You are on page 1of 3

ACI318-08 RC Beam-estribos viga leteral-prueba final-L-10.

2 VIGA EN L
Project: DATA CENTER
Location: DIVISA
Client: INCORD S.A.
Job No.: 7000 Calc. by: PS Checked by: CVR
Subject: Beam Date: 26-Jan-15 Revision: -
ANALYSIS & DESIGN OF RC BEAM AS PER ACI 318-08

INPUT DATA
MATERIAL PROPERTIES Cs
f c' = 28 Mpa CONCRETE STRENGTH
fy = 414 Mpa REBAR YIELD STRESS Ct
fys = 276 Mpa LINKS YIELD STRESS
Es = 200,000 Mpa Steel Modulus of Elasticity
Ec = 24,870 Mpa Ec = 4700*SQRT(f'c)
B
DIMENSIONS
L = 9.5 m BEAM LENGTH
Layer
B = 610 mm BEAM WIDTH space
H = 813 mm BEAM HEIGHT Cc
Ct = 51 mm COVER TO TOP REINFORCEMENT
Cc = 51 mm COVER TO BOTTOM REINFORCEMENT
Cs = 38 mm COVER TO SIDE BARS H

STEEL REINFORCEMENT
LEFT SUPPORT MIDSPAN RIGHT SUPPORT
TOP REINFORCEMENT TOP REINFORCEMENT TOP REINFORCEMENT
layer 1 layer 2 layer layer 1 layer 2 layer layer 1 layer 2 layer
no. mm no. mm space no. mm no. mm space no. mm no. mm space
9 25 0 25 53 3 25 0 12 53 9 25 0 25 53

BOTTOM REINFORCEMENT BOTTOM REINFORCEMENT BOTTOM REINFORCEMENT


layer 1 layer 2 layer layer 1 layer 2 layer layer 1 layer 2 layer
no. mm no. mm space no. mm no. mm space no. mm no. mm space
4 25 0 32 53 4 25 0 16 25 4 25 0 12 53

HOOPS STIRRUPS ADDITIONAL LONGITUDINAL BARS


no. spacing no. spacing legs mm spacing no. mm
1 50 20 75 3 10 227 6 20

APPLIED FORCES
LEFT SUPPORT MIDSPAN RIGHT SUPPORT
Mu = 827.00 kN-m Mu = 499.00 kN-m Mu = 827.00 kN-m
Ma = 300.00 kN-m Ma = 340.00 kN-m Ma = 300.00 kN-m
Vu = 325.00 kN Vu = 325.00 kN
Tu = kN-m Tu = kN-m
Pu = kN-m Pu = kN-m

OUTPUT RESULTS
FLEXURAL CAPACITY CHECKS
LEFT SUPPORT
b1 = 0.85 b1 = max. of: 0.85-(0.05*(f'c-28)/7) and 0.65
c = 108.58 mm Solve for "c" in: As*fy = 0.85*f'c*b1*c*b+A's*(c-d')/c*ec*Es
a = 92.29 mm a = b1*c
r = 0.0097 r = As/(b*d)
r(min) = 0.0034 r(min) >= 0.25*SQRT(f'c)/fy >= 1.4/fy
rb = 0.0289 rb = 0.85*b1*f'c/fy*(600/(600+fy)
rg = 0.0129 rg = (As+A's)/(b*h)
r(max) = N.A. r(max) = As(max)/(b*d)
As(min) = 1,546.07 mm2 As(min) = r(min)*b*d
As(max) = 10,580.5 mm2 As(max) = (0.85*f'c*b1*c*b+A's*(c-d')/c*ec*Es)/fy for c = ec*d/(ec+0.005)
ec = 0.003 ec = 0.003 (assumed concrete strain)
e's = 0.0012 e's = ec*(c-d')/c < fy/Es, f's does not yield
f's = 249.10 Mpa f's = e's*Es
As2 = 1181.42 mm2 As2 = A's*f's/fy for f's > 0
As1 = 3236.44 mm2 As1 = As-As2 for f's > 0
et = 0.0177 et = ec*(d-c)/c = (fy/Es+ec)/(r/rb)-ec >= 0.005, Tension-controlled
f = 0.90 f = 0.65+0.25*(et-fy/Es)/(0.005-fy/Es) <= 0.90
fMn = 1,150.15 kN-m > Mu = 827 kN-m, O.K.

