You are on page 1of 303

COMPONENTES

01 SISTEMA DE AGUA
Impulsin inc. Pozo tubular S/.
Lnea de conduccin S/.
Reservario 25m3 S/.
Reservario 100m3 S/.
Red de distribucin S/.
Conexiones domiciliarias S/.

SISTEMA DE ALCANT
Conexiones domiciliarias S/.
Redes colectoras S/.
Buzones S/.

PTAR
Emisor S/.
PTAR S/.
Tanque Imhoff S/.

Capacitacin en administracin, operacin y mantenimiento S/.

Capacitacin en educacin sanitaria


Mitigacin Ambiental y control del ambiente S/.

Supervisin y liquidacin S/.


Expediente Tcnico S/.
Plan de monitoreo arqueolgico S/.
PRESUPUESTO TOTAL

COMPONENTES

SISTEMA DE AGUA POTABLE S/.

SISTEMA DE ALCANTARILLADO S/.

PRESUPUESTO TOTAL
PERFIL EXPEDIENTE TECNICO (S/.)

01 SISTEMA DE AGUA POTABLE


S/. 556,555.71 S/. 741,798.25 S/. 185,242.55
S/. 232,034.50 S/. 213,618.09 S/. -18,416.41
S/. 26,523.30 S/. 23,361.91 S/. -3,161.39
S/. 232,084.66 S/. 269,744.03 S/. 37,659.36
S/. 1,641,125.79 S/. 1,469,061.37 S/. -172,064.42
S/. 622,289.05 S/. 435,028.92 S/. -187,260.13

SISTEMA DE ALCANTARILLADO
587,594.36 S/. 756,171.57 S/. 168,577.21
2,573,463.23 S/. 2,437,333.72 S/. -136,129.51
819,443.51 S/. 776,135.75 S/. -43,307.77

PTAR
136,061.14 S/. 86,679.40 S/. -49,381.74
1,673,757.63 S/. 4,204,184.39 S/. 2,530,426.76
1,335,473.28 S/. 1,430,972.77 S/. 95,499.49

S/. 33,945.99 S/. 30,559.70 S/. -3,386.29

S/. 47,400.22 S/. 44,330.65 S/. -3,069.58


S/. 16,052.36 S/. 15,168.97 S/. -883.40

S/. 687,170.00 S/. 423,820.00 S/. -263,350.00


S/. 34,569.87 S/. 67,500.00 S/. 32,930.13
S/. 0.00 S/. 79,432.70 S/. 79,432.70
S/. 11,255,544.61 S/. 13,504,902.17 S/. 2,249,357.56

PERFIL EXPEDIENTE TECNICO

3,570,458.25 S/. 3,313,018.59

7,685,086.36 S/. 10,184,583.32

S/. 11,255,544.61 S/. 13,497,601.90


33.28%
-7.94%
-11.92%
16.23%
-10.48%
-30.09%

28.69%
-5.29%
-5.29%

-36.29%
151.18%
7.15%

-9.98%

-6.48%
-5.50%

-38.32%
95.26%
100.00%
19.98%
COMPONENTES Unidad de Medida PIP VIABLE

AGUA POTABLE
Captacin l/s 4.54
Lnea de conduccin m 1468.78
Sistema de utilizacin m 0
Reservorio Nuevo m3 125

Instalacin de 16,845.97 m.

-Tubera PVC 3: 161.92 m.

-Tubera PVC 2: 481.10 m.

-Tubera PVC 1 1/2: 1,908.67 m.


Redes de distribucin m
-Tubera PVC 1: 3,645.95 m.

-Tubera PVC 4: 538.50 m.

-Tubera PVC 2 1/2: 345.97 m.

-Tubera PVC 3/4: 9,763.85 m.

Conexiones domiciliarias Nmero 475

SISTEMA DE ALCANTARILLADO
Conexiones domiciliarias Nmero 475
Redes colectoras m 18,012.82
Buzones und 230

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES


Emisor m 256
PTAR l/s 2.78
Tanque Imhoff l/s 3.86

Capacitacin en administracin, operacin Nmero personas


475
y mantenimiento capacitadas

Nmero personas
Capacitacin en educacin sanitaria 475
capacitadas

Mitigacin Ambiental % 50

Supervisin y Liquidacin Nmero 1


Plan de Monitoreo arqueolgico Nmero 1
Expediente Tcnico Nmero 1
PIP REFORMULADO

4.54
1468.78
769
125

Instalacin de 16,845.97 m.

-Tubera PVC 3: 161.92 m.

-Tubera PVC 2: 481.10 m.

-Tubera PVC 1 1/2: 1,908.67 m.

-Tubera PVC 1: 3,645.95 m.

-Tubera PVC 4: 538.50 m.

-Tubera PVC 2 1/2: 345.97 m.

-Tubera PVC 3/4: 9,763.85 m.

475

475
18,012.82
230

DUALES
256
2.78
3.86

475

475

50

1
1
1
VARIACION (%)
PIP A VERIFICAR VARIACION (3) =
COMPONENTES Unidad de Medida PIP A VIABLE (1) (4) = ((2)/(1)-
(2) (2)-(1)
1)*100
AGUA POTABLE
Captacin S/. 13,403.59 20,255.67 6,852.08 51.12%
Lnea de
S/. 3,650.08 5,785.04 2,134.96 58.49%
conduccin

Reservorio Nuevo S/. 19,296.40 22,984.07 3,687.67 19.11%

Redes primarias
S/. 7,987.78 39,777.48 31,789.70 397.98%
rehabilitadas

Redes
secundarias S/. 61,278.53 79,170.15 17,891.62 29.20%
rehabilitadas
Conexiones
domiciliarias S/. 9,692.58 24,340.84 14,648.26 151.13%
nuevas

Lavaderos de
S/. 74,260.06 74,260.06 #DIV/0!
pozo alto nuevas

Pileta con
lavadero/escurrid S/. 63,704.14 -63,704.14 -100.00%
ero

Subtotal Agua
179,013.10 266,573.31 87,560.21 48.91%
Potable (I)

DISPOSICIN DE EXCRETAS

UBS de arrastre
S/. 0 529,615.84 529,615.84 Err:512
hidrulico

Tratamiento -
S/. 0 139,819.02 139,819.02 Err:512
Biodigestor
Unidad de
percolacin -
S/. 0 54,676.49 54,676.49 Err:512
zanja de
infiltracin

Letrina de hoyo
S/. 94,081.39 0 -94,081.39 -100
seco ventilado

Subtotal
94,081.39 724,111.35 630,029.96 669.66%
Saneamiento (II)

Total Costo
273,094.49 990,684.66 717,590.17 262.76%
Directo (III)
Capacitacin en
gestin/Capacitac
S/. 1,939.11 58,000.71 56,061.60 2891.1
in en Educacin
Sanitaria

Mitigacin
Ambiental y
S/. 346.6 18,486.96 18,140.36 5233.8
control del
ambiente
Supervisin S/. 15,000.00 39,382.59 24,382.59 162.55
Expediente
S/. 5,000.00 18,000.00 13,000.00 260
Tcnico

Total Costo
22,285.71 133,870.26 111,584.55 500.70%
Indirecto (IV)

Total Inversin
295,380.19 1,124,554.93 829,174.74 280.71%
(V)
% avance fsico a
la fecha

0
0

100

13.45

1.6
COMPONENTES PIP VIABLE

AGUA POTABLE

En el PIP dentro de este componente se


Captacin consideraba 4.54lt/s y se media en litros por
segundo.

En el PIP dentro de este componente se


Lnea de conduccin consideraba 1468.78ml y se media en metros
lineales.

Sistema de utilizacin El perfil no consider este componente.

El perfil no consider, la reubicacin de un


Reservorio Nuevo tanque de 25m3 y la instalacin de 04 tanques
de polietileno de 25m3 cada uno

Instalacin de 16,845.97 m considerado en el


Redes de distribucin
perfil tcnico.

El perfil plantea la intacin de 475 conexiones


Conexiones domiciliarias
domiciliarias.

SISTEMA DE ALCANTARILLADO

El perfil plantea la instacin de 475 conexiones


Conexiones domiciliarias
domiciliarias.

En el PIP dentro de este componente se


Redes colectoras consideraba 18012.82ml y se media en metros
lineales.

Buzones El perfil plantea la instacin de 230 buzones.

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

El perfil plantea la ejecucin de 256ml de emisor


Emisor
de las PTAR.

2.78 l/s es el caudal de diseo que las PTAR


PTAR
tratarn, esto en el perfil tcnico.

3.86 l/s es el caudal que los tanques Imhoff ,


Tanque Imhoff
esto en el perfil tcnico.
Capacitacin en administracin, operacin El perfil plantea este componente y se mide en
y mantenimiento das de capacitacin, siendo estos 12.

El perfil este componente contempla una


Capacitacin en educacin sanitaria
capacitacin de 7 meses.

El perfil tcnico contempla la restauracin de


Mitigacin Ambiental
reas, y su unidad de medida global.

En el PIP dentro de este componente se


Supervisin y Liquidacin
consideraba: 01 y se media en trminos globales

El perfil tcnico no contempla la ejecucin de


Plan de Monitoreo arqueolgico
este componente.

En el PIP dentro de este componente se


Expediente Tcnico
consideraba: 01 y se media en trminos globales
PIP REFORMULADO

En el PIP dentro de este componente se


consideraba 4.54lt/s y se media en litros por
segundo.

En Expediente Tcnico en este componente se


considera 1468.78 ml y se media en metros
lineales.

Sistema de Utilizacion Tension 3, 22.9KV para


Sistema de Bombeo de Agua 0.769 Km

El expediente tcnico plantea la reubicacin de un


reservorio de 25m3 de polietileno y la
construccin de un reservorio de concreto armado
de 100m3. Incluye caseta de cloracin.

El expediente tcnico considera la Instalacin de


16,845.97 m.

475 es el nmero de conexiones domiciliarias


propuestas en el expediente tcnico.

LLADO

475 es el nmero de conexiones domiciliarias


propuestas en el expediente tcnico.

En Expediente Tcnico en este componente se


considera 18012.82 ml y se media en metros
lineales.

230 es el nmero de conexiones domiciliarias


propuestas en el expediente tcnico.

AS RESIDUALES

El expediente tcnico plantea la ejecucin de


256ml de emisor de las PTAR.

El expediente tcnico plantea 2.78 l/s de caudal


de diseo que las PTAR tratarn

El expediente tcnico plantea 3.86 l/s de caudal


que los tanques Imhoff tratarn
El expediente tcnico plantea este componente y
se mide en das de capacitacin, siendo estos 12.

El perfil este componente contempla una


capacitacin de 7 meses.

El expediente tcnico contempla la restauracin


de reas, y su unidad de medida global.

En el Expediente Tcnico dentro de este


componente se considera: 01 y se media en
trminos globales.
En el Expediente Tcnico dentro de este
componente se considera: 01 y se media en
trminos globales.
En el Expediente Tcnico dentro de este
componente se considera: 01 y se media en
trminos globales.
COMPONENTES PIP VIABLE

AGUA POTABLE

En el PIP dentro de este componente se


Captacin consideraba 4.54lt/s y se media en litros por
segundo.

En el PIP dentro de este componente se


Lnea de conduccin consideraba 1468.78ml tubra PVC y se media
en metros lineales.

Sistema de utilizacin El perfil no consider este componente.

El perfil no consider, la reubicacin de un


Reservorio Nuevo tanque de 25m3 y la instalacin de 04 tanques
de polietileno de 25m3 cada uno

Instalacin de 16,845.97 m considerado en el


Redes de distribucin
perfil tcnico.

El perfil plantea la intacin de 475 conexiones


Conexiones domiciliarias
domiciliarias.

SISTEMA DE ALCANTARILLADO

El perfil plantea la instacin de 475 conexiones


Conexiones domiciliarias
domiciliarias.

En el PIP dentro de este componente se


Redes colectoras consideraba 18012.82ml y se media en metros
lineales.

Buzones El perfil plantea la instacin de 230 buzones.

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

El perfil plantea la ejecucin de 256ml de emisor


Emisor
de las PTAR.

2.78 l/s es el caudal de diseo que las PTAR


PTAR
tratarn, esto en el perfil tcnico.
3.86 l/s es el caudal que los tanques Imhoff ,
Tanque Imhoff
esto en el perfil tcnico.

Capacitacin en administracin, operacin El perfil plantea este componente y se mide en


y mantenimiento das de capacitacin, siendo estos 12.

El perfil este componente contempla una


Capacitacin en educacin sanitaria
capacitacin de 7 meses.

El perfil tcnico contempla la restauracin de


Mitigacin Ambiental
reas, y su unidad de medida global.

En el PIP dentro de este componente se


Supervisin y Liquidacin
consideraba: 01 y se media en trminos globales

El perfil tcnico no contempla la ejecucin de


Plan de Monitoreo arqueolgico
este componente.

En el PIP dentro de este componente se


Expediente Tcnico
consideraba: 01 y se media en trminos globales
PIP REFORMULADO JUSTIFICACIN DE VARIACIIN

Se plantea la rehabilitacin de la captacin de


En el PIP dentro de este componente se
ladera "Cochambul", necesaria para garantizar la
consideraba 4.54lt/s y se media en litros por
operatividad del proyecto, con una dotacin de
segundo.
0.8lt/s.

En Expediente Tcnico en este componente se Se mantiene lo referente al cambio de la tubera


considera 1468.78 ml y se media en metros de conducci, pero se ha modificado la
lineales, 768.78 ml tubera PVC y 700ml HDPE composicin y se realizar en dos tramos, una de
SDR 9 material PVC y la otra parte tubera HDPE SDR 9

Necesaria la implementacin de esta para


Sistema de Utilizacion Tension 3, 22.9KV para
garantizar la operatividad de sistema de bombeo
Sistema de Bombeo de Agua 0.769 Km
del proyecto.

El expediente tcnico plantea la reubicacin de un


Cambio de tecnologa de uso de tanques
reservorio de 25m3 de polietileno y la
elevados de HDPE por el uso de tanque de
construccin de un reservorio de concreto armado
concreto armado.
de 100m3. Incluye caseta de cloracin.

El expediente tcnico considera la Instalacin de No se presentan variaciones, salvo en costos por


16,845.97 m. actualizacin de estos.

475 es el nmero de conexiones domiciliarias No se presentan variaciones, salvo en costos por


propuestas en el expediente tcnico. actualizacin de estos.

LLADO

475 es el nmero de conexiones domiciliarias No se presentan variaciones, salvo en costos por


propuestas en el expediente tcnico. actualizacin de estos.

En Expediente Tcnico en este componente se Si bien el metrado de este se mantiene es


considera 18012.82 ml y se media en metros necesaria la proteccin de un tramo de 111m de
lineales. esta red.

230 es el nmero de conexiones domiciliarias 230 es el nmero de conexiones domiciliarias


propuestas en el expediente tcnico. propuestas en el expediente tcnico.

AS RESIDUALES

El expediente tcnico plantea la ejecucin de No se presentan variaciones, salvo en costos por


256ml de emisor de las PTAR. actualizacin de estos.

Se increment al doble el rea de los humedales


El expediente tcnico plantea 2.78 l/s de caudal
artificiales, adems la construccin de muros de
de diseo que las PTAR tratarn
contencin .
El expediente tcnico plantea 3.86 l/s de caudal No se presentan variaciones, salvo en costos por
que los tanques Imhoff tratarn actualizacin de estos.

El expediente tcnico plantea este componente y No se presentan variaciones, salvo en costos por
se mide en das de capacitacin, siendo estos 12. actualizacin de estos.

El perfil este componente contempla una No se presentan variaciones, salvo en costos por
capacitacin de 7 meses. actualizacin de estos.

El expediente tcnico contempla la restauracin No se presentan variaciones, salvo en costos por


de reas, y su unidad de medida global. actualizacin de estos.

En el Expediente Tcnico dentro de este


No se presentan variaciones, salvo en costos por
componente se considera: 01 y se media en
actualizacin de estos.
trminos globales.

Puesto que los Certificado de Inexistencia de


En el Expediente Tcnico dentro de este
Restos Arqueolgicos, plantea la obligariotioridad
componente se considera: 01 y se media en
de llegar a cabo la ejecucin del Plan de
trminos globales.
Monitoreo Arqueolgico.

En el Expediente Tcnico dentro de este


No se presentan variaciones, salvo en costos por
componente se considera: 01 y se media en
actualizacin de estos.
trminos globales.
COMPONENTES Unidad de Medida PIP VIABLE (1)

AGUA POTABLE
Captacin l/s 4.54
Lnea de conduccin m 1468.78
Sistema de utilizacin m 0
Reservorio Nuevo m3 125

Redes de distribucin m 16,845.97

Conexiones domiciliarias Nmero 475

SISTEMA DE ALCANTARILLADO
Conexiones domiciliarias Nmero 475
Redes colectoras m 18,012.82
Buzones und 230

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES


Emisor m 256
PTAR l/s 2.78
Tanque Imhoff l/s 3.86

Capacitacin en administracin, Nmero personas


475
operacin y mantenimiento capacitadas

Nmero personas
Capacitacin en educacin sanitaria 475
capacitadas

Mitigacin Ambiental % 50

Supervisin y Liquidacin Nmero 1

Plan de Monitoreo arqueolgico Nmero 1

Expediente Tcnico Nmero 1


VARIACION (%)
VARIACION (3) = % avance fsico a
PIP A VERIFICAR (2) (4) = ((2)/(1)-
(2)-(1) la fecha
1)*100

4.54 0 0.00% 0
1468.78 0 0.00% 0
769 769 100.00% 0
125 0 0.00% 0

16,845.97 0 0.00% 0

475 0 0.00% 0

475 0 0.00% 0
18,012.82 0 0.00% 0
230 0 0.00%

SIDUALES
256 0 0.00% 0
2.78 0 0.00% 0
3.86 0 0.00% 0

475 0 0.00% 0

475 0 0.00% 0

50 0 0.00% 0

1 0 0.00% 0

1 0 0.00% 0

1 0 0.00% 0
COMPONENTES Unidad de Medida

01 SIST
Impulsin inc. Pozo tubular S/.
Lnea de conduccin S/.
Reservario 25m3 S/.
Reservario 100m3 S/.
Red de distribucin S/.
Conexiones domiciliarias S/.

SISTEM
Conexiones domiciliarias S/.
Redes colectoras S/.
Buzones S/.

Emisor S/.
PTAR S/.
Tanque Imhoff S/.

Capacitacin en administracin, operacin y mantenimiento S/.

Capacitacin en educacin sanitaria


Mitigacin Ambiental y control del ambiente S/.

Supervisin y liquidacin S/.


Expediente Tcnico S/.
Plan de monitoreo arqueolgico S/.
PRESUPUESTO TOTAL

COMPONENTES

SISTEMA DE AGUA POTABLE S/.

SISTEMA DE ALCANTARILLADO S/.

