You are on page 1of 14

L&T Infrastructure Engineering Ltd.

L&T Infra Engineering (Formerly known as LacT-Rambell Consulting Engineers Limited)


4th & 5th Floor, Triton Square (SKCL Building)

C3-C7, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai 600 032. India


Tel: +91-44-22509999 Fax: +91-44-22509600 E-mail: lntielchn@Intiel.com

DRAWING / DOCUMENT TRANSMITTAL


LNTIEL-C1162703-184-T-PML

April 10, 2017

To:
Kind Attn: Mr. Ranjeet Kalapure , General Manager Project
Subject: Hard copy submission of Pipe Culverts.

Dear Sir,

Sl. Drawing / Rev.*Description


No. Document No.
1 DDG477 B
89510
2 DDG478 B
90048
3 DDG484
91197
4 DDG486 B General Arrangement of Pipe Culvert at Ch-
91503
5 DDG488
91933
6 DDG489 B General
92215
7 DDG490
92278
8 DDG491
92518
9 DDG499
93550
to. DDG500
93586
11 DDG5o2
94041
12 DDG505
94554
13 DDG508
95212
14 DDG512
95799

" This revision supersedes the previous revision of drawings and documents, if any. Superseded drawings and documents shall be removed from
all points of issue and use.
Status codes: I 1 Preliminary 12 For Approval 13 Good for Construction I 4 As-Built

Thanking you and assuring you of our best services at all times,
Yours faithfully,

for L&T Infrastructure Engineering Ltd.

Murali P /kc 110


Project Consultant
1: \roads \ 2016 \cit62703 - dd arawali - kante \correspondences \outgoing\ transmittal \184b-t-pml- submiss
hard copy for comments on pipe culvert. Page 1

L&T Infrastructure Engineering Ltd.


L&T Infra Engineering (Formerly known as UT -H.imboll Consulting Engineers Limited)

zith & 5th Floor, Triton Square (SKCL Building)


C3-C7, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai 600 032. India
Tel: +91-44-22509999 Fax: +9u-44-22509600 E-mail: Intielchn@lntiel.com

DRAWING / DOCUMENT TRANSMITTAL

LNTIEL-C1u627o3-176-T-SVD
April 01, 2017

To: MEP SANJOSE ARAWALI KANTE ROAD PVT. LTD


Kind Attn: Mr. Raja Mulcherjee, DY GTO Civil

Subject: Arawali Ka nte Hard Copy Submission of Pavement Design & Material Investigation Report for
Main Carriageway & Service Road

Reference: Work Order MSAKPL/OUT/2o16-17/593c dated 11-07-2016


Dear Sir,

We are herewith submitting the hard copies of Pavement Design Report for Main Carriageway & Service Road.

SI. Drawing / Rev.*Description


No. Document No.
1 RPolo PA Pavement Design & Material

Investigation 'Report

" This revision supersedes the previous revision of drawings and documents, if any Superseded drawings and documents shall be removed from
all points of issue and use

Status codes: I t Preliminary I 2 For Approval I 3 Good for Construction 14 As-Built

Thanking you and assuring you of our best services at all times,
Yours faithfully,
for L&T Infrastructure Engineering Ltd.

c34-11,0 t
Vasudeva S
Associate Project Consultant

\ roads \ 2016 \c1162703 - dd arawali - kante \correspondences \ outgoing \176-t-svd-hard copy submission of
pavement design & material investigation report for mcw & sr.docxPage

L&T Infrastructure Engineering Ltd.


L&T Infra Engineering (Formerly known as L&T-Rambuli Consulting Engineers Limited)
h& 5th Floor, Triton Square (SKCL Building)t
C3-C7, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai 600 032. India
Tel: +91-44-22509999 Fax: +91-44-22509600 E-mail: lntielchn@lntiel.com
DRAWING / DOCUMENT TRANSMITTAL
LNTIEL-C11627o3-177-T-PML
April 01, 2017

To:
Kind Attn: Mr. Ranjeet Kalapure , General Manager Project
Subject:
Reference: Work Order :MSAKPL/OUT/2o16-17/593C dated 11-
Dear Sir,

Si. Drawing / Rev.*


No. Document No.
1 DDI 141

2 DDI 142
wall
3 DDI 143 A Details for PCC wall
4 DDI 144
5
DDI 337 A
structure
6 DDI 634

7- DDI 635

8 DN 051

" This revision supersedes the previous revision of drawings and documents, if any. Superseded drawings and documents shall be removed from
all points of issue and use.

Status codes: I 1 Preliminary I 2 For Approval I 3 Good for Construction I 4 As-Built

Thanking you and assuring you of our best services at all times,

Yours faithfully,

for L&T Infrastructure Engineering Ltd.


\''
Murali P

Project Consultant

\ roads \ 216 \ c11627o3 - dd arawali - lcante \correspondences \ outgoing \ transmittal \177b-t-pml- submission of
hard copy for miscellaneous drawings -structures.docx Page 1

L&T Infrastructure Engineering Ltd.


