Professional Documents
Culture Documents
International
Competition
for the urban planning
and architectural
concept of the new
residential area near
Kazan and the design
for primary building
and facilities
Malye
The Republic of Tatarstan.
Laishevsky Municipal District.
Bolshekabanskoe rural
settlement, village
Kabany
Invitation to
participate
Kazan
2015
Closed International Competition for the urban planning and archi-
CONTENTS
tectural concept of the new residential area near Kazan and the de-
sign for primary building and facilities (The Republic of Tatarstan.
Laishevsky Municipal District. Bolshekabanskoe rural settlement,
Malye Kabany village).
Context 20
Region 22
Reasons for Creating New Residential Area 27
Competition Territory 30
Ilfat Gilfanov,
General Director
of OOO Management Company Unistroy
3
Abour Unistroy
The evidence of stability of the
Company on the whole and of each
project in particular is not only a
Development
great amount of awards and inter-
national certificates, but also, in
the first place, reliable relation-
Company
ship, which emerged between the
Company and its customers during
many years of cooperation. The rep-
utation of the leader of the Repub-
lics construction sector witness
not only success and profitability
Every new project of the Company is of any undertaking of Unistroy,
but also the reliability of partner-
new possibilities and perspectives, ship relations.
4 5
4 5
Companys
Objects (KAZAN)
2003
2009
Tolbukhina str., h.21, 10-storeyd residential compound Druzhinnaya str., h.7, 16-storeyd residential compound
Druzhinnaza str., h.3, 16-storeyd residential compound
Chistopolskaya str., h.76, 18-storeyd residential compound
2004
Chuikova str., h.15, 9-storeyd residential compound
Tolbukhina str., h.9, 9-storeyd residential compound
2010
Tolbukhina str., h.13, 9-storeyd residential compound Vishnevskogo str., h.29/Dostoevskogo str., h.48,
15-storeyd residential compound
Minskaya str., h.37, 9-storeyd residential compound
2005
Kalinina str., h.5, 5-storeyd residential compound Sibgata Khakima str., h.39, 18-storeyd residential compound
Prospekt Svobody str., h.22, 5-storeyd residential compound
2nd Yugo-Zapadnaya str., h.3, 9-storeyd residential compound
2011
Tolbukhina str., h.11, 9-storeyd residential compound Gorsovetskaya str., h.29, 16-storeyd residential compound
Okolnaya str., h.11, 10-storeyd residential compound
2006
F.Karima str., h.9, 5-storeyd residential compound
2012
2nd Yugo-Zapadnaya str., h.11, 10-storeyd residential compound Pobezhimova str., h.36, 10-storeyd residential compound
2nd Yugo-Zapadnaya str., h.9, 9-storeyd residential compound Volkova str., h.70, 9-storeyd residential compound
2nd Yugo-Zapadnaya str., h.5, 9-storeyd residential compound Volkova str., h.22, 6-storeyd residential compound
Tovarishcheskaya str., h.34, 9-storeyd residential compound Kul Gali str., h.27, 10-storeyd residential compound
Chistopolskaya str., h.60, 13-storeyd residential compound
Zur Uram str., h.42, 9-storeyd residential compound
2013
Sibirsky Trakt str., h.23, 19-storeyd residential compound
Spartakovskaya str., h.165, 10-storeyd residential compound
2007
Druzhinnaya str., h.8, 9-storeyd residential compound S.Batyeva str., h.5, 10-storeyd residential compound
Druzhinnaya str., h.6, 9-storeyd residential compound S.Batyeva str., h.7, 10-storeyd residential compound
Druzhinnaya str., h.4, 9-storeyd residential compound
Volkova str., h.25, 4-storeyd residential compound
2014
Shirokaya str., h.2, 9-storeyd residential compound Sibirsky Trakt str., h.13, 24-storeyd residential compound
Teatralnaya str., h.3, 5-storeyd residential compound S.Batyeva str., h.15, 10-storeyd residential compound
Sportivnaya str., h.3, 9-storeyd residential compound S.Batyeva str., h.19, 10-storeyd residential compound
Chistopolskaya str., h.72, 9-storeyd residential compound S.Batyeva str., h.21, 10-storeyd residential compound
S.Batyeva str., h.7, 10-storeyd residential compound
Lyadova str., h.15, 10-storeyd residential compound
2008
Chistopolskaya str., h.70, 9-storeyd residential compound
Chistopolskaya str., h.74, 9-storeyd residential compound
Sibgata Khakima str., h.31, 9-storeyd residential compound