PRESUPUESTO TOTAL
PIP A VIABLE (1) PIP A VERIFICAR (2) VARIACION (3) = (2)-(1)

01 SISTEMA DE AGUA POTABLE


S/. 556,555.71 S/. 741,798.25 S/. 185,242.55
S/. 232,034.50 S/. 213,618.09 S/. -18,416.41
S/. 26,523.30 S/. 23,361.91 S/. -3,161.39
S/. 232,084.66 S/. 269,744.03 S/. 37,659.36
S/. 1,641,125.79 S/. 1,469,061.37 S/. -172,064.42
S/. 622,289.05 S/. 435,028.92 S/. -187,260.13

SISTEMA DE ALCANTARILLADO
587,594.36 S/. 756,171.57 S/. 168,577.21
2,573,463.23 S/. 2,437,333.72 S/. -136,129.51
819,443.51 S/. 776,135.75 S/. -43,307.77

PTAR
136,061.14 S/. 86,679.40 S/. -49,381.74
1,673,757.63 S/. 4,204,184.39 S/. 2,530,426.76
1,335,473.28 S/. 1,430,972.77 S/. 95,499.49

S/. 33,945.99 S/. 30,559.70 S/. -3,386.29

S/. 47,400.22 S/. 44,330.65 S/. -3,069.58


S/. 16,052.36 S/. 15,168.97 S/. -883.40

S/. 687,170.00 S/. 423,820.00 S/. -263,350.00


S/. 34,569.87 S/. 67,500.00 S/. 32,930.13
S/. 0.00 S/. 79,432.70 S/. 79,432.70
S/. 11,255,544.61 S/. 13,504,902.17 S/. 2,249,357.56

PERFIL EXPEDIENTE TECNICO

3,570,458.25 S/. 3,313,018.59

7,685,086.36 S/. 10,184,583.32

S/. 11,255,544.61 S/. 13,497,601.90


VARIACION (%) (4) = ((2)/ % avance fsico a la
(1)-1)*100 fecha

33.28% 0.00%
-7.94% 0.00%
-11.92% 0.00%
16.23% 0.00%
-10.48% 0.00%
-30.09% 0.00%

28.69% 0.00%
-5.29% 0.00%
-5.29% 0.00%

-36.29% 0.00%
151.18% 0.00%
7.15% 0.00%

-9.98% 0.00%

-6.48% 0.00%
-5.50% 0.00%

-38.32% 0.00%
95.26% 0.00%
100.00% 0.00%
19.98% 0.00%
MODIFICACIONES NO SUSTANCIALES: PIP VIABLE
Metas asociadas a la capacidad de produccin
Tecnologa de produccin

Mejoramiento del sistema de agua


potable referido a construccin de la
Captacin y lnea de conduccin
captacin y lnea de conduccin
(0.39 lt/seg)

Mejoramiento del sistema de agua


Reservorio potable, construccin de un
reservorio de 10m3.

Mejoramiento de la red de
Red de distribucin primaria distribucin primaria, considerada
esta en 482.70 metros lineales

Mejoramiento de la red de
Red de distribucin secundaria. secundaria, considerada esta en
3,703.05 metros lineales.

Construccin de 77 conexiones
Conexiones domiciliarias
domiciliarias.
Construccin de 77 Piletas con
lavadero/escurridero.

Sistema de tratamiento de excretas.


Construccin de 77 letrinas de hoyo
seco ventilado.

En el perfil se ha determinado un
Capacitacin en gestin/Capacitacin en Educacin Sanitaria monto de

S/. 1,939.11.

En el perfil se ha determinado un
Mitigacin Ambiental y control del ambiente monto de

S/. 346.60
En el perfil se ha determinado un
Supervisin monto de

S/. 15,000.00

En el perfil se ha determinado un
Expediente Tcnico monto de

S/. 5,000.00

Cambio de alternativa de solucin por otra prevista en el estudio con el Alternativa seleccionada en el PIP
que se obtuvo la viabilidad. Viable.

Plazo de ejecucin. 03 meses


PIP A VERIFICAR JUSTIFICACION DE VARAACION

Aumento en el presupuesto de este componente en


Mejoramiento del sistema de agua
52.70%. Debido a la reconstruccin de la captacin para
potable referido a la a construccin de
conducir mayor gasto, pues la dotacin por persona se ha
captacin y lnea de conduccin
incrementado en 30 litros por da y al sinceramiento de
(0.52lt/seg).
costos unitarios.

Aumento en el presupuesto de este componente en


19.11%. Debido al incremento en el metrado debido a la
Mejoramiento del sistema de agua
necesidad de dotar a los beneficiarios de una mayor
potable, construccin de un reservorio
dotacin, pues la dotacin por persona se ha
de 12m3.
incrementado en 30 litros por da y al sinceramiento de
costos unitarios. .

Aumento en el presupuesto de este componente en


397.98%. Debido al incremento en el metrado de estas
lneas ya que por el caudal a conducir fue necesaria la
Mejoramiento de la red de distribucin modificacin de algunas secciones de tubera de Tubera
primaria, considerada esta en 1,405.80 PVC 2: 2.00 m. a Tubera PVC 2: 329.80 m., de Tubera
metros lineales PVC 1 1/2: 354.50 m. a Tubera PVC 1 1/2: 151.00 m.,
de Tubera PVC 1: 126.20 m. a Tubera PVC 1: 925.00
m. y al sinceramiento de costos unitarios.

Aumento en el presupuesto de este componente en


Mejoramiento de la red de secundaria,
29.20%. Debido no se esta considerado el aporte comunal
considerada esta en 2,798.00 metros
para la ejecucin de este componente y al sinceramiento
lineales.
de costos unitarios.

No se presenta modificaciones en cuanto a metas, pero


Construccin de 77 conexiones existe u aumento en el presupuesto de este componente
domiciliarias. en 151.13%. el monto se incrementa debido al
sinceramiento de costos unitarios.
Aumento en el presupuesto de este componente en
16.57%. Debido a la modificacin del componente, cambio
Construccin de 77 Lavaderos de pozo
para buscar con la ejecucin de esta una mejora en la
alto.
calidad de vida de la poblacin a servir y al
sinceramiento de costos unitarios.

Aumento en el presupuesto de este componente en


669.66%. Este cambio se realiz porque el uso de
tecnologa de arrastre hidralico combinado con el uso de
biodigestores presentan las siguientes ventajas:

Construccin de 77 UBS de arrastre


hidrulico, cada cual con su biodigestor Dispositivo cerrado que sirve para el tratamiento biolgico
y sus zanjas de percolacin. de aguas domsticas. El biodigestor es un equipo de
tratamiento de aguas residuales autolimpiable. Alta
capacidad de remocin de carga orgnica.

Esto, no solo mejora las condicione de vida de la


poblacin, en cuanto a la salud y bienestar, sino que es
una tecnologa amigable con el medio ambiente y al
sinceramiento de costos unitarios.

El incremento en el presupuesto de este componente es


En el expediente tcnico se ha 2,891.10%. Debido las consideraciones planteadas, ya
determinado un monto de S/. que se ha considerado un programa de cambio de hbitos
58,000.71. de higiene y educacin sanitaria, un acompaamiento en y
durante la ejecucin de la obra, por un lapso de un ao.

El incremento en el presupuesto de este componente es


En el expediente tcnico se ha 5,233.80%. Debido las acciones necesarias para
determinado un monto de S/.18,486.96. garantizar el cuidado del medio ambiente, y al
sinceramiento de costos unitarios.
El incremento en el presupuesto de este componente es
En el expediente tcnico se ha
162.55% debido al incremento de meses de ejecucin de
determinado un monto de S/.39,382.59.
3 a 4 meses y sinceramiento de costos del servicio.

El incremento en el presupuesto de este componente es


En el expediente tcnico se ha 260.00% debido al cambio y las modificaciones de los
determinado un monto de S/.18,000. componentes y al sinceramiento de los costos por la
realizacin del estudio.

Alternativa prevista en el estudio del Cambio de la alternativa de solucin a la segunda dada en


Perfil. el perfil.

Por el cambio de tecnologa de produccin, metas


4 meses asociadas a la capacidad de produccin y metrado lo que
hace mayor el tiempo de ejecucin del proyecto.
CAMBIOS EN EL
MONTO DE
INVERSION S/.

8,987.04

3,687.67

31,789.70

17,891.62

14,648.26
10,555.92

630,029.96

56,061.60

18,140.36
24,382.59

13,000.00
COMPONENTES Unidad de Medida Situacin sin proyecto

AGUA POTABLE
Captacin l/s 0.44
Lnea de conduccin m 807.829
Sistema de utilizacin m 0
Reservorio Nuevo m3 25

Redes de distribucin m Instalacin de 2,189.98 m.

Conexiones domiciliarias Nmero 62

SISTEMA DE ALCANTARILLADO
Conexiones domiciliarias Nmero 0
Redes colectoras m 0.00
Buzones und 0

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES


Emisor m 0
PTAR l/s 0
Tanque Imhoff l/s 0

Capacitacin en administracin, operacin Nmero personas


0
y mantenimiento capacitadas

Nmero personas
Capacitacin en educacin sanitaria 0
capacitadas

Mitigacin Ambiental % 0

Supervisin y Liquidacin Nmero 0


Plan de Monitoreo arqueolgico Nmero 0
Expediente Tcnico Nmero 0
Situacin con proyecto

4.54
1468.78
769
125

Instalacin de 16,845.97 m.

475

475
18,012.82
230

DUALES
256
2.78
3.86

50

1
1
1
CRONOGRAMA FSICO DE INVERSION, SEGN METAS

METAS

AMPLIACION Y MEJORAMIENTO SISTEMA DE AGUA POTABLE


SISTEMA DE UTILIZACIN TENSIN 3, 22.9KV PARA SISTEMA DE BOMBEO DE
AGUA
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
PLANTA DE TRATAMIENTO
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
MITIGACIN AMBIENTAL
GASTOS GENERALES
UTILIDAD
EXPEDIENTE TECNICO
PLAN DE MONITOREO ARQUEOLGICO
SUPERVICIN Y LIQUIDACION

CRONOGRAMA FINANCIERO DE INVERSION, SEGN METAS

METAS

AMPLIACION Y MEJORAMIENTO SISTEMA DE AGUA POTABLE


SISTEMA DE UTILIZACIN TENSIN 3, 22.9KV PARA SISTEMA DE BOMBEO DE
AGUA
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
PLANTA DE TRATAMIENTO
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
MITIGACIN AMBIENTAL
GASTOS GENERALES
UTILIDAD
EXPEDIENTE TECNICO
PLAN DE MONITOREO ARQUEOLGICO
SUPERVICIN Y LIQUIDACION
UNIDAD DE MESES
MEDIDA 1 2 3 4 5
ml 0 2,406.57 2,406.57 2,406.57 2,406.57

ml 384.50 384.50
ml 0 2,573.26 2,573.26 2,573.26 2,573.26
l/s 0 0.40 0.40 0.40 0.40
dias 0 0 0 0 0
meses 0 1 1 1 1
GLB 0 14.29% 14.29% 14.29% 14.29%
% 0 14.29% 14.29% 14.29% 14.29%
% 0 14.29% 14.29% 14.29% 14.29%
% 100% 0 0 0 0
% 0 14.29% 14.29% 14.29% 14.29%
% 0 14.29% 14.29% 14.29% 14.29%

UNIDAD DE MESES
MEDIDA 1 2 3 4 5
S/. 0 400,783.79 400,783.79 400,783.79 400,783.79

S/. 63,840.55 63,840.55


S/. 0 504,650.58 504,650.58 504,650.58 504,650.58
S/. 0 727,402.83 727,402.83 727,402.83 727,402.83
S/. 0
S/. 0 5,635.64 5,635.64 5,635.64 5,635.64
S/. 0 1,928.39 1,928.39 1,928.39 1,928.39
S/. 0 107,049.13 107,049.13 107,049.13 107,049.13
S/. 0 98,657.17 98,657.17 98,657.17 98,657.17
S/. 67,500.00 0.00 0.00 0.00 0.00
S/. 0 11,347.53 11,347.53 11,347.53 11,347.53
S/. 0 60,545.71 60,545.71 60,545.71 60,545.71
TOTAL POR
6 7 8 META
2,406.57 2,406.57 2,406.57 16,845.97 2406.567143

769.00
2,573.26 2,573.26 2,573.26 18,012.82 2573.26
0.40 0.40 0.40 2.78 0.397142857
0 0 12 12
1 1 1 7
14.29% 14.29% 14.29% 100%
14.29% 14.29% 14.29% 100%
14.29% 14.29% 14.29% 100%
0 0 0 100%
14.29% 14.29% 14.29% 100%
14.29% 14.29% 14.29% 100%

TOTAL POR
6 7 8 META
400,783.79 400,783.79 400,783.79 2,805,486.50 2,805,486.50

127,681.10 127,681.10
504,650.58 504,650.58 504,650.58 3,532,554.06 3,532,554.06
727,402.83 727,402.83 727,402.83 5,091,819.83 5,091,819.83
27,194.85 27,194.85 27,194.85
5,635.64 5,635.64 5,635.64 39,449.51
1,928.39 1,928.39 1,928.39 13,498.75
107,049.13 107,049.13 107,049.13 749,343.90
98,657.17 98,657.17 98,657.17 690,600.21
0.00 0.00 0.00 67,500.00
11,347.53 11,347.53 11,347.53 79,432.70
60,545.71 60,545.71 60,545.71 423,820.00

13,648,381.41

13,648,381.41
16845.97

18,012.82
2.78
PRESUPUESTO GENERAL
PROYECTO

PROPIETARIO
UBICACION

FECHA PROYECTO

Item
01
01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
01.03.04.08
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.06
01.04.06.01
01.04.07
01.04.07.01
01.04.07.02
01.04.07.03
01.04.07.04
01.04.08
01.04.08.01
01.04.08.01.01
01.04.08.01.02
01.04.08.01.03
01.04.08.02
01.04.08.02.01
01.04.08.02.02
01.04.08.03
01.04.08.03.01
01.04.08.03.02
01.04.08.03.03
01.04.08.03.04
01.04.08.03.04.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.05
01.05.05.01
01.05.06
01.05.06.01
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.07.04
01.05.08
01.05.08.01
01.05.08.01.01
01.05.08.01.02
01.05.08.01.03
01.05.08.02
01.05.08.02.01
01.05.08.02.02
01.05.08.03
01.05.08.03.01
01.05.08.03.02
01.05.08.03.03
01.05.08.04
01.05.08.04.01
01.06
01.06.01
01.06.01.01
01.06.02
01.06.02.01
01.06.02.02
01.06.02.03
01.06.02.04
01.06.02.05
01.06.02.06
01.06.03
01.06.03.01
01.06.03.02
01.06.03.03
01.06.03.04
01.06.03.05
01.06.03.06
01.06.03.07
01.06.03.08
01.06.04
01.06.04.01
01.06.04.02
01.06.04.03
01.06.04.04
01.06.04.05
01.06.04.06
01.06.04.07
01.06.04.08
01.06.04.09
01.06.04.10
01.06.04.11
01.06.04.12
01.06.04.13
01.06.04.14
01.06.04.15
01.06.04.16
01.06.04.17
01.06.04.18
01.06.04.19
01.06.04.20
01.06.04.21
01.06.04.22
01.06.04.23
01.06.04.24
01.06.04.25
01.06.05
01.06.05.01
01.06.05.01.01
01.06.05.01.02
01.06.05.02
01.06.05.02.01
01.06.05.02.02
01.06.05.02.03
01.06.05.03
01.06.05.03.01
01.06.05.03.02
01.06.05.03.03
01.06.05.03.04
01.07
01.07.01
01.07.01.01
01.07.02
01.07.02.01
01.07.02.02
01.07.02.03
01.07.02.04
01.07.02.05
01.07.03
01.07.03.01
01.07.04
01.07.04.01
01.08
01.08.01
01.08.01.01
01.08.02
01.08.02.01
01.08.02.02
01.08.02.03
01.08.02.04
01.08.02.05
01.08.02.06
01.08.03
01.08.03.01
01.08.03.02
01.08.03.03
01.08.04
01.08.04.01
01.08.04.02
01.08.04.03
01.08.04.04
01.08.04.05
01.08.04.06
01.08.04.07
01.08.05
01.08.05.01
01.08.05.02
01.08.05.03
01.08.05.04
01.08.05.05
01.08.06
01.08.06.01
01.08.06.02
01.08.06.03
01.08.06.04
02
02.01
02.01.01
02.01.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.03
02.01.03.04
02.01.03.05
02.01.03.06
02.01.03.07
02.01.03.08
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.01.05.03
02.01.05.04
02.01.05.05
02.01.05.06
02.01.05.07
02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.03
02.02.03.01
02.02.04
02.02.04.01
02.02.05
02.02.05.01
02.02.05.02
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.01.01
02.03.02.01.02
02.03.02.01.03
02.03.02.01.04
02.03.02.01.05
02.03.02.01.06
02.03.02.02
02.03.02.02.01
02.03.03
02.03.04
02.03.05
03
03.01
03.01.01
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.03
03.01.03.01
03.01.03.02
03.01.04
03.01.04.01
03.01.04.02
03.01.04.03
03.01.05
03.01.05.01
03.01.05.02
03.01.05.03
03.01.06
03.01.06.01
03.01.06.02
03.01.07
03.01.07.01
03.01.07.02
03.01.07.03
03.01.07.04
03.01.07.05
03.01.07.06
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.03
03.02.03.01
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.05
03.02.05.01
03.02.06
03.02.06.01
03.02.06.02
03.03
03.03.01
03.03.01.01
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.02.06
03.03.03
03.03.03.01
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.05
03.03.05.01
03.03.05.02
03.03.05.03
03.03.06
03.03.06.01
03.03.06.02
03.03.07
03.03.07.01
03.03.07.02
03.03.07.03
03.03.07.04
03.03.07.05
03.03.07.06
03.03.07.07
03.03.07.08
03.03.07.09
03.03.07.10
03.03.07.11
03.03.07.12
03.03.07.13
03.03.07.14
03.03.07.15
03.03.07.16
03.03.07.17
03.03.07.18
03.03.08
03.03.08.01
03.03.08.02
03.03.08.03
03.04
03.04.01
03.04.01.01
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.02.05
03.04.02.06
03.04.02.07
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.03.04
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.05
03.04.05.01
03.04.05.02
03.04.06
03.04.06.01
03.04.06.02
03.04.06.03
03.04.06.04
03.04.06.05
03.04.07
03.04.07.01
03.04.07.02
03.04.07.03
03.04.07.04
03.04.07.05
03.04.07.06
03.04.07.07
03.04.07.08
03.04.07.09
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.05.02.03
03.05.02.04
03.05.02.05
03.05.02.06
03.05.02.07
03.05.03
03.05.03.01
03.05.03.02
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
03.05.04.04
03.05.04.05
03.05.04.06
03.05.04.07
03.05.04.08
03.05.04.09
03.05.04.10
03.05.04.11
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.03
03.06.03.01
03.06.03.02
03.06.03.03
03.06.04
03.06.04.01
03.06.04.02
03.06.04.03
03.06.05
03.06.05.01
03.06.05.02
03.06.06
03.06.06.01
03.06.06.02
03.06.06.03
03.07
03.07.01
03.07.01.01
03.07.01.02
03.07.01.03
03.07.02
03.07.02.01
03.07.02.02
03.07.02.03
03.07.02.04
03.07.03
03.07.03.01
03.07.03.02
03.07.03.03
03.07.03.04
03.07.03.05
03.07.03.06
03.07.03.07
03.07.04
03.07.04.01
03.07.04.02
03.07.04.03
03.07.04.04
03.07.05
03.07.06
03.07.06.01
03.07.06.02
03.07.06.03
03.07.07
03.07.07.01
03.07.07.02
03.07.07.03
03.07.08
03.07.08.01
03.07.08.02
03.07.09
03.07.09.01
03.07.09.02
03.07.09.03
03.08
03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.02.03
03.09.02.04
03.09.02.05
03.09.03
03.09.03.01
03.09.03.02
03.09.03.03
03.09.03.03.01
03.09.03.03.02
03.09.04
03.09.04.01
03.09.04.02
03.09.05
03.09.05.01
03.09.05.02
03.10
03.10.01
03.10.01.01
03.10.01.02
03.10.01.03
03.10.01.04
03.10.01.05
03.10.01.06
03.10.01.07
03.10.01.08
03.10.01.09
03.10.01.10
03.10.01.11
03.10.01.12
03.10.02
03.10.02.01
03.10.02.02
03.10.02.03
03.10.02.04
03.10.02.05
03.10.02.06
03.10.02.07
03.10.02.08
03.10.02.09
03.10.02.10
03.10.02.11
03.11
03.11.01
03.11.01.01
03.11.02
03.11.02.01
03.11.02.02
03.11.02.03
03.11.02.04
03.11.02.05
03.11.02.06
03.11.03
03.11.03.01
03.11.04
03.11.04.01
03.11.05
03.11.05.01
03.11.05.02
04
04.01
05
05.01
06
06.01
Refo

[Son: Once millones doscientos cincuenta y cinco mil quinientos cuarenta y cuatro Nue
PRESUPUESTO GENERAL

AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL ALCANTARILLADO EN EL C.P. LA HUARACLLA, D

