CORRIDA EQUPO BES

CORRIDA EQUPO BES


SERVICIOS PROFESIONALES

SERVICIOS COMPARTIDOS

ARBOL DE NAVIDAD
ARBOL DE NAVIDAD

CONTINGENCIA EMPAQUES
INFLABLES
COSTOS ASOCIADOS

70B-40 GP PACKER NEW SC-1R 07.000 IN 23.0-29.0 LB/FT CSG 5.500 IN 8RD CASING

TYPE: OUT; EXTENSION; DIAMETER: OD 5.500 IN; ID: 4.700 IN; LENGTH: 4 FT;

X-OVER 5 IN 8RD CSG (SHORT) BOX UP X 4 IN 9.5# NU 8RD PIN DOWN

STINGER PARA CEMENT RETAINER PARA CSG 5",7" Y 9 5/8"

RENT CHARGE - HYDRAULIC SETTING TOOL FURY 10 - PER RIH

SERVICE CHARGE - SPECIALIST/ENG OPERTOR - SPECIAL OPERATIONS - PER DAY

2.375 O-RING SEAL SUB 4.500 IN BUTT BOX UP 4.500 IN BUTT PIN DOWN

REAMER SHOE 4-1/2 CONEXION BTC.

FLOAT SHOE SHOE 4-1/2 CONEXION BTC.


MOVILIZACIN EN CAMIONETA

DRILL PIPE 2 3/8" OD, 2 7/8 HT PAC p/b, 6.65 lb/pie, S135

JUNTA PUP JOINTS 2 7/8", S135, 10.4 lb/pie, HT PAC x 5 ft.

JUNTA PUP JOINTS 2 7/8", S135, 10.4 lb/pie, HT PAC x 10 ft.

DRIFT FOR 2 3/8, 2 7/8" HT PAC DRILL PIPE.

CROSSOVERS CONVENCIONALES 2 7/8 HT PAC x CONEXIN ACORDADA (CS HYD)


CROSSOVERS CONVENCIONALES 2 7/8 HT PAC x CONEXIN ACORDADA (NC 38)

LIFTING CUP (AYATOLAS) 2 7/8 HT PAC conn.

VEHICULO TIPO TRACTOMULA AREA RUBIALES

CORRIDA DE TUBULARES (WASH PIPE)

CORRIDA DE TUBULARES (WASH PIPE)

UNIDAD DE FILTRACION

CARTUCHOS DE 5-2 MICRAS PARA UNIDADES DE FILTRACION

INGENIERO DE LODOS JUNIOR (3-5 AOS DE EXPERIENCIA)


UNIDAD DE FILTRACION

CARTUCHOS DE 5-2 MICRAS PARA UNIDADES DE FILTRACION

INGENIERO DE LODOS JUNIOR (3-5 AOS DE EXPERIENCIA)

EQUIPO BES TIPO 3

EQUIPO BES TIPO 4

EQUIPO BES TIPO 5

MANT, BOMBAS ALTERNATIVAS ( INSTALACION DE BOMBAS)

SERVICIO DE GRA MENSUAL (50 TON)


SERVICIO DE SUPERVICIN EN CAMPO

PUP JOINT 3 1/2" OD - N 80- 9.3 LB/FT - EUE - 8 FT LONG

TBG 3-1/2" OD - N-80 - 9,3 LB/FT - EUE

TUBING 4 1/2" N 80 11,6 LBS/PIE TSH W513 - R 2- SMLS

X-OVER 4 ", 11.6 #, N-80, TSH 5-13 BOX, POR 3 " EUE - N80 - 9.3# - PIN

FABRICACION 2 DRIFT MANDREL METALICO PARA CASING 4 1/2" 11.6#( DE 3.875" OD


+0.005/-.000 X 43" LONGITUD TOTAL)

FABRICACION 2 DRIFT MANDREL METALICO PARA TUBING 3 1/2" 9.3# EU (DE 2.867" OD
+0.005/-.000 X 43" LONGITUD TOTAL)

CAMIONETA AREA YOPAL - PUERTO GAITAN

PUMPING SUB DE 4.500 OD X 2" X 18"LONGITUD TOTAL: CONEXIN 4-1/2" 11.60# TSH
HYD PIN X CONEXIN FEMALE FIGURA 1502

PUMPING SUB DE 4.110 OD X 2" X 18"LONGITUD TOTAL: CONEXIN 3-1/2" 9.30# PIN X
CONEXIN FEMALE FIGURA 1502
ALQUILER UNIDAD MVIL DE SERVICIOS TECNOLOGICOS, EQUIPOS TELEMTICOS Y
APLICACIONES RTO POR POZO.

COMPANY MAN TIPO A2


INGENIERO ASISTENTE J2

INGENIERO SENIOR DE CAMPO

INGENIERO DE COMPLETAMIENTO J2

INGENIERO DE COMPLETAMIENTO J2

TARIFA POR COMIDA SERVIDA, CON O SIN CAMARERIA.

VUELOS
BOGOT - MORELIA
VILLAVICENCIO - MORELIA
MORELIA - BOGOT
MORELIA VILLAVICENCIO

X MAS TREE 4 1/2 2K ESP COMPLETION (SECCION C ITEMS C1 A C13)


X MAS TREE 3 1/2 2K ESP COMPLETION ( SECCION C ITEMS 1 A 11)

EMPAQUE INFLABLE DE 4 1/2 GRADO P 110 X 10ft DE SELLO ROSCA API PARA
REVESTIMIENTO O HUECO DE 6 1/8

HERRAMIENTAS PARA OPERACIN DE EMPAQUES INFLABLES Y CEMENTING PORT


COLLAR 5" - 9 5/8

CARGO POR TCNICO PARA OPERACIN DE EMPAQUES HINCHABLES, INFLABLES Y/O


PORT COLLAR.

