You are on page 1of 1

---..

Sewage Treatment Plant (1 st Stage) CAIRO CONSUL T


SHJJ.BLANGA - BANHA

Supply & Erection of


SH.A.9LANGA - BANHA - SEWAGE TREATMENT PLANT- STAGE 1
Bill of Quantities A- Mechanical Works
Item
Description of Item Unit Quantity Unit Price TOTAL
No.
- Amount Brought Forward
14 Mechanical sludge dewatering (belt press) building (section 2.16)
Manufacture, delivery, installation, testing, commissioning, guarantee &
maintenance (during guarantee period) ,of Mechanical sludge
dewatering (belt press) builaing cm all accessories & spare parts &
- -
services of the supplier technicians as specified in mechanical 'specs
Part2- section 2.16 & according to contract drawings.
Mechanical dewatering Belt press unit sets cm sludge feed pumps
14.1 as specified according to mechanical specification & Contract drawings. Set 2
Item( 2.16) up to (2.16.2.1.17) _
Polymer automatic preparation unit cm polymer dilution systems
14.2 and .polymer dosing pump as specified according to mechanical Set 1
_ specification & Contract drawings. Item ( 2.16)
14.3 Be!t Conveyor for sludge draw-off as specified according to Set 2
mechanical specificatron & Contract drawings. Item ( 2.1 S)
14.4 TravEtling crane double girdp,r type, with capacity of 10 ton, as specified Set 1
according to mechanical specification item (2.14) & Contract drawings.
Ventilation System
14.5 Ventilation system according to mechanical specifications item( 2.14) & -- L.S.
contract drawings.
1% ~.P~~: item (2.16.2.1.19)
.~\2J
LS
[ .,,>
')"".\
.~~~ s ~_ 'i~~.~\.
/ ~ TOTAL OF THIS PAGE
-

f .' \ I ACE ~TAL CARRIED FORWARD

\ " j
~
ARAB CO~SLLmG ~G.)
\