MUNICIPALIDAD DISTRITAL DE JESUS


DPTO:CAJAMARCA PROV:CAJAMARCA DIST:JESUS

5/31/2015

Descripcin
AMPLIACION Y MEJORAMIENTO SISTEMA DE AGUA POTABLE
OBRAS PROVISIONALES
CARTEL DE OBRA (2.40x4.80m)
OFICINA, ALMACN Y CASETA DE GUARDIANA
CERCOS PROVISIONALES DE SEGURIDAD DE OBRA
SEGURIDAD Y SALUD
PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
CAPACITACIN DE SEGURIDAD Y SALUD EN OBRA
RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
RELLENO Y COMPACTACION
TENDIDO DE TUBERIA
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA HDPE SDR 9 RESISTENCIA ASTM F714 PE 3608 D=109.91 mm
REDUCCION DE 5 A 4
VALVULA PURGA
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
INSTALACION DE VALVULA DE PURGA TIPO T 5"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACONDICIONAMIENTO PASE AEREO
RETIRO DE CABLE EXISTENTE Y DADO
REPOCICION DE CABLE INCLUYE TEMPLADORES Y FORRO
DADO CONCRETO
REUBICACION TANQUE HDPE 25 M3 ETERNIT
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D=30M
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUES
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
MONTAJE DESMONTAGE DE TANQUE DE 25 M3
CASETA DE VALVULAS TANQUE
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY=4200 KG/CM2
REVOQUES, ENLUCIDOS Y PINTURAS
TARRAJEO FROTACHADO 1:5 E= 1.5 CM
PINTURA OLEO MATE EN MUROS EXTERIORES
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
TAPA METALICA
TAPA METALICA DE 0.60x 0.60 M.
BATERIA DE TANQUES HDPE 25 M3
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D=30M
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUE
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
TRASLADO Y MONTAGE TANQUE DE 25 M3
CASETA DE VALVULAS BATERIA TANQUES
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY=4200 KG/CM2
REVOQUES, ENLUCIDOS Y PINTURAS
TARRAJEO FROTACHADO 1:5 E= 1.5 CM
PINTURA OLEO MATE EN MUROS EXTERIORES
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
TAPA METALICA
TAPA METALICA DE 0.60x 0.60 M.
RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAP CLASE 10, D=3"
TUBERIA PVC SAP CLASE 10, D=2"
TUBERIA PVC SAP CLASE 10, D=1 1/2"
TUBERIA PVC SAP CLASE 10, D=1"
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA PVC SAP CLASE 10, D=2 1/2"
TUBERIA PVC SAP CLASE 10, D=3/4"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS DE LA RED
SUMINISTRO Y COLOCACION TEE PVC 2"
SUMINISTROS Y COLOCACION TEE PVC 1"
SUMINISTRO Y COLOCACION TEE PVC 3"
SUMINISTRO Y COLOCACION TEE PVC 4"
SUMINISTRO Y COLOCACION TEE PVC 3/4"
SUMINISTRO Y COLOCACION TEE PVC 1 1/2"
SUMINISTRO Y COLOCACION TEE PVC 2 1/2"
SUMINISTRO Y COLOCACION CODO PVC 90 3/4"
SUMINISTRO Y COLOCACION CODO PVC 90 1"
SUMINISTRO Y COLOCACION CODO PVC 22.5 3/4"
SUMINISTRO Y COLOCACION CODO PVC 22.5 4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 1"
SUMINISTROS Y COLOCACION REDUCCION PVC 2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 1" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 2 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 3"
VALVULAS DE CONTROL Y PURGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
VALVULAS Y ACCESORIOS
INSTALACION DE VALVULA DE CONTROL 1"
INSTALACION DE VALVULA DE PURGA 1"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACOMETIDAS DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION DE ZANJAS, CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25 X 0.35 TAPA FG
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25X0.35 TAPA FG
VALVULAS Y ACCESORIOS
INSTALACION DE ACCESORIOS EN ACOMETIDAS
LINEA DE IMPULCION
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
NIVELACION Y COMPACTACION
PLATAFORMADO DE LOSA PARA POZO (RELLENO ESTRUCTURAL)
PERFORACION DE POZO TUBULAR
FILTRO PARA POZO TUBULAR
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TENDIDO DE TUBERIA DESDE LA BOMBA HASTA EL TANQUE
TUBERIA HDPE SDR 7 RESISTENCIA ASTM F714 PE 4710 D=81.64 mm
TUBERIA HDPE SDR 9 RESISTENCIA ASTM F714 PE 3608 D=88.90 mm
TUBERIA HDPE SDR 11 RESISTENCIA ASTM F714 PE 3608 D=93.52 mm
TUBERIA HDPE SDR 17 RESISTENCIA ASTM F714 PE 3608 D=100.84 mm
PEGADO POR TERMOFUSION DE TUBERIA HDPE
FORRADO INTERIOR DE TUBO RANURADO PARA POZO TUBULAR
FORRADO INTERIOR DE TUBO LISO PARA POZO TUBULAR (TRAMO INICIAL)
VALVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL
INSTALACION DE TABLERO ARRANQUE AUTOMATICO INCLUYE CABLEADO
INSTALACION DE MEDIDOR DE ENERGIA ELECTRICA
INSTALACION VALVULA ANTI RETORNO
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL DE RESGUARDO
VARIOS
LIMPIEZA DE POZO TUBULAR
SUMINISTRO E INSTALACION DE TAPON PARA POZO Y CABLE PARA IZAJE DE BOMBA SUMERGIBLE
FLETE TERRESTRE
LIMPIEZA FINAL DE OBRA
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
RED COLECTORA
TRAZO REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL PARA BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D=30M
CORTE DE PAVIMENTO ASFALTICO DE 2"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
TUBERIA PVC SAL D = 10" (250 mm ISO)
TUBERIA PVC SAL D = 12"
CONSTRUCCIN DE BUZONES
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
CONCRETO EN BUZONES F'C=210 KG/CM2
CONCRETO EN BUZONES f'c=140 kg/cm2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TAPA DE CONCRETO ARMADO PARA BUZONES
INSTALACIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS.
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAL D = 6" (160 mm ISO) (Instalaciones Domiciliarias)
CONEXION DOMICILIARIA CACHIMBA
CONEXION DOMICILIARIA CACHIMBA
CAJA DE REGISTRO DE DESAGUE (12"x20")
CAJA DE REGISTRO DE DESAGUE (12" X 20")
DADO CONCRETO
OTROS
PRUEBA HIDRAULICA + REPOSICION DE PAVIMENTO
PRUEBA HIDRAULICA ALCANTARILLADO
REPOSICION PAVIMENTO FLEXIBLE E = 2" + BASE
INST. TUB. A CAMARA DE REJAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAL D=12" (300 mm ISO)(BUZON 105-CAMARA DE REJAS)
ROTURA DE ESPECIMENES DE CONCRETO, POR COMPRESION
PLACA RECORDATORIA (0.40X0.60m)
FLETE TERRESTRE Y RURAL
PLANTA DE TRATAMIENTO
CAMARA DE REJAS (01 Und)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL CAMARA DE REJAS
REFINE NIVELACION Y COMPACTACION CAMARA DE REJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M CAMARA DE REJAS
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY=4200 KG/CM2
REVOQUES ENLUCIDOS
TARRAJEO DE EXTERIORES 1:5 e=1:5cm
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E= 1.5 CM.
PINTURA LATEX DOS MANOS
ESCALINES Y REJILLA
ESCALERA PARA CAMARA DE REJAS FG 3/4"
REJILLA DE SEPARACION DE SOLIDOS (0.30 M DE ANCHO)
INST. TUB. - TANQUE IMHOFF
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
TUBERIA PVC SAL D = 12" (300 mm ISO) ( CAMARA DE REJAS TANQUE IMHOFF)
DESARENADOR
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION
REFINE Y NIVELACION
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100 KG/CM2 PARA SOLADOS
CONCRETO ARAMADO
CONCRETO F'C=210 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO (OBRAS DE ARTE)
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE
VARIOS
COMPUERTA DE MADERA DE TRATADA 1"
VERTEDERO
CONSTRUCCIN DE TANQUE IMHOFF (02 Und)
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO C/MAQ.
EXCAVACION MANUAL
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 (IMHOFF)
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TAPA Y CAJAS
CONCRETO F'C=210 KG/CM2; (TAPA Y CAJAS)
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E=2 CM.
TARRAJEO DE EXTERIORES MEZCLA C:A 1:5
INST. TUB. A LECHO DE SECADO Y HUMEDAL ARTIFICIAL + ACCESORIOS
EXCAVACION MANUAL
REFINE NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CAJA DE REGISTRO DE ALBAILERIA 12" X 24" CON TAPA DE FF
TUBERIA PVC SAL D = 8" (200 mm ISO) (TANQUE IMHOFF - LECHO DE SECADO)
TUBERIA PVC SAL D = 10" (250 mm ISO) (TANQUE IMHOFF - HUMEDAL ARTIFICIAL)
TUBERIA PVC SAL D = 8" (200 mm ISO) (TANQUE IMHOFF - HUMEDAL ARTIFICIAL))
TUBERIA PVC SAL D=4" (TANQUE IMHOFF - HUMEDAL ARTIFICIAL)
VALVULA COMPUERTA FF TIPO MAZZA DE 8"
CANASTILLA DE BRONCE 8"
SOMBRERO DE VENTILACION PVC DE 8"
CODO PVC-SAL 8"x45
TEE PVC-SAL DE 8"
BARANDA DE TUBO FG PASAMANO 2"
ESCALERA FG 3/4"
COMPUERTA PARA LIMPIEZA DE LOS SOLIDOS FLOTANTES 0.70x 0.80 M.
INSTALACION DE MOTOBOMBA
SUMINISTRO Y COLOCACION MOTOBOMBA 3.5 HP.
SUMINISTRO E INST. TUB. PVC 2" C - 7.5
CODO PVC SAP 2"X90
LECHO DE SECADO DE SOLIDOS (02 Unid)
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
RELLENO Y COMPACTACION CON MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
FILTRO DE ARENA FINA
FILTRO DE GRAVA FINA
FILTRO DE GRAVA GRUESA
OBRAS DE CONCRETO SIMPLE
SOLADO 1:8 PARA e = 4"
CONCRETO CIMIENTO CORRIDO 1:10 +30% P.M.
CONCRETO F'C=140 KG/CM2 LOSA DE FONDO
ENCOFRADO Y DESENCOFRADO DE CANALETAS
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E=2.0 CM.
TARRAJEO DE EXTERIORES MEZCLA C:A 1:5 E = 1.5cm
COBERTURAS
VIGAS DE MADERA 6" x 3"
VIGAS DE MADERA 4" x 3"
CORREAS DE MADERA 3" x 2"
ANCLAJE EN VIGA DE MADERA Y COLUMNA
COBERTURA CON CALAMINA GALVANIZADA
INST. TUB. A LECHO DE SECADO - QUEBRADA
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CAJA DE REGISTRO DE ALBAILERIA 12" X 24" CON TAPA DE FF
TUBERIA PVC SAL D = 8" (200 mm ISO) (C8 - DESCARGA FINAL)
TUBERIA PVC SAL D = 6"
CODO PVC SAL 6"X90.
HUMEDAL ARTIFICIAL (02 Unid)
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
GRAVA DE 1/2"
CUERPO DE PIEDRA GRAVA 2" - 4"
LECHO FILTRANTE GRAVA 1"
COBERTURAS INPERMEABLES
GEOMEMBRANA DE PVC E = 5mm
GEOTEXTIL NT 3000
INST. TUB. ACCE. + OTROS
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CODO PVC SAL 4"X90.
VALVULA COMPUERTA FF TIPO MAZZA DE 4"
TUBERIA PVC SAL D=4" (HUMEDAL ARTIFICIAL - C8)
TUBO DE PVC 2" AGUJEROS DE 1/2" @ 5cm
TEE PVC-SAL 4"x2"
COMPRA Y SEMBRADO DE CARRIZO A CADA 0.50M
CAMARA DE CONTACTO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO C/MAQ.
REFINE Y NIVELACION
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
CONCRETO SIMPLE
SOLADO DE CONCRETO FC=100Kg/CM2 E=0.10m CEMENTO TIPO V
CONCRETO f'c=140 kg/cm2 EN DESCARGA
EMPEDRADO CON MORTERO 1:4
CONCRETO ARAMADO
CONCRETO F'C=210 KG/CM2; PARA ESTRUCTURAS DE CEMENTO TIPO V
ENCOFRADO Y DESENCOFRADO DE MUROS CARA VISTA
ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN EXTERIORES C:A=1:5 E=1.5 CM
TARRAJEO CON IMPERMEABILIZANTE
VARIOS
VERTEDERO DE ALUMINIO CON EMPAQUETADURA DE JEBE
TAPA METALICA EN CAMARA DE CONTACTO 0.70 X 0.70
ESCALERA DE GATO
CASETA DE CLORACIN
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ESTRUCTURAS DE CAMARA
REFINE Y NIVELACION
RELLENO Y CON MATERIAL PROPIO: MANUAL
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
CONCRETO SIMPLE
CONCRETO CIMIENTO CORRIDO 1:10 +30% P.M. PARA CIMIENTO CORRIDOS
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT
CONCRETO F'C=175 KG/CM2 EN BASE DE TANQUE DOSIFICADORES
ENCOFRADO Y DESENCOFRADO EN BASE DE TANQUE DOSIFICADORES
CONCRETO F'C=140 KG/CM2 EN ESCALINATA DE DE TANQUE DOSIFICADORES
ENCOFRADO Y DESENCOFRADO EN ESCALINATA DE DE TANQUE DOSIFICADORES
CONCRETO ARAMADO
CONCRETO F'C=175KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
ALBAILERIA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN INTERIORES Y EXTERIORES
CIELO RASO CON MEZCLA DE CEMENTO-ARENA
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO E=0.05M ESPESOR 1:5 CEMENTO ARENA
VEREDA DE CONCRETO F'C=140 kG/CM2 DE 4"
ENCOFRADO Y DESENCOFRADO
PINTURA
PINTURA LATEX EN MUROS INTERIORES YEXTERIORES 02 MANOS
PINTURA LATEX EN CIELO RASO 02 MANOS
TUBERIAS, VLVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION TUBERIA DE DRENAJE PVC DN 63 MM C-10
TANQUE DOSIFICADOR INCLUYE VALVULA Y ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS EN CASETA DE CLORACION
CERCO PERIMETRICO DE PTAR
CERCO PERIMETRICO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
OBRAS DE PROPECION LINEA DE COLECTORA PTAR 01
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION EN TALUD
EXCAVACION PARA COLCHON DE AMORTIGUAMIENTO
COMPACTACION EN FONDO DE CIMENTACION
RELLENO Y COMPACTACION (MATERIAL PROPIO)
ELIMINACION DE MATERIAL EXCEDENTE
MUROS
ACOPIO DE PIEDRA MEDIANA PARA GAVIONES
TRASLADO DE PIEDRA MEDIANA PARA GAVIONES
MALLA PARA GAVIONES
GAVION TIPO CAJA DE 5X1X1
GAVION TIPO CAJA DE 5X1X2.5
COLCHON DE AMORTIGUAMIENTO
CONCRETO PARA ESCOLLERA (F'C=175KG/CM2 +30% P.M.)
ENCOFRADO Y DESENCOFRADO
VARIOS
ACONDICIONAMIENTO DE ACCESO A PTAR 01
LIMPIEZA FINAL DE OBRA
MUROS DE CONTENCION EN PLANTAS DE TRATAMIENTO
MURO DE CONCRETO ARMADO
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO C/MAQ.
RELLENO Y CON MATERIAL PROPIO: MANUAL
CONFORMACION BASE GRANULAR (E=0.10M)
CONCRETO F'C=175 KG/CM2; MUROS
ENCOFRADO Y DESENCOFRADO
ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60
JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
MURO DE CONCRETO CICLOPEO
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO C/MAQ.
RELLENO Y CON MATERIAL PROPIO: MANUAL
CONFORMACION BASE GRANULAR (E=0.10M)
CONCRETO 1:8+25% P.M. PARA MUROS
ENCOFRADO Y DESENCOFRADO
JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
EMISOR QUEBRADA
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL DE BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MAT. ZARANDEADO
RELLENO Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
CONSTRUCCIN DE BUZONES
CONSTRUCCION DE BUZONES DE CONCRETO H=1.20 m.
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA PARA TUBERIAS 200MM
LIMPIEZA FINAL DE OBRA
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
CAPACITACIN EN EDUCACION SANITARIA
MITIGACIN AMBIENTAL
RECUPERACION DE AREAS AFECTADS
COSTO DIRECT
Gastos General
Utilid
Sub Tot
IG
VALOR REFERENCIA
Supervisi
Liquidaci
Reformulacion Expediente Tcni
TOTAL

[Son: Once millones doscientos cincuenta y cinco mil quinientos cuarenta y cuatro Nuevos Soles con secenta
L

ANTARILLADO EN EL C.P. LA HUARACLLA, DISTRITO DE JESUS-CAJAMARCA-CAJAMARCA

Und. Metrado Precio (S/.) Parcial (S/.)


