SATC MEH CONTENT

No. procedure
SAIC-A-2001 Review Procedure - Pressure Testing (All Applications)
Review of Test Package Preparation
SAIC-A-2003
(Content, Format & Database)
Verify Pneumatic Test Medium (Air, Nitrogen & Inert
SAIC-A-2004
Gas) & Bubble Solution (for Leak Testing)
SAIC-A-2005 Review of Leak Test Procedure (Bubble Test)
SAIC-A-2006 Review Procedure - Post Test Reinstatement & Checklist
SAIC-A-2007 Review Procedure - Lay-up of Piping Systems or Vessels
SAIC-A-2008 Verify Test Medium for Hydrostatic Testing & Lay-up
SAIC-A-2009 Verify Test Equipment (Safety Assessment)
SAIC-A-2010 Pre-Test Punch Listing of On-Plot Piping
SAIC-A-2011 Inspection of Pressure Test Preparation
SAIC-A-2012
SAIC-A-2013 Inspection of Filling & Pressurization (Hydrotest)
SAIC-A-2014
SAIC-A-2015 Visual Inspection at Test Pressure
SAIC-A-2016 Visual Insp of Air Test on Repads & Weld-Plus-Ends Cplgs
SAIC-A-2017 Depressurization & Disposal of Hydrotest Water
SAIC-A-2018 LAY-UP OF PIPING SYSTEMS & VESSELS
SAIC-A-2019
SAIC-A-2020 Pressurization of Pneumatic Test (Strength & Service)
SAIC-A-2021 Inspection of Pneumatic Test (Strength & Service)
SAIC-A-2022 Depressurization of Pneumatic Test (Perform Leak Test)
SAIC-A-2023 Pressurization for Bubble Leak Test (Using Air, Inert Ga
SAIC-A-2024 Inspection of Leaks for Tightness Testing
Pre-Test Inspection of Pressure Vessels (All
SAIC-A-2025 Applications, Including In-situ Testing of New Fin Fan
Coolers)
SAIC-A-2026 Pre-Test Inspection of API Tanks
Review Proprietary Fireproofing System & Procedure
SAIC-B-2001
(Intumescent Epoxy Mastics & Lightweight Concretes)
Review Qualifications for Proprietary (Intumescent)
SAIC-B-2002
Fireproofing Applicator
SAIC-B-2003 Receiving Inspection of Intumescent Fireproofing Mat'ls
Inspect Storage, Handling & Preservation of Intumescent
SAIC-B-2004
Fireproofing Mat'ls
Performance Verification of Equipment & Applicators of
SAIC-B-2005
Intumescent Fireproofing (FP) Materials
SAIC-B-2006 Pre-Application Insp of Intumescent Fireproofing Mat'ls
SAIC-B-2007 In-Process Inspection of Intumescent Fireproofing Mat'ls
SAIC-B-2008 Post-Application* Insp of Intumescent Fireproofing Mat'l
SAIC-B-2009 Top Coating Application (Intumescent Fireproofing Matls)
SAIC-B-2010 Final Inspection of Intumescent Fireproofing Application
SAIC-B-2011 Material Receiving Insp - Portable Fire Protection Equip
SAIC-B-2012 Storage, Handling & Preservation of Portable Fire Protection Equipment
SAIC-B-2013 Portable Fire Extinguishers - Installation Inspection
SAIC-B-2014 Foam Generating Equipment - Installation Insp & Testing
Special Fixed Extinguishing Equipment - Installation
SAIC-B-2015
Inspection & Testing
SAIC-B-2016 Access & Platforms for Portable Fire Protection System
SAIC-B-2017 Reinstatement of Portable Fire Protection Systems
Review of Vessel Safety Instruction Sheet & Procedure
SAIC-D-2001
for Vessel Internal Component Installation
SAIC-D-2002 Receiving Inspection of Pressure Vessels- External
SAIC-D-2003 Receiving Inspection of Pressure Vessels - Internal
Receiving Inspection of Fabricated Structural
SAIC-D-2004
Attachments to Equipment (Access and Supports)
SAIC-D-2005 Storage, Handling and Preservation (Vessels & Tanks
SAIC-D-2006 Equipment Pre-Installation Inspection
Equipment Installation - Alignment & Elevation Check
SAIC-D-2007
(Vertical & Horizontal Vessels)
SAIC-D-2008 Inspection of Vessel Trim Installation
Installation & Inspection of Trays & Packing in Vessels
SAIC-D-2009
(Special Construction Process Procedure)
SAIC-D-2010
SAIC-D-2011
SAIC-D-2012 Final Inspection of Pressure Vessels (Re-Instatement)
SAIC-D-2013
