PipingChecklistfor90%3DModelReview
0
SUBSCRIBEUPDATES.IT'SFREE!
90%3Dmodelreviewisafinalreviewin3setsofmodelreviews,30%,60%and90%.90%
3Dmodelreviewheldwhenthe3Dmodelhasbasicallybeencompleted.Thisoccurswhenall Youremail:
equipment,piping,valves,instruments,electrical,structuralandotheritemshavebeen Enteremailaddress...
modeledin3Denvironment.Inthisreview,theitemstobereviewedwillincludesuchthingsas
Subscribe
thelocationandorientationofvalvehandwheelsforoperability,thelocationoflocalinstruments
formaintainability.
Agreementonthelocationofallthesecriticalitemsshouldprecedethestartofpiping
isometricsEXTRACTIONorthepreparationofinstrumentlocationplandrawings,ifrequired. Popular Recent Comments

Belowisthepipingcheckpointwhichshallbereviewedpriorto90%3Dmodelreview: PipingLayoutDrawingsAbbreviationsand
Legends
May14,2015
PROJECTNAME: CLIENT:
NozzleOrientationDrawing
PROJECTNO.: DOCUMENTNO.:
May15,2015
AREAORWBSNAME: REV.:DATE:DD/MM/YYYY
CentrifugalPumpPipingDesignLayout
May15,2015
CheckListfor90%ModelReview

http://www.pipingengineering.com/pipingchecklistfor90percent3dmodelreview.html 1/5
3/29/2017 PipingChecklistfor90%3DModelReview

1 Thecommentsof60%modelreviewareclosed. Tankfarm:Types,DesignConsiderations,
PlotPlanArrangement,DykeEnclosurePart
2 Interdisciplinemodelreviewisconductedandcommentsofthesameareincorporated.
1
3 AllEquipmentcheckedtoIFCVendorinformation. May15,2015

4 Allpipingmodeledincludingpipingbelow2 7ExcelFunctionsYouMustKnow
5 AllPipesupportsaremodeledandchecked
toWorkSmarter
May15,2015
6 AllStresscommentincorporatedandchecked

7 AllSteelStructuresarecompletedandcheckedwithrespecttoIFCdrawings

8 AllBuildingsarecompletedandcheckedwithrespecttoIFCdrawings

9 AllFoundationsarecompletedandcheckedwithrespecttoIFCdrawings
Orreachmeonaj@pipingengineering.com
10 AllOnline,OfflineandequipmentmountedInstrumentsarecompletedandcheckedwithrespectto
approvedvendordrawings.

11 AllTelecomitemsincludingCCTVs,PAGAspeakersareshownandchecked
Google+
12 AllLightingfixturesarecompletedandchecked.

13 Allelectricalpanels/DistributionBoardsarecompletedandchecked.

14 AllFire&GasEquipmentiscompletedandchecked

15 AllU/Gfacilitiescompletedandchecked.

16 Anyexclusionfrom60%modelreviewisincorporatedandchecked.

17 AllUtilityStationsareidentified,locatedandcheckedforthemaximumlengthofhosewithproper
access.

18 AllSafetyshowersandeyebathsareidentified,locatedandcheckedwithproperaccess.

19 Locationofmobileandportable/manualfirefightingequipmentareshownandchecked.

20 AllSampleconnectionsareidentifiedandmodeledandcheckedforproperaccess.

21 Theminoraccessplatforms,ifanyarelocatedandcheckedforproperaccess.

22 Theofflineinstrumentsincludinganalyzerenclosures/panelsetc.aremodeledatproperlocationsand
checked.

23 ThefireandgasdetectorsareshownandlocationofeachischeckedbyHSEforfunctionandby
pipingforobstruction.

24 Thecableroutinginsidethebuildingiscompleteandcheckedsothatitisnotobstructingany
movementofcraneorwalkways.

http://www.pipingengineering.com/pipingchecklistfor90percent3dmodelreview.html 2/5
3/29/2017 PipingChecklistfor90%3DModelReview

25 Alltheinstrumentstandsandsupportsarecheckedsothattheyarenotobstructingthewalkwayson
theplatformsespeciallyincaseofplatformslocatedonverticalvesselsandcolumns.