2,359,288.23
6,437.99
und 1.00 565.99 565.99
m2 120.00 38.00 4,560.00
m 200.00 6.56 1,312.00
36,522.15
mes 7.00 745.23 5,216.61
mes 7.00 1,645.90 11,521.30
mes 7.00 375.26 2,626.82
mes 7.00 416.25 2,913.75
mes 7.00 1,389.56 9,726.92
mes 7.00 645.25 4,516.75
162,346.98
3,363.51
m2 1,468.78 0.69 1,013.46
m2 1,468.78 1.60 2,350.05
42,641.42
m3 969.39 29.26 28,364.35
m3 14.88 17.07 254.00
m3 957.86 14.64 14,023.07
69,508.62
m 769.00 27.76 21,347.44
m 700.00 68.54 47,978.00
und 2.00 91.59 183.18
3,596.99
m2 0.36 0.69 0.25
m2 0.36 1.60 0.58
m3 0.18 29.26 5.27
m3 0.23 17.07 3.93
m2 0.36 2.69 0.97
und 1.00 1,304.13 1,304.13
und 1.00 1,140.93 1,140.93
und 1.00 1,140.93 1,140.93
43,236.44
m 45.00 1.60 72.00
m 48.00 883.30 42,398.40
und 2.00 383.02 766.04
18,557.49
68.70
m2 30.00 0.69 20.70
m2 30.00 1.60 48.00
883.55
m3 16.15 29.26 472.55
m2 30.00 2.69 80.70
m3 19.35 17.07 330.30
972.60
m2 30.00 32.42 972.60
5,952.20
m2 8.10 53.10 430.11
m3 9.00 484.47 4,360.23
kg 237.60 4.89 1,161.86
3,025.35
und 1.00 3,025.35 3,025.35
455.20
und 1.00 455.20 455.20
3,288.97
m 24.40 87.48 2,134.51
und 1.00 417.70 417.70
m3 1.28 383.02 490.27
GLB 1.00 246.49 246.49
3,910.92
1,332.11
m3 1.58 356.04 562.54
m2 13.13 53.10 697.20
kg 14.80 4.89 72.37
504.31
m2 15.80 25.54 403.53
m2 10.52 9.58 100.78
2,074.50
und 1.00 764.56 764.56
und 1.00 42.74 42.74
und 1.00 1,140.93 1,140.93
126.27
und 1.00 126.27 126.27
162,382.08
300.47
m2 131.21 0.69 90.53
m2 131.21 1.60 209.94
5,824.06
m3 118.09 29.26 3,455.31
m2 131.21 2.69 352.95
m3 118.09 17.07 2,015.80
4,253.83
m2 131.21 32.42 4,253.83
25,939.12
m2 33.69 53.10 1,788.94
m3 39.36 484.47 19,068.74
kg 1,039.15 4.89 5,081.44
3,025.35
und 1.00 3,025.35 3,025.35
2,276.00
und 5.00 455.20 2,276.00
116,852.33
m 47.12 87.48 4,122.06
und 1.00 417.70 417.70
m3 2.82 383.02 1,080.12
GLB 5.00 22,246.49 111,232.45
3,910.92
1,332.11
m3 1.58 356.04 562.54
m2 13.13 53.10 697.20
kg 14.80 4.89 72.37
504.31
m2 15.80 25.54 403.53
m2 10.52 9.58 100.78
1,948.23
und 1.00 764.56 764.56
und 1.00 42.74 42.74
und 1.00 1,140.93 1,140.93
126.27
und 1.00 126.27 126.27
1,148,242.26
26,953.55
m 16,845.97 1.60 26,953.55
713,389.13
m 16,845.97 29.26 492,913.08
m 16,845.97 2.05 34,534.24
m 6,608.59 2.91 19,231.00
m3 6,064.55 22.83 138,453.68
m3 947.59 10.24 9,703.32
m3 947.59 19.58 18,553.81
179,948.31
m 161.92 20.60 3,335.55
m 481.10 14.33 6,894.16
m 1,908.67 12.23 23,343.03
m 3,645.95 10.13 36,933.47
m 538.50 27.76 14,948.76
m 345.97 16.82 5,819.22
m 9,763.85 5.89 57,509.08
m 16,845.97 1.85 31,165.04
6,283.59
und 4.00 30.40 121.60
und 41.00 19.11 783.51
und 2.00 48.28 96.56
und 2.00 66.37 132.74
und 30.00 16.61 498.30
und 22.00 21.09 463.98
und 4.00 34.18 136.72
und 8.00 18.01 144.08
und 3.00 18.11 54.33
und 6.00 18.01 108.06
und 1.00 52.53 52.53
und 11.00 27.44 301.84
und 4.00 28.96 115.84
und 2.00 30.07 60.14
und 69.00 21.44 1,479.36
und 35.00 22.24 778.40
und 17.00 25.55 434.35
und 7.00 27.44 192.08
und 1.00 28.55 28.55
und 1.00 29.24 29.24
und 1.00 35.64 35.64
und 2.00 38.34 76.68
und 1.00 38.34 38.34
und 2.00 40.24 80.48
und 1.00 40.24 40.24
221,667.68
531.16
m2 373.00 0.69 257.37
m2 171.12 1.60 273.79
3,237.74
m3 55.38 29.26 1,620.42
m3 69.23 17.07 1,181.76
m2 161.92 2.69 435.56
217,898.78
und 90.00 85.47 7,692.30
und 2.00 137.68 275.36
und 92.00 1,140.93 104,965.56
und 92.00 1,140.93 104,965.56
435,395.38
7,600.00
m 4,750.00 1.60 7,600.00
206,815.88
m 4,750.00 29.26 138,985.00
m 4,750.00 2.05 9,737.50
m 4,750.00 2.91 13,822.50
m3 1,710.00 22.83 39,039.30
m3 267.19 19.58 5,231.58
90,953.00
und 475.00 191.48 90,953.00
130,026.50
und 475.00 273.74 130,026.50
389,403.90
2,200.00
m2 1,375.00 1.60 2,200.00
154,975.42
m3 907.50 29.26 26,553.45
m3 1,134.38 19.58 22,211.16
m2 100.00 2.69 269.00
m3 4,690.93 20.64 96,820.80
hm 107.00 72.59 7,767.13
m3 7.02 192.86 1,353.88
14,771.37
m3 20.44 484.47 9,902.57
kg 805.09 4.89 3,936.89
m2 17.55 53.10 931.91
93,032.45
m 100.00 62.40 6,240.00
m 350.00 55.11 19,288.50
m 400.00 52.00 20,800.00
m 625.28 44.88 28,062.57
und 14.00 17.20 240.80
m 77.00 174.34 13,424.18
m 30.00 165.88 4,976.40
86,475.74
und 1.00 40,251.35 40,251.35
GLB 1.00 5,294.66 5,294.66
und 1.00 523.64 523.64
und 2.00 380.42 760.84
und 1.00 39,645.25 39,645.25
37,948.92
GLB 1.00 602.85 602.85
GLB 1.00 1,241.97 1,241.97
GLB 1.00 35,489.56 35,489.56
GLB 1.00 614.54 614.54
2,836,679.90
2,257,240.53
m 1,812.82 1.60 2,900.51
m 1,812.82 1.60 2,900.51
994,363.21
m3 14,263.95 29.26 417,363.18
m3 73.89 29.26 2,162.02
m 18,012.82 2.05 36,926.28
m 8,845.07 5.80 51,301.41
m3 6,484.61 22.83 148,043.65
m3 9,133.59 17.07 155,910.38
m2 1,400.00 1.75 2,450.00
m3 9,203.59 19.58 180,206.29
711,915.10
m 15,199.82 34.02 517,097.88
m 1,013.00 55.94 56,667.22
m 1,800.00 76.75 138,150.00
545,161.20
m2 308.49 1.60 493.58
m 308.49 1.60 493.58
m3 678.52 416.12 282,345.74
m3 166.90 311.50 51,989.35
kg 6,603.26 4.89 32,289.94
m2 4,018.49 39.49 158,690.17
und 273.00 69.08 18,858.84
390,916.08
4,940.00
m 3,087.50 1.60 4,940.00
199,379.45
m 3,087.50 29.26 90,340.25
m 3,087.50 2.05 6,329.38
m 3,087.50 5.80 17,907.50
m3 1,368.00 22.83 31,231.44
m3 2,736.00 19.58 53,570.88
83,084.63
m 3,087.50 26.91 83,084.63
33,734.50
und 475.00 71.02 33,734.50
69,777.50
und 475.00 100.22 47,604.50
und 475.00 46.68 22,173.00
188,523.29
115,178.28
m 18,012.82 1.27 22,876.28
m2 1,400.00 65.93 92,302.00
804.81
305.93
m3 4.29 29.26 125.53
m 6.50 2.05 13.33
m 6.50 5.80 37.70
m3 1.30 17.07 22.19
m3 3.58 22.83 81.73
m3 1.30 19.58 25.45
498.88
m 6.50 76.75 498.88
GLB 2.00 375.00 750.00
und 2.00 405.54 811.08
GLB 2.00 35,489.56 70,979.12
2,241,473.25
11,635.49
11.26
1,347.81
m3 25.89 29.26 757.54
m2 14.08 2.69 37.88
m3 32.36 17.07 552.39
393.35
m3 0.99 311.51 308.39
m2 1.60 53.10 84.96
3,986.78
m3 4.94 416.12 2,055.63
m2 24.11 53.10 1,280.24
kg 133.11 4.89 650.91
738.86
m2 12.60 25.54 321.80
m2 10.22 27.74 283.50
m2 12.60 10.60 133.56
800.10
und 2.00 237.29 474.58
und 2.00 162.76 325.52
4,357.33
m3 1.46 29.26 42.72
m 6.50 2.05 13.33
m 650.00 5.80 3,770.00
m3 0.29 22.83 6.62
m3 1.51 17.07 25.78
m 6.50 76.75 498.88
14,660.48
53.39
m2 16.13 2.62 42.26
m2 16.13 0.69 11.13
546.63
m3 9.73 29.26 284.70
m2 16.13 2.05 33.07
m3 22.35 10.24 228.86
443.28
m3 1.62 273.63 443.28
8,188.42
m3 9.48 398.78 3,780.43
kg 170.75 4.89 834.97
m2 62.01 57.62 3,573.02
2,173.12
m2 63.56 34.19 2,173.12
3,255.64
und 4.00 671.46 2,685.84
m2 2.00 284.90 569.80
252,979.28
320.00
m2 200.00 1.60 320.00
28,713.86
m3 631.84 4.75 3,001.24
m3 1.88 29.26 55.01
m3 162.24 22.83 3,703.94
m3 589.35 17.07 10,060.20
m2 131.60 2.69 354.00
m3 589.35 19.58 11,539.47
6,924.91
m2 213.60 32.42 6,924.91
149,140.86
m3 150.12 416.12 62,467.93
kg 9,916.98 4.89 48,494.03
m2 719.00 53.10 38,178.90
10,162.34
m3 5.49 416.12 2,284.50
kg 1,170.03 4.89 5,721.45
m2 40.61 53.10 2,156.39
6,465.06
m2 143.08 27.74 3,969.04
m2 97.73 25.54 2,496.02
24,512.67
m3 145.27 29.26 4,250.60
m 215.22 2.05 441.20
m 215.22 5.80 1,248.28
m3 116.22 22.83 2,653.30
m3 37.48 17.07 639.78
und 8.00 232.21 1,857.68
m 85.32 34.02 2,902.59
m 5.00 55.94 279.70
m 31.52 34.02 1,072.31
m 93.72 7.11 666.35
und 4.00 323.76 1,295.04
und 4.00 211.86 847.44
pza 4.00 25.18 100.72
und 4.00 122.47 489.88
und 4.00 121.96 487.84
m 26.40 162.89 4,300.30
und 2.00 237.29 474.58
und 4.00 126.27 505.08
26,739.58
und 2.00 13,282.77 26,565.54
m 10.00 3.01 30.10
und 6.00 23.99 143.94
206,617.64
492.77
m2 307.98 1.60 492.77
97,765.87
m3 1,094.09 29.26 32,013.07
m3 30.61 22.83 698.83
m3 1,367.61 17.07 23,345.10
m3 1,367.61 19.58 26,777.80
m3 79.56 101.07 8,041.13
m3 18.56 101.07 1,875.86
m3 49.61 101.07 5,014.08
14,862.20
m3 6.75 268.44 1,811.97
m3 16.88 291.13 4,914.27
m3 23.22 311.51 7,233.26
m2 17.00 53.10 902.70
60,425.09
m3 57.20 416.12 23,802.06
kg 2,470.39 4.89 12,080.21
m2 462.20 53.10 24,542.82
8,829.11
m2 248.29 27.74 6,887.56
m2 76.02 25.54 1,941.55
18,215.23
m 109.20 13.99 1,527.71
m 370.80 9.77 3,622.72
m 509.60 5.44 2,772.22
und 24.00 56.38 1,353.12
m2 374.82 23.85 8,939.46
6,027.37
m3 46.24 29.26 1,352.98
m 78.50 2.05 160.93
m 68.50 5.80 397.30
m3 36.99 22.83 844.48
m3 11.93 17.07 203.65
und 4.00 232.21 928.84
m 15.76 34.02 536.16
m 52.74 26.91 1,419.23
pza 4.00 45.95 183.80
84,147.02
774.82
m2 484.26 1.60 774.82
66,174.29
m3 499.10 29.26 14,603.67
m2 484.26 2.69 1,302.66
m3 643.84 17.07 10,990.35
m3 643.84 19.58 12,606.39
m3 16.44 89.61 1,473.19
m3 10.06 86.62 871.40
m3 236.94 102.67 24,326.63
9,200.23
m2 470.58 12.90 6,070.48
m2 325.00 9.63 3,129.75
7,997.68
m3 48.04 29.26 1,405.65
m 62.80 2.05 128.74
m 62.80 5.80 364.24
m3 35.32 22.83 806.36
m3 16.40 17.07 279.95
pza 8.00 32.30 258.40
und 8.00 377.14 3,017.12
m 31.40 7.11 223.25
m 54.60 3.01 164.35
und 8.00 58.96 471.68
m2 31.40 27.96 877.94
32,998.15
857.89
m2 11.44 0.69 7.89
m 11.44 1.53 17.50
mes 2.00 416.25 832.50
116.49
m3 5.34 4.75 25.37
m2 11.44 2.05 23.45
m3 6.42 10.54 67.67
1,244.49
m2 30.74 27.75 853.04
m3 0.44 311.50 137.06
m3 1.44 176.66 254.39
25,798.52
m3 17.64 439.49 7,752.60
m2 151.80 73.94 11,224.09
kg 1,663.86 4.10 6,821.83
3,038.22
m2 2.60 25.55 66.43
m2 86.92 34.19 2,971.79
1,942.54
und 2.00 477.74 955.48
und 4.00 170.83 683.32
m 4.80 63.28 303.74
33,009.89
1,341.95
m2 41.98 0.69 28.97
m 41.98 1.53 64.23
mes 3.00 416.25 1,248.75
497.71
m3 11.50 34.14 392.61
m2 20.60 2.05 42.23
m3 7.00 0.88 6.16
m3 5.38 10.54 56.71
5,765.15
m3 9.46 220.91 2,089.81
m3 1.62 229.93 372.49
m2 21.64 39.49 854.56
m3 0.84 356.04 299.07
m2 10.14 39.49 400.43
m3 2.82 311.50 878.43
m2 22.04 39.49 870.36
7,373.76
m3 7.82 356.04 2,784.23
m2 47.60 39.49 1,879.72
kg 385.66 4.10 1,581.21
m2 330.00 3.42 1,128.60
3,063.68
4,432.68
m2 111.96 25.55 2,860.58
m2 37.22 36.22 1,348.11
m 21.60 10.37 223.99
3,360.39
m2 20.60 29.63 610.38
m3 17.32 153.35 2,656.02
m2 2.38 39.49 93.99
1,775.33
m2 94.68 13.20 1,249.78
m2 37.22 14.12 525.55
5,399.24
m 12.00 13.76 165.12
und 4.00 699.78 2,799.12
und 2.00 1,217.50 2,435.00
34,033.44
m 370.00 87.48 32,367.60
und 2.00 417.70 835.40
m3 17.79 46.68 830.44
642,986.97
5,589.93
m2 1,688.80 0.69 1,165.27
m2 1,688.80 2.62 4,424.66
109,883.18
m3 10,161.72 3.95 40,138.79
m3 253.32 4.75 1,203.27
m2 1,064.18 2.69 2,862.64
m3 7,302.64 0.88 6,426.32
m3 3,890.49 15.23 59,252.16
437,722.79
m3 3,316.94 28.59 94,831.31
m3 3,316.39 9.12 30,245.48
312,646.00
und 647.00 475.52 307,661.44
und 18.00 276.92 4,984.56
85,605.28
m3 253.32 324.77 82,270.74
m2 84.44 39.49 3,334.54
4,185.79
m2 633.20 5.64 3,571.25
GLB 1.00 614.54 614.54
902,630.77
543,380.87
m2 607.00 2.62 1,590.34
m3 7,712.50 4.75 36,634.38
m3 1,316.52 0.88 1,158.54
m2 607.11 9.36 5,682.55
m3 802.77 356.04 285,818.23
m2 1,908.06 39.49 75,349.29
kg 27,702.77 4.10 113,581.36
m 71.00 3.34 237.14
m2 1,908.06 0.43 820.47
m 119.72 7.11 851.21
m 173.46 7.24 1,255.85
m3 227.67 89.61 20,401.51
359,249.90
m2 519.75 2.62 1,361.75
m3 259.87 4.75 1,234.38
m3 265.05 0.88 233.24
m2 737.75 9.36 6,905.34
m3 1,226.87 229.93 282,094.22
m2 1,177.98 39.49 46,518.43
m 27.05 3.34 90.35
m2 1,177.98 0.43 506.53
m 120.98 7.11 860.17
m 273.55 7.24 1,980.50
m3 194.90 89.61 17,464.99
25,774.12
246.34
m2 153.96 1.60 246.34
6,720.79
m3 169.36 12.80 2,167.81
m3 4.89 12.80 62.59
m 256.60 2.05 526.03
m 256.60 5.80 1,488.28
m3 123.17 14.64 1,803.21
m3 63.84 10.54 672.87
8,729.53
m 256.60 34.02 8,729.53
9,137.04
und 6.00 1,522.84 9,137.04
940.42
m 256.60 1.27 325.88
GLB 1.00 614.54 614.54
24,191.40
da 12.00 2,015.95 24,191.40
33,779.48
mes 7.00 4,825.64 33,779.48
11,439.62
GLB 1.00 11,439.62 11,439.62
COSTO DIRECTO S/. 7,506,851.88
Gastos Generales 10.58% 794320.00
Utilidad 8.336% 625781.29
Sub Total 8926953.17
IGV 18.00% S/. 1,606,851.57
VALOR REFERENCIAL S/. 10,533,804.74
Supervisin 5.67% 596870.00
Liquidacion 0.86% 90300.00
Reformulacion Expediente Tcnico 0.33% 34569.87
TOTAL : S/. 11,255,544.61

cuatro Nuevos Soles con secenta y un cntimos]


2783960.1114
7596.8282
667.8682
5380.8
1548.16
43096.137
6155.5998
13595.134
3099.6476
3438.225
11477.7656
5329.765
191569.4364
3968.9418
1195.8828
2773.059
50316.8756
33469.933
299.72
16547.2226
82020.1716
25189.9792
56614.04
216.1524
4244.4482
0.295
0.6844
6.2186
4.6374
1.1446
1538.8734
1346.2974
1346.2974
51018.9992
84.96
50030.112
903.9272
21897.8382
81.066
24.426
56.64
1042.589
557.609
95.226
389.754
1147.668
1147.668
7023.596
507.5298
5145.0714
1370.9948
3569.913
3569.913
537.136
537.136
3880.9846
2518.7218
492.886
578.5186
290.8582
4614.8856
1571.8898
663.7972
822.696
85.3966
595.0858
476.1654
118.9204
2447.91
902.1808
50.4332
1346.2974
148.9986
148.9986
191610.8544
354.5546
106.8254
247.7292
6872.3908
4077.2658
416.481
2378.644
5019.5194
5019.5194
30608.1616
2110.9492
22501.1132
5996.0992
3569.913
3569.913
2685.68
2685.68
137885.7494
4864.0308
492.886
1274.5416
131254.291
4614.8856
1571.8898
663.7972
822.696
85.3966
595.0858
476.1654
118.9204
2298.9114
902.1808
50.4332
1346.2974
148.9986
148.9986
1354925.8668
31805.189
31805.189
841799.1734
581637.4344
40750.4032
22692.58
163375.3424
11449.9176
21893.4958
212339.0058
3935.949
8135.1088
27544.7754
43581.4946
17639.5368
6866.6796
67860.7144
36774.7472
7414.6362
143.488
924.5418
113.9408
156.6332
587.994
547.4964
161.3296
170.0144
64.1094
127.5108
61.9854
356.1712
136.6912
70.9652
1745.6448
918.512
512.533
226.6544
33.689
34.5032
42.0552
90.4824
45.2412
94.9664
47.4832
261567.8624
626.7688
303.6966
323.0722
3820.5332
1912.0956
1394.4768
513.9608
257120.5604
9076.914
324.9248
123859.3608
123859.3608
513766.5484
8968
8968
244042.7384
164002.3
11490.25
16310.55
46066.374
6173.2644
107324.54
107324.54
153431.27
153431.27
459496.602
2596
2596
182870.9956
31333.071
26209.1688
317.42
114248.544
9165.2134
1597.5784
17430.2166
11685.0326
4645.5302
1099.6538
109778.291
7363.2
22760.43
24544
33113.8326
284.144
15840.5324
5872.152
102041.3732
47496.593
6247.6988
617.8952
897.7912
46781.395
44779.7256
711.363
1465.5246
41877.6808
725.1572
3347282.282
2663543.8254
3422.6018
3422.6018
1173348.5878
492488.5524
2551.1836
43573.0104
60535.6638
174691.507
183974.2484
2891
212643.4222
840059.818
610175.4984
66867.3196
163017
643290.216
582.4244
582.4244
333167.9732
61347.433
38102.1292
187254.4006
22253.4312
461280.9744
5829.2
5829.2
235267.751
106601.495
7468.6684
21130.85
36853.0992
63213.6384
98039.8634
98039.8634
39806.71
39806.71
82337.45
56173.31
26164.14
222457.4822
135910.3704
26994.0104
108916.36
949.6758
360.9974
148.1254
15.7294
44.486
26.1842
96.4414
30.031
588.6784
588.6784
885
957.0744
83755.3616
2644938.435
13729.8782
13.2868
1590.4158
893.8972
44.6984
651.8202
464.153
363.9002
100.2528
4704.4004
2425.6434
1510.6832
768.0738
871.8548
379.724
334.53
157.6008
944.118
560.0044
384.1136
5141.6494
50.4096
15.7294
4448.6
7.8116
30.4204
588.6784
17299.3664
63.0002
49.8668
13.1334
645.0234
335.946
39.0226
270.0548
523.0704
523.0704
9662.3356
4460.9074
985.2646
4216.1636
2564.2816
2564.2816
3841.6552
3169.2912
672.364
298515.5504
377.6
377.6
33882.3548
3541.4632
64.9118
4370.6492
11871.036
417.72
13616.5746
8171.3938
8171.3938
175986.2148
73712.1574
57222.9554
45051.102
11991.5612
2695.71
6751.311
2544.5402
7628.7708
4683.4672
2945.3036
28924.9506
5015.708
520.616
1472.9704
3130.894
754.9404
2192.0624
3425.0562
330.046
1265.3258
786.293
1528.1472
999.9792
118.8496
578.0584
575.6512
5074.354
560.0044
595.9944
31552.7044
31347.3372
35.518
169.8492
243808.8152
581.4686
581.4686
115363.7266
37775.4226
824.6194
27547.218
31597.804
9488.5334
2213.5148
5916.6144
17537.396
2138.1246
5798.8386
8535.2468
1065.186
71301.6062
28086.4308
14254.6478
28960.5276
10418.3498
8127.3208
2291.029
21493.9714
1802.6978
4274.8096
3271.2196
1596.6816
10548.5628
7112.2966
1596.5164
189.8974
468.814
996.4864
240.307
1096.0312
632.6688
1674.6914
216.884
99293.4836
914.2876
914.2876
78085.6622
17232.3306
1537.1388
12968.613
14875.5402
1738.3642
1028.252
28705.4234
10856.2714
7163.1664
3693.105
9437.2624
1658.667
151.9132
429.8032
951.5048
330.341
304.912
3560.2016
263.435
193.933
556.5824
1035.9692
38937.817
1012.3102
9.3102
20.65
982.35
137.4582
29.9366
27.671
79.8506
1468.4982
1006.5872
161.7308
300.1802
30442.2536
9148.068
13244.4262
8049.7594
3585.0996
78.3874
3506.7122
2292.1972
1127.4664
806.3176
358.4132
38951.6702
1583.501
34.1846
75.7914
1473.525
587.2978
463.2798
49.8314
7.2688
66.9178
6802.877
2465.9758
439.5382
1008.3808
352.9026
472.5074
1036.5474
1027.0248
8701.0368
3285.3914
2218.0696
1865.8278
1331.748
3615.1424
5230.5624
3375.4844
1590.7698
264.3082
3965.2602
720.2484
3134.1036
110.9082
2094.8894
1474.7404
620.149
6371.1032
194.8416
3302.9616
2873.3
40159.4592
38193.768
985.772
979.9192
758724.6246
6596.1174
1375.0186
5221.0988
129662.1524
47363.7722
1419.8586
3377.9152
7583.0576
69917.5488
516512.8922
111900.9458
35689.6664
368922.28
363040.4992
5881.7808
101014.2304
97079.4732
3934.7572
4939.2322
4214.075
725.1572
1065104.3086
641189.4266
1876.6012
43228.5684
1367.0772
6705.409
337265.5114
88912.1622
134026.0048
279.8252
968.1546
1004.4278
1481.903
24073.7818
423914.882
1606.865
1456.5684
275.2232
8148.3012
332871.1796
54891.7474
106.613
597.7054
1015.0006
2336.99
20608.6882
30413.4616
290.6812
290.6812
7930.5322
2558.0158
73.8562
620.7154
1756.1704
2127.7878
793.9866
10300.8454
10300.8454
10781.7072
10781.7072
1109.6956
384.5384
725.1572
28545.852
28545.852
39859.7864
39859.7864
13498.7516
13498.7516
8858085.2184
937297.6
738421.92456
10533804.743
10,533,804.74
2,783,960.11
CD OTROS

