You are on page 1of 8

December 2014

MINISTRY OF EDUCATION, MALAYSIA

VOCATIONAL COLLEGE STANDARD CURRICULUM

COURSE INFORMATION

PROGRAMME : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING WORKS

COURSE CODE : WTP 501

YEAR / SEMESTER : 1 SEMESTER 1

CREDIT UNIT : 4.0 credit/hrs

CONTACT HOUR : FACE TO FACE : 6.0 HOURS/WEEK

NON FACE TO FACE :

COURSE TYPE : VOCATIONAL

PREREQUISITE : -

CORE REQUISITE : -

COURSE OUTCOMES:

Module Page 1/8 Document Page 1


December 2014

At the end of the module, students should be able to:-

1. perform taking off for different types of building trades


2. produce progress charts for work scheduling.
3. produce schedule to order materials and estimate costs
4. produce estimation of materials and costing by completing approximate and detail estimation
5. produce estimation of man- days/costs based types of work involved and progress chart
6. estimate machinery needed and the costs to be allocated based types of work involved

COURSE DESCRIPTION

This module is designed as an introduction for students about civil and structure drawings interpretation, progress charts, schedule to
order materials and estimate costs, the estimation of costs for man-days and machinery needed. They will learn how to calculate
and estimate costs for civil engineering work in terms of materials, labor and machinery. They will use all the necessary drawings,
charts and forms so that the work can be proceeded according to the specifications. Positive attitude during work is also stressed in
these lessons such as consideration of suitable quantity in order to reduce wastage of energy, time and costs as well as cooperation
between personals. Students will be exposed to the instructions and procedures of the work that suit the current industrial needs.

CONTENT AND LEARNING STANDARDS

PROGRAM : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING

Module Page 2/8 Document Page 2


December 2014

COURSE CODE : WTP 501

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS
1.
1.1 Prepare the blue prints for
12 HOURS2. 1. PERFORM TAKING 1.1.1 Interpret the given drawing specifically according
building drawings.
(2 WEEKS ) OFF to specification

1.2 Conduct Taking Off for 1.2.1 Carry-out Taking Off on the information for
different trade of brickwork, brickwork from given drawings according to
concrete work, and wood standard procedure and specification
work and plaster work. 1.2.2 Carry-out Taking Off on the information for the
concrete work from given drawings according to
standard procedure and specification
1.2.3 Carry-out Taking Off on the information for wood
work from given drawings according to standard
procedure and specification
1.2.4 Carry-out Taking Off on the information for
plaster work from given drawings according to
standard procedure and specification
1.2.5 Carry-out Taking Off on the information for Steel
for R.C.C work from given drawings according to
standard procedure and specification

CONTENT AND LEARNING STANDARDS

PROGRAM : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING

COURSE CODE : WTP 501

Module Page 3/8 Document Page 3


December 2014

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS

12 HOURS 2. PRODUCE 2.1 Identify various stages of work 2.1.1 Perform supervision and list the various stages of
(2 WEEKS ) PROGRESS and schedule building construction work according to Standard
CHARTS. Operational Procedure
2.1.2 Match the work with the schedule according to
job specification

2.2 Identify expected / proposed 2.2.2 List the expected / proposed progress work
progress. activity according to standard requirement
2.2.3 Confirm expected/proposed work progress
provided according to job specification

2.3.1 Develop the progress charts by using blue prints,


2.3 Establish progress charts
summary of tender specifications so that the
complete with proposed and
work can be completed according to the
actual physical progress
schedule.

CONTENT AND LEARNING STANDARDS

PROGRAM : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING

COURSE CODE : WTP 501

Module Page 4/8 Document Page 4


December 2014

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS

12 HOURS 3. PRODUCE 3.1.1 Select the type of materials by referring the


2.1 Identify type of materials used
(2 WEEKS ) SCHEDULE drawing and specification
TO ORDER
MATERIALS AND
ESTIMATE COSTS 3.2.1 List down the materials and the estimations
2.2 Identify the estimation of
needed in the Standard form according to
costs and the quantity of
specification
materials

2.3 Establish the schedule for 2.3.1 Develop the schedule to enable ordering of
materials purchase materials according to the progress chart.

CONTENT AND LEARNING STANDARDS

PROGRAM : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING

COURSE CODE : WTP 501

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS

Module Page 5/8 Document Page 5


December 2014

12 HOURS 3. PRODUCE 3.1 Identify types of estimation 3.1.1 Define Approximate and Detail Estimation
(2 WEEKS ) ESTIMATION OF correctly according to standard requirement.
MATERIALS AND 3.1.2 Prepare Approximate and Detail
COSTING Estimation for Building materials by
taking off on the information for brick, concrete,
wood plaster and steel reinforcement from
given drawing in accordance with
specification

3.2 Perform approximate and 3.2.1 Carry out the estimation of materials listed using
detail estimation Approximate and Detail Estimation
according to progress chart and blue print

CONTENT AND LEARNING STANDARDS

PROGRAM : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING

COURSE CODE : WTP 501

Module Page 6/8 Document Page 6


December 2014

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS

18HOURS 4. PRODUCE 4.1 Identify types of work 4.1.1 List the types of work involved in the project given
(3 WEEKS ) ESTIMATION OF according to job specification
MAN- DAYS/COSTS

4.2.1 Prepare the estimation of man-days needed


4.2 Recognize estimated number according to standard requirement.
of man-days needed 4.2.2 Perform the estimation of man-days needed by
calculation using the progress chart and blue
print

4.3 Recognize the estimated cost 4.3.1 Prepare the estimation cost of labour according to
of labours standard requirement.
4.3.2 Perform the estimation of cost of labours by
calculation using the progress chart and blue
print

CONTENT AND LEARNING STANDARDS

PROGRAM : CONSTRUCTION TECHNOLOGY

COURSE NAME : COST AND ESTIMATING

COURSE CODE : WTP 501

Module Page 7/8 Document Page 7


December 2014

CONTACT
CONTENT STANDARD LEARNING STANDARD PERFORMANCE CRITERIA
HOURS
6.1.1 List the types of machinery needed in a
18 HOURS 6. ESTIMATE 6.1 Identify types of machinery standard form in accordance with the project
(3 WEEKS ) MACHINERY needed given.
NEEDED AND THE
COSTS 6.2 Prepare estimated number 6.2.1 Carry out estimation work for number and
and duration of usage of duration of usage by referring to the progress
machinery chart.

6.3 Prepare estimated costs. 6.3.1 State the price/costs of machinery usage
according to specification
6.3.2 Develop report on number, time and cost
estimation for machinery usage according to job
specification

Module Page 8/8 Document Page 8

You might also like