TRANSPORTE HERRAMIENTAS REA RUBIALES


FASE DE 6-1/8"

ACTIVIDAD

COMPAA CONTRATO NOMBRE CONTRATO

BAKER HUGHES 7000132 LINER HANGER

BAKER HUGHES 7000132 LINER HANGER

BAKER HUGHES 7000132 LINER HANGER

BAKER HUGHES 5213032 MULTISERVICIOS - CEMENTACIN

MULTISERVICIOS - ALQUILER DE
BAKER HUGHES 5213032 HERRAMIENTAS ESPECIALES DE
FONDO

MULTISERVICIOS - ALQUILER DE
BAKER HUGHES 5213032 HERRAMIENTAS ESPECIALES DE
FONDO

BAKER HUGHES 7000132 LINER HANGER

BAKER HUGHES 7000132 LINER HANGER

BAKER HUGHES 7000132 LINER HANGER


MULTISERVICIOS - ALQUILER DE
BAKER HUGHES 5213032 HERRAMIENTAS ESPECIALES DE
FONDO

WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD 5215587 ALQUILER DE TUBERIA


WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD 5215587 ALQUILER DE TUBERIA

WEATHERFORD CORRIDA DE TUBULARES

ITS 5219188 CORRIDA DE TUBULARES

FLUIDO DE PERFORACION,
QMAX SOLUTIONS COLOMBIA UCN-UP-222 COMPLETAMIENTO Y FILTRACION

FLUIDO DE PERFORACION,
QMAX SOLUTIONS COLOMBIA UCN-UP-222 COMPLETAMIENTO Y FILTRACION

FLUIDO DE PERFORACION,
QMAX SOLUTIONS COLOMBIA UCN-UP-222 COMPLETAMIENTO Y FILTRACION
FLUIDO DE PERFORACION,
WEATHERFORD COMPLETAMIENTO Y FILTRACION

FLUIDO DE PERFORACION,
WEATHERFORD COMPLETAMIENTO Y FILTRACION

FLUIDO DE PERFORACION,
WEATHERFORD COMPLETAMIENTO Y FILTRACION

BAKER HUGHES 7000587 ACUERDO BASES ECONOMICAS

BAKER HUGHES 7000587 ACUERDO BASES ECONOMICAS

BAKER HUGHES 7000587 ACUERDO BASES ECONOMICAS

BAKER HUGHES ABE 76000274 ACUERDO BASES ECONOMICAS

MONTEJO SERVICIOS COMPARTIDOS


BAKER HUGHES ABE 76000274 ACUERDO BASES ECONOMICAS

MAPLE OIL TOOLS S.A.S. 5300083

MATERIAL DE INVENTARIO

TENARIS TUBO CARIBE 5304132 TENARIS TUBO CARIBE

STAR OIL COMPRA DIRECTA MAQUINADO

WEATHERFORD 5213216 MULTISERVICIOS MACHINE SHOP

WEATHERFORD 5213216 MULTISERVICIOS MACHINE SHOP

WEATHERFORD 5213216 MULTISERVICIOS MACHINE SHOP

WEATHERFORD 5213216 MULTISERVICIOS MACHINE SHOP

WEATHERFORD 5213216 MULTISERVICIOS MACHINE SHOP

AUXURE TECHNOLOGIES 5212756 COMUNICACIONES

CONSULTEC MA-0034684 SERVICIOS PROFESIONALES


CONSULTEC MA-0034684 SERVICIOS PROFESIONALES

CONSULTEC MA-0034684 SERVICIOS PROFESIONALES

CONSULTEC MA-0034684 SERVICIOS PROFESIONALES

CONSULTEC MA-0034684 SERVICIOS PROFESIONALES

DUFLO 3000627 SERVICIOS COMPARTIDOS

HELICOL PENDIENTE CREACIN SERVICIOS COMPARTIDOS

FMC 7000132 ACUERDO BASES ECONOMICAS


FMC 7000132 ACUERDO BASES ECONOMICAS

HALLIBURTON 5213422 LINER HANGER

HALLIBURTON 5213422 LINER HANGER

HALLIBURTON 5213422 LINER HANGER

HALLIBURTON 5213422 LINER HANGER


FASE DE 6-1/8"