2,783,960.11

01 SISTEMA DE AGUA POTABLE 2,733,267.15 50,692.97

IMPULSION INC. POZO TUBULAR 459,496.60 8522.12535723


CONDUCCIN 191,569.44 3552.97241483
RESERVORIO 25 21,897.84 406.131669702
RESERVORIO 100 191,610.85 3553.74058022
DISTRIBUCIN 1 1,354,925.87 25129.3438001
CONEXIN DOMIC 513,766.55 9528.65137796

SISTEMA DE ALCANTARILLADO 3,124,824.80 222,457.48


CONEXIONES DOM 461,280.97 32838.7704035
REDES COLECTORAS 2,020,253.61 143822.633314
BUZONES 643,290.22 45796.0784824

PTAR 703,060.56 1,941,877.88


EMISOR 30,413.46 84003.0462092
PTAR 374,131.54 1033364.4273
TANQUE IMHOFF 298,515.55 824510.40609

CAPACITACIN EN ADMINISTRACION OPERACION Y MAN 28,545.85


CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDU 39,859.79
MITIGACIN AMBIENTAL 13,498.75

AGUA
8,971.52
CAPACITACIN EN ADMINISTRACION OPERACION Y 12,527.32
CAPACITACIN EN A+O+M + EDUCACION SANITARI 4,242.45
MITIGACIN AMBIENTAL
SANEAMIENTO
CAPACITACIN EN ADMINISTRACION OPERACION Y 19,574.33
CAPACITACIN EN A+O+M + EDUCACION SANITARI 27,332.47
MITIGACIN AMBIENTAL 9,256.30
SUB TOTAL CD GG UTIL

8,858,085.22 937,297.60 738,421.92

2,783,960.11 294,578.24 232,074.67

468,018.73 49,522.31 39,014.67


195,122.41 20,646.42 16,265.67
22,303.97 2,360.04 1,859.29
195,164.59 20,650.89 16,269.18
1,380,055.21 146,027.32 115,043.26
523,295.20 55,371.26 43,622.59

3,347,282.28 354,184.86 279,033.96


494,119.74 52,284.13 41,190.49
2,164,076.24 228,986.67 180,400.31
689,086.29 72,914.06 57,443.16

2,644,938.44 279,867.98 220,485.63


114,416.51 12,106.72 9,537.91
1,407,495.97 148,930.90 117,330.76
1,123,025.96 118,830.37 93,616.96

28,545.85 3,020.51 2,379.62


39,859.79 4,217.67 3,322.77
13,498.75 1,428.34 1,125.27

8,971.52 949.30 747.88


12,527.32 1,325.55 1,044.29
4,242.45 448.90 353.66

19,574.33 2,071.21 1,631.74


27,332.47 2,892.12 2,278.47
9,256.30 979.43 771.62
TOTAL ET PAMA SUP Y LIQ

10,533,804.74 34,569.87 0.00 687,170.00

3,310,613.02 10,864.78 0.00 215,966.98

556,555.71 1,826.51 0.00 36,306.77


232,034.50 761.49 0.00 15,136.71
26,523.30 87.04 0.00 1,730.24
232,084.66 761.66 0.00 15,139.98
1,641,125.79 5,385.85 0.00 107,058.41
622,289.05 2,042.23 0.00 40,594.86

3,980,501.10 13,063.22 0.00 259,666.95


587,594.36 1,928.37 0.00 38,331.56
2,573,463.23 8,445.60 0.00 167,879.20
819,443.51 2,689.25 0.00 53,456.18

3,145,292.05 10,322.23 0.00 205,182.31


136,061.14 446.53 0.00 8,875.91
1,673,757.63 5,492.94 0.00 109,187.14
1,335,473.28 4,382.76 0.00 87,119.25

33,945.99 111.40 0.00 2,214.46


47,400.22 155.56 0.00 3,092.14
16,052.36 52.68 0.00 1,047.17
TOTAL DE PTO

11,255,544.61 11,255,544.61

3,537,444.77 33013.4783878 3,570,458.25

594,688.98
247,932.70
28,340.59
247,986.30
1,753,570.06
664,926.15

4,253,231.27 39693.6115651 4,292,924.88


627,854.29
2,749,788.03
875,588.95

3,360,796.59 31364.8954607 3,392,161.48


145,383.58
1,788,437.72
1,426,975.29

36,271.85
50,647.92
17,152.22

11,151,472.63 104,071.99
PRESUPUESTO GENERAL
PROYECTO

PROPIETARIO
UBICACION

FECHA PROYECTO

Item

01
01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06

01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
01.03.04.08
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.06
01.04.06.01
01.04.07
01.04.07.01
01.04.07.02
01.04.07.03
01.04.07.04
01.04.08
01.04.08.01
01.04.08.01.01
01.04.08.01.02
01.04.08.01.03
01.04.08.02
01.04.08.02.01
01.04.08.02.02
01.04.08.03
01.04.08.03.01
01.04.08.03.02
01.04.08.03.03
01.04.08.03.04
01.04.08.03.04.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03

01.05.02.04
01.05.02.05
01.05.03
01.05.03.01
01.05.03.02
01.05.04
01.05.04.01
01.05.04.01.01
01.05.04.01.01.01

01.05.04.01.01.02
01.05.04.01.01.03

01.05.04.01.02
01.05.04.01.02.01

01.05.04.01.02.02
01.05.04.01.02.03
01.05.04.01.03
01.05.04.01.03.01

01.05.04.01.03.02
01.05.04.01.04
01.05.04.01.04.01

01.05.04.01.04.02
01.05.04.01.05
01.05.04.01.05.01
01.05.04.01.05.02
01.05.04.01.05.03

01.05.04.01.05.04

01.05.04.02
01.05.04.02.01
01.05.04.02.01.01
01.05.04.02.01.02
01.05.04.02.02
01.05.04.02.02.01

01.05.04.02.02.02
01.05.04.02.02.03
01.05.04.02.03
01.05.04.02.03.01
01.05.04.02.03.02
01.05.04.02.03.03
01.05.04.02.04
01.05.04.02.04.01

01.05.04.02.04.02
01.05.04.02.04.03

01.05.05
01.05.05.01

01.05.05.02
01.05.06
01.05.06.01
01.05.06.02
01.05.07
01.05.07.01

01.05.07.02
01.05.07.03
01.05.07.04

01.05.07.05
01.05.07.06
01.05.08
01.05.08.01
01.05.08.02

01.05.08.03

01.05.08.04

01.05.08.05
01.05.08.05.01
01.05.08.05.02
01.05.08.05.03
01.05.08.06
01.05.08.06.01
01.05.08.07
01.05.08.07.01
01.05.08.08
01.05.08.08.01
01.05.08.08.02
01.05.08.08.03
01.05.08.08.04
01.06
01.06.01
01.06.01.01
01.06.02
01.06.02.01
01.06.02.02
01.06.02.03
01.06.02.04
01.06.02.05
01.06.02.06
01.06.03
01.06.03.01
01.06.03.02
01.06.03.03
01.06.03.04
01.06.03.05
01.06.03.06
01.06.03.07
01.06.03.08
01.06.04
01.06.04.01
01.06.04.02
01.06.04.03
01.06.04.04
01.06.04.05
01.06.04.06
01.06.04.07
01.06.04.08
01.06.04.09
01.06.04.10
01.06.04.11
01.06.04.12
01.06.04.13
01.06.04.14
01.06.04.15
01.06.04.16
01.06.04.17
01.06.04.18
01.06.04.19
01.06.04.20
01.06.04.21
01.06.04.22
01.06.04.23
01.06.04.24
01.06.04.25
01.06.05
01.06.05.01
01.06.05.01.01
01.06.05.01.02
01.06.05.02
01.06.05.02.01
01.06.05.02.02
01.06.05.02.03
01.06.05.03
01.06.05.03.01
01.06.05.03.02
01.06.05.03.03
01.06.05.03.04
01.07
01.07.01
01.07.01.01
01.07.02
01.07.02.01
01.07.02.02
01.07.02.03
01.07.02.04
01.07.02.05
01.07.03
01.07.03.01
01.07.04
01.07.04.01
01.08
01.08.01
01.08.01.01
01.08.02
01.08.02.01
01.08.02.02
01.08.02.03
01.08.02.04
01.08.02.05
01.08.02.06
01.08.03
01.08.03.01
01.08.03.02
01.08.03.03
01.08.04
01.08.04.01
01.08.04.02
01.08.04.03
01.08.04.04
01.08.04.05
01.08.04.06
01.08.04.07
01.08.05
01.08.05.01
01.08.05.02
01.08.05.03
01.08.05.04
01.08.05.05
01.08.06
01.08.06.01
01.08.06.02

01.08.06.03
01.08.06.04
02
02.01
02.01.01
02.01.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.03
02.01.03.04
02.01.03.05
02.01.03.06
02.01.03.07
02.01.03.08
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.01.05.03
02.01.05.04

02.01.05.05
02.01.05.06

02.01.05.07
02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.03
02.02.03.01
02.02.04
02.02.04.01
02.02.05
02.02.05.01
02.02.05.02
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.01.01
02.03.02.01.02
02.03.02.01.03
02.03.02.01.04
02.03.02.01.05
02.03.02.01.06
02.03.02.02
02.03.02.02.01
02.03.03
02.03.04
02.03.05
03
03.01
03.01.01
03.01.01.01
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.03
03.01.03.01
03.01.03.02
03.01.04
03.01.04.01
03.01.04.02
03.01.04.03
03.01.05
03.01.05.01
03.01.05.02
03.01.05.03
03.01.06
03.01.06.01
03.01.06.02
03.01.07
03.01.07.01
03.01.07.02
03.01.07.03
03.01.07.04
03.01.07.05
03.01.07.06
03.01.08
03.01.08.01
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.03
03.02.03.01
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.05
03.02.05.01
03.02.06
03.02.06.01
03.02.06.02
03.03
03.03.01
03.03.01.01
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.02.06
03.03.03
03.03.03.01
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.05
03.03.05.01
03.03.05.02
03.03.05.03
03.03.06
03.03.06.01
03.03.06.02
03.03.07
03.03.07.01
03.03.07.02
03.03.07.03
03.03.07.04
03.03.07.05
03.03.07.06
03.03.07.07
03.03.07.08
03.03.07.09
03.03.07.10
03.03.07.11
03.03.07.12
03.03.07.13
03.03.07.14
03.03.07.15
03.03.07.16
03.03.07.17
03.03.07.18
03.03.08
03.03.08.01
03.03.08.02
03.03.08.03
03.04
03.04.01
03.04.01.01
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.02.05
03.04.02.06
03.04.02.07
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.03.04
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.05
03.04.05.01
03.04.05.02
03.04.06
03.04.06.01
03.04.06.02
03.04.06.03
03.04.06.04
03.04.06.05
03.04.07
03.04.07.01
03.04.07.02
03.04.07.03
03.04.07.04
03.04.07.05
03.04.07.06
03.04.07.07
03.04.07.08
03.04.07.09
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.05.02.03
03.05.02.04
03.05.02.05
03.05.02.06
03.05.02.07
03.05.03
03.05.03.01
03.05.03.02
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
03.05.04.04
03.05.04.05
03.05.04.06
03.05.04.07
03.05.04.08
03.05.04.09

03.05.04.10
03.05.04.11
03.06
03.06.01
03.06.02
03.06.03
03.07
03.07.01
03.07.01.01
03.07.01.02
03.07.02
03.07.02.01
03.07.02.02
03.07.02.03
03.07.02.04
03.07.02.05
03.07.03
03.07.03.01
03.07.03.02
03.07.03.03
03.07.03.03.01
03.07.03.03.02
03.07.04
03.07.04.01
03.07.04.02

03.07.04.03
03.07.04.04
03.07.04.05
03.07.05
03.07.05.01
03.07.05.02
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.01.03
03.08.01.04
03.08.01.05
03.08.01.06

03.08.01.07
03.08.01.08
03.08.01.09
03.08.01.10
03.08.01.11
03.08.01.12
03.08.02
03.08.02.01
03.08.02.02
03.08.02.03
03.08.02.04
03.08.02.05
03.08.02.06

03.08.02.07
03.08.02.08
03.08.02.09
03.08.02.10
03.08.02.11
03.09
03.09.01
03.09.01.01
03.09.02
03.09.02.01
03.09.02.02
03.09.02.03
03.09.02.04
03.09.02.05
03.09.02.06
03.09.03
03.09.03.01
03.09.04
03.09.04.01
03.09.05
03.09.05.01
03.09.05.02
04
04.01
05
05.01
06
06.01
7
7.01
07.01.01
07.01.01.01
07.01.01.02
07.01.01.03
07.01.01.04
07.01.02
07.01.02.01
07.01.03
07.01.03.01
07.01.03.02
07.01.04
07.01.04.01
07.01.04.02
07.01.04.03
7.02
07.02.01
07.02.01.01
07.02.01.02
07.02.02
07.02.02.01
07.02.02.02
07.02.02.03
07.02.02.04
07.02.02.05
07.02.03
07.02.03.01
07.02.03.02
07.02.03.03
07.02.04
07.02.04.01
07.02.04.02
07.02.05
07.02.05.01
07.02.05.02
07.02.05.03
07.02.05.04
07.02.06
07.02.06.01
07.02.07
07.02.07.01
07.02.07.02
07.02.07.03
07.02.08
07.02.08.01
7.03
07.03.01
VAL
Superv
Plan de Mon
Reformulacion

[Son: trece millones trecientos ochenta y dos mil cuatrocientos treinta y tres

PRESUPUESTO ALTERNATIVA UNICA - A PRECIOS DE M


PROYECTO: MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLAD
Item
01

02

03

04

05

06
07
PRESUPUESTO GENERAL

AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL ALCANTARILLADO EN EL C.P. LA HUARACLLA, D

MUNICIPALIDAD DISTRITAL DE JESUS


DPTO:CAJAMARCA PROV:CAJAMARCA DIST:JESUS

8/31/2016

Descripcin

AMPLIACION Y MEJORAMIENTO SISTEMA DE AGUA POTABLE


OBRAS PROVISIONALES
CARTEL DE OBRA (2.40x4.80m)
OFICINA, ALMACN Y CASETA DE GUARDIANA
CERCOS PROVISIONALES DE SEGURIDAD DE OBRA
SEGURIDAD Y SALUD
PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN DE SEGURIDAD TEMPORAL EN OBRA
CAPACITACIN DE SEGURIDAD Y SALUD EN OBRA
RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL.
ELIMINACION DE MATERIAL EXCEDENTE D=30M
RELLENO Y COMPACTACION
TENDIDO DE TUBERIA
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA HDPE SDR 9 RESISTENCIA ASTM F714 PE 3608 D=109.91 mm
REDUCCION DE 5 A 4
VALVULA PURGA
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
INSTALACION DE VALVULA DE PURGA TIPO T 5"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACONDICIONAMIENTO PASE AEREO
RETIRO DE CABLE EXISTENTE Y DADO
REPOCICION DE CABLE INCLUYE TEMPLADORES Y FORRO
DADO CONCRETO
REUBICACION TANQUE HDPE 25 M3 ETERNIT
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D=30M
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUES
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
MONTAJE DESMONTAGE DE TANQUE DE 25 M3
CASETA DE VALVULAS TANQUE
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS
ACERO FY=4200 KG/CM2
REVOQUES, ENLUCIDOS Y PINTURAS
TARRAJEO FROTACHADO 1:5 E= 1.5 CM
PINTURA OLEO MATE EN MUROS EXTERIORES
VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
TAPA METALICA
TAPA METALICA DE 0.60x 0.60 M.
RESERVORIO DE CONCRETO ARMADO 100 M3
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS DE RESERVORIOS Y CAJA DE VALVULAS DE 1.00-1.60M
EXCAVACION DE PARA UAS DE VEREDAS
NIVELACION INTERIOR Y APISONADO EN FONDO DE RESERVORIO Y CASETA DE VALVULAS E=4'' C/EQUIPO LIVIANO CON
MATERIALE PROPIO
AFIRMADO DE 4'' PARA VEREDAS CON EQUIPO LIVIANO
ELIMINACION DE MATERIAL EXCEDENTE MANUAL DIST./PRO=30M
OBRAS DE CONCRETO SIMPLE
SOLADO PARA RESERVORIO E=4'' MEZCLA CEM:HOR 1:12 (CON CEMENTO TIPO II)
CIMIENTOS CORRIDOS F'C=140 KG/CM2 +30% DE PIEDRA GRANDE (CON CEMENTO TIPO II)
OBRAS DE CONCRETO ARMADO
CASETA DE VALVULAS BATERIA TANQUES
COLUMNAS
CONCRETO EN COLUMNAS PARA CASETA DE VALVULAS F'C=175 KG/CM2 (CEMENTO TIPO II)

ACERO EN COLUMNAS PARA CASETA DE VALVULAS FY=4200 KG/CM2 GRADO 60


ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS PARA CASETA DE VALVULAS

VIGAS
CONCRETO EN VIGAS PARA CASETA DE VALVULAS F'C=175 KG/CM2 (CEMENTO TIPO II)

