You are on page 1of 3

d 13.

48 18
Area 142.7335 0.126109 12.61091 20400
m3 2997.404

21 0.60% 0.126109
diameter (in) 12
cm 2.54 30.48
m 100 0.3048
circumference 2*pi*r 0.9576816
Length (m) 800 766.14528
Thickness (m) 0.01 7.6614528
3.461538
12461.54
1044

N2 room dimension 3.28084


m f
L 12 39 0.539
W 6 20 0.14139
H 6 20 333.3333
volume 432 15256
air change factor 18
per hr 7776 274606.875 12000
per min 129.6 4576.78125 4560
166.6667

Sorini warehouse painting area 28


square area 210 18.05556
triangle area 75 1083.333
6060
blanketing valve price 192.3077
1513843200
112,137
9,344.71

Flame arrestor
5505.15463918 carbon steel
6082.02636036 stainless steel

Cable length for pressure transmitter


14 8
20 24
6 43
12 59
47 11
29 56
22 10
7 24
157 235
4 2
628 470
1110

Concrete drainage cost 420m2 600mm width


Excavation 35,700,000
Concrete 132,300,000
BRC MS 134,400,000
Form work 268,800,000
Finishing 12,600,000
Total (IDR) 583,800,000
US$ 43,244 13500
Unit cost (US$) 102.96 420
3.142
2.54 1.27
5.0677318 1.266933

16900 30000
23,660,000 30,000,000

2.625
6,000
2.6
15,600
3600 450
7200 360
6390
3195

You might also like