PROJECT: L&T RAINTREE BOULEVARD

ACHIEVEMENTS BY BANGALORE PROJECT/DESIGN TEAM FY15-16 & FY16-17 AS ON DATE


TOTAL SALEABLE AREA in SFT ### BUA 2,483,897 4/27/2017
STRUCTURAL
FY 15-16
SL.NO DESCRIPTION Lead by Amount Cost/Savi Attributa Whether REMARKS
Saved from ngs per ble to any
Approved sft savings
Budget in Time
achieved
1 Eliminating 900 Dia Piling KC ### 100.00 Santosh Yes The scope for protecting the excavation slope by 900 dia
under excavation scope Biraj piles is eliminated and the protection of slope is done by
providing proper slope of 1:5 with geotechnical data for
10 m of the excavation depth.

2 Eliminated micro piling for KC ### 22.22 Santosh Yes To protect raintrees geotech consultant had proposed
protecting Raintree's Biraj micropiling we proposed soil nailing and shorcreting thus
saving a huge cost. Proposal is approved by structural
consultant

3 General Excavation Slopes KC 535,500.00 0.30 Santosh Yes Slopes were redesigned with 1:5 slopes as proposed by
Biraj the consultant with 1:2 slopes thus saving 5355 cum of
earth excavation in phase 1

4 Eliminated 350 mm thick raft KC ### 18.78 Santosh Yes Structural consultant had proposed 350 mm thick raft
for non tower area Biraj which was not required and we have proposed isolated
footing in NTA. Our proposal accepted by the structural
consultant. Thus saving huge cost of 4136 cum of
concrete and 240 MT of steel and pcc 1182 cum

5 Tie beams in NTA KC 4,541,000.00 2.52 Santosh Yes Tie beams was provided. But as per soil investigation
Biraj report there was no differential settlement and SBC was
70 t/m2. Hence we asked to avoid tie beams which was
accepted by consultants. Thus savings was achieved on
concrete, rebar and formwork.( estimated 2.5% cost of
foundation system). Data from sterling BOQ
6630 m3 Concrete & rebar 530 MT for foundation
Hence, 0.025 x (14957 x 8000 + 1142 x 50000 + 4884x
1000) = 45,41,000

6 Roof Slab designed for KC 1,400,000.00 0.78 Santosh Yes Roof Slab asked to redesign with 3kN/m2 which was
10kN/m2 Biraj preliminary designed for 10 kN/m2 load. Increased
consumption 27 kg/m3. Hence increase in rebar quantity
is 2.35 MT for each tower. Therefore 2.35 x 17 = 40 MT.
(40 x 35000 = 14,00,000)
SL.NO DESCRIPTION Lead by Amount Cost/Savi Attributa Whether REMARKS
Saved from ngs per ble to any
Approved sft savings
Budget in Time
achieved
7 Cost impact by avoiding KC ### 150.00 Santosh Yes For 6 additonal floors consultant had provided podium
podium slab for provision of 6 Biraj slab to accommodate additional car requirement. We had
additonal floors proposed and substaintiated that the additonal car
parking requirement can be achieved by providing girder
beams within tower footprint and thus saving on a huge
cost of podium slab. Again podium option would require
statuatory approvals.

Total ### 294.60


SL.NO DESCRIPTION Lead by Amount Cost/Savi Attributa Whether REMARKS
Saved from ngs per ble to any
Approved sft savings
Budget in Time
achieved
FY 16-17
1 Cost impact due to clear KC ### 10.58 Santosh Yes All shear walls were designed taking 40mm where as
cover in shear walls Biraj code specifies 25mm clear cover Thus saving a huge cost
by tweeking the design process. (Review has revealed a
difference of 13% increase in rebar consumption for the
given floor plate area of 520m2. ). Further 40mm cover
had handling issues at site as the wall thickness is 160
mm rebar in two layers gives (160 - 40 -40 -16 x 2 - 8 - 8 -
32mm) gap between reinforcement hence practically
difficult to concrete.

2 Cost impact due to PCC grade KC 9,403,800.00 5.22 Santosh No The PCC specification is given as M15 which is not
Biraj required for levelling coarse and the same was replaced
by M7.5 which resulted in cost saving.
No rate item for M7.5 and contractor requested to make
use of M15 grade due to site conditions.

3 Cost impact due to clear KC 4,474,400.00 2.49 Santosh Yes All slabs were designed taking 25mm where as code
cover in slabs Biraj specifies 20mm clear cover Thus saving a huge cost by
tweeking the design process

4 Cost impact due to difference KC ### 13.11 Santosh Yes For all buildings, above 1st floor to terrace higher grade
in grade of concrete Biraj of concrete M40/M30 is used for shear walls, slabs. Which
is not required as design passes using M25 grade of
concrete with same consumption of rebar