ACERO EN VIGAS PARA CASETA DE VALVULAS FY=4200 KG/CM2 GRADO 60


ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS PARA CASETA DE VALVULAS
MUROS
CONCRETO EN MUROS PARA CASETA DE VALVULAS F'C=175 KG/CM2 (CEMENTO TIPO II)

ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS PARA CASETA DE VALVULAS


PISOS
CONCRETO EN PISOS PARA CASETA DE VALVULAS F'C=175 KG/CM2 (CEMENTO TIPO II)

ACERO EN PISOS PARA CASETA DE VALVULAS FY=4200 KG/CM2 GRADO 60


LOSA ALIGERADA H=0.20 M
CONCRETO EN LOSA ALIGERADA PARA CASETA DE VALVULAS F'C=175 KG/CM2
ACERO EN LOSA ALIGERADA PARA CASETA DE VALVULAS FY=4200 KG/CM2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA PARA CASETA DE VALVULAS

LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADO EN CAJA DE VALVULAS H=0.20M

RESERVORIO
CIMINETO
CONCRETO EN CIMIENTO REFORZADO F'C=245 KG/CM2 (CON CEMENTO TIPO II)
ACERO EN CIMIENTO REFORZADO FY=4200 KG/CM2 GRADO 60
PAREDES DE RESERVORIO
CONCRETO EN PARED CIRCULAR DE RESERVORIO F'C=175 KG/CM2 (CEMENTO TIPO II)

ACERO EN PARED CIRCULAR DE RESERVORIO FY=4200 KG/CM2 GRADO 60


ENCOFRADO Y DESENCOFRADO NORMAL EN PARED CIRCULAR DE RESERVORIO
VIGA CIRCULAR
CONCRETO EN VIGA CIRCULAR DE RESERVORIO F'C=175 KG/CM2 (CEMENTO TIPO II)
ACERO EN VIGA CIRCULAR DE RESERVORIO FY=4200 KG/CM2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGA CIRCULAR DE RESERVORIO
COVERTURA ESFERICA
CONCRETO EN COBERTURA ESFERICA DE RESERVORIO F'C=175 KG/CM2 (CEMENTO TIPO II)

ACERO EN COBERTURA ESFERICA DE RESERVORIO FY=4200 KG/CM2 GRADO 60


ENCOFRADO Y DESENCOFRADO NORMAL EN COBERTURA ESFERICA DE RESERVORIO

VEREDAS
VEREDA DE CONCRETO 1:8 DE 4'' CON BRUAS DE CANTO Y TRANSVERSALES (INCLUYE ENCOFRADO)

CONCRETO EN UAS DE VEREDA CEMENTO: HORMIGON 1:8


REVOQUES Y ENLUCIDOS
TARRAJEO INTERIOR CON IMPERMEABILIZANTE, EN RESERVORIO E=2 CM
TARRAJEO EXTERIOR EN RESERVORIO ACABADO CON CEMENTO - ARENA 1:5
CARPINTERIA METALICA
ESCALERA METALICA CON PASMANO DE TUBO DE 2" Y PELDAOS DE 1'' ANCHO 0.50 M SEGUN DISEO

TAPA METALICA CON PLANCHA ESTRIADA E=3/16'' DIAMETRO DE 0.50M SEGUN DISEO
PUERTA METALICA CON PLANCHA Y PERFILES DE FIERRO SEGUN DISEO
VENTANA METALICA CON MARCO DE ANGULO DE 2X1/4'' Y FIERRO CUADRADO VERTICAL DE 3/4'' SEGUN DISEO

COLOCACION DE VENTANA
COLOCACION DE PUERTA
PINTURA
PINTURA LATEX EN EXTERIORES DE RESERVORIO
PINTURA ANTICORROSIVA ZINCROMATO ACABADO CON ESMALTE SINTETICO EN ESCALERA METALICA CON TUBO DE 2'' Y 1''

PINTURA EN PUERTA METALICA ANTICORROSIVA ZINCROMATO ACABADO CON ESMALTE SINTETICO

PINTURA EN VENTANA METALICA ANTICORROSIVA ZINCROMATO ACABADO CON ESMALTE SINTETICO

VALVULAS Y ACCESORIOS.
SUMINISTRO Y COLOCACION VALVULAS Y ACC. 2"
ACCESORIOS PARA INGRESO D = 2"
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
DOSADOR DE CLORO
SUMINISTRO Y COLOCACION DE DOSADOR DE CLORO
VALVULAS Y ACCESORIOS
ACCESORIOS P/LIMP. Y REBOSE DE - 2" Y VENTILACION 2"
CERCO PERIMETRICO Y TANQUE
CERCO PERIMETRICO EN RESERVORIO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
TRASLADO Y MONTAGE TANQUE DE 25 M3
RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAP CLASE 10, D=3"
TUBERIA PVC SAP CLASE 10, D=2"
TUBERIA PVC SAP CLASE 10, D=1 1/2"
TUBERIA PVC SAP CLASE 10, D=1"
TUBERIA PVC SAP CLASE 10, D=4"
TUBERIA PVC SAP CLASE 10, D=2 1/2"
TUBERIA PVC SAP CLASE 10, D=3/4"
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
ACCESORIOS DE LA RED
SUMINISTRO Y COLOCACION TEE PVC 2"
SUMINISTROS Y COLOCACION TEE PVC 1"
SUMINISTRO Y COLOCACION TEE PVC 3"
SUMINISTRO Y COLOCACION TEE PVC 4"
SUMINISTRO Y COLOCACION TEE PVC 3/4"
SUMINISTRO Y COLOCACION TEE PVC 1 1/2"
SUMINISTRO Y COLOCACION TEE PVC 2 1/2"
SUMINISTRO Y COLOCACION CODO PVC 90 3/4"
SUMINISTRO Y COLOCACION CODO PVC 90 1"
SUMINISTRO Y COLOCACION CODO PVC 22.5 3/4"
SUMINISTRO Y COLOCACION CODO PVC 22.5 4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2" - 1"
SUMINISTROS Y COLOCACION REDUCCION PVC 2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 1" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 1 1/2" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 3/4"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 2 1/2" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 1 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 3" - 2 1/2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 1"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 2"
SUMINISTRO Y COLOCACION REDUCCION PVC 4" - 3"
VALVULAS DE CONTROL Y PURGA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE D=30M
NIVELACION Y COMPACTACION
VALVULAS Y ACCESORIOS
INSTALACION DE VALVULA DE CONTROL 1"
INSTALACION DE VALVULA DE PURGA 1"
CAJA DE CONCRETO ARMADO
DADO MOVIL DE CONCRETO 0.20x0.20x0.30/ DESAGUE
ACOMETIDAS DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS /ML
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS EN TIERRA (ML) (0.45x0.90)
REFINE, NIVELACION Y CONFORMACION DE FONDO PARA TUBERA
CAMA DE APOYO PARA TUBERIAS DE AGUA
RELLENO Y COMPACTACION DE ZANJAS, CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25 X 0.35 TAPA FG
CAJA DE REGISTRO PRE FABRICADA CONCRETO 0.25X0.35 TAPA FG
VALVULAS Y ACCESORIOS
INSTALACION DE ACCESORIOS EN ACOMETIDAS
LINEA DE IMPULCION
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
NIVELACION Y COMPACTACION
PLATAFORMADO DE LOSA PARA POZO (RELLENO ESTRUCTURAL)
PERFORACION DE POZO TUBULAR
FILTRO PARA POZO TUBULAR
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=280 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TENDIDO DE TUBERIA DESDE LA BOMBA HASTA EL TANQUE
TUBERIA HDPE SDR 7 RESISTENCIA ASTM F714 PE 4710 D=100.91 mm
TUBERIA HDPE SDR 11 RESISTENCIA ASTM F714 PE 3608 D=115.60 mm
TUBERIA HDPE SDR 17 RESISTENCIA ASTM F714 PE 3608 D=124.69mm
TUBERIA HDPE SDR 17 RESISTENCIA ASTM F714 PE 3608 D=124.17 mm
PEGADO POR TERMOFUSION DE TUBERIA HDPE
FORRADO INTERIOR DE TUBO RANURADO PARA POZO TUBULAR
FORRADO INTERIOR DE TUBO LISO PARA POZO TUBULAR (TRAMO INICIAL)
VALVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL
INSTALACION DE TABLERO ARRANQUE AUTOMATICO INCLUYE CABLEADO
INSTALACION DE MEDIDOR DE ENERGIA ELECTRICA
INSTALACION VALVULA ANTI RETORNO
SUMINISTRO E INSTALACION DE BOMBA SUMERGIBLE VERTICAL DE RESGUARDO
VARIOS
LIMPIEZA DE POZO TUBULAR
SUMINISTRO E INSTALACION DE TAPON PARA POZO Y CABLE PARA IZAJE DE BOMBA SUMERGIBLE

FLETE TERRESTRE
LIMPIEZA FINAL DE OBRA
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
RED COLECTORA
TRAZO REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL PARA BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D=30M
CORTE DE PAVIMENTO ASFALTICO DE 2"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
TUBERIA PVC SAL D = 10" (250 mm ISO)
TUBERIA PVC SAL D = 12"
CONSTRUCCIN DE BUZONES
TRAZO Y REPLANTEO PRELIMINAR
TRAZO Y REPLANTEO DURANTE LA OBRA
CONCRETO EN BUZONES F'C=210 KG/CM2
CONCRETO EN BUZONES f'c=140 kg/cm2_x000D_

ACERO FY=4200 KG/CM2


ENCOFRADO Y DESENCOFRADO_x000D_

TAPA DE CONCRETO ARMADO PARA BUZONES


INSTALACIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS.
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAL D = 6" (160 mm ISO) (Instalaciones Domiciliarias)
CONEXION DOMICILIARIA CACHIMBA
CONEXION DOMICILIARIA CACHIMBA
CAJA DE REGISTRO DE DESAGUE (12"x20")
CAJA DE REGISTRO DE DESAGUE (12" X 20")
DADO CONCRETO
OTROS
PRUEBA HIDRAULICA + REPOSICION DE PAVIMENTO
PRUEBA HIDRAULICA ALCANTARILLADO
REPOSICION PAVIMENTO FLEXIBLE E = 2" + BASE
INST. TUB. A CAMARA DE REJAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MATERIAL ZARANDEADO
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
TUBERIAS
TUBERIA PVC SAL D=12" (300 mm ISO)(BUZON 105-CAMARA DE REJAS)
ROTURA DE ESPECIMENES DE CONCRETO, POR COMPRESION
PLACA RECORDATORIA (0.40X0.60m)
FLETE TERRESTRE Y RURAL
PLANTA DE TRATAMIENTO
CAMARA DE REJAS
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR CAMARA DE REJAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL CAMARA DE REJAS
REFINE NIVELACION Y COMPACTACION CAMARA DE REJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M CAMARA DE REJAS
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY=4200 KG/CM2
REVOQUES ENLUCIDOS
TARRAJEO DE EXTERIORES 1:5 e=1:5cm
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E= 1.5 CM.
PINTURA LATEX DOS MANOS
ESCALINES Y REJILLA
ESCALERA PARA CAMARA DE REJAS FG 3/4"
REJILLA DE SEPARACION DE SOLIDOS (0.30 M DE ANCHO)
INST. TUB. - TANQUE IMHOFF
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
TUBERIA PVC SAL D = 12" (300 mm ISO) ( CAMARA DE REJAS TANQUE IMHOFF)
INST. AFORADOR PARSHALL
SUMINISTRO E INSTALACION DE AFORADOR
DESARENADOR
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION
REFINE Y NIVELACION
ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100 KG/CM2 PARA SOLADOS
CONCRETO ARAMADO
CONCRETO F'C=210 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO (OBRAS DE ARTE)
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE
VARIOS
COMPUERTA DE MADERA DE TRATADA 1"
VERTEDERO
CONSTRUCCIN DE TANQUE IMHOFF
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO C/MAQ.
EXCAVACION MANUAL
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
OBRAS DE CONCRETO SIMPLE
SOLADO E=4", MEZCLA 1:12 CEMENTO-HORMIGON
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 (IMHOFF)
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
TAPA Y CAJAS
CONCRETO F'C=210 KG/CM2; (TAPA Y CAJAS)
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E=2 CM.
TARRAJEO DE EXTERIORES MEZCLA C:A 1:5
INST. TUB. A LECHO DE SECADO Y HUMEDAL ARTIFICIAL + ACCESORIOS
EXCAVACION MANUAL
REFINE NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CAJA DE REGISTRO DE ALBAILERIA 12" X 24" CON TAPA DE FF
TUBERIA PVC SAL D = 8" (200 mm ISO) (TANQUE IMHOFF - LECHO DE SECADO)
TUBERIA PVC SAL D = 10" (250 mm ISO) (TANQUE IMHOFF - HUMEDAL ARTIFICIAL)
TUBERIA PVC SAL D = 8" (200 mm ISO) (TANQUE IMHOFF - HUMEDAL ARTIFICIAL))
TUBERIA PVC SAL D=4" (TANQUE IMHOFF - HUMEDAL ARTIFICIAL)
VALVULA COMPUERTA FF TIPO MAZZA DE 8"
CANASTILLA DE BRONCE 8"
SOMBRERO DE VENTILACION PVC DE 8"
CODO PVC-SAL 8"x45
TEE PVC-SAL DE 8"
BARANDA DE TUBO FG PASAMANO 2"
ESCALERA FG 3/4"
COMPUERTA PARA LIMPIEZA DE LOS SOLIDOS FLOTANTES 0.70x 0.80 M.
INSTALACION DE MOTOBOMBA
SUMINISTRO Y COLOCACION MOTOBOMBA 3.5 HP.
SUMINISTRO E INST. TUB. PVC 2" C - 7.5
CODO PVC SAP 2"X90
LECHO DE SECADO DE SOLIDOS
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
RELLENO Y COMPACTACION CON MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
FILTRO DE ARENA FINA
FILTRO DE GRAVA FINA
FILTRO DE GRAVA GRUESA
OBRAS DE CONCRETO SIMPLE
SOLADO 1:8 PARA e = 4"
CONCRETO CIMIENTO CORRIDO 1:10 +30% P.M.
CONCRETO F'C=140 KG/CM2 LOSA DE FONDO
ENCOFRADO Y DESENCOFRADO DE CANALETAS
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
ACERO FY=4200 KG/CM2
ENCOFRADO Y DESENCOFRADO
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 , E=2.0 CM.
TARRAJEO DE EXTERIORES MEZCLA C:A 1:5 E = 1.5cm
COBERTURAS
VIGAS DE MADERA 6" x 3"
VIGAS DE MADERA 4" x 3"
CORREAS DE MADERA 3" x 2"
ANCLAJE EN VIGA DE MADERA Y COLUMNA
COBERTURA CON CALAMINA GALVANIZADA
INST. TUB. A LECHO DE SECADO - QUEBRADA
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CAJA DE REGISTRO DE ALBAILERIA 12" X 24" CON TAPA DE FF
TUBERIA PVC SAL D = 8" (200 mm ISO) (C8 - DESCARGA FINAL)
TUBERIA PVC SAL D = 6"
CODO PVC SAL 6"X90.
HUMEDAL ARTIFICIAL
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE.
GRAVA DE 1/2"
CUERPO DE PIEDRA GRAVA 2" - 4"
LECHO FILTRANTE GRAVA 1"
COBERTURAS INPERMEABLES
GEOMEMBRANA DE PVC E = 5mm
GEOTEXTIL NT 3000
INST. TUB. ACCE. + OTROS
EXCAVACION MANUAL
REFINE Y NIVELACION Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS
RELLENO Y COMPACTACION CON MAT. PROPIO DE ZANJAS
ELIMINACION DE MATERIAL EXCEDENTE D = 30M
CODO PVC SAL 4"X90.
VALVULA COMPUERTA FF TIPO MAZZA DE 4"
TUBERIA PVC SAL D=4" (HUMEDAL ARTIFICIAL - C8)
TUBO DE PVC 2" AGUJEROS DE 1/2" @ 5cm _x000D_

TEE PVC-SAL 4"x2"


COMPRA Y SEMBRADO DE CARRIZO A CADA 0.50M
CERCO PERIMETRICO DE PTAR
CERCO PERIMETRICO
PUERTA EN CERCO DE PROTECCION
DADO CONCRETO
OBRAS DE PROPECION LINEA DE COLECTORA PTAR 01
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION EN TALUD
EXCAVACION PARA COLCHON DE AMORTIGUAMIENTO
COMPACTACION EN FONDO DE CIMENTACION
RELLENO Y COMPACTACION (MATERIAL PROPIO)
ELIMINACION DE MATERIAL EXCEDENTE
MUROS
ACOPIO DE PIEDRA MEDIANA PARA GAVIONES
TRASLADO DE PIEDRA MEDIANA PARA GAVIONES
MALLA PARA GAVIONES
GAVION TIPO CAJA DE 5X1X1
GAVION TIPO CAJA DE 5X1X2.5
COLCHON DE AMORTIGUAMIENTO
CONCRETO PARA ESCOLLERA (F'C=175KG/CM2 +30% P.M.)
ENCOFRADO Y DESENCOFRADO_x000D_

CONCRETO F'C=210 KG/CM2; LOSA MACIZA


ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS
ACERO FY=4200 KG/CM2
VARIOS
ACONDICIONAMIENTO DE ACCESO A PTAR 01
LIMPIEZA FINAL DE OBRA
MUROS DE CONTENCION EN PLANTAS DE TRATAMIENTO
MURO DE CONCRETO ARMADO
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO C/MAQ.
RELLENO Y CON MATERIAL PROPIO: MANUAL
CONFORMACION BASE GRANULAR (E=0.10M)
CONCRETO F'C=175 KG/CM2; MUROS
ENCOFRADO Y DESENCOFRADO_x000D_

ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60


JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
MURO DE CONCRETO CICLOPEO
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO C/MAQ.
RELLENO Y CON MATERIAL PROPIO: MANUAL
CONFORMACION BASE GRANULAR (E=0.10M)
CONCRETO 1:8+25% P.M. PARA MUROS
ENCOFRADO Y DESENCOFRADO_x000D_

JUNTA ASFALTICA
CURADO DE CONCRETO
TUBERIA DREN D=4"
TUBERIA DREN PERFORADO D=4"
GRAVA DE 1/2"
EMISOR QUEBRADA
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
EXCAVACION MANUAL DE BUZONES Y CAJAS
REFINE DE ZANJAS Y CONFORMACION DE FONDOS
CAMA DE APOYO PARA TUBERIAS MAT. ZARANDEADO
RELLENO Y COMPACTACION
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO D=30m
SUMINISTRO E INSTALACION DE TUBERIA
TUBERIA PVC SAL D = 8" (200 mm ISO)
CONSTRUCCIN DE BUZONES
CONSTRUCCION DE BUZONES DE CONCRETO H=1.20 m.
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA PARA TUBERIAS 200MM
LIMPIEZA FINAL DE OBRA
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
CAPACITACIN EN EDUCACION SANITARIA
MITIGACIN AMBIENTAL
RECUPERACION DE AREAS AFECTADS
SISTEMA DE UTILIZACION PARA
SUMINISTRO MATERIALES
ARMADOS
ARMADO PMI-3
ARMADO PSV4-3
ARMADO PTSV4-3
ARMADO SAM-3
CABLES Y CONDUCTORES
CONDUCTOR ALUMINIO AAAC 3x35mm2
RETENIDAS
RETENIDA INCLINADA TIPO V1
RETENIDA VERTCIAL TIPO V2
PUESTAS A TIERRA
PUESTA A TIERRA TIPO PAT-1
PUESTA A TIERRA TIPO PAT-2
PUESTA A TIERRA TIPO PAT-3
MONTAJE ELECTROMECANICO
OBRAS PRELIMINARES
REPLANTEO TOPOGRAFICO Y REUBICACION DE ESTRUCTURAS
DESPEJE ARBOLES DENTRO DE LA FRANJA DE SERVIDUMBRE_x000D_
EXCAVACION,RELLENO Y COMPACTACION
EXCAVACION EN TERRENO NORMAL_x000D_
EXCAVACION EN TERRENO ROCOSO
RELLENO Y COMPACTACIN PARA CIMENTACIN DE POSTE _x000D_
RELLENO Y COMPACTACIN PARA INSTALACIN BLOQUE DE ANCLAJE_x000D_
RELLENO Y COMPACTACIN PARA PUESTA A TIERRA_x000D_
INSTALACION POSTES DE CONCRETO
TRANSPORTE DE POSTE DE CONCRETO 13 METROS A PUNTOS IZAJE
IZADO DE POSTE DE CAC 13 /300_x000D_
IZADO DE POSTE DE CAC 13 /400_x000D_
INSTALACION DE RETENIDAS
INSTALACION DE RETENIDA INCLINADA TIPO V1
INSTALACION DE RETENIDA VERTICAL TIPO V2
MONTAJE DE ARMADOS
MONTAJE ARMADO PMIC-3
MONTAJE ARMADO PSV-3
MONTAJE ARMADO PSVA-3
MONTAJE ARMADO SAM-3P
MONTAJE CONDUCTORES DE ALEACION DE ALUMINIO
TENDIDO Y PUESTA EN FLECHA CONDUCTOR AAAC 3x35 mm2_x000D_
INSTALACION DE PUESTA A TIERRA
INSTALACION PAT-1
INSTALACION PAT-2
INSTALACION PAT-3
PRUEBAS Y PUESTA EN SERVICIO
PRUEBAS Y PUESTA EN SERVICIO RED PRIMARIA
TRANSPORTE DE MATERIALES Y EQUIPOS
TRANSPORTE DE MATERIALES Y EQUIPOS
COSTO DIRECTO
Gastos Generales
Utilidad
Sub Total
IGV
VALOR REFERENCIAL
Supervisin y Liquidacin
Plan de Monitoreo Arqueolgico
Reformulacion Expediente Tcnico
TOTAL :