ACTIVIDAD

VALOR UNITARIO VALOR UNITARIO


UNIDAD TIPO DE NEGOCIO
SIN IVA USD /FT CON IVA USD

EA 12,215.00 14,169.40 COMPRA

EA 2,944.00 3,415.04 COMPRA

EA 1,760.00 2,041.60 COMPRA

CORRIDA 1,100.00 1,276.00 SERVICIO

CORRIDA 3,000.00 3,480.00 SERVICIO

DIA 1,200.00 1,392.00 SERVICIO

EA 3,095.82 3,591.15 COMPRA

EA 6,514.46 6,514.46 COMPRA

EA 1,965.60 2,280.10 COMPRA


TRAYECTO 990.00 1,148.40 SERVICIO

JTA/DIA 5.74 6.66 SERVICIO

JTA/DIA 19.98 23.18 SERVICIO

JTA/DIA 19.98 23.18 SERVICIO

JTA/DIA 11.48 13.32 SERVICIO

JTA/DIA 14.17 16.44 SERVICIO


JTA/DIA 14.76 17.12 SERVICIO

EA 13.96 16.19 SERVICIO

VIAJE 3,972.00 4,607.52 SERVICIO

GLOBAL N/A N/A SERVICIO

CORRIDA 2,625.00 3,045.00 SERVICIO

DA 150.48 174.56 SERVICIO

EA 24.00 27.84 SERVICIO

DA 240.00 278.40 SERVICIO


DA 141.93 164.64 SERVICIO

EA 22.41 26.00 SERVICIO

DA 226.00 262.16 SERVICIO

EA 62,499.07 72,498.92 COMPRA

EA 64,168.89 74,435.91 COMPRA

EA 71,450.31 82,882.36 COMPRA

EA 9,000.00 10,440.00 SERVICIO

MES 1,553.25 1,801.77 SERVICIO


DA 548.00 635.68 SERVICIO

EA 400.00 464.00 COMPRA

JTA INSPECCIN

FT 11.67 13.54 COMPRA

EA 773.23 896.94 COMPRA

EA 1,067.00 1,237.72 SERVICIO

EA 1,044.00 1,211.04 SERVICIO

EA 1,263.16 1,465.27 SERVICIO

EA 1,869.60 2,168.74 SERVICIO

EA 1,681.50 1,950.54 SERVICIO

DIA 179.28 207.97 SERVICIO

DIA 2,449,770.00 2,841,733.20 SERVICIO


DIA 467,500.00 542,300.00 SERVICIO

DIA 1,217,641.15 1,412,463.73 SERVICIO

DIA 939,389.00 1,089,691.24 SERVICIO

DIA 234,847.25 272,422.81 SERVICIO

GLOBAL 16,256.00 18,856.96 SERVICIO

TRAYECTO 368,772.00 427,775.52 SERVICIO

EA 11,198.24 12,989.96 COMPRA


EA 4,667.16 5,413.91 COMPRA

COMPRA ASOCIADA A UN
EA 15,845.58 18,380.87 SERVICIO

CORRIDA 7,920.45 9,187.72 SERVICIO

DIA 936.50 1,086.34 SERVICIO

GLOBAL 1,901.00 2,205.16 SERVICIO


COMENTARIO

EMPAQUE COLGADOR: SE DEBE CARGAR AL DA DE COMPLETAMIENTO


ASI SE CORRA EN LA FASE DE PERFORACIN

ACCESORIO EMPAQUE COLGADOR: SE DEBE CARGAR AL DA DE


COMPLETAMIENTO ASI SE CORRA EN LA FASE DE PERFORACIN

ACCESORIO EMPAQUE COLGADOR: SE DEBE CARGAR AL DA DE


COMPLETAMIENTO ASI SE CORRA EN LA FASE DE PERFORACIN

HERRAMIENTA QUE SE CORRE EN LA PUNTA DE LA WASH PIPE DE 2-


3/8" PARA REALIZAR EL DESPLAZAMIENTO: SE DEBE CARGAR AL DA
DE COMPLETAMIENTO ASI SE CORRA EN LA FASE DE PERFORACIN

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. ESPECIALISTA PARA CORRIDA DE EMPAQUE
COLGADOR. SE DEBE REVISAR CONTRA EL TIQUETE SEGN NMERO
DE DAS DE OPERACIN (SOLO SE PAGARN DAS OPERATIVOS)

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SOLO SE DEBE CARGAR A LOS PRIMEROS DOS
POZOS DE CADA FRENTE

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SOLO SE DEBE CARGAR DESDE EL TERCER
POZO DE CADA FRENTE
SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA
FASE DE PERFORACIN. SE DEBE REVISAR CONTRA TIQUETE, EN
ALGUNOS CASOS EL PERSONAL PUEDE ENTRAR POR VIA AEREA Y NO
SE COBRARIA ESTE MONTO DE CAMIONETA

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. POR CADA TALADRO HAY 45 JUNTAS DE WP
DE 2-3/8", SE DEBE CARGAR EL VALOR DE LAS 45 JUNTAS POR EL
NMERO DE DAS OPERATIVOS (INICIO ODR - FINALIZACIN OCM). SE
ESTABAN HCIENDO UNOS AJUSTES CON EL ADMINISTRADOR, PERO EL
DA DE MAANA ESPERO PASAR POR LOS TALAROS A LEGALIZAR
TIQUETES CON EL CO-MAN

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. POR CADA TALADRO HAY 2 PUP JOINT DE WP
DE 2-3/8", SE DEBE CARGAR EL VALOR DEL PUP JOINT POR EL
NMERO DE DAS OPERATIVOS (INICIO ODR - FINALIZACIN OCM).
PARA TODA LA OPERACIN HAY 2 PUP JOINT DE BACK UP, SI EN EL
TALADRO EL SET DE BACK SE DEBE COBRAR TAMBIEN ESTOS POR EL
MISMO VALOR.

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. POR CADA TALADRO HAY 2 PUP JOINT DE WP
DE 2-3/8", SE DEBE CARGAR EL VALOR DEL PUP JOINT POR EL
NMERO DE DAS OPERATIVOS (INICIO ODR - FINALIZACIN OCM).
PARA TODA LA OPERACIN HAY 2 PUP JOINT DE BACK UP, SI EN EL
TALADRO ESTA EL SET DE BACK SE DEBE COBRAR TAMBIEN ESTOS POR
EL MISMO VALOR.

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. POR CADA TALADRO HAY 1 CALIBRADOR DE
DRIFT DE WP DE 2-3/8", SE DEBE CARGAR EL VALOR DEL CALIBRADOR
POR EL NMERO DE DAS OPERATIVOS (INICIO ODR - FINALIZACIN
OCM).