Page 1 of 3
ACI318-08 RC Beam-estribos viga leteral-prueba final-L-10.2 VIGA EN L
Project: DATA CENTER
Location: DIVISA
Client: INCORD S.A.
Job No.: 7000 Calc. by: PS Checked by: CVR
Subject: Beam Date: 26-Jan-15 Revision: -
ANALYSIS & DESIGN OF RC BEAM AS PER ACI 318-08
MIDSPAN
b1 = 0.85 b1 = max. of: 0.85-(0.05*(f'c-28)/7) and 0.65
c = 64.63 mm Solve for "c" in: As*fy = 0.85*f'c*b1*c*b+A's*(c-d')/c*ec*Es
a = 54.93 mm a = b1*c
r = 0.0043 r = As/(b*d)
r(min) = 0.0034 r(min) >= 0.25*SQRT(f'c)/fy >= 1.4/fy
rb = 0.0289 rb = 0.85*b1*f'c/fy*(600/(600+fy)
rg = 0.0069 rg = (As+A's)/(b*h)
r(max) = N.A. r(max) = As(max)/(b*d)
As(min) = 1,546.07 mm2 As(min) = r(min)*b*d
As(max) = 10,029.8 mm2 As(max) = (0.85*f'c*b1*c*b+A's*(c-d')/c*ec*Es)/fy for c = ec*d/(ec+0.005)
ec = 0.003 ec = 0.003 (assumed concrete strain)
e's = 0.0001 e's = ec*(c-d')/c < fy/Es, f's does not yield
f's = 10.45 Mpa f's = e's*Es
As2 = 37.17 mm2 As2 = A's*f's/fy for f's > 0
As1 = 1926.32 mm2 As1 = As-As2 for f's > 0
et = 0.0318 et = ec*(d-c)/c = (fy/Es+ec)/(r/rb)-ec >= 0.005, Tension-controlled
f = 0.90 f = 0.65+0.25*(et-fy/Es)/(0.005-fy/Es) <= 0.90
fMn = 527.74 kN-m > Mu = 499 kN-m, O.K.

RIGHT SUPPORT
b1 = 0.85 b1 = max. of: 0.85-(0.05*(f'c-28)/7) and 0.65
c = 108.58 mm Solve for "c" in: As*fy = 0.85*f'c*b1*c*b+A's*(c-d')/c*ec*Es
a = 92.29 mm a = b1*c
r = 0.0097 r = As/(b*d)
r(min) = 0.0034 r(min) >= 0.25*SQRT(f'c)/fy >= 1.4/fy
rb = 0.0289 rb = 0.85*b1*f'c/fy*(600/(600+fy)
rg = 0.0129 rg = (As+A's)/(b*h)
r(max) = N.A. r(max) = As(max)/(b*d)
As(min) = 1,546.07 mm2 As(min) = r(min)*b*d
As(max) = 10,580.5 mm2 As(max) = (0.85*f'c*b1*c*b+A's*(c-d')/c*ec*Es)/fy for c = ec*d/(ec+0.005)
ec = 0.003 ec = 0.003 (assumed concrete strain)
e's = 0.0012 e's = ec*(c-d')/c < fy/Es, f's does not yield
f's = 249.10 Mpa f's = e's*Es
As2 = 1181.42 mm2 As2 = A's*f's/fy for f's > 0
As1 = 3236.44 mm2 As1 = As-As2 for f's > 0
et = 0.0177 et = ec*(d-c)/c = (fy/Es+ec)/(r/rb)-ec >= 0.005, Tension-controlled
f = 0.90 f = 0.65+0.25*(et-fy/Es)/(0.005-fy/Es) <= 0.90
fMn = 1,150.15 kN-m > Mu = 827 kN-m, O.K.