Sibgata Khakima str., h.33, 9-storeyd residential compound
Sibgata Khakima str., h.35, 9-storeyd residential compound
6 7
Having been working at the market
Construction
over 18 years, the Company has technologies
managed to prove its credibility and While building residential and commercial objects,
reliability Unistroy uses only materials of the highest quality
and reliability as well as modern technologies. The
basic technology used by the Company is brick and
composite construction with finishing of the facades
of houses. The houses built by Unistroy have a radial
routing system. Constantly developing with each
project, the Company strives to use all its experience
in order to maximally consider the customers wishes.
Service in the
Companys Company
reliability During its 18 years history Unistroy has set itself as
one of the main tasks raising the level of customer
Due to the well-considered policy and highest service quality. It is this task which the Companys
requirements to the quality of construction, Unistroy sales department was created for, and there a
has won the respect of many customers as a reliable customer can obtain all necessary information about
real estate developer and partner. objects, prices and the Companys future projects.
Many partners and customers respect the Company Year 2013 was marked for the Company by the
for the high speed of building. It becomes possible due transition of sales department to a new high-quality
to a properly designed system of projects development level. While customers enjoy a cup of hot tea or coffee
from the idea to the delivery, which involves all the in comfortable client zones, the Companys friendly
Companys employees. Setting itself high aims, managers help them to choose real estate using large
Unistroy tries to realize the customers wishes. screens, and representatives of partner banks help to
The Company does not stop in its development, and calculate favourable mortgage loans in the Companys
construction outside the Republic of Tatarstan is to sales offices. Unistroy takes care of its clients
become a new stage of its development. during the whole period of the transaction execution,
that is why the Company takes upon itself all cares
concerning the registration of contracts as well as of
rights to property after the delivery of a house.
8 9
Competition OOO Agency for strategic development CENTER is a
team of professionals in the field of territory complex
development. An important direction of the Agencys
Organizer
activity is development of social spaces (renovation of
parks, cultural objects and industrial areas).
unlocking the potential of each place The Agency is one of Russias three leading
competition operators. It has successfully carried out
by creating new cultural, social and 8 competitions, among them 3 international ones.
10 11
10 11
Competition
12 13
12 13
The purpose of Object Participants
the Competition Residential district planned for construction in Malye Russian and foreign companies in the field of
Kabany village, Bolshekabanskoe rural settlement, architecture and design, having experience in
Creation of the urban planning and architectural Laishevsky municipal district, the Republic of development of residential and commercial real estate
concept (and master plan) for new residential area, Tatarstan, 21 km from the centre of Kazan on the objects, social spaces, desirably having experience
with designs of main buildings and installations federal highway, connecting the city with Kazan in working in the Russian context and capable of
with consideration of further functional zoning of international airport . involving specialists in the fields of economics,
the territory: residential area, objects of social finance, social studies, content programming into the
infrastructure (kindergarten and school) and green team.
zones for recreation (parks and squares).
14 15
SCHEDULE OF THE COMPETITION 1
2015
13,30 Working group with the finalists.
November
15 December Working group with the finalists.
06 October
Selection of 30 participants (targeted invitation and portfolios
gathering).
08 October
Presentation of the catalogue with portfolios of 30 participants of
the Competition to the Jury.