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. POR CADA TALADRO HAY 2 X-OVER PARA
CONECTAR A 2-3/8" CS HYD UNO PARA LA CONEXION AL STINGER Y EL
OTRO A LA CONEXION DE LA SWIVEL DEL PACKER, SE DEBE CARGAR EL
VALOR DE LOS X-OVER POR EL NMERO DE DAS OPERATIVOS (INICIO
ODR - FINALIZACIN OCM). PARA TODA LA OPERACIN HAY 2 X-OVER
DE BACK UP, SI EN EL TALADRO SE ENCUENTRA EL SET DE BACK UP SE
DEBE COBRAR TAMBIEN ESTOS POR EL MISMO VALOR.
SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA
FASE DE PERFORACIN. POR CADA TALADRO HAY 1 X-OVER PARA
CONECTAR DE 2-7/8" HT PAC A NC-38 EL CUAL SE UTILIZA CUANDO
TENEMOS QUE IR A INFLAR EMPAQUES POR CONTINGENCIA, SE DEBE
CARGAR EL VALOR DEL X-OVER POR EL NMERO DE DAS OPERATIVOS
(INICIO ODR - FINALIZACIN OCM).

SOLO SE DEBE CARGAR 4 UNIDADES, 2 AL POZO RB-1220H Y LOS


OTROS 2 AL RB-1217H. ESTA HERRAMIENTA PERMANECE EN CAMPO
PERO NO TENDR COSTO ADICIONAL A LOS DEMAS POZOS.

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SOLO SE DEBE CARGAR AL PRIMER POZO DE
CADA FRENTE. (4 PRIMEROS POZOS DE LA CAMPAA Y CUANDO SE
LIBERENLAS HRTAS Y SE DEVUELVA AL PROVEEDOR).

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. ES UN SOLO GLOBAL POR CORRIDA DE RVTO,
LINER, TBG Y WASH PIPE, SE CARGA COMO GLOBAL EN LA FASE DE
PERFORACIN SI ES CON LA COMPAA WTF

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SOLO SE CARGA EL VALOR QUE ESTA EN LA
TABLA POR CORRIDA DE WASH PIPE CUANDO ES CON ITS

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SE UTILIZA PARA EL DESPLAZAMIENTO DEL
LODO POR FLUIDO DE COMPLETAMIENTO, HASTA QUE NO DEN AVAL
DE USAR FLUIDO CON ADITIVO SOLO SE CARGARA ESTOS ITEMS, UNA
VEZ DEN EL AVAL SERA INFORMADO CON LA RESPECTIVA
FORMULACIN Y COSTOS. SE DEBE COMPARAR CONTRA TIQUETE.

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SE DEBE COMPARAR CONTRA TIQUETE PARA
COLOCAR EL NMERO DE CARTUCHOS UTILIZADOS.

SOLO SE DEBE CARGAR CUANDO SE REALIZA LA FILTRACIN EL DIA DE


LA CORRIDA DEL LINER RANURADO, SI SE REALIZA LA FILTRACIN UN
DA ANTES SOLO SE CARGARA ESE DA EN LA FASE DE PERFORACIN.
SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA
FASE DE PERFORACIN. SE UTILIZA PARA EL DESPLAZAMIENTO DEL
LODO POR FLUIDO DE COMPLETAMIENTO, HASTA QUE NO DEN AVAL
DE USAR FLUIDO CON ADITIVO SOLO SE CARGARA ESTOS ITEMS, UNA
VEZ DEN EL AVAL SERA INFORMADO CON LA RESPECTIVA
FORMULACIN Y COSTOS. SE DEBE COMPARAR CONTRA TIQUETE.

SE DEBE CARGAR AL DA DE COMPLETAMIENTO ASI SE CORRA EN LA


FASE DE PERFORACIN. SE DEBE COMPARAR CONTRA TIQUETE PARA
COLOCAR EL NMERO DE CARTUCHOS UTILIZADOS.

SOLO SE DEBE CARGAR CUANDO SE REALIZA LA FILTRACIN EL DIA DE


LA CORRIDA DEL LINER RANURADO, SI SE REALIZA LA FILTRACIN UN
DIA ANTES SOLO SE CARGARA ESE DA EN LA FASE DE PERFORACIN.

ESTE COSTO SE DEBE CARGAR EN EL OCM. EL COSTO TOTAL INCLUYE:


MOTOR, BOMBA, SELLOS (2 SELLOS), INTAKE, MIDJOINT (70 UND POR
COMPRA), OVERCOUPLING (70 UND POR COMPRA) Y CABLE DE
FONDO (2600 POR COMPRA) Y CABLE DE SUPERFICIE (300 FT). (VER
HOJA DETALLE EQUIPO BES)

ESTE COSTO SE DEBE CARGAR EN EL OCM. EL COSTO TOTAL INCLUYE:


MOTOR, BOMBA, SELLOS (2 SELLOS), INTAKE, OVERCOUPLING (87 UND
POR COMPRA) Y CABLE DE FONDO (2600 POR COMPRA) Y CABLE DE
SUPERFICIE (300 FT). (VER HOJA DETALLE EQUIPO BES)

ESTE COSTO SE DEBE CARGAR EN EL OCM. EL COSTO TOTAL INCLUYE:


MOTOR, BOMBA, SELLOS (2 SELLOS), INTAKE, OVERCOUPLING (87 UND
POR COMPRA) Y CABLE DE FONDO (2600 POR COMPRA) Y CABLE DE
SUPERFICIE (300 FT). (VER HOJA DETALLE EQUIPO BES)

ESTE COSTO SE DEBE CARGAR EN EL OCM. EL SERVICIO DE


INSTALACIN SE DEBE CARGAR A CADA CORRIDA DE BES. ESTE
INCLUYE SUPERBANDAS, VALVULA CHEQUE, VALVULA DE DRENAJE,
DESCARGA DE LA BOMBA, PANEL DEL SENSOR Y CHOCKE, AS COMO
SU RESPECTIVO CONEXIONADO DE SUPERFICIE.

