You are on page 1of 11

See

discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/265350187

A Method for the Sag-Tension Calculation in


Electrical Overhead Lines

Article in International Review of Electrical Engineering May 2011

CITATIONS READS

10 1,018

3 authors, including:

Isabel Albizu A.J. Mazon


Neiker-Tecnalia Basque Institute for Agricult Universidad del Pas Vasco / Euskal Herriko U
62 PUBLICATIONS 1,066 CITATIONS 75 PUBLICATIONS 687 CITATIONS

SEE PROFILE SEE PROFILE

All content following this page was uploaded by A.J. Mazon on 05 November 2015.

The user has requested enhancement of the downloaded file.


Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

A method for the sag-tension calculation in electrical overhead lines

I. Albizu1, A.J. Mazon1, E. Fernandez1

Abstract The sag and tension values of overhead conductors are influenced by the creep
developed during the line lifetime. This paper presents a method for the sag-tension calculation of
overhead conductors that is characterised by the creep sequential calculation. Thus, the creep
developed in previous stages influences the creep developed in subsequent stages. Two periods
are differenced in the creep development: the installation period and the operation period. The
relation between the creep development and the factors that influence it such as the installation
process and the operation conditions during the line lifetime is described step by step. Copyright
2011 Praise Worthy Prize S.r.l. - All rights reserved.

Keywords: Sag-tension, Overhead conductor, Creep

The most complete methods are those that consider an


independent core and aluminium behaviour and obtain
I. Nomenclature the creep value from experimental tests [6-8]. These
T tension methods calculate the aluminium tension and for this
L length reason they calculate the knee-point temperature where
A area the aluminium gets slack.
E elastic modulus The most widely used method is the graphical method
[6] that is implemented in commercial software programs
coefficient of thermal expansion
such as SAG10 or PLS-CADD. This method is based on
weight
stress-strain and creep experimental curves. The core and
temperature
the aluminium curves are obtained separately.
s span length The strain summation method [7] was proposed as an
stress alternative to the graphical method. The method is
total strain characterized for having the conductor strain as the
strain related to temperature dependent variable. The strain can be caused by tension,
T strain related to tension temperature and creep. The creep is the result of the
mc strain related to metallurgical creep addition of metallurgic creep and geometrical settlement.
gs strain related to geometrical settlement Each of these strains is evaluated individually and they
t time are added to obtain the total strain.
g related to span geometry In [8], the authors developed a method for the special
c related to conductor requirements of the gap-type conductors. The method
core related to core was based on the strain summation method but some
a related to aluminium changes and improvements were carried out. For
o related to reference condition example, independent core and aluminium reference
lengths were considered and the calculation of the creep
developed during the installation was defined in detail.
II. Introduction The authors have carried out the generalization of the
method. As a result, the method is valid not only for gap-
The aim of the sag-tension calculation is the
type conductors but for any type of conductor, including
calculation of the installation tension as a function of the
the high temperature low sag (HTLS) conductors [9-12]
sag and tension limits. Sag-tension calculation methods
and the conventional conductors such as the ACSR. The
allow the calculation of the conductor sag and tension for
main advantage of the method is the flexibility for the
different conductor temperatures, and wind and ice load
consideration of several creep stages and the ability to
conditions, taking into account the evolution of the
take into account the influence of previous creep stages.
conductor creep during the line lifetime [1]. The tension
This paper gives a detailed description of the method
is limited by the tension limit of the conductor and the
and it includes diagrams that relate all the parts of the
towers. The sag limit is related to the security distance to
calculation algorithm. The relation between the outputs
ground and line crossings. If the crossing distance is
and the inputs of the algorithm parts are clearly defined
below the security distance, line faults could occur [2-5].
from the installation of the conductor to the end of the
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