13 October
2016
Voting of the Jury in absentia. Selection of 10 candidates of the
Competition (short-list).
20 October
Project seminar for 10 candidates and members of the Jury.
Excursion at the object.
21 October
In-person session of the Jury. Selection of 3 finalists of the
Competition.
27 October
Launching seminar for the Competition finalists with participation
of representatives of MC Unistroy and Organization Committee 20 January Delivery of competition works by the finalists.
of the Competition.
22 January
Delivery of competition works of the finalists to the members
of the Jury.
23 October Finalists work on competition proposals.
28 January
In-person meeting of the Jury.
19
1
January Selection of the winner.
1
The Schedule of the Competition can be slightly changed
16 17
THE JURY
Gilfanov Mukosei
Ilfat Ilya
General Director of Architect, co-owner
Unistroy of architectural studio
PlanAR, teacher at
The Jury of the Competition will include the
MARCH
representatives of MC Unistroy the developer
of the territory, as well as leading Russian
experts in the field of architecture, city design and
planning, landscape architects, specialists in the
sphere of residential real estate development. An
invited curator from abroad will be responsible for
international expertise. The tasks of the Jury involve
the selection of a shortlist of finalists, assessment Kovalchuk Pankratieva
of competition proposals in line with the competition Yaroslav Yulia
goals, disqualification of the participants, forming Ex-leader of Head of the Project
of rating of competition proposals, selection of the Architectural and Workshop of City
winner. Michael Geller Design Workshop development of
as part of Science- Moscow region
International curator of the competition, Canadian Project Association territories and
architect, specialist in the field of stable development 38 Historical New territories of
of territories, President of The Geller Group, architect Zones, State Unitary Moscow, State Unitary
(AIBC, FCIP RPP) / David Hernandez Falagan, Partner Enterprise Scientific Enterprise Scientific
at 21st-century Housing Laboratory at the Catalonia Research and Design Research and Design
Polytechnic University, co-author of the book Tools Institute General Plan Institute General Plan
for Inhabiting the Present1. of Moscow of Moscow
20 21
20 21
REGION
The Republic of Tatarstan is one of the most In 2015 Tatarstan topped the national rating in
economically developed regions in the Russian investment climate. The amount of investment from The share of the Republic of Tatarstan in the countrys economy amounts to:
Federation, which significantly contributes to its small and medium enterprises reaches 40% (the
economy. average in Russia is 25%).
4,5% 3% 3% 6,3%
in the volume of in the volume of new in the retail trade of the Russian oil is
construction works housing turnover extracted
3 7
rd th
among subjects of
among subjects of
Russian Federation in of Russian of synthetic of cargo of car
Russian Federation in
the volume of the gross
place agriculture
regional product
place polyethylene rubber trucks tyres
5 8
among subjects of
th among subjects of th
Russian Federation in the
Russian Federation in
industrial production and
the new housing and
place volume of investments into
retail trade turnover1 place
fixed assets
6 9
th th
among subjects of
New housing
Russian Federation in
1
place construction place
1
according to the data of the Ministry of Economy of the Republic of Tatarstan. www.mert.tatarstan.ru
22 23
Key competitive advantages of Measures of support from
Background of the Republic of the region the Government of the Republic
3 855 300
organization for project realization.
Population of
the region
A developed infrastructure Reimbursement subsidies
people
of support for investors and to refund the equipment
entrepreneurs. purchase.
8400
Average rental rent of class A Favourable administrative, tax, customs
office premises A highly developed scientific
and land privileges for residents of special
research base.
economic zones Alabuga and Innopolis.