26 Locationofjunctionboxesischeckedsothattheyarenotobstructingthewalkways.

27 Junctionboxes/fireboxesaremodeledwithvolumefordooropeninganddoesnotenterintothehard
standing/accessareaslocatedforcrane/walkways,etc.

28 Cableconduitsarecheckedsothattheyarenotcomingoutinthemiddleoftheroad/walkways.

29 Ensurethatarrangementofsmallborepipinghasbeendoneinsuchawaythatthepipesupportis
providedtopreventthebreakageduetovibration.

30 Ensurepurgingconnectionisprovidedatthedeadendofflareheader.

31 Ensurethatcoolingwaterlinesbranchofffromtheheaderfromtop.

32 Ensurethattherearenovalvesinstalledwiththestempointingbelowthehorizontalplanein
downwarddirection.

33 Ensurethattheventsfromananalyzerhouse/cabinetarelocatedandroutedtoatmosphereatsafe
heightfromgrade.

34 Theventsofsealchambersofreciprocatingcompressorsareproperlyroutedandsupported.

35 Unloadingandstorageofchemicalsandadditivesisreviewedforanyenvironmentalimpact.

36 Vendortrimpipingaroundequipmentisputinthemodelandchecked.

37 EnsureToeplateismodeledproperlyatplatformopening.

38 CheckthattheSiren/safetyalarmsystemisinstalledattopofhighestbuildingandatthecentreofplant
area.

39 Theproperlightingpolesandfixturesetc.areshownandchecked.

40 Thesafetyequipmentlikewindsocks,breathingapparatusarestrategicallylocatedasperescapeand
safetyequipmentlayout.

41 Theroutingofbranchcabletraystotheinstrumentandsupportforthesameisproperlyshownand
checked.

42 Theparkingarea,trafficbarriers,boulders,etc.asapplicableismodeledandchecked.

43 Steamtracingmanifoldsandsteamjacketingdetailsareshowninmodelandchecked.

44 Alldesignchangenotices(DCNs)aretakencarewithrespecttocompleteness.

Instructionsforfillingthechecklistfor90%modelreview:

http://www.pipingengineering.com/pipingchecklistfor90percent3dmodelreview.html 3/5
3/29/2017 PipingChecklistfor90%3DModelReview

1.Thislistisnotintendedforuseinmilestonereviews,itisforensuringthatthemodelisready
forthemilestonereviewandthereforeitisrequiredtobecompletedandsignedbefore
proceedingformilestonereview.

2.Manycheckpointsinthechecklistdonotspecifythecriteriaorbasisforchecking.The
pointsarelistedwiththeintentiontocoverthefullscopeofmodelandthattherearenomiss
outsbeforeproceedingformilestonereview.Separatecheckprintsofpointsneedtobe
maintainedbyAreaDesigners,LeadDesignersandAreaengineerstosupportthereadinessof
themodelreview.

3.ThischecklististobepreparedbypipingLeadDesignerforeachareaorWBSseparately.

4.ThoughthischecklistispreparedbypipingLeadDesignerandcheckedbypipingArea
Engineer,itrequiresinputfrommanydisciplines.Insuchcasesthepipingleaddesignerhasto
obtaintheconfirmationfromthedesigneroftherespectivediscipline.

5.TheModelManageristheapproverforthelist.

6.Thesignedcopyistobepreservedforrecord.

SharethisonWhatsApp

MOREREAD

ChecklistforPiping OffshoreEngineering PipingChecklistfor60%


Isometrics:P&ID, ChecklistNozzle 3DModelReview
Layout,DraftingRelated Orientation March16,2016

May30,2016 February22,2015

http://www.pipingengineering.com/pipingchecklistfor90percent3dmodelreview.html 4/5
3/29/2017 PipingChecklistfor90%3DModelReview

LEAVEAREPLY

Youremailaddresswillnotbepublished.Requiredfieldsaremarked*

Name*

Email*

CheckheretoSubscribetonotificationsfornewposts

PostComment

ConfirmyouareNOTaspammer

copyrightPipingengineering2017AllRightsReserved.PrivacyPolicy|AboutUs

http://www.pipingengineering.com/pipingchecklistfor90percent3dmodelreview.html 5/5

You might also like