line lifetime. The creep calculation during the installation maximum tension conditions are characterised by the
is fully described as a function of the type of conductor conductor temperature and the ice and wind load values.
(gap-type or non gap-type) and taking into account the The tension limit values are defined for these conditions.
time the conductor is at rest and whether there is The conditions are related to specific stages (after the
pretensioning or not. The calculation of creep developed installation, 10 year operation, etc.). Thus, from the
during the operation is also described. installation tension Tinst, the algorithm calculates the
conductor tension in the defined maximum tension
conditions. The installation tension value Tinst is iterated
III. Sag-Tension Calculation Algorithm until one of the maximum tension conditions does not
The creep developed in previous stages influences the allow increasing its value. The state calculation
creep developed in subsequent stages [13,14]. For this algorithm determines the conductor tension value
reason, the algorithm makes a sequential calculation of calculating separately the core tension Tcore and the
the creep. Two periods are differenced in the creep aluminium tension Ta from the conductor temperature i,
development: the installation period and the operation the wind and ice load and the creep core,
mc
i
, a,mci , core,
gs
i
period (Fig. 1). The creep developed during the operation and a,gsi of the corresponding stage (installation, stage 1,
depends on the creep previously developed during the
installation. The creep developed during each operation stage 2, etc.).
stage is calculated taking into account the creep
developed so far.
IV. State Calculation Algorithm
In each stage, the metallurgical creep mc and the creep
due to geometrical settlement gs are calculated The state calculation algorithm is shown in Fig. 2. The
separately. The metallurgical creep is calculated as a core tension Tcore is iterated until the difference between
function of the conductor tension T, the conductor the span geometry length Lg and the conductor length Lc
temperature and the duration t of the stage. The strain is below a threshold value. The aluminium tension Ta
due to geometrical settlement is assumed to be cannot go below its minimum value. This minimum
independent of time. It is only dependent on the value is zero or a negative value if aluminium
conductor construction and the historical maximum compression is considered [15]. This is taken into
tension Tmax experienced. This calculation process is account in the algorithm when aluminium tension Ta is
carried out for the aluminium and the core separately. evaluated.
INSTALLATION OPERATION State calculation
Installation Operation Operation
core,
mc
inst stage 1 core
mc
,1 stage n
mc
core, n
Core
a,mcinst amc,1 a,mcn core
mc
(2,4)
Lcore
core,
gs
inst
core
gs
,1 core,
gs
n
core
gs

Lc
a,gsinst ags,1 a,gsn
Iterate on Tcore
Tamax
,inst
Tamax
,1 Tamax
,n until Lc = Lg
Tcore
La
Aluminium
max max max
Tcore ,inst Tcore ,1 Tcore ,n (1,3)
Ta
amc

ags
Fig. 1. Creep and maximum tension evolution in time

When the method characterises the conductor


Load
installation it differentiates between the gap-type Span Lg
geometry
conductors and the rest of conductors. Tc
The conductor temperature and the wind and ice loads
are assumed to be constant during each operation stage. +
+
Thus, the parameters that characterise each stage i are the
following:
Conductor temperature i Fig. 2. State calculation algorithm
Load conditions (ice and wind)
The state calculation algorithm is based in the
Duration ti
dependence of the core and aluminium lengths Lcore and
From the creep strain values calculated for the
La on the strain values due to tension core
T
, aT ,
operation stages, the tension values related to the
maximum tension conditions are calculated by the state temperature core

, a , and creep core
mc
, amc , core
gs
, ags ,
calculation algorithm described in section IV. The
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

and the core and aluminium reference lengths Lcore


o
and expected to support during the pre-sagging step (usually
70 %) and the duration tpre-sagging of the pre-sagging step.
Lao (1,2). The outputs of the algorithm are the maximum tension
Tamax experienced and the deformation due to