[Son: trece millones trecientos ochenta y dos mil cuatrocientos treinta y tres soles con 00 centim

PRESUPUESTO ALTERNATIVA UNICA - A PRECIOS DE MERCADO


PROYECTO: MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO EN EL C.
CAJAMARCA-CAJAMARCA ALTERNATIVA I
Descripcin
AMPLIACION Y MEJORAMIENTO SISTEMA DE AGUA POTABLE
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
IMPLEMENTACION SISTEMA DE ALCANTARILLADO
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
PLANTA DE TRATAMIENTO
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
MITIGACIN AMBIENTAL
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
SISTEMA DE UTILIZACION PARA
Insumo de origen nacional
Insumo de origen Importado
Remuneraciones (MOC)
Remuneraciones (MNOC)
Remuneraciones (MNOC)
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
I.G.V. 18%
EXPEDIENTE TECNICO
PLAN DE MONITOREO ARQUEOLGICO
SUPERVISION Y LIQUIDACIN

TOTAL PRESUPUESTO

TANGIBLES
INTANGIBLES
TOTAL

COSTOS DIRECTOS

COSTO SOCIALES

SISTEMA DE AGUA POTABLE


SISTEMA DE ALCANTARILLADO
SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES

COSTOS PRIVADOS
SISTEMA DE AGUA POTABLE
SISTEMA DE ALCANTARILLADO
SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES
COSTO DE COMPONENTES A PRECIOS PRIVADOS Y SOCIALES
COMPONENTE
SISTEMA DE AGUA POTABLE
SISTEMA DE ALCANTARILLADO
SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES
TOTAL
ENERAL

EL ALCANTARILLADO EN EL C.P. LA HUARACLLA, DISTRITO DE JESUS-CAJAMARCA-CAJAMARCA

Und. Metrado Precio S/. Parcial S/.

2,377,530.93
10,834.16
und 1.00 494.16 494.16
m2 120.00 32.20 3,864.00
m 200.00 32.38 6,476.00
36,522.15
mes 7.00 745.23 5,216.61
mes 7.00 1,645.90 11,521.30
mes 7.00 375.26 2,626.82
mes 7.00 416.25 2,913.75
mes 7.00 1,389.56 9,726.92
mes 7.00 645.25 4,516.75

157,890.46
3,319.44
m2 1,468.78 0.69 1,013.46
m2 1,468.78 1.57 2,305.98
42,639.21
m 1,468.78 19.31 28,362.14
m3 14.88 17.07 254.00
m3 957.86 14.64 14,023.07
66,163.47
m 769.00 23.41 18,002.29
m 700.00 68.54 47,978.00
und 2.00 91.59 183.18
3,458.14
m2 0.36 0.69 0.25
m2 0.36 1.57 0.57
m3 0.18 29.26 5.27
m3 0.23 17.07 3.93
m2 0.36 2.29 0.82
und 1.00 1,293.28 1,293.28
und 1.00 1,077.01 1,077.01
und 1.00 1,077.01 1,077.01
42,310.20
m 45.00 1.60 72.00
m 48.00 864.57 41,499.36
und 2.00 369.42 738.84
17,267.37
67.80
m2 30.00 0.69 20.70
m2 30.00 1.57 47.10
871.55
m3 16.15 29.26 472.55
m2 30.00 2.29 68.70
m3 19.35 17.07 330.30
934.50
m2 30.00 31.15 934.50
5,540.29
m2 8.10 51.12 414.07
m3 9.00 450.78 4,057.02
kg 237.60 4.50 1,069.20
3,025.35
und 1.00 3,025.35 3,025.35
468.43
und 1.00 468.43 468.43
2,563.96
m 24.40 58.48 1,426.91
und 1.00 417.70 417.70
m3 1.28 369.42 472.86
GLB 1.00 246.49 246.49
3,795.49
1,274.28
m3 1.58 339.54 536.47
m2 13.13 51.12 671.21
kg 14.80 4.50 66.60
486.20
m2 15.80 24.64 389.31
m2 10.52 9.21 96.89
2,035.01
und 1.00 792.20 792.20
und 1.00 52.68 52.68
und 1.00 1,077.01 1,077.01
113.12
und 1.00 113.12 113.12
199,374.54
133.31
m2 58.99 0.69 40.70
m2 58.99 1.57 92.61
1,481.98
m3 3.87 29.26 113.24
m3 1.06 29.26 31.02
m2 45.59 2.29 104.40

m2 19.16 63.96 1,225.47


m3 0.46 17.07 7.85
4,171.42
m2 58.99 31.15 1,837.54
m3 10.93 213.53 2,333.88
57,260.50
14,362.14
2,110.83
m3 1.45 339.54 492.33

kg 213.69 4.50 961.61


m2 12.85 51.12 656.89

3,073.27
m3 2.68 339.54 909.97

kg 347.48 4.50 1,563.66


m2 11.73 51.12 599.64
5,606.76
m3 7.91 339.54 2,685.76

m2 57.14 51.12 2,921.00


1,173.73
m3 2.60 339.54 882.80

kg 64.65 4.50 290.93


2,397.55
m3 1.53 339.54 519.50
kg 80.68 4.50 363.06
m2 20.79 51.12 1,062.78

m2 149.74 3.02 452.21

42,898.36
17,536.27
m3 20.18 450.78 9,096.74
kg 1,875.45 4.50 8,439.53
19,237.52
m3 14.98 339.54 5,086.31

kg 1,465.25 4.50 6,593.63


m2 147.84 51.12 7,557.58
2,204.91
m3 1.87 339.54 634.94
kg 231.08 4.50 1,039.86
m2 10.37 51.12 530.11
3,919.66
m3 3.38 339.54 1,147.65

kg 274.18 4.50 1,233.81


m2 30.09 51.12 1,538.20

1,026.06
m2 19.16 39.38 754.52

m3 1.06 256.17 271.54


7,630.24
m2 135.59 25.91 3,513.14
m2 167.09 24.64 4,117.10
2,657.32
m 9.45 185.85 1,756.28

und 1.00 74.23 74.23


und 2.31 278.63 643.64
m2 0.94 105.12 98.81

und 1.00 42.18 42.18


und 1.00 42.18 42.18
125,013.71
m2 167.09 10.45 1,746.09
m 9.45 26.51 250.52

m2 4.62 52.30 241.63

m2 0.94 41.05 38.59

1,921.89
und 1.00 792.20 792.20
und 1.00 52.68 52.68
und 1.00 1,077.01 1,077.01
3,025.35
und 1.00 3,025.35 3,025.35
2,342.15
und 5.00 468.43 2,342.15
115,447.49
m 47.12 58.48 2,755.58
und 1.00 417.70 417.70
m3 2.82 369.42 1,041.76
GLB 5.00 22,246.49 111,232.45
1,085,819.92
26,616.63
m 16,845.97 1.58 26,616.63
707,291.93
m 16,845.97 29.26 492,913.08
m 16,845.97 2.05 34,534.24
m 6,608.59 2.85 18,834.48
m3 6,064.55 21.89 132,753.00
m3 947.59 10.24 9,703.32
m3 947.59 19.58 18,553.81
135,250.77
m 161.92 14.44 2,338.12
m 481.10 8.50 4,089.35
m 1,908.67 7.55 14,410.46
m 3,645.95 8.37 30,516.60
m 538.50 23.41 12,606.29
m 345.97 10.56 3,653.44
m 9,763.85 4.46 43,546.77
m 16,845.97 1.43 24,089.74
6,286.92
und 4.00 38.78 155.12
und 41.00 20.07 822.87
und 2.00 47.95 95.90
und 2.00 66.04 132.08
und 30.00 15.96 478.80
und 22.00 25.70 565.40
und 4.00 33.85 135.40
und 8.00 17.16 137.28
und 3.00 19.16 57.48
und 6.00 17.68 106.08
und 1.00 20.56 20.56
und 11.00 21.46 236.06
und 4.00 28.92 115.68
und 2.00 30.03 60.06
und 69.00 21.11 1,456.59
und 35.00 21.91 766.85
und 17.00 25.22 428.74
und 7.00 27.11 189.77
und 1.00 28.22 28.22
und 1.00 28.91 28.91
und 1.00 35.31 35.31
und 2.00 38.01 76.02
und 1.00 38.01 38.01
und 2.00 39.91 79.82
und 1.00 39.91 39.91
210,373.67
526.03
m2 373.00 0.69 257.37
m2 171.12 1.57 268.66
3,172.98
m3 55.38 29.26 1,620.42
m3 69.23 17.07 1,181.76
m2 161.92 2.29 370.80
206,674.66
und 90.00 91.23 8,210.70
und 2.00 147.06 294.12
und 92.00 1,077.01 99,084.92
und 92.00 1,077.01 99,084.92
321,540.73
7,505.00
m 4,750.00 1.58 7,505.00
204,923.48
m 4,750.00 29.26 138,985.00
m 4,750.00 2.05 9,737.50
m 4,750.00 2.85 13,537.50
m3 1,710.00 21.89 37,431.90
m3 267.19 19.58 5,231.58
83,215.25
und 475.00 175.19 83,215.25
25,897.00
und 475.00 54.52 25,897.00
548,281.60
2,158.75
m2 1,375.00 1.57 2,158.75
145,138.91
m3 907.50 29.26 26,553.45
m3 1,134.38 19.58 22,211.16
m2 100.00 2.29 229.00
m3 4,690.93 18.56 87,063.66
hm 107.00 72.56 7,763.92
m3 7.02 187.71 1,317.72
13,734.01
m3 20.44 450.78 9,213.94
kg 805.09 4.50 3,622.91
m2 17.55 51.12 897.16
93,032.45
m 100.00 62.40 6,240.00
m 350.00 55.11 19,288.50
m 400.00 52.00 20,800.00
m 625.28 44.88 28,062.57
und 14.00 17.20 240.80
m 77.00 174.34 13,424.18
m 30.00 165.88 4,976.40
256,790.40
und 1.00 125,931.30 125,931.30
GLB 1.00 4,289.52 4,289.52
und 1.00 443.76 443.76
und 2.00 380.31 760.62
und 1.00 125,365.20 125,365.20
37,427.08
GLB 1.00 380.77 380.77
GLB 1.00 942.21 942.21

GLB 1.00 35,489.56 35,489.56


GLB 1.00 614.54 614.54
2,993,689.88
2,279,356.02
m 1,812.82 1.58 2,864.26
m 1,812.82 1.58 2,864.26
984,409.58
m3 14,263.95 29.26 417,363.18
m3 73.89 29.26 2,162.02
m 18,012.82 2.05 36,926.28
m 8,845.07 5.31 46,967.32
m3 6,484.61 21.89 141,948.11
m3 9,133.59 17.07 155,910.38
m2 1,400.00 2.09 2,926.00
m3 9,203.59 19.58 180,206.29
738,694.66
m 15,199.82 37.41 568,625.27
m 1,013.00 49.03 49,667.39
m 1,800.00 66.89 120,402.00
550,523.26
m2 308.49 1.57 484.33
m 308.49 1.58 487.41
m3 678.52 370.57 251,439.16
m3 166.90 298.09 49,751.22

kg 6,603.26 4.50 29,714.67


m2 4,018.49 37.42 150,371.90

und 273.00 250.09 68,274.57


536,362.41
4,878.25
m 3,087.50 1.58 4,878.25
196,580.66
m 3,087.50 29.26 90,340.25
m 3,087.50 2.05 6,329.38
m 3,087.50 5.31 16,394.63
m3 1,368.00 21.89 29,945.52
m3 2,736.00 19.58 53,570.88
98,182.50
m 3,087.50 31.80 98,182.50
34,504.00
und 475.00 72.64 34,504.00
202,217.00
und 475.00 377.87 179,488.25
und 475.00 47.85 22,728.75
177,971.45
104,918.15
m 18,012.82 1.26 22,696.15
m2 1,400.00 58.73 82,222.00
734.18
299.39
m3 4.29 29.26 125.53
m 6.50 2.05 13.33
m 6.50 5.31 34.52
m3 1.30 17.07 22.19
m3 3.58 21.89 78.37
m3 1.30 19.58 25.45
434.79
m 6.50 66.89 434.79
GLB 2.00 317.85 635.70
und 2.00 352.15 704.30
GLB 2.00 35,489.56 70,979.12
4,315,101.55
8,104.32
11.05
m2 7.04 1.57 11.05
344.85
m3 6.18 29.26 180.83
m2 14.08 2.29 32.24
m3 7.72 17.07 131.78
376.90
m3 0.99 298.09 295.11
m2 1.60 51.12 81.79
3,662.12
m3 4.94 370.57 1,830.62
m2 24.11 51.12 1,232.50
kg 133.11 4.50 599.00
706.93
m2 12.60 24.64 310.46
m2 10.22 25.91 264.80
m2 12.60 10.45 131.67
714.78
und 2.00 201.09 402.18
und 2.00 156.30 312.60
557.49
m3 1.46 29.26 42.72
m 6.50 2.05 13.33
m 6.50 5.31 34.52
m3 0.29 21.89 6.35
m3 1.51 17.07 25.78
m 6.50 66.89 434.79
1,730.20
und 2.00 865.10 1,730.20
13,802.17
51.78
m2 16.13 2.52 40.65
m2 16.13 0.69 11.13
546.63
m3 9.73 29.26 284.70
m2 16.13 2.05 33.07
m3 22.35 10.24 228.86
412.87
m3 1.61 256.44 412.87
7,830.30
m3 9.48 377.12 3,575.10
kg 170.75 4.50 768.38
m2 62.01 56.23 3,486.82
2,073.33
m2 63.56 32.62 2,073.33
2,887.26
und 4.00 594.26 2,377.04
m2 2.00 255.11 510.22
429,056.59
285.90
m2 182.10 1.57 285.90
62,778.59
m3 1,092.58 4.75 5,189.76
m3 91.05 29.26 2,664.12
m3 198.54 21.89 4,346.04
m3 1,365.72 17.07 23,312.84
m2 229.27 2.29 525.03
m3 1,365.72 19.58 26,740.80
5,672.42
m2 182.10 31.15 5,672.42
287,154.58
m3 510.08 370.57 189,020.35
kg 13,636.13 4.50 61,362.59
m2 719.32 51.12 36,771.64
15,154.40
m3 5.49 370.57 2,034.43
kg 2,454.22 4.50 11,043.99
m2 40.61 51.12 2,075.98
7,356.88
m2 191.00 25.91 4,948.81
m2 97.73 24.64 2,408.07
23,881.78
m3 145.27 29.26 4,250.60
m 215.22 2.05 441.20
m 215.22 5.31 1,142.82
m3 116.22 21.89 2,544.06
m3 37.48 17.07 639.78
und 8.00 206.41 1,651.28
m 85.32 37.41 3,191.82
m 5.00 49.03 245.15
m 31.52 37.41 1,179.16
m 93.72 9.12 854.73
und 4.00 322.08 1,288.32
und 4.00 152.00 608.00
pza 4.00 25.14 100.56
und 4.00 122.36 489.44
und 4.00 121.93 487.72
m 26.40 148.20 3,912.48
und 2.00 201.09 402.18
und 4.00 113.12 452.48
26,772.04
und 2.00 13,282.77 26,565.54
m 10.00 2.77 27.70
und 6.00 29.80 178.80
199,776.12
483.53
m2 307.98 1.57 483.53
96,126.13
m3 1,094.09 29.26 32,013.07
m3 30.61 21.89 670.05
m3 1,367.61 17.07 23,345.10
m3 1,367.61 19.58 26,777.80
m3 79.56 85.32 6,788.06
m3 18.56 95.82 1,778.42
m3 49.61 95.82 4,753.63
14,158.97
m3 6.75 256.17 1,729.15
m3 16.88 274.83 4,639.13
m3 23.22 298.09 6,921.65
m2 17.00 51.12 869.04
55,941.02
m3 57.20 370.57 21,196.60
kg 2,470.39 4.50 11,116.76
m2 462.20 51.12 23,627.66
8,306.32
m2 248.29 25.91 6,433.19
m2 76.02 24.64 1,873.13
18,511.73
m 109.20 14.89 1,625.99
m 370.80 13.31 4,935.35
m 509.60 4.88 2,486.85
und 24.00 56.73 1,361.52
m2 374.92 21.61 8,102.02
6,248.42
m3 46.24 29.26 1,352.98
m 68.50 2.05 140.43
m 68.50 5.31 363.74
m3 36.99 21.89 809.71
m3 11.93 17.07 203.65
und 4.00 206.41 825.64
m 15.76 37.41 589.58
m 52.74 31.80 1,677.13
pza 4.00 71.39 285.56
1,038,881.57
9,198.16
m2 5,858.70 1.57 9,198.16
727,756.94
m3 5,980.86 29.26 174,999.96
m2 5,858.70 2.29 13,416.42
m3 7,715.31 17.07 131,700.34
m3 7,715.31 19.58 151,065.77
m3 292.93 97.32 28,507.95
m3 2,050.54 97.32 199,558.55
m3 292.93 97.32 28,507.95
131,043.61
m2 6,364.43 11.72 74,591.12
m2 6,364.43 8.87 56,452.49
170,882.86
m3 48.04 29.26 1,405.65
m 62.80 2.05 128.74
m 62.80 5.31 333.47
m3 35.32 21.89 773.15
m3 16.40 17.07 279.95
pza 8.00 28.39 227.12
und 8.00 377.14 3,017.12
m 31.40 9.12 286.37
m 54.60 2.77 151.24

und 8.00 58.85 470.80


m2 5,858.70 27.96 163,809.25
44,164.23
m 601.00 58.48 35,146.48
und 2.00 417.70 835.40
m3 171.00 47.85 8,182.35
920,222.01
5,510.93
m2 1,716.80 0.69 1,184.59
m2 1,716.80 2.52 4,326.34
110,781.24
m3 10,404.13 3.95 41,096.31
m3 257.52 4.75 1,223.22
m2 1,085.18 2.29 2,485.06
m3 7,466.65 0.69 5,151.99
m3 3,993.74 15.23 60,824.66
440,631.47
m3 3,393.94 28.59 97,032.74
m3 3,393.94 9.12 30,952.73
312,646.00
und 647.00 475.52 307,661.44
und 18.00 276.92 4,984.56
359,308.87
m3 257.52 315.86 81,340.27
m2 84.44 37.42 3,159.74

m3 238.67 370.57 88,443.94


m2 812.22 42.68 34,665.55
kg 33,710.97 4.50 151,699.37
3,989.50
m2 633.20 5.33 3,374.96
GLB 1.00 614.54 614.54
1,635,104.97
1,604,007.29
m2 1,960.91 2.52 4,941.49
m3 13,170.65 4.75 62,560.59
m3 4,347.76 0.69 2,999.95
m2 1,960.91 7.00 13,726.37
m3 2,592.88 339.54 880,386.48
m2 6,162.86 37.42 230,614.22

