SEPCO QC FORM Rev 0 27-May-17

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TEST REPORT
Commissioning of HRSG System SATR-CO-3014 MECH-
PROJECT TITLE: CONTRACT No.: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JIGCC POWER BLOCK PROJECT
6600033163 (IK) 6600033162 (OOK) SEPCO Electrical Power Construction Corporation
(Package # 4)
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQUIRD

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

ITEM PROJECT PHASE & QUALITY


ACTIVITY DESCRIPTION QUALITY RECORD ACTUAL PASS FAIL REMARKS
NO. ACTIVITY CODE PROCEDURE

1 Condensate System

OTP For
Condensate
HRSG economizer recirculation pump
1.1 prheater system ATTACHMENT #1
and condensate preheater
SES-PGB-CO-OTP-
0100

2 IP System

IP steam line A10-A-VE-229070


2.1 ATTACHMENT #2
IP steam temperatur and pressure HRSG description

3 RH System

RH steam line A10-A-VE-229070


3.1 ATTACHMENT#3
RH steam temperatur and pressure HRSG description

4 HP System

HP steam line A10-A-VE-229070


4.1 ATTACHMENT#4
HP steam temperatur and pressure HRSG description

5 Blowdown System

Blowdown pump,Atmospheric blowdown A10-A-VE-229070


5.1 ATTACHMENT#5
tank and continue blowdown tank HRSG description

6 Burner System

Inlet duct burner and the intermediate A10-A-VE-229070


6.1 ATTACHMENT#6
burner HRSG description

7 Exhaust System

A10-A-VE-229070
7.1 Exhaust bypass system ATTACHMENT#7
HRSG description

8 Rotor Air System

A10-A-VE-229070
8.1 Rotor air cooled system ATTACHEMNT#8
HRSG description

9 Auxiliary System

Page 1 of 2
SEPCO QC FORM Rev 0 27-May-17
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TEST REPORT
Commissioning of HRSG System SATR-CO-3014 MECH-
PROJECT TITLE: CONTRACT No.: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
JIGCC POWER BLOCK PROJECT
6600033163 (IK) 6600033162 (OOK) SEPCO Electrical Power Construction Corporation
(Package # 4)
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION TEST SYSTEM No./Test Pack No. PLANT NO.

DRAWING NUMBER (P&ID/ISO) / REV. No. PRESSURE TEST DIAGRAM NATURE OF TEST WORK PERMIT REQUIRD

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME LOCATION OF TEST (PLANT NAME & NO.)

SAUDI ARAMCO TIP (SATIP) NUMBER SATIP Activity No TEST IN ACCORDANCE WITH: a) Procedure No. b) Supporting SAIC No.

ITEM PROJECT PHASE & QUALITY


ACTIVITY DESCRIPTION QUALITY RECORD ACTUAL PASS FAIL REMARKS
NO. ACTIVITY CODE PROCEDURE

A10-A-VE-229070
9.1 Hot air inlet system ATTACHMENT#9
HRSG description

REMARKS:

Contractor / Third-Party Saudi Aramco


Commissioning Representative* PMT Representative
Name, Title, Department, Test is ready for inspection: Name, Initials T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Date and Date:
QC Inspector PID Representative
Witnessed Test Work / Rework May Proceed Name, Initials T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:
and Date:
QC Supervisor Proponent and Others
Quality Record Approved: Name, T&I Witnessed QC Record Reviewed Work Verified
Organization,
Name, Sign and Date:
Initials and
Date:

Page 2 of 2