La Lao aT a amc ags (1)
,inst

metallurgical creep amc,inst and geometrical settlement


Lcore L core
T
core mc
gs
(2)
o core core core
ags,inst .
From the installation sagging tension Tinst and the
As described in [8], the core and aluminium reference percentage of the sagging tension Ta,inst(%), the
lengths Lcore and Lao correspond to the reference aluminium tension Ta,inst is calculated.
o
The metallurgical creep amc,inst is calculated as a
condition with no tension and no creep. They are
obtained from the installation condition, where the function of the aluminium tension Ta,inst the installation
temperature and the tension values are known and the temperature inst and the duration tpre-sagging of the pre-
creep strain is estimated from the installation process sagging step. The metallurgical creep in the aluminium
(3,4). The span geometry is characterised by the catenary follows the law given in (6), where K, , and are
equation. The catenary equation is a function of the constant coefficients that represent the behaviour of the
conductor tension T and the weight . The weight value aluminium [14].
depends on the conductor weight c and the wind and
ice load. The catenary length Lg,inst is obtained from the mc K e t (6)
installation tension Tinst and the conductor weight c (5).
The deformation due to geometrical settlement ags,inst
L g ,inst
Lao (3) is obtained from the modified stress-strain curves of the
1 T
a ,inst

a ,inst amc,inst ags,inst aluminium. The strain in the stress-strain curve [16] is
L g ,inst composed of three components related to the stress, the
Lcore (4) geometrical settlement and the metallurgical creep
o
1 T
core , inst

core,inst core
mc
,inst core , inst
gs
developed during one hour. To obtain directly the value
Tinst s c of the geometrical settlement from the curve, this is
L g ,inst 2 sinh (5) modified removing the strain related to the metallurgical
c 2 Tinst creep. For this purpose, the metallurgical creep at the
stress-strain test temperature s-s and different stress
values is calculated by (6). Thus, a modified curve is
V. Creep Developed during the obtained as it is shown in Fig. 4.
Installation The total strain a corresponding to the tension Ta at
the installation temperature inst is obtained from the
modified aluminium stress-strain curve. The modified
V.1. Gap-type Conductors stress-strain curve corresponding to the stress-strain test
The gap-type conductors allow a relative displacement carried out at the temperature s-s is displaced in the
between the core and the aluminium during the strain axis in order to model the deformation a,inst due
installation of the conductor. In this way, the aluminium to thermal expansion (Fig. 5). This deformation a,inst is
gets slack during the installation and the knee-point
temperature is forced to be the temperature of a function of the installation temperature inst, the
installation. Thus, the installation process of the gap-type temperature s-s of the stress-strain test and the
conductors is special and comprises several steps. For a coefficient of thermal expansion a of the aluminium (7).
few minutes, during the pre-sagging step, around 70 % From the tension Ta,inst and the area of the aluminium Aa,
of the sagging tension is applied only to the aluminium. the aluminium stress a,inst is calculated and the strain a
In the final installation step, the whole sagging tension is is obtained from the aluminium stress-strain curve (Fig.
applied only to the steel for a few hours, between 2 and 5). The strain due to tension a,T inst is obtained from the
24 hours depending on the span. Due to this special aluminium stress a,inst and the elastic modulus of the
installation process, the total strains of the aluminium a aluminium Ea (8). The deformation due to geometrical
and the core core have different values. settlement ags,inst is then calculated subtracting from the
Fig. 3 shows a diagram of the algorithm that
calculates the creep developed by the aluminium during total strain a the strain due to tension a,T inst and the
the installation of the gap-type conductors. The input strain due to thermal expansion a,inst (9).
values of the algorithm are the installation temperature
inst, the installation sagging tension Tinst, the percentage
of the sagging tension Ta,inst (%) the aluminium is
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3


Geometrical

settlement (9) a,gsinst
inst Thermal a,inst Modified aluminium
expansion (7) stress-strain curve a,inst
(Fig. 5)
Tinst Ta,inst
Aluminium
pre-sagging
Ta,inst (%) tension

Elastic a,T inst


deformation (8)