ESTE COSTO SE DEBE CARGAR EN EL OCM. SE DEBE CARGAR ESTE


VALOR Y UNA VEZ SE HAGA LA LIQUIDACIN MENSUAL HACER CIERRE
Y CARGAR EL VALOR SEGN EL NMERO DE POZOS REALIZADOS EN EL
MES.
ESTE COSTO SE DEBE CARGAR EN EL OCM. ESTE SERVICIO SOLO SE
CARGAR UNA VEZ SE HAGA LA LQUIDACIN MENSUAL SI SE HA
UTILIZADO PARA EL DESCARGUE DE LOS EQUIPOS BES EN BODEGA.

ESTE COSTO SE DEBE CARGAR EN EL OCM. SE DEBE CARGAR EL VALOR


DE LA COMPRA 1 POR CADA POZO

ESTE COSTO SE DEBE CARGAR EN EL OCM. SE DEBERA CARGAR EL


VALOR DE LA INSPECCIN QUE DEFINA EL REA DE LOGISTICA
CUANDO HAGAN EL CIERRE Y DEN UN VALOR OFICIAL DE INSPECCIN
POR POZO.

SE DEBE CARGAR LAS JUNTAS QUE SE BAJAN AL POZO.

SE DEBE CARGAR ESTE VALOR A TODOS LOS POZOS CON TUBERA DE


4-1/2"

SE DEBE CARGAR 2 CALIBRADORES AL 1218H, Y OTROS 2 AL 1219H.


SOLO PARA CARGUE DE COSTOS, PERO FISICAMENTE DEBE HABER UN
SET DE 3-1/2" Y 4-1/2" EN CADA TALADRO.

SE DEBE CARGAR 2 CALIBRADORES AL 1218H, Y OTROS 2 AL 1219H.


SOLO PARA CARGUE DE COSTOS, PERO FISICAMENTE DEBE HABER UN
SET DE 3-1/2" Y 4-1/2" EN CADA TALADRO.
SOLO SE DEBE CARGAR AL POZO 1218H
SE DEBE CARGAR 2 BOTELLAS AL 1219H Y 1 AL 1209H. SOLO PARA
CARGUE DE COSTOS, PERO FISICAMENTE DEBE HABER UN SET DE 3-
1/2" Y 4-1/2" EN CADA TALADRO.

SE DEBE CARGAR 3 BOTELLAS AL 1218H Y 1 AL 1208H. SOLO PARA


CARGUE DE COSTOS, PERO FISICAMENTE DEBE HABER UN SET DE 3-
1/2" Y 4-1/2" EN CADA TALADRO.
SOLO SE DEBE CARGAR ESTE VALOR PARA EL DA DEL
COMPLETAMIENTO.

ESTE VALOR ESTA EN PESOS. SOLO SE DEBE CARGAR ESTE VALOR PARA
EL DA DEL COMPLETAMIENTO. EN COMENTARIOS SE DEBE COLOCAR
EL NOMBRE DE LA PERSONA A LA QUE SE LE ESTA ASOCIANDO EL
PRESUPUESTO
ESTE VALOR ESTA EN PESOS. SOLO SE DEBE CARGAR ESTE VALOR PARA
EL DA DEL COMPLETAMIENTO. EN COMENTARIOS SE DEBE COLOCAR
EL NOMBRE DE LA PERSONA A LA QUE SE LE ESTA ASOCIANDO EL
PRESUPUESTO

ESTE VALOR ESTA EN PESOS. SE DEBE CARGAR EL MONTO DE 8 DAS


EN EL OCM PARA EL INGENIERO DE COMPLETAMIENTO SENIOR A LOS
POZOS REALIZADOS EN EL PX-42 Y EN EL PX-38. EN COMENTARIOS SE
DEBE COLOCAR EL NOMBRE DE LA PERSONA A LA QUE SE LE ESTA
ASOCIANDO EL PRESUPUESTO

ESTE VALOR ESTA EN PESOS. SE DEBE CARGAR EL MONTO DE 8 DAS


EN EL OCM PARA EL INGENIERO DE COMPLETAMIENTO JUNIOR A LOS
POZOS REALIZADOS EN EL PX-40 Y EN EL PX-43. EN COMENTARIOS SE
DEBE COLOCAR EL NOMBRE DE LA PERSONA A LA QUE SE LE ESTA
ASOCIANDO EL PRESUPUESTO SEGN INGENIERO DE TURNO

ESTE VALOR ESTA EN PESOS. SE DEBE CARGAR EL MONTO DE 8 DAS


EN EL OCM DE 234847,25 COP YA QUE ES 1 ING JUNIOR POR LOS 4
POZOS. EN COMENTARIOS SE DEBE COLOCAR EL NOMBRE DE LA
PERSONA A LA QUE SE LE ESTA ASOCIANDO EL PRESUPUESTO SEGN
INGENIERO DE TURNO