RUB/sq.m. a year
High level of industrial Developed engineering
29717800
Population of the neighboring production development. infrastructure.
regions
people
Overall characteristics of
3000 000
billion roubles (2014) the Russian regions (data for year 2012)
Average cost of lands for location of
production maintaining of leading positions
by the indicator of volume of
decrease of unemployment level: 4%
RUB/ha investments into fixed assets: 525,7
billion roubles (2013), 542,8 billion
(2013) and 3,9% (2014)
roubles (2014)
28 352
Average
monthly salary dynamics of consumer inflation: dynamics of industrial inflation: 2,3%
6,3% (2013), 9,7% (2014) (2013), 4,7% (2014)
RUB 1
1
according to the data Business in Russia. Geography of Possibilities, Agency of Strategic Initiatives, 2015.
http://invest.midural.ru/uploads/ckeditor/attachments/260/Biznes_v_Rossii-GEOGRAFIYA_VOZMOZHNOSTEY.pdf
24 25
Main branches of the Republic of
Tatarstan (RT) economy REASONS FOR
Industrial production Energy complex CREATING A NEW
By types of economic activity the structure of RT
industrial production in 2009 had the following ratio:
One of the main branches of the region, based on
oil-extracting industry. Nowadays 34 companies in
RESIDENTIAL AREA
mining 33,1% Tatarstan carry out oil extraction. The largest of them
manufacturing industries 57,9 % is OAO Tatneft.
production and allocation of electric energy, gas
and water - 9%
Quality parks are being renovated, the areas along the water
are being developed: for example, in the frameworks
The volume of the construction works for year 2009 Due to its geographical location Kazan is an important
due to the fact that during several decades housing
used to satisfy only basic needs. Standard houses
complex urban planning network of streets and
roads and availability of public spaces;
amounted to 184,1 billion roubles. The volume of transport hub of Russia. This position is supported by were built in the circumstances of severe shortage of correspondence of exterior of the buildings to the
the new housing amounts to 4% of the all-Russian creation of quality infrastructure: Tatarstan disposes of apartments and absence of private property. Future general atmosphere and spirit of the region, to the
volume. By this indicator the Republic of Tatarstan 3 cargo ports with 5 cargo districts, 4 passenger ports, 6 inhabitants of such areas had no possibility to choose values and lifestyle of the local dwellers;
has the third place in the Russian Federation (after riverside stations, as well as 3 enterprises of industrial themselves a place for living. scale of the buildings and all types of space or-
Moscow region and Krasnodar Krai). railway transport, international airports, main railway ganization, which is proportional for a human;
lines, oil and gas pipelines, all of them operating. In Gradually, the country economy was reformed, but the the yard promoting involvement and communica-
2009 three class A logistics complexes were opened in changes, however, involved the urban landscape only tion with each other;
Oil-extracting and
oil-refining industries
the Republic. partially. Democratization process in the sphere of set of social infrastructure and concentration of
architecture was not a fast one. At first, new-quality urban services within walking distance;
environment could be afforded only by the elite. They childrens growth and development in friendly en-
The most favourable branches for were the first who formed a demand for non-standard vironment, etc.
investors architecture, visual diversity and landscaping. Now
comfortable environment is becoming available for a
Oil-extraction, oil-refinery, chemical and petrochemical Videos about Tatarstan greater amount of users. On a city-wide scale Kazan
industry, information technologies and communications, RU http://www.youtube.com/watch?v=gJp-aMVlr4k forms a demand for new urban areas: within the
machine building, food industry and agriculture. EN http://www.youtube.com/watch?v=evqwbIwoDBE program Parks and squares of Tatarstan the largest
26 27
Aynur Abdulnasyrov Radmila Khakova
IT entrepreneur, founder of LinguaLeo PR-specialist
In nowadays economy the true source I visited Tatarstan in 2013 in order to present my I left Tatarstan for Moscow 10 years ago. I visited my
project LinguaLeo. We discussed a possibility relatives in Naberezhnye Chelny always via Kazan. And
of economic growth is clustering and to create a mass platform for studying the Tatar every year I noticed how the city was changing. I think,
concentration of talented, young, pro- language, but it still remains ahead. At the same time these changes started with the millennium anniversary
I got acquainted with Kazan, the IT-park. And I set my of Kazan and continued over the Universiade, the World
ductive people in one place. mind to move to Kazan. Aquatics Championship.