Tamax
,inst

Metallurgical
creep (6) a,mcinst
tpre-sagging

Fig. 3. Creep developed in the aluminium of a gap-type conductor during the installation

calculates the creep developed by the core during the


modified installation of the gap-type conductors. The input values
original of the algorithm are the installation temperature inst, the
installation sagging tension Tinst and the time the core is
at rest under installation sagging tension trest. The outputs
max
of the algorithm are the maximum tension Tcore ,inst

experienced and the deformation due to metallurgical


creep core
mc
and geometrical settlement core
gs
.
,inst ,inst

Fig. 4. Modified (1 h metallurgical creep removed) stress-strain curve The metallurgical creep core
mc
,inst
is calculated as a
function of the core tension Tinst, the installation
temperature inst and the time the core is at rest trest. The
metallurgical creep in the core follows the law given in
a,inst (6), where K, , and are constant coefficients that
represent the behaviour of the core steel. These
coefficients are different from those previously given for
the aluminium.
a,inst
The deformation due to geometrical settlement
a,inst core
gs
,inst
is obtained from the stress-strain curves in a
similar way to the aluminium (10-12). This process has
Fig. 5. Modified (1 h metallurgical creep removed) aluminium
stress-strain curve
been described above.

a,inst a inst s s ,inst core inst s s



(7) core (10)

aT,inst a ,inst E a (8) T


core,inst core,inst Ecore (11)

ags,inst a ,inst aT,inst a,inst (9) core
gs
,inst core core,inst core,inst
T
(12)

Fig. 6 shows a diagram of the algorithm that


Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3


Geometrical

settlement (12) core,
gs
inst
inst Thermal core, inst Modified core
expansion (10) stress-strain curve
core
Tinst

Elastic core,
T
inst
deformation (11)
max
Tcore ,inst

Metallurgical core,
mc
inst
creep (6)
trest

Fig. 6. Creep developed in the core of a gap-type conductor during the installation

values avirtual and core


virtual
obtained from the virtual
V.2. Non gap-type Conductors stress-strain curves of the aluminium and the core as it is
shown in Fig. 8. From the stress values, the tension
In the case of non gap-type conductors there is no values are obtained (15,16).
relative displacement between the core and the
A
aluminium during the installation of the conductor. a ,inst avirtual
,inst
(13)
Hence, the total strains of the conductor c, the Aa
aluminium a and the core core have the same values. For A
core,inst core ,inst
virtual
(14)
this reason, the reference lengths of the core Lcore
o
and the Acore
aluminium Lao have the same values.
,inst a ,inst Aa
Tamax (15)
It is recommended to maintain the conductors at rest
T max
core ,inst core,inst Acore (16)
under the sagging tension Tinst for some hours in order to
reduce the metallurgical creep during line operation. 12
hours is recommended and 48 hours is desirable. While the conductor is at rest during the period trest,
The deformation due to geometrical settlement is the deformation due to creep develops, the conductor
independent from the duration of the period at rest. It stress value decreases and as a consequence the creep
depends on the sagging tension Tinst and the installation deformation developed afterwards decreases too. In other
temperature inst. Fig. 7 shows a diagram of the algorithm words, the creep that results from a constant stress value
that calculates the geometrical settlement creep equal to the initial stress of the period is higher than the
developed in the core core
gs
and the aluminium ags,inst creep that actually develops. To take into account this
,inst
fact, the calculation method follows the following steps.
during the installation. The deformation due to Firstly, the initial reference length Lo,ini is calculated
geometrical settlement is obtained from the stress-strain taking into account the catenary conductor length Lg
curves of the conductor. In this case, the total strains of related to the installation tension Tinst, the creep strain
the aluminium a and the core core have the same values. due to geometrical settlement ags,inst calculated
Fig. 8 shows the way these strains are obtained. Firstly,
the core and aluminium curves are displaced in the strain previously, the strain due to tension a,T inst and the strain
axis to take into account the strain due to temperature due to temperature a, inst (17). The metallurgical creep is

core and a,inst . Then, from the tension Tinst and the
,inst not taken into account because it has not started
area of the conductor A, the conductor stress inst is developing yet.
calculated and the total strain c is obtained from the
conductor stress-strain curve. This strain value is the Lg
Lo ,ini Lcore
o ,ini Lo ,ini
a (17)
same as the aluminium a and the core core strains.
Besides, the stress values of the aluminium a and the
1 T
a ,inst a,inst ags,inst
core core are calculated (13,14) from the virtual stress
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3