Se carga por pozo 16256 USD y la primera semana del siguiente mes se
ajusta con el valor real, el cual se calcula dividiendo el consumo
mensual entre al cantidad de pozos perforados.
Numero de contrato 3000627 (CAMARERIA, LAVANDERIA Y
ALIMENTACION)

SE DEBER CARGAR UN VALOR DE 901 USD POR POZO MIENTRAS SE


HACE EL CIERRE DEL MES. PARA EL CARGUE SE DEBER TENER EN
CUENTA: PERSONAL DE CONSULTEC, BAKER ALS, BAKER COMPLETION
(SOLO CUANDO APLIQUE), HALLIBURTON EMPAQUE INFLABLE Y
SUPERVISOR DE TENARIS POR POZO, CERRADO EL MES SE PASARA LA
LISTA PARA ASIGNACIN DE COSTOS DE VUELOS PARA CADA POZO.
NOTA: LOS VUELOS DE LOS FUNCIONARIOS SE CARGARAN EN OTROS
ITEM DEL PROYECTO, NO SE CARGAN A LOS POZOS.

SE DEBE CARGAR SOLO A LOS POZOS CON TUBERA DE 4-1/2"


SE DEBE CARGAR SOLO A LOS POZOS CON TUBERA DE 3-1/2"

SOLO SE DEBE CARGAR EN CASO DE QUE SE PRESENTE LA


CONTINGENCIA EN LA GEONAVEGACIN DE LA FASE DE 6-1/8" Y SE
DEBAN CORRER
SOLO SE DEBE CARGAR EL VALOR CUANDO SE PRESENTE LA
CONTINGENCIA.

SE DEBERA CARGAR LOS DAS DE OPERACIN Y TAMBIEN LOS DAS


POR DISPONIBILIDAD DEL PERSONAL EN CAMPO SEGN TIQUETE
BAJO VISTO BUENO DEL INGENIERO DE COMPLETAMIENTO A CARGO

SE DEBE CARGAR EL VALOR DE 551,29 USD CON IVA AL PRIMER POZO


DE CADA FRENTE.
POZOS A CARGAR ESTE VALOR

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H


PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1209H


PX-40: RB-1212H, RB-1215H
PX-43: RB-1217H, RB-1218H
PX-38: RB-1220H, RB-1221H

PX -42: RB-1208H, RB-1210H


PX-40: RB-1214H, RB-1213H
PX-43: RB-1219H, RB-1235H
PX-38: RB-1236H, RB-1237H
PX -42: RB-1207H, RB-1209H, RB-1208H, RB-1210H
PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1208H, RB-1209H


PX-40: RB-1212H, RB-1213H, RB-1214H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1208H, RB-1209H


PX-40: RB-1212H, RB-1213H, RB-1214H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1208H, RB-1209H


PX-40: RB-1212H, RB-1213H, RB-1214H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1208H, RB-1209H


PX-40: RB-1212H, RB-1213H, RB-1214H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H, RB-1208H, RB-1209H


PX-40: RB-1212H, RB-1213H, RB-1214H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H
PX -42: RB-1207H, RB-1208H, RB-1209H
PX-40: RB-1212H, RB-1213H, RB-1214H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1235H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H

PX -42: RB-1207H
PX-40: RB-1212H
PX-43: RB-1217H
PX-38: RB-1220H

PX -42: RB-1207H

PX-40: RB-1212H
PX-43: RB-1217H
PX-38: RB-1220H

PX-43: RB-1217H- ITS - QMAX

PX-43: RB-1217H- ITS - QMAX

PX-43: RB-1217H- ITS - QMAX


PX-40: RB-1212H- ITS - WTF
PX-38: RB-1220H- ITS - WTF

PX-40: RB-1212H- ITS - WTF


PX-38: RB-1220H- ITS - WTF

PX-40: RB-1212H- ITS - WTF


PX-38: RB-1220H- ITS - WTF

PX -42: RB-12011H
PX-40: RB-1226H, RB-1227H, RB-1228H, RB-1229H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1232H,RB-1230H, RB-
1231H
PX-38: RB-1251H, RB-1253H, RB-1249H

PX -42: RB-1207H, RB-1208H, RB-1210H, RB-1225H, RB-1222H, RB-


1224H, RB-1223H, RB-1239H
PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H, RB-1216H, RB-
1241H
PX-43: RB-1235H, RB-1234H, RB-1233H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H, RB-1238H, RB-
1250H

PX -42: RB-1209H
PX-43: RB-1247H

TODOS LOS 39 POZOS

TODOS LOS 39 POZOS


SOLO PARA LOS POZOS EN DONDE SE SOLICITO EL SERVICIO

TODOS LOS 39 POZOS

SOLO POZOS CON TUBERA DE 3-1/2"

PX -42: RB-1207H, RB-1208H, RB-1209H RB-1210H, RB-1225H, RB-


1222H, RB-1224H, RB-1223H, RB-1239H, RB-1209H
PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H, RB-1216H, RB-
1241H
PX-43: RB-1235H, RB-1234H, RB-1233H, RB-1247H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H, RB-1238H, RB-
1250H

PX -42: RB-1207H, RB-1208H, RB-1209H RB-1210H, RB-1225H, RB-


1222H, RB-1224H, RB-1223H, RB-1239H, RB-1209H
PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H, RB-1216H, RB-
1241H
PX-43: RB-1235H, RB-1234H, RB-1233H, RB-1247H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H, RB-1238H, RB-
1250H