At the end of 2014 I concocted an interactive Every year I increasingly felt the energy of these changes,
educational project LeveL90, made investments and I wished to become a part of this process.
into the network language school LinguaLike and
Richard Florida, economist
moved to Kazan. Later I became a resident of the IT- This summer, when I moved to Kazan, I have started noticing
park where I immediately made two investments as that people around me do what they are really interested
a business angel. Since then I have been living and in they have acquired faith in their abilities. Such places
working in Kazan. as a small one-table coffee house, cafes distinct from
social activity of unique modern city where there are a lot of possibilities
for professional and personal self-fulfilment. I am
People began acting more often instead of complaining
that they do something which does not bring any pleasure.
28 29
COMPETITION Neighbourhood Malye Kabany
Nowadays Malye Kabany is a prestigious ecologically
clean area located on a governmental highway and
TERRITORY
having both cultural and historical significance as well
as unique strategic importance. Now the population
is 1,403 people1 .
The existing infrastructure objects cannot satisfy the
populations needs. That is why the implementation
of the new residential quarters project contemplating
a new model of public spaces could become a new
The territory, where a new residential area is to
centre of attraction in this territory.
appear, is situated in a strategically favourable
location over a distance from the urban noise of Malye Kabany has a rich history connected with the
Kazan, on the federal highway connecting the city and Khanate of Kazan. It formed part of the lands of Kazan
the airport. The site is undeveloped and surrounded Monastery of the Transfiguration of the Saviour.
by the natural wild landscape.
Malye Bolshie
Kabany Kabany
Overall area of the territory: 360 ha; Schools: in view of 172 places for 1,000 inhabitants;
Area of the planned residential area: 180 ha; Kindergartens: in view of 80 places for 1,000
Housing per capita: 30 sq.m/person; Number of storeys in all buildings: 3-5 storeys.
30 31
Bolshie Kabany object is situated approximately 800 m north-
east from Malye Kabany village in the territory of
Located in the neighbourhood, in Bolshie Kabany Stolbishchensky rural settlement.
village there are objects of social and cultural
servicing: community centres, libraries, schools Natural landscape
as well as significant and symbolic landmarks. In
In the territory of Laishevsky district, where Malye
particular, one of the dwellers favourite place (563
Kabany village is located, there are 12 lakes. One
people1 are registered in the village) is the Church
of the interesting monuments of nature of regional
of the Transfiguration of the Saviour built in 1560.
significance is lake Lesnoe, which has never been
Bolshie Kabany is the birth place of the Russian poet
surrounded by forest. It is situated 6 km north-east
G.R. Derzhavin, the only square in the district centre
from Bolshie Kabany village. The lake is relatively
Laishevo is named after him.
the Church of the Transfiguration of the Saviour
small: it is 470 m long, about 100 m wide, with the
average depth of 5 m, its maximum depth is 12 m.
The banks and water of the lake are noted for their
particular cleanliness, and fish live there. But the way
to the lake by car is hampered in the period of heavy
rains due to the gullets crossing the way, which get
filled with water.
1
Data for the year 2008
32 33
The federal highway connecting
Kazan and the airport
SMART City Kazan The distance between Malye Kabany village and Kazan
equals 21 km, this distance may be covered by car in 20
Great influence on complex development of the minutes. Kazan International Airport is situated 6 km
territory will be exercised by the satellite city south-east of the village.
SMART City Kazan, its construction started
in 2013. A cultural and business complex and 26 km away from Malye Kabany village, in the
scientific research centres, a special economic settlement Borovoe Matyushino, summer residences
and parking zones are expected here. The future of Tatarstans Government, a big sanatorium Santa
and other recreation facilities are located as well as
elite cottages of Kazan dwellers on the Volga banks
and amid the forest plantations nearby.