Geometrical
settlement (9,12)


inst Thermal core ,inst Modified conductor core core,
gs
inst
expansion a,inst
stress-strain curves
a
(7,10) (Fig. 8)
Tinst
a ,inst a,T inst ags,inst
Elastic
core,inst deformation core
T
,inst
(8,11)

Tamax
,inst
Tension
max
(15,16) Tcore ,inst

Fig. 7. Geometrical settlement creep developed in the core and the aluminium during the installation

conductor Lg
Lo Lcore Lao (18)
o
1 T
a ,inst

a ,inst ags,inst amc,inst
inst
core
virtual
core,inst
The conductor can be pretensioned during the
installation process causing the geometrical settlement of
a,virtual
inst
aluminium
the conductor and decreasing the deformation developed
during the operation. During the pretensioning period,

core, a the conductor is under a tension Tpret that is higher than
inst core
c the installation tension Tinst.
a,inst The calculation of the deformation due to geometrical
Fig. 8. Modified conductor stress-strain curve settlement is carried out in a similar way to the
calculation when there is no pretensioning. The only
Then, to calculate the metallurgical creep developed difference is the value of the tension. Thus, the
during the rest period trest, the method proposed by calculation algorithm is that given in Fig. 7 but with Tpret
CIGRE [14] is used. This method divides the period of instead of Tinst.
time trest in short sub-periods in which the change in The calculation of the metallurgical creep is also
stress and creep strain is small enough. Sub-periods in carried out in a similar way to the calculation when there
which the change in strain is around 20 m/m are is no pretensioning. The only difference is that when the
considered. The initial tension of the first sub-period is initial reference length Lo,ini corresponding to the
the installation tension Tinst. At the end of each sub- beginning of the period at rest is calculated, the creep
period, with the new creep values, the core and developed during the pretensioning period is taken into
aluminium tension values are updated by the state account (19).
calculation algorithm and these are used to evaluate the
creep in the following sub-period. This process is carried Lg
Lo,ini (19)
out until the period is completed. As a result, the
metallurgical creep developed by the core core,
mc
and
1 T
a ,inst

a ,inst ags, pret amc, pret
inst

the aluminium a,mcinst , and the tension value T at the end


of the period are obtained. VI. Creep Developed during the Operation
At the end of the period, the conductor catenary length To calculate the creep developed during the operation,
Lg related to the final tension T is higher than the initial the line lifetime is divided in operation stages where the
conductor catenary length Lg related to Tinst, and for this conductor temperature and the wind and ice loads are
reason the conductor is retensioned to the initial value. assumed to be constant. The method calculates
Hence, a portion of the conductor is removed. Thus, the sequentially each of the operation stages.
new reference value Lo is lower than the initial reference Fig. 9 shows the calculation of the creep in the
value Lo,ini and it is given by (18) taking into account the operation stage i. The input values are the creep strain
metallurgical creep a,mcinst developed during this period. values core ,i 1 a ,i 1 core ,i 1
mc
, mc , gs and ags,i 1 and the historical
maximum tension values Tcore
max
,i 1
and Tamax
,i 1
at the end of
the stage (i-1). The output values are the same but at the
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

end of the stage i.


Operation stage i

Metallurgical
creep
calculation
core,
mc
i

core
mc a,mci
,i 1 State ti
Calculation
mc
a ,i 1 (Fig. 2)

