Project : RSKU Kundang Date : 4/5/2017


Subject : 4.2m Long Precast Plank Done by : Alex

Ref Calculations Remarks

Material Parameters:

Grade of Concrete = 30 N/mm


2
gc = 1.5
Grade of Steel = 500 N/mm2 gs = 1.15
Concrete cover , c= 25 mm gf D.L = 1.4
Thickness of Plank = 65 mm gf L.L = 1.6
Thickness of Topping = 75 mm Thickness of Slab, t = 140 mm
Spacing of Lattice Girder = 600 mm
2
Grade of Steel Shear = 250 N/mm

Loadings:

2
S.D.L Finishes : 0 kN/m
2
Others : 0 kN/m
2
M&E: 0.3 kN/m
2
L.L Imposed Load : 2.5 kN/m

Design:

Case : 1 Lifting case

Dynamic Factor for Lifitng = 1.5


2
Self Wt of Plank = 1.56 kN/m
2
Factored Self Wt = 2.34 kN/m

From Analysis, Refer Appendix 1

Moment Top MTOP = 2.2 kNm


Moment Bottom Mbottom = 1.5 kNm

Diameter of Lattice Top bar, t = 10 mm


Diameter of Lattice bottom bar, b = 6 mm
Diameter of Slab Top bar, ts = 8 mm
Diameter of Slab bottom bar, bs = 10 mm
Diameter of Slab distribution bar, bds = 8 mm
Diameter of Diagonal bar, ds = 6 mm
Lever arm of Lattice Girder, Z = 48 mm

2
Ast TOP Lattice Girder = 63.25 mm Use T10 bar
2
Ast bottom Lattice Girder = 43.125 mm Use T6 bar

Shear,V = 3.5 kN
Force in Diagonal bar= 2.97 kN ( inclined at 45 degree)

2
Ast Shear Area Girder = 10.3 mm USE 6 bar size
Area of diagonal Lattice bar= 0.28 Use R6 bar
per interface area cross section

Summary :
Lattice Girder top bar = 10 mm
Lattice Girder bottom bar = 6 mm
Lattice Diagonal bar = 6 mm

Case : 2 Final Case

2
Self Wt of Slab = 3.36 kN/m
2
SDL = 0.3 kN/m
2
IL= 2.5 kN/m
2
Factored Design Load = 9.12 kN/m

Effective Depth of Slab = 110.00 mm


Lever arm of slab = 104.50 mm
Span = 4200.00 mm

From Analysis, Refer Appendix 2

Page 1 of 2
PJPT
Project : RSKU Kundang Date : 4/5/2017
Subject : 4.2m Long Precast Plank Done by : Alex

Ref Calculations Remarks


Moment Top MTOP = 20.1 kNm
Moment Bottom Mbottom = 14.9 kNm

2
Ast TOP First Internal Support = 365.00 mm /m Spacing= 100
2
Ast BOTTOM End Span = 275.00 mm /m Spacing= 100
2
Ast Provided Top= 505.00 mm /m
2
Ast Provided Bottom= 785.00 mm /m
2
Ast Minimum= 182.00 mm /m Spacing= 200

Deflection Check:

Tension Modification factor = 1.96


Basic Value= 20

Allowable Deflection= 39.2


Actual Deflection= 38.18 Deflection Pass

Summary :
Provide Top Steel T8@100 @ Support
Provide Bottom Steel T10@100 @ Mid Span
Provide Distribution steel T8@200

Case : 3 Construction stage

Number of Props= 2

2
Self Wt of Plank = 1.56 kN/m
2
Self Wt of Topping = 1.875 kN/m
2
Total Dead Load = 3.435 kN/m
2
Construction load = 1.5 kN/m

From Analysis, Refer Appendix 3

Moment Top MTOP = 1.4 kNm


Moment Bottom Mbottom = 1.3 kNm

2
Ast TOP First Internal Support = 45.00 mm /m
2
Ast BOTTOM End Span = 40.00 mm /m
2
Ast Provided Top= 78.50 mm /m
2
Ast Provided Bottom= 815.00 mm /m

Result :
Length of Plank= 4.2m
Number of propping = 2
Lattice Girder Top bar = T10 bar.
Lattice Girder Bottom bar = 2T6 bar.
Lattice Diagonal bar =R6 bar.
Provide Bottom Steel Reinforcement T10 - 100C/C.
Provide Top Steel Reinforcement T8 - 100C/C.
Provide Distribution Reinforcement T8 - 200C/C.