SAIC-D-2014 Review of Tank Data Sheet & Safety Instruction Sheet
SAIC-D-2015 Receiving Insp of Small Tanks per SAES-D-109- (Ext Insp)
SAIC-D-2016 Receiving Insp of Small Tanks per SAES-D-109- (Int Insp)
SAIC-D-2017 Inspection of Buried Tank installation
SAIC-D-2018 Insp of Under-Tank Leak Detection, Sub-Grade Protection
SAIC-D-2019 Inspection of Above Ground Small Tank Installation
SAIC-D-2020 Inspection of Tank Trim Installation
SAIC-D-2021 Final Insp of Tank Installation (Tanks)
Verification of Non-Material Requirements for Vessels
SAIC-D-2022
and Trays
SAIC-D-2023 Receiving Insp of API Tank Plate Mat'l & Appurtenances
SAIC-D-2024 Insp Foundation & Undertank before Floor Plate Layout
SAIC-D-2025 Inspect Installation of API Tank Plates & Appurtenances
SAIC-E-2001 Review of SIS for Shell & Tube Heat Exchanger
SAIC-E-2002 Receiving Inspection of Shell & Tube Heat Exchanger
SAIC-E-2003 Storage Handling & Presevation of Heat Exchangers.
SAIC-E-2004 Review of SIS for Air Cooled Heat Exchanger
SAIC-E-2005 Receiving Inspection of Air-Cooled Heat Exchanger
SAIC-E-2006 Inspect Assembly of Air-Cooled Heat Exchanger Components
SAIC-E-2007
SAIC-E-2008 Re-instatement of Air Cooled Heat Exchanger
SAIC-E-2009 Internal Cleanliness Inspection of Heat Exchangers
SAIC-E-2010 In-Situ Strength Test of Fin Fan Coolers (Preparation)
SAIC-E-2011 Nitrogen and Pearlite Application on BAHE Frame
SAIC-F-2001 Review Procedure - Fired Heater Installation
SAIC-F-2002 Review UT Thickness Record (Fired Heater Components)
SAIC-F-2003 Review of Data Sheet & SIS for Fired Heaters.
SAIC-F-2004 Receiving Inspection of Fired Heaters & Components
SAIC-F-2005 Handling, Storage and Preservation of Fired Heaters
SAIC-F-2006 Installation of Fired Heaters and Components
SAIC-F-2007 Heater Box Closure Inspection
SAIC-F-2008 Final Insp of Fired Heater & Components (Re-Instatement)
SAIC-F-2020 Review Industrial Boiler Forms & Data Sheets (SIS, etc)
SAIC-F-2021 Receiving Insp of Industrial Boilers & Mech. Components
SAIC-F-2022 Receiving Inspection of Power Piping & Auxillaries
Storage, Handling & Preservation of Industrial Boilers
SAIC-F-2023
& Mech. Components
SAIC-F-2024 Lay-Up of Boiler Tubes & Drums
SAIC-F-2025 Lay-Up & Preservation of Boiler's Furnace
SAIC-F-2026 Cleaning of Boiler Tubes, Associated Piping & Vessels
SAIC-F-2027 Installation of Economizer
SAIC-F-2028 Installation of Boiler Trim, Connections & Instruments
SAIC-F-2029 Installation of Boiler Stack
SAIC-F-2030 Final Punchlisting of Boilers & Accessories
SAIC-F-2031 Receiving Inspection of Flare Package Components
SAIC-F-2032 Handling, Storage & Preservation (Flare System Pkg.)
SAIC-F-2033 Final Insp of Fired Heater & Components (Re-Instatement)
Review of Procedure for Storage, Handling &
SAIC-G-2001
Preservation of Equipment
SAIC-G-2002 Receiving Inspection of Centrifugal Pumps
SAIC-G-2003 Handling, Storage & Preserv. Insp of Centrifugal Pumps
SAIC-G-2004 Handling, Storage & Preserv. Insp of Centrifugal Pumps
SAIC-G-2005 Inspection of Auxiliary Piping Installation
SAIC-G-2006 Inspect Pump Suction and Discharge Piping Connection
SAIC-G-2007 Final Inspection / Walkthrough of Pump installation
SAIC-G-2008
SAIC-G-2009 Receiving Inspection of Positive Displacement Pumps
Handling, Storage and Preservation Inspection of
SAIC-G-2010
Positive Displacement Pumps (Per API 675 & API 686)
SAIC-G-2011 Chemical Cleaning and Flushing Procedures
Receiving, Handling, Storage & Preservation Inspection
SAIC-G-2012 of Lubrication, Shaft Sealing & Oil Syst. (Rotating
Equip)
Lubrication System (Lubrication Skid) Handling, Storage
SAIC-G-2013
and Preservation