core
gs
,i 1
Geometrical
ags,i 1 settlement
calculation
i Toa,i core,
gs
i

Tocore,i
Loadi a,gsi

Tamax
Tamax
,i 1
,i

max max
Tcore ,i 1
Tcore ,i

Fig. 9. Creep calculation in the operation stage i

In a first step, the initial tension values Tao,i and Tcore


o
,i
whereas the conductor behaviour is affected by the
conductor temperature i. The algorithm iterates the
corresponding to the creep at the end of the stage (i-1)
tension value Tc until the difference between the span
and the temperature and the load of the stage i are
geometry length Lg and the conductor length Lc is below
calculated by the state calculation algorithm. From these
a threshold value. The conductor is characterised from
tension values the geometrical settlement is calculated
the stress-strain curves of the core and the aluminium.
first and the metallurgical creep is calculated afterwards.
These curves have been modified as it has been
The initial tension values Tao,i and Tcore
o
,i
of the stage i described above (Fig. 4). Besides, below the maximum
are compared with the historical maximum tension historical tension value, the behaviour of the aluminium
max max
values Tcore ,i 1 and Ta ,i 1 . If they are lower, the creep and the core is linear and is a function of the elastic
modulus (Fig. 11).
strain due to geometrical settlement and the maximum To make the calculation of the metallurgical creep
historical tension values do not change. If the initial developed during the stage i, the period ti is divided in
tension value is higher, the creep strain due to several sub-periods where stress and temperature values
geometrical settlement and the maximum historical are considered to be constant. As it has been mentioned
tension values are recalculated. Fig. 10 shows the before, sub-periods in which the change in strain is
calculation of the geometrical settlement of the around 20 m/m are considered. To evaluate the creep
aluminium a,gsi . The total strain a,i is given by (20) and during the first sup-period, the core and aluminium stress
the geometrical settlement of the aluminium a,gsi is values are calculated by the state calculation algorithm
from the geometrical settlement calculated for the stage i,
calculated by the equation (21). The calculation for the the metallurgical creep at the end of the stage (i-1) and
core is carried out in a similar way. the temperature i . At the end of each sub-period, the
core and aluminium tension values are updated. As a
La
a ,i (20) result, the metallurgical creep developed by the core
Lao core,
mc
and the aluminium a,mci are obtained.
i
ags,i a ,i aT,i a,i amc,i 1 (21)
The load due to wind or ice affects the span geometry
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

Aluminium geometrical settlement

Span
Lg Iterate on Tc
geometry
until Lg = Lc Tc
Loadi (catenary
equation)

i Conductor Lc
stress-strain Tamax
Ta ,i
curve at stage
(i-1)

Deformation
La
a ,i Geometrical a,gsi
calculation settlement (21)
(20)

Elastic aT,i
deformation

Thermal a,i
expansin
amc,i 1

Fig. 10. Aluminium geometrical settlement calculation in the operation stage i

aluminium assumed to be 15 C for 6 months, 30 C for 3 months,


60 C for 2 months and 120 C for one month every year.
max
a ,i
max stage (i-1)
a ,i 1
stage i VII.1. Creep Developed during the Installation
The ZTACIR conductor is a non gap-type conductor
and for this reason the algorithm described in sub-section
V.2 is applied. Thus, the geometrical settlement is
a, i amc,i1 ags,i1 calculated with the algorithm given in Fig. 7 The inputs
gs
T are the installation temperature inst (15 C) and tension
a,i a,i
Tinst (1681 kg). The obtained results are the geometrical
a,i settlement of the core core gs
(6.5410-6) and the
,inst

Fig. 11. Stress-strain curve of the aluminium at the end of the stages
aluminium ags,inst (1.710-4), and the historical maximum
(i-1) and i max
tension of the core Tcore (812 kg) and the aluminium
,inst

Tamax
,inst
(869 kg). For the metallurgical creep calculation,
VII. Application Example
the period the conductor is at rest trest is assumed to be
The described method is applied in an application one hour. The obtained results are the metallurgical creep
example. The span length is 350 m and the conductor is developed by the core core,mc
inst
(3.5510-6) and the
the ZTACIR Hen. The installation tension is 1681 kg (15
% RTS) and it has been carried out at 15 C. aluminium a,mcinst (8.510-6). As the ZTACIR is a non
The maximum tension conditions evaluated are those gap-type conductor, the reference lengths Lcore and Lao
o
established in the Spanish regulation. The maximum
tension condition in Spanish lines considers ice load at given by the equation (18) have the same value (350.65
-20 C. Besides, a high temperature operation of the line m). They are obtained from the catenary length of the
is expected. In order to model the effect of different installed conductor Lg (350.89 m).
operation temperatures, the conductor temperature is
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

