Coursework includes: -
Circuits Analysis
Electronic Analysis and Design
Microprocessor Systems
Digital Signal Processing
Power Electronics
Communication Systems
Data Communications and Network Architecture
Computer Architecture
Process Control and Instrumentations
Languages
English - fluent (spoken and written)
Malay - fluent (spoken and written)
Deutsche – beginner
Spanish - beginner
Technical Experiences
Working Experiences
Internship Trainee
On Job Trainings:
Achievements
Setup material floor stock for assemblers and technicians in the manufacturing
plant floor.
Re-layout and reduced the space and time constraints for product Mechanical
Press AMS-i.
Achieved sales target of USD 14.5 million dollars for Singulation MISS 2 in first
and second quarters of the year 2007.
Setup re-layout for assembly for to minimize working space and save about RM
1.2million
Setup new process flow of in-cell working area for module assembly, integration,
debug and application purposes.
Activities
1. JOB SUMMARY
2. MAIN RESPONSIBILITIES
Expected to carry out planning and analysis, design and programming, implementation and
after sales support/service for the following applications:
A) DCS/PLC Design
DCS/PLC design scope involves hardware and software for small project and assist senior engineer to
implement complex project. Small projects generally refer to IO less than 200 IOs for an add-on or a
small
system expansion. The design work is summarized as follows:-
i. Hardware sizing inclusive of power supplies, controllers, input & output (IO) devices,
communication devices, etc base on process area.
ii. Open-loop control strategy (start-up or shutdown of major components in the plant
such as pumps, conveyors, fans, feeders, circuit breakers, valves, etc.)
iii. Closed-loop control strategy (feedback control of process via control valves such as
drum level, turbine speed, boiler drum pressure, HP/LP steam temperature and etc.). These
include single-element
feedback control, dual-element cascade control, feed-forward control and etc.
iv. Protection or interlock scheme for equipment and process including fail-safe
consideration such as
Boiler protection and Turbine protection.
v. Interface to foreign devices such as OPC, modbus, etc.
Major Tool used: Composer, WinTool, PDAG, EDS20/EDS-P3, ADVANT-FCB and Control
Builder
Major HSI Systems used: Conductor, OS500 series, POS30, 800xA HMI (Industrial IT HMI
inclusive all the process portals) and PGP
C) Field Instrumentation
Liaise with customer or end-user to gather detail information on the plant instrumentation.
vii. The instrument data shall be analyzed and transform to useable HSI interfacing
database inclusive of tagname(KKS), description, measuring signal type, ranges, units, alarm
limits, etc.
D) Hardware Planning
Generation of all erection documents. These include:-
Erection drawings for control panel in DCS equipment room.
Erection drawings for control room layout, hard panels.
x. Detail design drawings for electrical distribution to DCS system with proper
calculated power rating.
Detail design drawings of C-Net and O-Net network routes.
xii. Detail design drawings of signals and power cables from field instruments to DCS
terminals. (cable list, connection diagram and signal flow list)
Detail design drawings for junction box, mounting, location, etc.
To derive information from plant P&ID for the above.
4. PROJECTS EXECUTED
TNB Paka Exhaust Temperature Monitoring (Procontrol P14 and POS30) – June 2008
TNB Kenyir Turbine Vibration Monitoring (Bailey INFI90 and Conductor NT - July 2008
Powertek Pahlawan MPS3 Upgrade (INFI90) - August 2008
TNB Pasir Gudang EAbus Upgrade (Procontrol P14 and POS30) - September 2008 – December
2009
KEV Kapar PGP Upgrade (Bailey INFI90 and Industrial IT PGP) - December 2008 – March 2009
PLN Tarahan DCS Simulator (INFO 90 and Traxx Simulator) - April 2009
KEV Kapar CVMS Upgrade - (Conductor CVMS) – May 2009
KEV Kapar Conductor NT Upgrade – (Conductor NT) – July 2009
Pergau GPMS via OPC Server – (Industrial IT PGP) – August 2009
Pergau Turbine Governor Upgrade – ( From Advant Masterpiece90 to 800xA) – ongoing.
University level
School level
Member of the School Editorial Board
Member of the English Language Society
Projects
University level
Expected Salary
References
Jack Vanderhorst
Regional Manager
Technical Sales Support
Jack.vanderhorst@sg.abb.com