L&T Infra Engineering (Formerly known as LIkT-Eambeli Consulting Engineers Limited)

e 4th & 5th Floor, Triton Square (SKCL Building)


C3-C7, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai 600 032. India
Tel: +91-44-22509999 Fax: +91-44-22509600 E-mail: lntielchn@lntiel.com

DRAWING / DOCUMENT TRANSMITTAL


LNTIEL-C1162703-174-T-SVD
March 31, 2017

To: MEP SANJOSE ARAWALI KANTE ROAD PVT. LTD


Kind Attn: Mr. Raja Mukherjee, DY CTO Civil

Subject: Arawali Kante Hard Copy Submission of Service Roads Plan & Profile, Intersections &
Miscellaneous Drawings

Reference: Work Order MSAKPL/OUT/2016-17/593c dated 11-07-2016


Dear Sir,

We are herewith submitting the hard copies of Service Roads Plan & PMiscellaneous
Drawings

SI. Drawing / Rev.*


No. Document No.

1 DDPiot A

2 DDI31.02 A

DDP103 &
3 A
DDPloaa

4 DDP104 A

5- DDP105 A

6 DDP1o6 A
7 DDP1o7 A

DDP108 &
8 A
DDP108a

9 DDP109 A

to. DDP151 A

11 DDP152 A

DDP153 &
12 A
DDP153a

13 DDP154 A

14 DDP155 A

1: \roads \ 2016 \ci162703 - dd arawali - kante \ correspondences \outgoing \174-t-svd-hard copy submission of sr
p&p intersections mist dwg.docx Page 1
svd

To: MEP SANJOSE ARAWALI KANTE ROAD PVT. LTD


L&T Infra Engineering LNTIEL-C1162703-174-T-SVD
March 31, 2017

SI. Drawing /
No. Docu m

15 DDP156

16 DDP1

DDP158 &
17
DD121,58a

18 DDP1 59

19 DDMoot

20 DDMoo2
21 DDMoo3

22 DDM004
23 DDMoo5
24 DDMoo6
DDM007 &
25
DDMoo7a
DDMoo8a,
26
DDMoo8b &
DDMoo8c
DDMoo9 &
27
DDMoo9a

This revision supersedes the previous revision of drawings and documents, if any. Superseded drawings and documents shall be removed from
all points of issue and use.

Status codes: I I Preliminary I 2 For Approval I 3 Good for Construction I 4 As-Built

Thanking you and assuring you of our best services at all times,
Yours faithfully,

for L&T infrastructure Engineering Ltd.

3\\O A T

Vasudeva S
Associate Project Consultant

1: \ roads \ 2016 \c1162703 - dd arawali - kante \correspondences \outgoing \174-t-svd-hard copy submission of sr

p&p intersections misc dwg.docx Page 2


svd

L&T Infrastructure Engineering Ltd.


L&T Infra Engineering (Formerly known as L&T-Rambell Consulting Engineers Limited)
4th & 5th Floor, Triton Square (SKCL Building)
C3-C7, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai 600 032. India
Tel: +91-44-22509999 Fax: +91-44-22509600 E-mail: lntielchn@lntiel.com

DRAWING / DOCUMENT TRANSMITTAL


LNTIEL-C1162703-173-T-BSR
March 3o, 2017

To: MEP SANJOSE ARAWALI KANTE ROAD PVT LTD, Mumbai


Kind Attn: Mr. Ranjeet Kalapure , General Manager Project
Subject: Arawali-Kante - Hard copy submission of Soil investigation reports.

Reference: Work Order :MSAKPL/OUT/2o16-17/593C dated 11-07-2016


Dear Sir,
We are herewith submitting the below listed hard copies of Soil investigation reports.

Sl.
Description
No.
1 Soil report for MJB @ 77+869
2 Soil report for MJB @ 96+741
Soil report for VUPs @ 78+208, MNBs @ 89+800, MNB @
3 100+046 & VUPs @ 110+524
4 Soil report for MNBs @ 90+590, 92+396, 102+923, 108+027
Soil report for MNB @ 105+728, MNB @
5 105+783 & LVUP @ 111+288
6 Soil report for LVUP @ 93+983, VUP @ 95+610, LVUP @ 104+5

Thanking you and assuring you of our best services at all times,
Yours faithfully,

for L&T Infrastructure Engineering Ltd.

Bandaru Subbarao

Senior Engineering Consultant

mAroads \ 2016 \c1162703 - dd arawali - kante \correspondences \outgoing \173-t-bsr- submission of hard copy for
soil investigation report.docx Page 1
MEP SANJOSE ARAWALI KANTE ROAD PVT LTD, Mumbai
Kalapure , General Manager Project

Reference: Work Order :MSAKPL/OUT/2016-17/593C dated 11-07-2016

The hard copy Drawing for Culverts is attached herewith for your Approval.
Copies Status Remarks
code
General Arrangement of Pipe Culvert at 4 2 Hard Copy

General Arrangement of Pipe Culvert at 4 2 Hard Copy

B General Arrangement of Pipe Culvert a 4 2 Hard Copy

of Pipe Culvert at Ch- 4 2 Hard Copy

B General Arrangement of Pipe Culvert a 4 2 Hard Copy

Arrangement of Pipe Culvert at Ch- 4 2 Hard Copy .

