TENDER No.: KPSB/2016/1 Dt: 04.02.2016
TRANSFORMER SIZING & TENTATIVE LOAD LIST (OPTION-2 - PLOUGH)
Installed Power Power Consumption
Sl.
Description
No. Qty KW/ Unit Rpm Total KW Working D.Factor U. Factor Running kW

1a Mobile conveyor -Belt Feeder MBC1 1 55.00 1440 55.00 1 0.60 0.85 28.05
1b Mobile conveyor -Belt Feeder MBC2 1 110.00 1440 110.00 1 0.60 0.85 56.10
2a BC01A 1 30.00 1440 30.00 1 0.80 0.85 20.40
2b BC01B 1 30.00 1440 30.00 1 0.80 0.85 20.40
3a BC02A 1 55.00 1440 55.00 1 0.80 0.85 37.40
3b BC02B 1 55.00 1440 55.00 1 0.80 0.85 37.40
4a BC03A 1 75.00 1440 75.00 1 0.80 0.85 51.00
4b Actuator for Plough 6 1.50 730 9.00 1 0.80 0.85 1.02
5 BC3 A1-A6 6 18.50 1440 111.00 1 0.80 0.85 12.58
6 2 way Chute actuators 3 1.50 1440 4.50 1 0.80 0.85 1.02
7 BC3B 1 18.50 1440 18.50 1 0.80 0.85 12.58
8a BC4B 1 55.00 1440 55.00 1 0.80 0.85 37.40
8b Actuator for Plough 4B 2 1.50 730 3.00 1 0.40 0.85 0.51
9 Hoist 6 5.50 1440 33.00 0 0.30 0.85 0.00
Fire Fighting system, Dust Control
10 1 11.00 1440 11.00 1 0.80 0.85 7.48
system, Water washing system
11 Lighting and Utility Power 1 35.00 1440 35.00 1 0.80 0.60 16.80
12 Control Supply & UPS Power 1 25.00 1440 25.00 1 0.80 0.60 12.00
Total Installed 715.00
Total Running 352.14 10.70 12.75
Installed 715.00
Running 352.14
Future Margin (25%) 893.75
Transformer Loading (80%) 1117.19
Transformer Efficiency (95%) 1175.99
Transformer Size in KVA 1383.51
Nearby Transformer Size (kVA) 2400.00