PX-43: RB-1218H, RB-1219H

PX-43: RB-1218H, RB-1219H

PX-43: RB-1218H

PX -42: RB-1209H
PX-43: RB-1219H

PX -42: RB-1208H
PX-43: RB-1218H, RB-1219H

TODOS LOS 39 POZOS

TODOS LOS 39 POZOS


TODOS LOS 39 POZOS

PX -42: Javier Mantilla/Luis Fernando Lobo


PX-40: Raul Muoz/Edwin Fonseca
PX-43: Raul Muoz/Edwin Fonseca
PX-38: Javier Mantilla/Luis Fernando Lobo

PX-40: Raul Muoz/Edwin Fonseca


PX-43: Raul Muoz/Edwin Fonseca

PX -42: Carolina Barreto/Leidy Porras


PX-40: Carolina Barreto/Leidy Porras
PX-43: Carolina Barreto/Leidy Porras
PX-38: Carolina Barreto/Leidy Porras

TODOS LOS 39 POZOS

TODOS LOS 39 POZOS

PX -42: RB-1207H, RB-1208H, RB-1209H RB-1210H, RB-1225H, RB-


1222H, RB-1224H, RB-1223H, RB-1239H, RB-1209H
PX-40: RB-1212H, RB-1215H, RB-1214H, RB-1213H, RB-1216H, RB-
1241H
PX-43: RB-1235H, RB-1234H, RB-1233H, RB-1247H
PX-38: RB-1220H, RB-1221H, RB-1236H, RB-1237H, RB-1238H, RB-
1250H
PX -42: RB-12011H
PX-40: RB-1226H, RB-1227H, RB-1228H, RB-1229H
PX-43: RB-1217H, RB-1218H, RB-1219H, RB-1232H,RB-1230H, RB-
1231H
PX-38: RB-1251H, RB-1253H, RB-1249H

EN CASO DE CONTINGENCIA

EN CASO DE CONTINGENCIA

A LOS POZOS QUE ESTAN EN OPERACIN DURANTE EL TIEMPO EN


QUE HA ESTADO DISPONIBLE EL OPERADOR DE HALLIBURTON ASI
NO SE TENGA OPERACIN DE CORRIDA DE EMPAQUES.

PX -42: RB-1207H
PX-40: RB-1212H
PX-43: RB-1217H
PX-38: RB-1220H
CODIGO SAP
PROVEEDOR CONTRATO
UTILIZADO
BAKER HUGHES 7000587 71500002357
BAKER HUGHES 7000587 71500024702
BAKER HUGHES 7000587 71500002362
BAKER HUGHES 7000587 71005281365
BAKER HUGHES 7000587 71005281340
BAKER HUGHES 7000587 71005281357
BAKER HUGHES 7000587 71500002360
BAKER HUGHES 7000587 71500002361
BAKER HUGHES 7000587 71500002356
BAKER HUGHES 7000587 71500002355
BAKER HUGHES ABE 76000274 4000807
BAKER HUGHES 7000587 71005281340
BAKER HUGHES 7000587 71006532238
BAKER HUGHES 7000587 71005281365
BAKER HUGHES 7000587 71500002362
BAKER HUGHES 7000587 71500002358
BAKER HUGHES 7000587 71005281357
BAKER HUGHES 7000587 71500002359
BAKER HUGHES 7000587 71500002361
BAKER HUGHES 7000587 71500002360
BAKER HUGHES ABE 76000274 4000807
BAKER HUGHES 7000587 71500002354
BAKER HUGHES 7000587 71500002362
BAKER HUGHES 7000587 71006745111
BAKER HUGHES 7000587 71005281365
BAKER HUGHES 7000587 71005281340
BAKER HUGHES 7000587 71005281357
BAKER HUGHES 7000587 71500002360
BAKER HUGHES 7000587 71500002361
BAKER HUGHES 7000587 71500002359
BAKER HUGHES ABE 76000274 4000807
DESCRIPCION DEL MATERIAL TIPO

