You are on page 1of 3

Ref.

#
MEP/1403/5VWF1/16/00001
SUBCONTRACT
AGREEMENT

This Contract is made on


11/15/2016 between the
following parties :-
MEP Infrastructure
Developers Limited (which is
referred to hereinafter as the
"First Party") A 412,
Boomerang Chandivali Farm
Road, Near Chandivali
Studio Andheri East Mumbai,
400072, India & Samarth
Softech Solutions Pvt. Ltd.
(which is referred to
hereinafter as the "Second
Party") 507,Pujit Plaza Plot
no. 67, Sector-11, Palm Beach
Road, CBD Belapur Navi
Mumbai,
400614,Maharashtra, India.
Preamble
The First Party is executing
which require a specialized
contractor who is having the
required trained tradesmen to
carry out and the Second
Party agreed to provide the
necessary services under
construction activities as per
the terms and conditions of
this contract.

Therefore, the parties have


agreed as follows:-
1) Project Arawali to Kante
2) Main Contractor MEP Infrastructu
3) Subcontractor Samarth Softech
4) Scope of Work Topographical S
5) Bill of Quantities As per Annexure
6) Subcontract Value 300,000.00 (INR
7) Payment Terms

Samarth Softech Solutions Pvt.


Ltd.

16/12/2016 03:47:53 PM
Carried Forward to Next Page 1/3
GENERAL CONDITIONS
1) All the works to be
carried out to the entire
satisfaction of the
Client and Consultants
and as per the
drawings, specifications
and the BOO
2) Any Variation shall be
admissible only if any
corresponding variation
order issued under the
Main Contract to the
First Party subject to
approval from the
Client / Consultant.
3) Unit rates are fixed for the
duration of the Contract
and no escalation in costs
will be paid for any
additional / Variation
works
4) In connection with the
above job / assignment
the terms of this
Agreement will prevail
over the contrary
terms found elsewhere
in the documents
forming part of the
contract. Further all
previous
arrangements,
undertakings verbal or
in writing concluded or
otherwise in connection
with the above job /
assignment which do
not form a part of this
Contract are treated as
cancelled.

5) The

order shall

be read in

conjunctio
n with

terms and

conditions

as per

Annexure

B attached

herewith.

Please sign

a copy of

the same

as your

acceptance

For MEP Infrastructure


Developers Limited
by

You might also like