5 Conducting soil investigation KC ### 6.45 Santosh Yes Raft sizes 520m2. reduction in depth 0.25m. Concrete
for RTB which helped enhance Biraj savings 520 x 0.25 x 11 Towers X 8000Rs = 1,14,40,000
the SBC from 45t/m2 to 70 Saving in shear links in raft 20 dia @ 500mm c/c. Approx
t/m2 in camparision to prior 3MT per tower. Hence for 11 Towers
report. Hence reduction in 33 x 11 x 50,000 = 16,50,00
raft footing sizes and raft
depth from 1000mm to
750mm was achieved.
SL.NO DESCRIPTION Lead by Amount Cost/Savi Attributa Whether REMARKS
Saved from ngs per ble to any
Approved sft savings
Budget in Time
achieved
6 NTA footings were optimised KC 3,570,000.00 1.98 Santosh Yes Instead of providing conventional flat footing stepped
Biraj footing were designed, thereby saving on concrete
quantity. 409 m3 x 8000 = 32,72,000 & formwork 298
m2 x 1000 = 2,98,000
SL.NO DESCRIPTION Lead by Amount Cost/Savi Attributa Whether REMARKS
Saved from ngs per ble to any
Approved sft savings
Budget in Time
achieved
7 In absence of water table (as KC ### 27.82 Santosh Yes Consultants option 1 - 200mm Grade slab,
per soil investigation report). Biraj Steel@50kg/m3, 100mm VDF & sub soil drainage cost -
Design was tweaked to merge 13.35 Cr.
grade slab and VDF for Consultants option -2 - 75mm PCC, WP, 150mm stitch
basement floor finishes. slab M30, Steel 40kg/m3, 200 mm GSB, LDPE, 100mm
VDF cost - 13.35 Cr.
Tweaked design - 175mm GSB, LDPE, 125mm VDF
@40kg/m3 - cost - 8.35 Cr.
Hence saving - 5 Cr. Which is accepted by consultant to
release as GFC.

8 Sterling BOQ to Cratis BOQ, it KC ### 66.67 Santosh Yes In comparision to sterling quantities, the design of towers
is estimated to make target Biraj was tweaked and initial assement on quantities for
savings for 17 towers in concrete, reinforcement and formwork is estimated at 12
concrete, reinforcement and Cr. Workings is attached.
formwork

9 Variation in BOQ was stated KC 2,420,000.00 2.20 Santosh Yes Checked in depth to understand the extra claims by
in the soil investigation Biraj vendor w.r.t actual variation and it was found only upto
conducted by vendor for SEZ 3.8 lakhs was varying in BOQ.
for 48 boreholes to the Hence saving 28 - 3.8 = 24.2 lakhs.
tune28 lakhs.