Installation of Mechanical Components of Lubrication,


SAIC-G-2014
Shaft Sealing and Oil Systems for Rotating Equipmen

Final Inspection / Walkthrough of Lubrication, Shaft


SAIC-G-2015
Sealing and Control Oil Systems
SAIC-G-2016 Pre-Cleaning Insp of the Lube and/or Seal Oil System
SAIC-G-2017 Mech & Chemical Cleaning of Lube & or Seal Oil System
Final Cleanliness Inspection After Cleaning and
SAIC-G-2018
Flushing of Lube and/or Seal Oil System.
SAIC-G-2019 Final Reinstatement after Mechanical & Chem Cleaning
SAIC-G-2020
SAIC-G-2021 Mounting Plate Installation and Leveling for Pumps
SAIC-G-2022 Final Alignment of Pump & Driver
SAIC-G-2023 Pump & Component Installation for Lift Stations
SAIC-GI-2102 Pressure Testing Safely
Review Procedure: Cement- Mortar protective lining for
SAIC-H-2001
steel water pipe
SAIC-H-2002 Receiving Inspection of Raw Materials for Cement Lining
SAIC-H-2003
SAIC-H-2004 Verification of Cement Lining Equipment
SAIC-H-2005 Pre-Application Inspection of Cement Lining
SAIC-H-2006 In-Process Inspection of Cement Lining
Final Inspection & Acceptance of Cement Lining
SAIC-H-2007
[Includes repairs]
SAIC-H-2008