B General Arrangement of Pipe Culvert a 4 2 Hard Copy

B Ge neral Arrangement of Pipe Culvert 4 2 Hard Copy

B General Arrangement of Pipe Culvert a 4 2 Hard Copy

B General Arrangement of Pipe Culvert a 4 2 Hard Copy

B GeneralArrangement of Pipe Culvert a 4 2 Hard Copy

B General Arrangement of Pipe Culvert a 4 2 Hard Copy

B General Arrangement of Pipe Culvert 4 2 Hard Copy

B General Arrangement of Pipe Culvert a 4 2 Hard Copy


utgoing\ transmittal \184b-t-pml- submission of

Material Investigation Report for

CopiesStatus Remarks
code
5 2
MEP SANJOSE ARAWALI KANTE ROAD PVT LTD, Mumbai
Kalapure , General Manager Project
Hard copy submission of Design Document & Miscellaneous Drawings.
MSAKPL/OUT/2o16-17/593C dated 11-07-2016

The hard copy of Design Document & Miscellaneous Drawings is attached herewith for your Approval.
Description Copies Status Remarks
code
A Details of Crash barrier, Anchor Beam, 2 Hard Copy
Terminal Slab, Expansion Joint & Deck D 4
A Numeration & RC details of RCC Retaining 2 Hard Copy
4
4 2 Hard Copy
A Numeration & RC details of RCC Retu 4 2 Hard Copy
Detail of Curtain wall, Kerb, Toe wall &
Connection between Existing and New 4 2 Hard Copy

A Numeration & RC details of Collection 4 2 Hard Copy


Chamber for Pipe Culverts (Sheet 1 of 2)
A Numeration & RC details of Collection 4 2 Hard Copy
Chamber for Pipe Culverts (Sheet 2 of 2)
A Design of Retaining wall & PCC wall 4 2 Hard Copy
Profile, Intersections &

Description Copies Status Remarks


code
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 77.992 Km 78.434
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 93.710-Km 94.150
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 95.400-Km 95.900
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 96.350-Km 96.68o
LEFT SERVICE ROAD PLAN & PROFILE FROM
2
Km 96.800-Km 97.200
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 104-539-Km 104.820
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 105.786-Km 106.050
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 110.300 - Km 111.115
LEFT SERVICE ROAD PLAN & PROFILE FROM
5 2
Km 111.281-KM 111.650
RIGHT SERVICE ROAD PLAN & PROFILE
5 2
FROM Km 77.975-Km 78.418
RIGHT SERVICE ROAD PLAN & PROFILE
5 2
FROM Km 93.745-Km 94.185
RIGHT SERVICE ROAD PLAN & PROFILE
5 2
FROM Km 95.400-Km 95.900
RIGHT SERVICE ROAD PLAN & PROFILE
5 2
FROM Km 96.350-Km 96.68o
RIGHT SERVICE ROAD PLAN & PROFILE
5 2
FROM Km 96.800-Km 97.200

Rev.*Description Copies Status Remarks


ent No. ' code
RIGHT SERVICE ROAD PLAN & PROFILE
A 5 2
FROM Km 104.539-Km 10482o
RIGHT SERVICE ROAD PLAN & PROFILE
57 A 5 2
FROM Km 105.786-Km 106.05o
RIGHT SERVICE ROAD PLAN & PROFILE
A 5 2
FROM Km 110.300-KM 111.112
RIGHT SERVICE ROAD PLAN & PROFILE
A 5 2
FROM Km 111.280-Km 111.651
DETAILS OF CURVES AND
A 5 3
SUPERELEVATION
A SPEED BREAKER & CRASH BA 5 2
TYPICAL DETAILS OF PEDESTRIAN GUARD
A 5 2
RAIL AT BUSBAY LOCATION
A TYPICAL DETAILS OF RUMBLE 5 2
A PAVEMENT LAYER EXTENSION 5 2
A TYPICAL DETAILS OF KERB 5 2

A METAL BEAM CRASH BARRIE 5 2

A TYPICAL LAYOUT OF BUSBAY 5 2

A DETAILS OF BUS SHELTER 5 2


Copies Remarks

('' 5 Hard Copy


5 Hard Copy
8+208, MNBs @ 89+800, MNB @
--- 5 Hard Copy
90+590, 92+396, 102+923, 108+027 / 5 Hard Copy
y LVUP @
5 Hard Copy
93+983, VUP @ 95+610, LVUP @ 104+537 5 Hard Copy