VII.2. Creep Developed during the Operation conditions during the line lifetime is described step by
step. The algorithm is characterised by the creep
The creep developed for 10 years is calculated. The
sequential calculation. Thus, the creep developed in
first step is the definition of the operation stages. For this
previous stages influences the creep developed in
purpose, in addition to the duration of the stage, the
subsequent stages. Two periods are differenced in the
conductor temperature and the wind and ice loads have
creep development: the installation period and the
been defined. Each year is divided in 4 stages of
operation period.
different length (6, 3, 2 and 1 month) where different
The method is suitable for modelling the conductor
conductor temperatures are assumed (15 C, 30 C, 60
behaviour including the multiple stages during the line
C, 120 C). Besides, after 5 years in operation an ice
lifetime. Besides, it allows a detailed modelling of the
load condition is assumed at -20 C. Hence, 41 stages are
installation process. The described algorithm takes into
calculated. The algorithm described in Fig. 9 is applied
account the interaction between the metallurgical creep
to each of the stages.
and the geometrical settlement. Thus, the method
Fig. 12 shows the evolution of the creep during the 10
calculates the installation tension for new lines taking
year period. The first 5 years there is an increase of the
into account the expected conditions during the line
metallurgical creep that decreases the tension value. As a
lifetime. Furthermore, the method is also useful for the
consequence, the tension values are below the historical
calculation of the current state of lines in operation
tension values and no geometrical settlement is
whose historical operation conditions are known.
developed. When the ice load occurs new historical
The method has several advantages over other
tension values are obtained for the core Tcore max
(1494 kg)
methods proposed in literature. Some advantages of the
and the aluminium Tamax
,inst
(2109 kg). Hence, geometrical developed method over the graphical method are related
settlement is developed and it mainly affects the to the creep stages (several stages are calculated
aluminium. During the last 5 years the metallurgical sequentially and there is interaction between
creep develops but much slower than at the beginning. metallurgical creep and creep due to wind or ice loads),
the gap-type conductor installation (the aluminium creep
3,E04 is modelled and the steel is assumed to be at rest during a
configurable duration), the high temperature
Metallurgical creepstrain

2,E04
metallurgical creep (independent core and aluminium
2,E04 creep calculation and coefficients as a function of the
conductor type) and the pretensioning during the
1,E04
installation (it is included in the calculation method).
5,E05 Some advantages over the strain summation method are
0,E+00 the independent core and aluminium reference lengths
0 1 2 3 4 5 6 7 8 9 10 for gap-type conductors and the detailed calculation of
Time,year the creep developed during the installation.
Core Aluminium

5,E04
Acknowledgements
Geometricalsettlementstrain

4,E04 This work is financially supported by the University


of the Basque Country UPV/EHU under project
3,E04
EHU09/18, the Ministerio of Ciencia e Innovacin under
2,E04 project DPI2009-08454 and the Eusko Jaurlaritzako
Hezkuntza, Unibertsitate eta Ikerketa Saila (Euskal
1,E04
unibertsitate-sistemako ikerketa-taldeak Ref. IT532-10).
0,E+00
0 1 2 3 4 5 6 7 8 9 10

Time,year References
Core Aluminium [1] CIGR B2-12 Brochure (Ref. No. 324), Sag-tension calculation
methods for overhead lines, 2007.
Fig. 12. Creep developed during the operation [2] H. Mokhlis, H.Y. Li, A.R. Khalid, The application of voltage sags
pattern to locate a faulted section in distribution network,
International Review of Electrical Engineering, vol. 5, n. 1, 2010,
VIII. Conclusion pp. 173-179.
[3] H. Mokhlis, A.H.A. Bakar, D.N.A. Talib, H. Mohamad, The
A complete description of a sag-tension calculation improvement of voltage sags pattern approach to locate a fault in
algorithm developed by the authors has been presented distribution network, International Review of Electrical
Engineering, vol. 5, n. 3, 2010, pp. 1159-1164.
including a calculation example. The relation between [4] H. Mokhlis, H.Y. Li, H. Mohamad, A.H.A. Bakar, A
the creep development and the factors that influence it comprehensive fault location estimation using voltage sag profile
such as the installation process and the operation for non-homogenous distribution networks, International Review
of Electrical Engineering, vol. 5, n. 5, 2010, pp. 2310-2316.
Copyright 2011, Praise Worthy Prize S.r.l..
Reprinted, with permission of Praise Worthy Prize S.r.l.. from the International Review of Electrical Engineering, IREE, Vol. 6. n. 3

