DAILY WORK REPORT

DR 279 - 2017

Project Name:
Contractor: Project No.:
Residential Compound At Umm AL Quwain -
Combined Group Contracting Co. C025
232 House
Client: Consultant: Repot No.:
Sheikh Zayed Housing Programme Al Suweidi Engineering Consultants DR - 279
LOCATION: Date:
UMM AL QUWAIN, SHANTEER AREA, SECTOR NO.12, BLOCK NO.1, PLOT NO.1 16 / 04 / 2017

WORK IN PROGRESS (PART A)


No. Description And Location of Work in Progress Work Executed By Remarks
A Earth Work
1 Excavation for septic tank and soakaway for Villas (46,47).
2 Installation for septic tank and soakaway for Villas (42,43).
3 Installation of boundary wall for Villas (1 to 13).
B Formwork and steel work
1 First Floor Columns for Villas (92,115,96).
2 Roof Slab. for Villas (102,103,104,105,99,98,64,65).
C Casting Concrete Work
7 First Floor Columns for Villa (96).
8 Roof Slab. for Villas (114,65,102).
9 Parapet for Villas (50,51,52).
D Block Work
1 Ground Floor Block Work for Villas (28 to 38), (81 to 83).
2 First Floor Block Work for Villas (50 to 55), (83,84,85,30,31,32,33).
3 Parapet Block Work for Villas
E Plaster Work
1 External plaster for ground floor for villas (8,21).
2 Internal plaster for ground floor for villas (12,13,17).
3 External plaster for First floor for villas (8,21).
4 Internal plaster for First floor for villas (12,13,17).
F Painting Work
1 Internal Paint for villas (15,16).

CONTRACTOR
CONSULTANT
Consultant's
Comments :

CGC-C025-FM-004 / Revision: 0 Page 1/5


DAILY WORK REPORT

DR 279 - 2017

Project Name:
Contractor: Project No.:
Residential Compound At Umm AL Quwain -
Combined Group Contracting Co. C025
232 House
Client: Consultant: Repot No.:
Sheikh Zayed Housing Programme Al Suweidi Engineering Consultants DR - 279
LOCATION: Date:
UMM AL QUWAIN, SHANTEER AREA, SECTOR NO.12, BLOCK NO.1, PLOT NO.1 16 / 04 / 2017

WORK IN PROGRESS (PART A)


No. Description And Location of Work in Progress Work Executed By Remarks
A Earth Work
1 Installation for septic tank and soakaway for Villas (153,154,155).
B Formwork and steel work
1 First Slab. For villa (181).
2 First Floor Columns for Villas (229,216,215).
3 Roof Slab. for Villas (214,222).
C Casting Concrete Work
1 First Slab. For villa (181).
2 First Floor Columns for Villa (229,216,215).
3 Roof Slab. for Villas (214,222).
D Plaster Work
1 External plaster for ground floor for villas (125,123).
2 Internal plaster for ground floor for villas (123,121).
3 External plaster for First floor for villa (125).
4 Internal plaster for First floor for villa (123).

CONTRACTOR
CONSULTANT
Consultant's
Comments :

Project Name: Contractor: Project No.:


Residential Compound At Umm AL Quwain - 232 House Combined Group Contracting Co. C025
CGC-C025-FM-004 / Revision: 0 Page 2/5
DAILY WORK REPORT

DR 279 - 2017

Client: Consultant: Repot No.:


Sheikh Zayed Housing Programme Al Suweidi Engineering Consultants DR - 279
LOCATION:
Date: 16 / 04 / 2017
UMM AL QUWAIN, SHANTEER AREA, SECTOR NO.12, BLOCK NO.1, PLOT NO.1
MANPOWER
Sub-Contractor
Position / Trade Main Contractor Shutter and Steel sub-
Aktona
contractor
Project Manager 1 1
Construction Manager 1
Project Engineer 2 1
Site Engineer 4
Office Engineer 1
Planning Engineer 1
QA/QC Engineer 2
QS Engineer 1
Accountant 1
Administrator 1
MEP Engineer 3
Senior Safety Officer 1
Safety Officer 3
General Foreman 2 12
Foreman 10 2
Charge Hand 14
Secretary 1
Document controller 1
Draughtsman 3
Surveyor 4
Assistant Surveyor 3
Chainman 5
Store Keeper 1
Store Helper 3
Office Boy 5
Driver 12 5
Operator 12 3
Watchman 6
Carpenter 77 188
3
180
Steel Fixer 107
8
117
Mason 53
Labour 216 6 49
Plumber 1
Pipe Fitter 6
Electrician 1
Mechanic 1
Total
CONTRACTOR CONSULTANT

Consultant's Comments :

Project Name: Contractor: Project No.:


Residential Compound At Umm AL Quwain - 232 House Combined Group Contracting Co. C025

CGC-C025-FM-004 / Revision: 0 Page 3/5


DAILY WORK REPORT

DR 279 - 2017

Client: Consultant: Repot No.:


Sheikh Zayed Housing Programme Al Suweidi Engineering Consultants DR 279
LOCATION:
Date: 16 / 04 / 2017
UMM AL QUWAIN, SHANTEER AREA, SECTOR NO.12, BLOCK NO.1, PLOT NO.1
MACHINERY & EQUIPMENT

Description Qty. Description Qty.


Tower Crane Air Compressor 3
Mobile Crane Air Compressor with Jack Hammer
Fork Lift Generator 35 KVA 3
Bobcat Generator(petrol)5 KVA 8
Generator(diesel)5 KVA 2
JCB 1 Generator 100 KVA 5
3 Ton Pick up 1 Generator 150 KVA
Double Door Pick Up 4X4 8 Concrete Vibrator(petrol) 12
6 Wheels 1 Concrete Vibrator(diesel) 2
Salt Water Tanker 5000 Gallons 6 Cradle
Drinking Water Tanker 2 Man Hoist
Dumper Steel Cutting Machine 4
Shovel 2 Bar Bending Machines 4
Excavator 3 Booster Pump 1.5 HP 2
Grader Water Pump 1 HP 65
Bulldozer Submersible Pump 3
Boom Loader 8 Dewatering Pump
Roller Compactor 4 Water Cooler 4 taps 5
Plate Compactor 4 Diesel Tank 2700 Gallons 1
Desalination Plant 1
84 Seats Bus 6
34 Seats Coaster Bus 1

CONTRACTOR CONSULTANT

Consultant's Comments :

Project Name: Contractor: Project No.:


Residential Compound At Umm AL Quwain - 232 House Combined Group Contracting Co. C025
Client: Consultant: Repot No
Sheikh Zayed Housing Programme Al Suweidi Engineering Consultants DR 279

CGC-C025-FM-004 / Revision: 0 Page 4/5


DAILY WORK REPORT

DR 279 - 2017

LOCATION:
Date: 16 / 04 / 2017
UMM AL QUWAIN, SHANTEER AREA, SECTOR NO.12, BLOCK NO.1, PLOT NO.1

TOOLS
Description Qty. Description Qty.
Total Station 5
Mini Prism 5
Auto Level Machine 5
Hilti Concrete breaker (heavy duty) 15
Hilti Concrete Breaking and Drilling 5
Grinder 9 11
Grinder 4 25
Hand Wood Cutter 9 7
Table Wood Cutter 12 5
Jig Saw 2
Wooden Drill Machine 14
Concrete Drill Machine 4

CONTRACTOR CONSULTANT

Consultant's Comments :

CGC-C025-FM-004 / Revision: 0 Page 5/5