SAUDI ARAMCO ID/PID FORM REV 1 - 010109

SAUDI ARAMCO TYPICAL COMMISSIONING INSPECTION PLAN SATIP No.


SES-PGB-CO-OTP-
APPROVED DATE DISCIPLINE:

OT PROCEDURE NAME 1-Jun-09 MECHANICAL


PROJECT TITLE: WBS/BI/JO/NO.
0003 CONTRACTOR/SUBCONTRACTOR

SEPCO COMPANY Manufacturer


QUALITY
ITEM
TASK / ACTIVITY RECORD/REFERE REMARKS
NO.
NCE DOCUMENT Code Sign Code Sign Code Sign

1 Bearing Temperature I W R
2 Lube Oil Temperature and Pressure
3 Test Water Inlet and Outlet Temperature
Cooling Water in and out Temperature and Pressure (if
4
any)
5 Bearing Housing Vibration (mm/s or in/s)
6 Shaft Vibration (m or mil)
7 Shaft Speed
8 Power consumption
9 mechanical Seal Leakage rate

final inspection for document/certificate W W R


Acceptance Criteria