[5] N. Kang, Y. Liao, New fault location technique for series


compensated transmission lines, International Review of I. Albizu was born in Zumaia, Spain, in 1975.
Electrical Engineering, vol. 4, n. 6, 2009, pp. 1385-1390. He received the M.Sc. degree in electronic
[6] T. Varney, Graphic method for sag-tension calculations for ACSR instrumentations systems from the University
and other conductors, Alcoa, 1926. of Manchester Institute of Science and
[7] J.S. Barrett, S. Dutta, O. Nigol, A new computer model of ACSR Technology, Manchester, U.K., in 1999, and
conductors, IEEE Trans. Power App. Syst., vol. PAS-102 n. 3, the Ph.D. degree from the University of the
1983, pp. 614-621. Basque Country, Bilbao, Spain, in 2008.
[8] I. Albizu, A.J. Mazon, I. Zamora, Flexible strain-tension Currently, he is a Lecturer with the Electrical
calculation method for gap-type overhead conductors, IEEE Engineering Department, Faculty of Engineering of Bilbao, University
Trans. on Power Del., vol. 24 n. 3, 2009, pp. 1529-1537. of the Basque Country. His research activities are concentrated in the
[9] CIGR B2-12 Brochure (Ref. No. 244), Conductors for the area of transmission-line thermal rating..
uprating of overhead lines, 2004.
[10] I. Albizu, A.J. Mazon, V. Valverde, G. Buigues, Aspects to take A.J. Mazon was born in Bilbao, Spain, in
into account in the application of mechanical calculation to high 1965. He received the Ph.D. degree from the
temperature low sag conductors, IET Gener. Transm. Dis., vol. 4 University of the Basque Country, Bilbao,
n. 5, 2010, pp. 631-640. Spain, in 1994. In 1992, he was with Labein
[11] Technical Specifications for the Installation of Gap Type Research Laboratories.
Conductors. SAPREM Method, SAPREM, 2006. Currently, he is a Full-Time Professor in the
[12] M. Landeira, P. Morentin, A.J. Mazon, I. Albizu, The high Electrical Engineering Department, Faculty of
temperature cable solution for electrical overhead distribution Engineering of Bilbao. His research activities
lines, DYNA, vol. 82 n. 5, 2007, pp. 226-230. are concentrated in the area of electric power systems, transients
[13] CIGR 22-05, A practical method of conductor creep simulation, fault analysis, and transmission-line thermal rating.
determination, ELECTRA, vol. 24, 1972, pp. 105-137.
[14] CIGR 22-05, Permanent elongation of conductors. Predictor
equations and evaluation methods, ELECTRA, vol. 75, 1981, pp. E. Fernandez was born in Bilbao, Spain, in
63-98. 1973. She received her Ph.D. degree from the
[15] O. Nigol, J.S. Barrett, Characteristics of ACSR conductors at high University of the Basque Country, Bilbao,
temperatures and stresses, IEEE Trans. Power App. Syst., vol. Spain, in 2008.
PAS-100 n. 2, 1981, pp. 485-493. Currently, she is a Lecturer with the Electrical
[16] A method of stress-strain testing of aluminum conductor and a test Engineering Department, Faculty of
for determining the long time tensile creep of aluminum Engineering of Bilbao, University of the
conductors in overhead lines, Electrical Technical Committee of Basque Country. Her research activities are
The Aluminum Association, 1999 concentrated in the area of transmission-line thermal rating and low-
voltage arc chutes studies.

Authors information
1
Electrical Engineering Department
Faculty of Engineering of Bilbao
UPV/EHU University of the Basque Country
Alda. Urquijo s/n
48013-Bilbao
Spain
e-mails igor.albizu@ehu.es
javier.mazon@ehu.es
elvira.fernandezh@ehu.es

View publication stats