Review Procedure - Field Applied External FBE Coating


SAIC-H-2009
and Repair Procedure

Review of Contractor Qualifications - Coating Personnel


SAIC-H-2010
Certification (In-Kingdom Field Application Only)
Receiving Inspection of FBE Powder & Abrasive Materials
SAIC-H-2011
and its Storage
SAIC-H-2012
SAIC-H-2013 Insp & Verification of FBE Powder Application Equipment
Surface Preparation for Application of External Epoxy
SAIC-H-2014
Coating on Pipeline
In-Process Inspection of FBE coating Application on
SAIC-H-2015 External Field Girth Welds [Includes Repair / Patch-up
coating]
SAIC-H-2016 Holiday Testing of External Coatings on Pipelines
SAIC-H-2017
Final Inspection of External FBE Coated Field Girth
SAIC-H-2018
Welds before Backfill
SAIC-H-2019
SAIC-H-2020
SAIC-H-2021
SAIC-H-2022
Review Procedure for Liquid Coatings on Industrial
SAIC-H-2023
Services & Pipelines-Buried Services (APCS-113A, B & D)
SAIC-H-2024 Receiving Inspection of Paint & Abrasive Materials
Storage, Handling and Preservation of Paint and
SAIC-H-2025
Abrasive Materials.
SAIC-H-2026 Coating Equipment Inspection
SAIC-H-2027 Surface Preparation for Liquid Coating Systems
In-Process Insp. of Primer or First Coat (Liquid
SAIC-H-2028
Coating System)
SAIC-H-2029 Inspection of Primer Coat (Prior to Top Coating)
SAIC-H-2030 In-Process Insp - Intermediate or Top Coat Application
SAIC-H-2031 Inspection of Top Coat(s) of Liquid Coating System
SAIC-H-2032 Repair and/or Touch-up of Coatings
Application of Safety Color Coding & Stenciling of
SAIC-H-2033
Equipment/Piping Identification.
SAIC-H-2034 Final Inspection of Coating for Mechanical Completion
Surface Preparation for Application of APCS-113 liquid
SAIC-H-2048
Coating Systems on Pipeline.
SAIC-H-2049 In-Process Inspection of APCS-113 Coating Systems Applic
SAIC-H-2050 Visual Inspection of APCS-113 Coating systems Applicat
SAIC-H-2051 Final Inspection before Backfill - APCS 113 Coated Pipe
SAIC-H-2057 Review Procedure - Field Applied Internal FBE Coating &
Receiving Inspection of FBE Coating Materials for Over-
SAIC-H-2058
the-Ditch Internal Field Girth Welds
Surface Preparation of Pipe Joints for Field Internal
SAIC-H-2059
FBE Coating
In-Process & Final Inspection of FBE coating
SAIC-H-2060
Application on Internal Field Girth Welds
SAIC-H-2063 Review of Personnel Qualification for Tape Wrap Applicat
SAIC-H-2064 Material Insp for Tape Wrap Application (SAEP-362)
SAIC-H-2065 Storage Handling & Preservation of Tape Wrap Materials
Surface Preparation (After Blast) Prior to Application
SAIC-H-2066
of Tape Wrap (SAEP-362)
SAIC-H-2067 Primer Application for Tape Wrap (Per SAEP-362)
SAIC-H-2068 In-Process Insp. of Tape Wrap Application (SAEP-362)
SAIC-H-2069 Tape Wrap Inspection--Adhesion Testing (Per SAEP-362)
SAIC-H-2071 Repair of Tape Wrap (Per SAEP-362)
SAIC-H-2072 Handling of Tape Wrapped Piping (Per SAEP-362)
SAIC-H-2073 Final Visual Insp. of Tape Wrapped Piping (SAEP-362)
Review Procedure - External Protective Coating System
SAIC-H-2080
For Repair & Renovation of Buried Pipelines (APCS 113C
SAIC-H-2081 Verification & Storage of APCS - 113C Materials
Surface Preparation, Application and Acceptance of
SAIC-H-2082
APCS-113C Coating System (Including Repairs)
SAIC-J-2005 Review of Relief Valve Authorization Form 3099A
SAIC-J-2006 Receiving Inspection Of Relief Valves
SAIC-J-2007 Storage, Handling & Preservation of Relief Valves
SAIC-J-2008 Relief Valve testing & Calibration
SAIC-J-2009 Relief Valve Installation
SAIC-J-2010 Completion of Form 3099A
Receiving Inspection of Instrument Air Compressor &
SAIC-J-2011
Mechanical Components
Storage, Handling & Preservation of Instrument Air
SAIC-J-2012
Compressor and its Mechanical Componen
SAIC-J-2013 Installation of Air Compressor and its Components
SAIC-J-2014 Punch Listing of Instrument Air Supply System
SAIC-J-2015 Piping Installation for Instrument Air Distribution Syst
Re-instatement / Final Inspection of Instrument Air
SAIC-J-2016
Distribution Piping System
SAIC-J-2017
SAIC-J-2018 Receiving Inspection of Meter Prover Skid
Review of Procedure for Storage, Handling &
SAIC-K-2001
Preservation of Gas Compressors
SAIC-K-2002 Receiving Inspection of Centrifugal Compressor
Storage, Handling , and Preservation of Centrifugal and
SAIC-K-2003
Reciprocating Gas Compressors
SAIC-K-2004 Mounting Plate Installation and Leveling for Compressors
SAIC-K-2005 Inspection of Auxiliary Piping Installation for Compress
SAIC-K-2006
SAIC-K-2007 Process Piping Connections to Centrifugal Compressor
SAIC-K-2008 Final Compressor / Driver Alignment
SAIC-K-2009 Final Insp/Walkthrough of Centrifugal Compressor Install
SAIC-K-2010
SAIC-K-2011 Recv Insp of Reciprocating Compressor (Process Air or Ga
SAIC-K-2017 Verification & Visual Insp of Diesel Engine & Accessorie
SAIC-K-2018 Diesel Engine Storage and Preservation
SAIC-K-2019 Installation of Diesel Engine & Mechanical Components
SAIC-K-2020 Final Insp / Walkthrough of Diesel Engine Installation
Reciprocating Compressor Suction & Discharge Process
SAIC-K-2026
Piping Installation
Final Inspection / Walkthrough of Reciprocating
SAIC-K-2029
Compressor for Process Air or Gas Services installation
SAIC-L-2005 Recv Inspection of Pipe and Pipe Nipples (Plant Piping)
SAIC-L-2006 Receiving Inspection of Pipe Fittings and Flanges
SAIC-L-2007 Receiving Inspection of Gaskets
Receiving Inspection of Flange Bolts (Studs, Machine
SAIC-L-2008
Bolts and Washers)
SAIC-L-2009 Receiving Insp of Venturi, Restriction & Flow Orifices
Positive Material Identification (PMI) of Alloy Piping
SAIC-L-2010
& Alloy Components (All Applications)
SAIC-UT-2001 Review of Procedure for Ultrasonic Testing
SAIC-UT-2002 Review of UT Personnel Qualifications.
SAIC-UT-2003
SAIC-UT-2004 Verification of Ultrasonic Test Equipment
SAIC-UT-2005 Verification and/or set up of Mock-up of TKY Joints.
SAIC-UT-2006
SAIC-UT-2007
SAIC-UT-2008
SAIC-UT-2009
SAIC-UT-2010
Protection Equipment