BOMBA - PMP 538PMSSD 032 FLEX47 FER M NO_PNT H6 ESP TIPO 3


MOTOR 562 84HP/1725V/30AMP ESP TIPO 3
SENSOR - WellLift N Down hole Gaugue ESP TIPO 3
SELLO - 513 GSB3DBHLPFS H6 ESP TIPO 3
INTAKE GPXARCINT FER H6 ESP TIPO 3
SELLO - 513 GSB3DBHL H6 ESP TIPO 3
CABLE DE FONDO - 4SOLBC 5KV DD13 LD B GAL F ESP TIPO 3
CABLE DE SUPERFICIE - 4SOLBC 5KV 90 LD B GAL FF ESP TIPO 3
MID JOINT - PROTR CBL MID-JT 3.5 9.3PPF TBG SGL CLP ESP TIPO 3
OVER COUPLING - PROTR CBL XCPLG 3.5 9.3PPF TBG DBL CLP ESP TIPO 3
MANT, BOMBAS ALTERNATIVAS ( INSTALACION DE BOMBAS) ESP TIPO 3
INTAKE - INTAKE GPXARCINT FER H6 ESP TIPO 4
MOTOR - 562 MSP3 126HP/2300V/33AMP ESP TIPO 4
SELLO - 513 GSB3DBHLPFS H6 ESP TIPO 4
SENSOR - WellLift N Down hole Gaugue ESP TIPO 4
BOMBA - PMP 538 29FLEX80 PMSSDH6 ESP TIPO 4
SELLO - 513 GSB3DBHL H6 ESP TIPO 4
MID JOINT - MID JOINT 4.5'' ESP TIPO 4
CABLE DE SUPERFICIE - 4SOLBC 5KV 90 LD B GAL FF ESP TIPO 4
CABLE DE FONDO - 4SOLBC 5KV DD13 LD B GAL F ESP TIPO 4
MANT, BOMBAS ALTERNATIVAS ( INSTALACION DE BOMBAS) ESP TIPO 4
MOTOR - MTR 562MSP3 168/2295/44/08R ESP TIPO 5
SENSOR - WellLift N Down hole Gaugue ESP TIPO 5
BOMBA - PMP 538PMSSD 044 FLEX80 H6 FER ESP TIPO 5
SELLO - 513 GSB3DBHLPFS H6 ESP TIPO 5
INTAKE - INTAKE GPXARCINT FER H6 ESP TIPO 5
SELLO - 513 GSB3DBHL H6 ESP TIPO 5
CABLE DE FONDO - 4SOLBC 5KV DD13 LD B GAL F ESP TIPO 5
CABLE DE SUPERFICIE - 4SOLBC 5KV 90 LD B GAL FF ESP TIPO 5
MID JOINT - MID JOINT 4.5'' ESP TIPO 5
MANT, BOMBAS ALTERNATIVAS ( INSTALACION DE BOMBAS) ESP TIPO 5
VALOR UNITARIO VALOR UNITARIO
SIN IVA USD /FT CON IVA USD
7,759.44 9,000.95
10,848.38 12,584.12
10,133.21 11,754.52
5,115.12 5,933.54
2,800.53 3,248.61
4,785.47 5,551.15
5.80 6.73
2.40 2.78
23.37 27.11
51.61 59.87
9,000.00 10,440.00
2,800.53 3,248.61
10,995.62 12,754.92
5,115.12 5,933.54
10,133.21 11,754.52
12,158.02 14,103.30
4,785.47 5,551.15
27.27 31.63
2.40 2.78
5.80 6.73
9,000.00 10,440.00
14,814.47 17,184.79
10,133.21 11,754.52
15,620.59 18,119.88
5,115.12 5,933.54
2,800.53 3,248.61
4,785.47 5,551.15
5.80 6.73
2.40 2.78
27.27 31.63
9,000.00 10,440.00
CODIGO SAP
PROVEEDOR CONTRATO
UTILIZADO

FMC TECHNOLOGIES INC 7000132 71500002363

FMC TECHNOLOGIES INC 7000132 71500002367

FMC TECHNOLOGIES INC 7000132 71500002386

FMC TECHNOLOGIES INC 7000132 71500002363

FMC TECHNOLOGIES INC 7000132 71500002369

FMC TECHNOLOGIES INC 7000132 71500002385


FEPCO ZONA FRANCA S.A.S 71005067210 71005067210
FEPCO ZONA FRANCA S.A.S 71006537872 71006537872
FEPCO ZONA FRANCA S.A.S 71005067350 71005067350
FEPCO ZONA FRANCA S.A.S 71005599535 71005599535
FEPCO ZONA FRANCA S.A.S 71006537880 71006537880
FEPCO ZONA FRANCA S.A.S 71005599733 71005599733
VALOR UNITARIO
DESCRIPCION DEL MATERIAL
SIN IVA USD /FT
CASING HEAD C-22-BP-ET, 9 5/8 API BC PREP X 11-2K W/ TWO 2 LPO, AA, U (SECCION A - 2683.64
ITEMS 1 A 7 )
TUBING HEAD ASSY, TCM-ET 7 FS PREP, 11-2K X 7 1/16-2K FLG TOP W/ TWO 2 LPO, AA, 2748.40
S-U, PSL 2, (SECCION B -ITEMS 1 A 6)
X MAS TREE 3 1/2 2K ESP COMPLETION ( SECCION C ITEMS 1 A 11) 4667.16
CASING HEAD C-22-BP-ET, 9 5/8 API BC PREP X 11-2K W/ TWO 2 LPO, AA, U (SECCION A - 2683.64
ITEMS 1 A 7 )
TUBING TCM-ET, 11 2K X 11 2K W/ TWO 2 API LP, P-U, AABBDDEE, PSL 1 (SECCION B - 3199.76
ITEMS 1 A 6 )
X MAS TREE 4 1/2 2K ESP COMPLETION (SECCION C ITEMS C1 A C13) 11198.24
TEST PLUG RETRIEVING TOOL FP-TP 11 X 4-1/2 IF PIN X BOX 2279.16
BOWL PROTECTOR FP-BP-C22/C29 11 X 8-3/4 MAX BIT DIAM.X 12 LONG 1189.98
PACK.(FOR/OR TYPE) DOVETAIL NITRILO OD 10 11/32 ID 9 9/16 D/H 7/8 183.91
TEST PLUG RETRIEVING TOOL 7-1/16 X 3-1/2 IF BOX X PIN 1728.90
BOWL PROTECTOR FP-C22/C29 7 1/16 X 6-1/4 MAX BIT DIAMETER 689.11
PACK.(FOR/OR TYPE) OO NITRILO OD 7 ID 6 D/H 1/2 102.00
VALOR UNITARIO
ASOCIADO A
CON IVA USD

3113.02 ESP TIPO 3

3188.14 ESP TIPO 3

5413.91 ESP TIPO 3

3113.02 ESP TIPO 4

3711.72 ESP TIPO 4

12989.96 ESP TIPO 4


2643.83 HTA PRUEBA 11"
1380.38 HTA PRUEBA 11"
213.33 HTA PRUEBA 11"
2005.52 HTA PRUEBA 7 1/16"
799.37 HTA PRUEBA 7 1/16"
118.32 HTA PRUEBA 7 1/16"