Professional Documents
Culture Documents
ESC= 1:300
MATIAS
ROMERO
46.6
VER DETALLE DE RAMPA 57
KM
VER DETALLE DE RAMPA 53 VER DETALLE DE RAMPA 55
LAVENTOSA 89.8 KM
VER DETALLE DE RAMPA 51
TAPANATEPEC
KM
IXTEPEC
OAXACA
BANQUETA
19
16.5
BANQUETA BANQUETA
.9
BANQUETA
KM
202.1
KM M
19.4 K JUCHITAN
30
TEQUISISTLAN .1
97.92 97.85 97.78 97.76 97.29 97.12 97.03 97.02 KM
98.01 99.34
KM
UNION HIDALGO
98.08 8.30 10.00 12.15 12.62 10.00 8.30 8.00
27.5
8.00 8.30
TEHUANTEPEC
8.00 8.00 8.30 10.00 15.41 15.81
0+086.49
0+080.00
0+060.00
0+126.49
0+040.00
0+146.49
0+162.54
0+000.00
0+020.00
0+106.49
MICROLOCALIZACION
0+086.49
VER DETALLE DE RAMPA 52
VER DETALLE DE RAMPA 56
AVENIDA LIC. JOSE MURAT CASAB.
VER DETALLE DE RAMPA 54
ESC= 1:300
CARRETERA PRINCIPAL.
97.92 97.85 97.78 97.76 97.29 97.12 97.03 97.02
98.08 98.01 12.62 99.34
12.15 16.02
11.64 13.26
8.00 15.41 15.81 ESPECIFICACIONES
LONGITUD DE CALLE = 162.54 MTS.
AVENIDA 12 DE DICIEMBRE
0+086.49
0+080.00
0+060.00
0+126.49
0+040.00
0+146.49
0+162.54
0+000.00
0+020.00
0+106.49
0+086.49
DE 25 CMS. AL 90% PROCTOR STANDARD.
102
102 101
MATIAS
ROMERO
101 100
46.6
KM
100 99 LAVENTOSA 89.8 KM
99 TAPANATEPEC
KM
98 OAXACA
IXTEPEC
19
16.5
-0.4231 % en 76.05m
.9
-0.3190 % en 20.00m -0.4533 % en 20.00m -0.3574 % en 20.00m
KM
202.1
98 / / / / / / /
-0.3507 % en 20.00m -0.3507 % en 6.50m 97
/ / / / / / / / / / / / / / /
KM
19.4 K
M
JUCHITAN
/ / / / / / /
/ / 30
/ / / TEQUISISTLAN .1
KM
KM
UNION HIDALGO
97
27.5
96 TEHUANTEPEC
96 95
SALINA CRUZ
SAN PEDRO
ORDENADAS DE LA ORDENADAS DE LA
10,000
10,308
10,765
11,222
11,675
11,732
HUILOTEPEC
10,000
10,379
10,759
11,139
11,518
11,641
CURVA MASA CURVA MASA
MICROLOCALIZACION
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TERRAPLEN TERRAPLEN
VOLUMEN
VOLUMEN
AVENIDA LIC. JOSE MURAT CASAB.
307.62
457.13
456.86
453.50
379.23
379.73
379.76
379.25
123.23
57.34
0.00
0.00
CORTE CORTE
ESPESOR
ESPESOR
2.41
2.43
2.41
2.38
2.40
1.93
1.93
1.93
1.93
1.93
1.93
CORTE CORTE
IEMBRE.
AVENIDA 12 DE DIC
CARRETERA PRINCIPAL.
97.34
97.29
97.20
97.12
97.03
97.02
98.08
98.01
97.92
97.85
97.78
97.76
SUBRASANTE SUBRASANTE
ELEVACION
ELEVACION
100.01
99.74
99.70
99.63
99.53
99.42
99.42
TERRENO
99.94
99.85
99.78
99.71
99.69
TERRENO
0+086.49
0+100.00
0+120.00
0+140.00
0+160.00
0+162.54
0+000.00
0+020.00
0+040.00
0+060.00
0+080.00
0+086.49
PERFIL
PERFIL
ESCALA HORIZONTAL 1 : 1000
ESCALA HORIZONTAL 1 : 1000
ESCALA VERTICAL 1 : 100
21
ESCALA VERTICAL 1 : 100 TOTAL VOLUMEN CORTE = 1,732.45m3
TOTAL VOLUMEN CORTE = 1,641.20m3
TOTAL VOLUMEN TERRAPLEN = 0.00m3
TOTAL VOLUMEN TERRAPLEN = 0.00m3 ESPECIFICACIONES
LONGITUD DE CALLE = 162.54 MTS.
CL
20 ANCHO CALLE = 8.00 MTS.
T.N.=99.69
R=98.01
R=97.76
OFF=4.00
OFF=-4.00
OFF=4.00
OFF=-4.00
R=97.93
R=97.93
99 99 99 OFF=4.00
R=97.77
R=97.77
R=97.68
103
CP. WILSON SANCHEZ CHEVEZ
CL PRESIDENTE MUNICIPAL
102 102 102 2017 - 2018
T.N.=100.01
T.N.=99.85
CL CL
T.N.=99.71
R=98.08
R=97.92
OFF=4.00
OFF=-4.00
OFF=4.00
R=98.00
R=98.00
OFF=-4.00
R=97.84
99 99 99 2017 - 2018
R=97.70
R=97.70
DE CONCRETO DE LA CALLE
96 PAVIMENTO = 1.20m2 96 PAVIMENTO = 1.20m2 96 PAVIMENTO = 1.20m2 ENTRE LA AVENIDA Y AV. 12 DE