 133 10
125 5 141.3 5.563 6.55 0.258 21.77 14.62 26.34 17.58 1.670 117 8
150 6 168.3 6.625 7.11 0.280 28.26 18.97 34.21 22.84 1.520 106 7
200 8 219.1 8.625 8.18 0.322 42.55 28.55 53.25 35.54 1.340 94 5
250 10 273.0 10.750 9.27 0.365 60.29 40.48 75.60 50.46 1 .220 85
300 12 323.8 12.750 10.31 0.406 79.70 53.52 103.40 69.02 1.150 80
~~'J"'S:'(.!I4.~~I~~I~ ~0
-
; ,IUi.Jiift;:, T
,'r'r'!n',,-(' _ . ~I
~---~,., ' .... -~,---- ..~.)"""'" ,
~JI::l.I"..k..iU1
Outside Diameter
Page 12 of 16
Note: 1. Dimension & Weight are in accordance with ISO 65
2. Hydrostatic test pressure: 700 psi (50kg / cm 2 )
63.4
3.5
Page 13 of 16
Page 14 of 16
Page 15 of 16
Page 16 of 16