Total ### 136.52

Rates are based on Contract dept inputs

APART FROM ABOVE FOLLOWING ARE THE IMPORTANT CONTR


1 Non tower area column sizes optimised. Few column locations tweaked to get better supporting system and provided sustainable design
2 Co-ordinate with structural and architectural consultant to reconfigure the approved expansion joint detail proposed by Sterling, without
disturbing the
approved framing system by architects thereby saving resources and rework which would be required by all disciplines and thereby
accommodating structural feasibility
3 Ensured RFI's/ Site queries are cleared within max time period of 1 day. Hence giving comfort to site execution and ensured construction is not de
3 Developed methodology to ensure checklists on analysis and design are followed by the consultants (attached)
4 Developed In-house design sheets to ensure speedy checks/reviews are done. The sheets developed
are equiped to analyse and design within minutes.
( Attached retaining wall design sheet)
Date : 16.01.2017
PROJECT : RAINTREE BOULEVARD
Structural BOQ Quantities Based on Evaluation of Budget v/s GFC's
Sl.no Particulars Units Other consuCratis Qty Remarks STERLING CRATIS
1 T1
Concrete Cum 5300.8 4979.27 321.53 43,466,560 40,830,032
Formwork Sqm 46111.6 44660.62 1450.98 46,111,600 44,660,618
ReinforcemM.tons 476 488.16 -12.16 23,800,000 24,408,023
113,378,160 109,898,672
2 T2
Concrete Cum 5300.8 4960.84 339.96 43,466,560 40,678,868
Formwork Sqm 46111.6 44711.39 1400.21 46,111,600 44,711,393
ReinforcemM.tons 476 486.11 -10.11 23,800,000 24,305,691
113,378,160 109,695,953
3 T3
Concrete Cum 5870.43 5614.49 255.94 48,137,514 46,038,808
Formwork Sqm 51065.71 51134.13 -68.42 51,065,714 51,134,133
ReinforcemM.tons 527.14 544.19 -17.05 26,357,143 27,209,554
125,560,371 124,382,494
4 T4
Concrete Cum 5870.43 5614.49 255.94 48,137,514 46,038,808
Formwork Sqm 51065.71 51134.13 -68.42 51,065,714 51,134,133
ReinforcemM.tons 527.14 544.19 -17.05 26,357,143 27,209,554
125,560,371 124,382,494
5 T5
Concrete Cum 8918 7960.92 957.08 73,127,600 65,279,510
Formwork Sqm 77573 75000 2573 77,573,000 75,000,000
ReinforcemM.tons 801 800 1 40,050,000 40,000,000
190,750,600 180,279,510
6 T6
Concrete Cum 5870.43 5575.41 295.02 48,137,514 45,718,374
Formwork Sqm 51065.71 51318.67 -252.96 51,065,714 51,318,670
ReinforcemM.tons 527.14 541.1 -13.96 26,357,143 27,055,172
125,560,371 124,092,216
7 T7
Concrete Cum 5870.43 5636.42 234.01 48,137,514 46,218,632
Formwork Sqm 51065.71 51412.45 -346.74 51,065,714 51,412,452
ReinforcemM.tons 527.14 548.79 -21.65 26,357,143 27,439,431
125,560,371 125,070,515
8 T8
Concrete Cum 5300.8 4891.76 409.04 43,466,560 40,112,405
Formwork Sqm 46111.6 44461.29 1650.31 46,111,600 44,461,288
ReinforcemM.tons 476 477.73 -1.73 23,800,000 23,886,580
113,378,160 108,460,272
9 T9
Concrete Cum 6488.5 5006.91 1481.59 53,205,700 41,056,631
Formwork Sqm 56441 53036.56 3404.44 56,441,000 53,036,564
ReinforcemM.tons 582.5 560 22.5 29,125,000 28,000,000
138,771,700 122,093,195
10 T10
Concrete Cum 6488.5 6000 488.5 53,205,700 49,200,000
Formwork Sqm 56441 53510.32 2930.68 56,441,000 53,510,320
ReinforcemM.tons 582.5 530 52.5 29,125,000 26,500,000
138,771,700 129,210,320
11 T11
Concrete Cum 6772.5 6000 772.5 55,534,500 49,200,000
Formwork Sqm 58912 57823.12 1088.88 58,912,000 57,823,121
ReinforcemM.tons 608 504.33 103.67 30,400,000 25,216,342
144,846,500 132,239,463
12 T12
Concrete Cum 5870.43 5414.75 455.68 48,137,514 44,400,930
Formwork Sqm 51065.71 48469.27 2596.45 51,065,714 48,469,269
ReinforcemM.tons 527.14 527.19 -0.05 26,357,143 26,359,434
125,560,371 119,229,633
13 T13
Concrete Cum 5870.43 5399.13 471.3 48,137,514 44,272,858
Formwork Sqm 51065.71 48457.04 2608.68 51,065,714 48,457,036
ReinforcemM.tons 527.14 525.72 1.43 26,357,143 26,285,782
125,560,371 119,015,676
14 T14
Concrete Cum 5300.8 4000 1300.8 43,466,560 32,800,000
Formwork Sqm 46111.6 42000 4111.6 46,111,600 42,000,000
ReinforcemM.tons 476 410 66 23,800,000 20,500,000
113,378,160 95,300,000
15 T15
Concrete Cum 5300.8 4000 1300.8 43,466,560 32,800,000
Formwork Sqm 46111.6 42000 4111.6 46,111,600 42,000,000
ReinforcemM.tons 476 410 66 23,800,000 20,500,000
113,378,160 95,300,000
16 T16
Concrete Cum 5870.43 5317.01 553.42 48,137,514 43,599,482
Formwork Sqm 51065.71 48543.32 2522.39 51,065,714 48,543,321
ReinforcemM.tons 527.14 517.64 9.5 26,357,143 25,882,188
125,560,371 118,024,991
17 T17
Concrete Cum 6772.5 6586.33 186.17 55,534,500 54,007,925
Formwork Sqm 58912 58005.99 906.01 58,912,000 58,005,993
ReinforcemM.tons 608 640.52 -32.52 30,400,000 32,025,979
144,846,500 144,039,897
Exclusions: TOTAL SAVING
1)Tower -T9,T10,T11,T14,T15 -Foundations, Basement and upper basement columns
2)NTA area -Quantities
3)OHT
4)terrace Duct cover Slabs
3,479,488

3,682,207

1,177,877

1,177,877

10,471,090

1,468,155

489,856

4,917,888

16,678,505

9,561,380
12,607,037

6,330,739

6,544,695

18,078,160

18,078,160

7,535,381

806,603
123,085,097

TOWERS STERLING QUANTITY in 'Re' CRATIS QUANTITY in 'Re'


T1 113,378,160 109,898,672
T2 113,378,160 109,695,953
T3 125,560,371 124,382,494
T4 125,560,371 124,382,494
T5 190,750,600 180,279,510
T6 125,560,371 124,092,216
T7 125,560,371 125,070,515
T8 113,378,160 108,460,272
T9 138,771,700 122,093,195
T10 138,771,700 129,210,320
T11 144,846,500 132,239,463
T12 125,560,371 119,229,633
T13 125,560,371 119,015,676
T14 113,378,160 95,300,000
T15 113,378,160 95,300,000
T16 125,560,371 118,024,991
T17 144,846,500 144,039,897
Total Saving's in 'Re'
DIFFERENCE
3,479,488
3,682,207
1,177,877
1,177,877
10,471,090
1,468,155
489,856
4,917,888
16,678,505
9,561,380
12,607,037
6,330,739
6,544,695
18,078,160
18,078,160
7,535,381
806,603
123,085,097