Page 2 of 3
ACI318-08 RC Beam-estribos viga leteral-prueba final-L-10.2 VIGA EN L
Project: DATA CENTER
Location: DIVISA
Client: INCORD S.A.
Job No.: 7000 Calc. by: PS Checked by: CVR
Subject: Beam Date: 26-Jan-15 Revision: -
ANALYSIS & DESIGN OF RC BEAM AS PER ACI 318-08
SHEAR CAPACITY CHECKS
@ 2H for Seismic Provision for transverse Reinforcements per Sec.21.5.3.2
S(max)= smallest of ==> S(max) = d/4
S(max) = 8db (smallest longitudinal bar)
S(max) = 96.00 mm.o.c. S(max) = 24db (diameter of hoop bar)
> 75mm, O.K. S(max) = 300mm

For Shear Reinforcements


fVc = 308.45 kN fVc = 0.17*l*SQRT(f'c)bd
fVs = 161.04 kN fVs = f*fy*d*Av(stirrup)/s >= 0
fVn = 469.49 kN >=Vu = 325.00 kN, O.K.
fVs(max) = 1,197.53 kN >= Vu-(phi)Vc = 16.55 kN, O.K.
Av(prov) = 235.62 mm2
Av(req'd) = 137.04 mm2 <= Av(prov) = 235.62 mm^2, O.K.
Av(min) = 175.60 mm2 <= Av(prov) = 235.62 mm^2, O.K.
s(max) = 374.75 mm >= s = 227 mm, O.K.

For Torsion Reinforcements


Tc = 28.47 kN-m < 0.00 kN-m, torsion need not to be considered!
Tumax = N.A. kN-m
Atprov = N.A. mm2 (Av+t(used)-Av(req'd))/2
Atreq'd = N.A. mm2
Atmin = N.A. mm2
Alreq'd = N.A. mm2
Almin = N.A. mm2
Alprov = 1,963.50 mm2 add'l web bars are not required!

Total (Av+t) = N.A. mm2


Total (Av+t)min = N.A. mm2

CRACK CONTROL
Es = 200,000 MPa Steel Modulus of Elasticity
Ec = 24,870 MPa Ec = 4700*SQRT(f'c)
n = 8.04 n = Es/Ec

LEFT SUPPORT
fs = 617.47 MPa fs = Ma/(As*d*(1-(SQRT(2*As/(b*d)*n+(As/(b*d)*n)^2)-As/(b*d)*n)/3))
fs(used) = 276.00 MPa fs(used) = minimum of: fs and 2/3*fy
s(max) = 233.01 mm s(max) = minimum of: 380*280/fs(used)-2.5*Cc and 300*280/fs(used)
s(min) = 25.00 mm
s(act) = 57.11 mm s(min) <= s(act) <= s(max), O.K.!

MIDSPAN
fs = 989.60 MPa fs = Ma/(As*d*(1-(SQRT(2*As/(b*d)*n+(As/(b*d)*n)^2)-As/(b*d)*n)/3))
fs(used) = 276.00 MPa fs(used) = minimum of: fs and 2/3*fy
s(max) = 233.01 mm s(max) = minimum of: 380*280/fs(used)-2.5*Cc and 300*280/fs(used)
s(min) = 25.00 mm
s(act) = 128.50 mm s(min) <= s(act) <= s(max), O.K.!

RIGHT SUPPORT
fs = 617.47 MPa fs = Ma/(As*d*(1-(SQRT(2*As/(b*d)*n+(As/(b*d)*n)^2)-As/(b*d)*n)/3))
fs(used) = 276.00 MPa fs(used) = minimum of: fs and 2/3*fy
s(max) = 233.01 mm s(max) = minimum of: 380*280/fs(used)-2.5*Cc and 300*280/fs(used)
s(min) = 25.00 mm
s(act) = 57.11 mm s(min) <= s(act) <= s(max), O.K.!

Page 3 of 3