34 35
Design Gas pipeline protected zone Besides, in the territory of Stolbishchensky rural
settlement bordering of Bolshekabansky one there is
limitations The gas pipeline protected zone spreads for 100 metres
a household waste dump, and its 1,000-metre sanitary
protection zone covers a part of the undeveloped
on either side of the gas pipe axis (on the topographical territory of Malye Kabany village. It is also important
survey it is marked blue). to bear in mind that Company Darkat dealing with
The design must take into consideration a number of secure storage, freight, lease of the warehouse
Proximity of Kazan airport
peculiarities of the competition territory: and acting as a distributor of beer, beverages and
It provides for low-storeyed housing development
3-5 storeys.
Electric power line protected zones confectionary from Kazan and having a sanitary
protection zone of 50 m is situated 140 m south of the
boundaries of the populated locality. Near the village
The land plot partially falls within the electric power
there is a farm not functioning at present.
line protected zone. The electric substation is situated
200 m north-east from Malye Kabany village1.
Protected zone of
gas pipeline
1 5
.
0,5
1
As an electric substation is the object of III class of hazard, its sanitary protection zone is 300 m.
36 37
Preliminary Technical
Design Specification
38 39
38 39
1 5
.
0,5
Materials to be prepared by the
finalists1:
1. The site plan with planning constraints the plan survey of the territory with the corresponding scale
prepared on the basis of topographical survey of topographical survey 1:500 more detailed)
(provided by the customer), aerial photo of the the layout plan representing the proposals on
area may be used as a base. The plan shows the site improvement and landscaping. With the
the existing situation, it is necessary to single scale of topographical survey 1:500 highlighting
out all the constraints imposed on construction of pavements. In the explanatory notes areas
(sanitary protection zones of existing engineering of different types of the site improvements and
communications, constraints from neighbouring landscaping.
areas, forests, rivers etc.)
6. The priority territory development plan (if
2. The layout plan of the territory the layout plan required) the layout plan with indication of
with proposals on location of facilities (from volumes of sequences for bringing the site area
the competitors), roads, pavements (with the into operation.
corresponding scale of topographical survey
7. Facades of main buildings and construction (2-3
1:500), grassed and landscaped areas with the
buildings) main facade decisions for 2-3 main
corresponding scale of topographical survey etc.
buildings.
In the explanatory notes assignment of space
for each type of development. 8. Plans of main buildings and constructions (2-3
buildings) floor-by-floor plans (excluding the
3. The layout plan of engineering communications
repeated floors). In the explanatory notes main
the layout plan depicting the location of the main
areas.
engineering networks, including engineering
network facilities (if necessary: water supply 9. The note with brief information about the
facilities, waste treatment facilities, transforming territory, number of inhabitants, built-up density,
substations). In the explanatory notes lengths main built-up areas, roads, pavements, site
of the main networks, structural design load). improvements and landscaping. Information
about the engineering networks: structural
4. The transport layout plan the layout plan
design loads, lengths. Main prospective decisions
showing the road, pavement (provided the
on buildings and constructions: construction
Customer delivers the topographic survey of
material, type of constructions, facade finish
the territory with the corresponding scale of
materials.
topographical survey 1:500) network, location
of public transport stops, public traffic plan.
Indication of cross-sections of the main roads. In
the explanatory notes areas of different paving,
type of paving.
5. The layout plan of improvements (enlarged)
(provided the Customer delivers the topographic
1
1
At this stage only the preliminary technical design specification is provided, the participants will receive more detailed information about
the competitive territory and the technical design specification later.
40
Closed International Competition for the urban
planning and architectural concept
Organizer:
Agency for strategic development CENTER
121205, Moscow
st. Bolshaya Molchanovka,
21, 6th floor, ofice 13
www.centeragency.org
Info@centeragency.org
+7 (495) 697-72-24
+7 (495) 695-33-58