kg 86,055.41 3.75 322,707.79


m 500.55 3.06 1,531.68
m2 6,162.86 0.43 2,650.03
m 584.00 8.96 5,232.64
m 560.26 9.09 5,092.76
m3 735.34 97.32 71,563.29
31,097.68
m2 48.28 2.52 121.67
m3 24.14 4.75 114.67
m3 21.73 0.69 14.99
m2 40.66 7.00 284.62
m3 113.96 215.66 24,576.61
m2 96.56 37.42 3,613.28

m 0.37 3.06 1.13


m2 96.56 0.43 41.52
m 37.58 8.96 336.72
m 25.41 9.09 230.98
m3 18.10 97.32 1,761.49
25,989.57
241.72
m2 153.96 1.57 241.72
6,595.06
m3 169.36 12.80 2,167.81
m3 4.89 12.80 62.59
m 256.60 2.05 526.03
m 256.60 5.31 1,362.55
m3 123.17 14.64 1,803.21
m3 63.84 10.54 672.87
9,599.41
m 256.60 37.41 9,599.41
8,615.52
und 6.00 1,435.92 8,615.52
937.86
m 256.60 1.26 323.32
GLB 1.00 614.54 614.54
23,046.48
da 12.00 1,920.54 23,046.48
33,431.79
mes 7.00 4,775.97 33,431.79
11,439.62
GLB 1.00 11,439.62 11,439.62
108,204.32
80,303.19
72,238.78
und 1.00 32,698.08 32,698.08
und 3.00 3,329.87 9,989.62
und 1.00 4,671.68 4,671.68
und 1.00 24,879.41 24,879.41
1,041.80
m 231.51 4.50 1,041.80
1,159.12
und 1.00 539.56 539.56
und 1.00 619.56 619.56
5,863.50
und 4.00 651.50 2,606.00
und 1.00 1,303.00 1,303.00
und 1.00 1,954.50 1,954.50
24,220.88
266.57
km 0.23 771.12 177.36
km 0.23 387.87 89.21
2,429.41
m3 9.00 49.53 445.73
m3 1.80 84.96 152.92
m3 10.80 57.25 618.25
m3 3.60 54.00 194.40
m3 13.50 75.42 1,018.11
3,311.80
und 6.00 330.33 1,981.98
und 3.00 197.01 591.03
und 3.00 246.26 738.79
158.19
und 1.00 70.31 70.31
und 1.00 87.88 87.88
9,605.23
und 1.00 3,161.67 3,161.67
und 3.00 213.57 640.70
und 1.00 439.52 439.52
und 1.00 5,363.34 5,363.34
155.58
km 0.23 676.42 155.58
1,019.80
und 4.00 143.84 575.36
und 1.00 177.78 177.78
und 1.00 266.66 266.66
7,274.31
PRB 3.00 2,424.77 7,274.31
3,680.25
glb 1.00 3,680.25 3,680.25
COSTO DIRECTO S/. 9,862,444.57
Gastos Generales 6.44% 635037.20
Utilidad 5.934% 585254.42
Sub Total S/. 11,082,736.19
IGV 18.00% S/. 1,994,892.51
VALOR REFERENCIAL S/. 13,077,628.71
Supervisin y Liquidacin 3.24% 423820.00
Plan de Monitoreo Arqueolgico 79432.70
Reformulacion Expediente Tcnico 0.52% 67500
TOTAL : S/. 13,648,381.41

ocientos treinta y tres soles con 00 centimos]

- A PRECIOS DE MERCADO
CANTARILLADO EN EL C.P. HUARACLLA, DISTRITO DE JESUS -
CA ALTERNATIVA I
Und. PRECIOS PRIVADOS FC PRECIOS SOCIALES
glb 2,377,530.93 1,879,319.32
0.7 1,664,271.65 0.85 1,414,630.90

5% 118,876.55 0.909 108,058.78


0.25 594,382.73 0.60 356,629.64
glb 2,993,689.88 2,366,362.17
0.7 2,095,582.92 0.85 1,781,245.48

5% 149,684.49 0.909 136,063.21


0.25 748,422.47 0.60 449,053.48
glb 4,315,101.55 3,410,872.02
0.7 3,020,571.09 0.85 2,567,485.42

5% 215,755.08 0.909 196,121.37


0.25 1,078,775.39 0.60 647,265.23
glb 23,046.48 18,217.09
0.7 16,132.54 0.85 13,712.66

5% 1,152.32 0.909 1,047.46


0.25 5,761.62 0.60 3,456.97
glb 33,431.79 26,426.16
0.7 23,402.25 0.85 19,891.92

5% 1,671.59 0.909 1,519.47


0.25 8,357.95 0.60 5,014.77
glb 11,439.62 9,042.45
0.7 8,007.73 0.85 6,806.57

5% 571.98 0.909 519.93


0.25 2,859.91 0.60 1,715.94
glb 108,204.32 85,530.11
0.7 75,743.03 0.85 64,381.57

5% 5,410.22 0.909 4,917.89


0.25 27,051.08 0.60 16,230.65
0.25 2,859.91 0.60 1,715.94
9,754,240.250 7,795,769.31
glb 635,037.20 0.85 539,781.62
glb 585,254.42 0.85 497,466.25
glb 1,994,892.51 0.85 1,695,658.64
glb 67,500.00 0.909 61,357.50
glb 79,432.70 0.909 72,204.32
glb 423,820.00 0.909 385,252.38

S/. 13,540,177.08 S/. 11,047,490.03

12,969,424.38 10,528,675.83
570,752.70 518,814.20
13,540,177.08 11,047,490.03

MITIGACION GG UTI
1,964,849.43 25% 1,978,474.23 2,115,464.43 2,241,715.49
2,366,362.17 31% 2,382,771.16 2,547,755.02 2,699,805.21
3,410,872.02 44% 3,434,523.93 3,672,331.49 3,891,496.49

7,742,083.62 100% 7,795,769.31 8,335,550.94 4,941,520.70

MITIGACION GG UTI
2,485,735.25 25% 2,502,972.01 2,664,136.96 2,812,667.62
2,993,689.88 31% 3,014,448.93 3,208,547.59 3,387,430.17
4,315,101.55 44% 4,345,023.63 4,624,797.23 4,882,638.40
9,794,526.68 100% 9,862,444.57 10,497,481.78 11,082,736.19

OS Y SOCIALES
PRIVADOS SOCIALES
3,463,798.09 2,803,722.56
4,171,617.74 3,376,657.21 8,243,767.47
6,012,965.57 4,867,110.26
13,648,381.41 11,047,490.03
INC IGV
2,805,486.50 127,681.10
12,784.31
583.11
4,559.52
7,641.68
43,096.14
6,155.60
13,595.13
3,099.65
3,438.23
11,477.77

5,329.77
186,310.74
3,916.94
1,195.88
2,721.06
50,314.27
33,467.33
299.72
16,547.22
78,072.89
21,242.70
56,614.04
216.15
4,080.61
0.30
0.67
6.22
4.64
0.97
1,526.07
1,270.87
1,270.87
49,926.04
84.96
48,969.24
871.83
20,375.50
80.00
24.43
55.58
1,028.43
557.61
81.07
389.75
1,102.71
1,102.71
6,537.54
488.60
4,787.28
1,261.66
3,569.91
3,569.91
552.75
552.75
3,025.47
1,683.75
492.89
557.97
290.86
4,478.68
1,503.65
633.03
792.03
78.59
573.72
459.39
114.33
2,401.31
934.80
62.16
1,270.87
133.48
133.48
235,261.96
157.31
48.03
109.28
1,748.74
133.62
36.60
123.19
1,446.05
9.26
4,922.28
2,168.30
2,753.98
67,567.39
16,947.33
2,490.78

580.95
1,134.70

775.13
3,626.46

1,073.76
1,845.12
707.58
6,615.98

3,169.20
3,446.78
1,385.00

1,041.70
343.30
2,829.11
613.01
428.41

1,254.08

533.61
50,620.06
20,692.80
10,734.15
9,958.65
22,700.27

6,001.85
7,780.48
8,917.94
2,601.79
749.23
1,227.03
625.53
4,625.20

1,354.23
1,455.90

1,815.08
1,210.75

890.33
320.42
9,003.68
4,145.51
4,858.18
3,135.64

2,072.41
87.59
759.50

116.60
49.77
49.77
147,516.18
2,060.39

295.61

285.12

45.54
2,267.83
934.80
62.16
1,270.87
3,569.91
3,569.91
2,763.74
2,763.74
136,228.04
3,251.58
492.89
1,229.28
131,254.29
1,281,267.51
31,407.62
31,407.62
834,604.48
581,637.43
40,750.40
22,224.69
156,648.54
11,449.92
21,893.50
159,595.91
2,758.98
4,825.43
17,004.34
36,009.59
14,875.42
4,311.06
51,385.19
28,425.89
7,418.57
183.04
970.99
113.16
155.85
564.98
667.17
159.77
161.99
67.83
125.17
24.26
278.55
136.50
70.87
1,718.78
904.88
505.91
223.93
33.30
34.11
41.67
89.70
44.85
94.19
47.09
248,240.93
620.72
303.70
317.02
3,744.12
1,912.10
1,394.48
437.54
243,876.10
9,688.63
347.06
116,920.21
116,920.21
379,418.06
8,855.90
8,855.90
241,809.71
164,002.30
11,490.25
15,974.25
44,169.64
6,173.26
98,194.00
98,194.00
30,558.46
30,558.46
646,972.29
2,547.33
2,547.33
171,263.91
31,333.07
26,209.17
270.22
102,735.12
9,161.43
1,554.91
16,206.13
10,872.45
4,275.03
1,058.65
109,778.29
7,363.20
22,760.43
24,544.00
33,113.83
284.14
15,840.53
5,872.15
303,012.67
148,598.93
5,061.63
523.64
897.53
147,930.94
44,163.95
449.31

1,111.81
41,877.68
725.16
3,532,554.06
2,689,640.10
3,379.83
3,379.83
1,161,603.30
492,488.55
2,551.18
43,573.01
55,421.44
167,498.77
183,974.25
3,452.68
212,643.42
871,659.70
670,977.82
58,607.52
142,074.36
649,617.45
571.51
575.14
296,698.21

58,706.44
35,063.31

177,438.84
80,563.99
632,907.64
5,756.34
5,756.34
231,965.18
106,601.50
7,468.67
19,345.66
35,335.71
63,213.64
115,855.35
115,855.35
40,714.72
40,714.72
238,616.06
211,796.14
26,819.93
210,006.31
123,803.42
26,781.46
97,021.96
866.33
353.28
148.13
15.73
40.73
26.18
92.48
30.03
513.05
513.05
750.13
831.07
83,755.36
5,091,819.83
9,563.10
13.04
13.04
406.92
213.38
38.04
155.50
444.74
348.23
96.51
4,321.30
2,160.13
1,454.35
706.82
834.18
366.34
312.46
155.37
843.44
474.57
368.87
657.84
50.41
15.73
40.73
7.49
30.42
513.05
2,041.64
2,041.64
16,286.56
61.10
47.97
13.13
645.02
335.95
39.02
270.05
487.19
487.19
9,239.75
4,218.62
906.69
4,114.45
2,446.53
2,446.53
3,406.97
2,804.91
602.06
506,286.78
337.36
337.36
74,078.74
6,123.92
3,143.66
5,128.33
27,509.15
619.54
31,554.14
6,693.46
6,693.46
338,842.40
223,044.01
72,407.86
43,390.54
17,882.19
2,400.63
13,031.91
2,449.66
8,681.12
5,839.60
2,841.52
28,180.50
5,015.71
520.62
1,348.53
3,001.99
754.94
1,948.51
3,766.35
289.28
1,391.41
1,008.58
1,520.22
717.44
118.66
577.54
575.51
4,616.73
474.57
533.93
31,591.01
31,347.34
32.69
210.98
235,735.82
570.57
570.57
113,428.83
37,775.42
790.66
27,547.22
31,597.80
8,009.91
2,098.54
5,609.28
16,707.58
2,040.40
5,474.17
8,167.55
1,025.47
66,010.40
25,011.99
13,117.78
27,880.64
9,801.46
7,591.16
2,210.29
21,843.84
1,918.67
5,823.71
2,934.48
1,606.59
9,560.38
7,373.14
1,596.52
165.71
429.21
955.46
240.31
974.26
695.70
1,979.01
336.96
1,225,880.25
10,853.83
10,853.83
858,753.19
206,499.95
15,831.38
155,406.40
178,257.61
33,639.38
235,479.09
33,639.38
154,631.46
88,017.52
66,613.94
201,641.77
1,658.67
151.91
393.49
912.32
330.34
268.00
3,560.20
337.92

178.46
555.54
193,294.92
52,113.79
41,472.85
985.77
9,655.17
1,085,861.97
6,502.90
1,397.82
5,105.08
130,721.86
48,493.65
1,443.40
2,932.37
6,079.35
71,773.10
519,945.13
114,498.63
36,524.22
368,922.28
363,040.50
5,881.78
423,984.47
95,981.52

3,728.49
104,363.85
40,905.35
179,005.26
4,707.61
3,982.45
725.16
1,929,423.86
1,892,728.60
5,830.96
73,821.50
3,539.94
16,197.12
1,038,856.05

272,124.78
380,795.19
1,807.38
3,127.04
6,174.52
6,009.46
84,444.68
36,695.26
143.57
135.31
17.69
335.85
29,000.40

4,263.67
1.33
48.99
397.33
272.56
2,078.56
30,667.69
285.23
285.23
7,782.17
2,558.02
73.86
620.72
1,607.81
2,127.79
793.99
11,327.30
11,327.30
10,166.31
10,166.31
1,106.67
381.52
725.16
27,194.85
27,194.85
39,449.51
39,449.51
13,498.75
13,498.75
127,681.10
94,757.76
85,241.76
38,583.73
11,787.75
5,512.58
29,357.70
1,229.32
1,229.32
1,367.76
636.68
731.08
6,918.93
3,075.08
1,537.54
2,306.31
28,580.64
314.55
209.28
105.27
2,866.71
525.96
180.45
729.54
229.39
1,201.37
3,907.92
2,338.74
697.41
871.77
186.66
82.96
103.70
11,334.17
3,730.77
756.03
518.63
6,328.74
183.58
183.58
1,203.36
678.92
209.78
314.66
8,583.69
8,583.69
4,342.70
4,342.70
11,637,684.60 11,637,684.60
749,343.90
690,600.21
13,077,628.71
13,077,628.71
IGV
2,672,053.64
3,218,082.03
4,638,540.16

5,890,135.67

IGV
3,318,947.79
3,997,167.60
5,761,513.31
13,077,628.71
01 SISTEMA DE AGUA POTABLE

IMPULSION INC. POZO TUBULAR


CONDUCCIN
RESERVORIO 25
RESERVORIO 100

DISTRIBUCIN 1
CONEXIN DOMIC

SISTEMA DE ALCANTARILLADO
CONEXIONES DOM
REDES COLECTORAS
BUZONES

PTAR
EMISOR
PTAR
TANQUE IMHOFF

PTAR

CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO


CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
MITIGACIN AMBIENTAL

SISTEMA DE UTILIZACIN TENSIN 3, 22.9KV PARA SISTEMA DE BOMBEO DE AGUA


CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO
CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
MITIGACIN AMBIENTAL

CAPACITACIN EN ADMINISTRACION OPERACION Y MANTENIMIENTO


CAPACITACIN EN A+O+M + EDUCACION SANITARIA (EDUSA)
MITIGACIN AMBIENTAL
EXPED

EXPED
2,933,167.60
CD OTROS SUB TOTAL CD GG
11,637,684.60
11,637,684.60 749,343.90
0.00
2,749,606.05 55,880.45 2,805,486.50 180,643.68

646,972.29 13148.46534203 660,120.75 42,504.80


186,310.74 3786.40691416 190,097.15 12,240.25
20,375.50 414.0927143879 20,789.59 1,338.63
235,261.96 4781.246040852 240,043.20 15,456.25

1,281,267.51 26039.2936509283 1,307,306.80 84,176.74


379,418.06 7710.941137646 387,129.00 24,927.02

3,322,547.75 210,006.31 3,532,554.06 227,459.15


632,907.64 40003.81923244 672,911.46 43,328.39
2,040,022.66 128942.5058966 2,168,965.16 139,658.43
649,617.45 41059.98587092 690,677.43 44,472.33

2,024,420.20 3,067,399.63 5,091,819.83 327,859.39


30,667.69 46467.65963458 77,135.35 4,966.70
1,487,465.73 2253806.710299 3,741,272.44 240,898.41
506,286.78 767125.2578666 1,273,412.03 81,994.28

0.00 71,193.66 0.00 0.00

27,194.85 27,194.85 1,751.06


39,449.51 39,449.51 2,540.13
13,498.75 13,498.75 869.18

127,681.10 0 127,681.10 8,221.31


AGUA
6,555.84 6,555.84 422.13
9,510.06 9,510.06 612.35
3,254.13 3,254.13 209.53

SANEAMIENTO
20,639.01 20,639.01 1,328.93
29,939.45 29,939.45 1,927.78
10,244.62 10,244.62 659.65
100.00

PLAN M ARQ SUP + LIQ TOTAL


2,705,950.05 2,803,722.56 2,803,722.56
3,258,905.10 3,376,657.21 3,376,657.21
4,697,382.50 4,867,110.26 4,867,110.26

5,964,855.15 6,180,379.77 11,047,490.03

PLAN M ARQ SUP + LIQ TOTAL


3,356,237.58 3,463,798.09 3,463,798.09
4,042,077.47 4,171,617.74 4,171,617.74
5,826,246.36 6,012,965.57 6,012,965.57
13,224,561.41 13,648,381.41 13,648,381.41
UTIL TOTAL

690,600.21 13,077,628.71

166,482.39 3,152,612.57

39,172.70 741,798.25
11,280.69 213,618.09
1,233.69 23,361.91
14,244.58 269,744.03

77,577.83 1,469,061.37
22,972.90 435,028.92

209,627.83 3,969,641.04
39,931.72 756,171.57
128,710.12 2,437,333.72
40,985.99 776,135.75

302,157.34 5,721,836.56
4,577.34 86,679.40
222,013.54 4,204,184.39
75,566.46 1,430,972.77

0.00 0.00

1,613.79 30,559.70
2,341.00 44,330.65
801.04 15,168.97

7,576.82 143,479.23
389.03 21,710.52
564.34
193.11

1,224.75 68,348.79
1,776.66
607.93
ET PAMA SUP Y LIQ TOTAL DE PTO
13,648,381.41
67,500.00 79,432.70 423,820.00 13,648,381.41
13,648,381.41
16,272.17 19,148.77 102,169.92 3,290,203.43

3,828.78 4,505.64 24,040.21 774,172.88


1,102.59 1,297.50 6,922.94 222,941.12
120.58 141.90 757.11 24,381.50
1,392.28 1,638.41 8,741.87 281,516.58

7,582.54 8,922.99 47,609.36 1,533,176.27


2,245.40 2,642.34 14,098.42 454,015.08

20,489.25 24,111.35 128,648.19 4,142,889.83


3,902.97 4,592.94 24,506.02 789,173.50
12,580.26 14,804.21 78,989.15 2,543,707.35
4,006.01 4,714.20 25,153.02 810,008.98

29,533.18 34,754.08 185,433.37 5,971,557.19


447.39 526.49 2,809.11 90,462.39
21,699.84 25,535.95 136,249.27 4,387,669.46
7,385.95 8,691.64 46,374.99 1,493,425.34

0.00 0.00 0.00 0.00

157.73 185.62 990.38 31,893.43


228.81 269.26 1,436.67 46,265.39
78.29 92.14 491.60 15,830.99

740.57 871.48 4,649.88 149,741.16


13,554,391.60
13,648,381.41

22815.1580634 3,313,018.59

28727.9155628 4,171,617.74

41408.3882908 6,012,965.57

0 0.00

1038.34559183 150,779.51
93,989.81

You might also like