You are on page 1of 20

Company Profile

PT TRUBA ALAM MANUNGGAL ENGINEERING Tbk.

State-of-the-art quality and reliability in


Engineering, Procurement and
Construction
Vision
To respond to the challenges of engineering
and power generation

Mission
l Produce and provide products and services that are of
high quality standards, timely, and cost efficient both
in terms of production and services

l Utilize technical abilities and technologies that are


appropriate and are dedicated towards providing
innovative solutions

l Understand needs, provide solutions to problems as


well as exceed client expectations

Contents
Page 1. The World of Truba Manunggal
Page 2. Message from The President Director
Page 4. Corporate Structure
Page 5. Some of Truba Manunggals Subsidiaries
Page 6. Integrated EPC Services
Page 9. Power Generation
Page 11. Coal
Page 15. The People of Truba Manunggal
Page 14. Environment, Health and Safety
Page 17. Management Team
The World of
TRUBA MANUNGGAL
Integrated Engineering, Procurement and Construction (EPC)
The Company provides EPC services through its subsidiaries,
PT Manunggal Infrasolusi. PT Manunggal Infrasolusi deals with
EPC work related projects to power infrastructure as well as
other industrial EPC such as the oil and gas sector. PT Manunggal
Infrasolusi operates two other companies under its management
in the form of PT Truba Jaya Engineering and PT Manunggal
Engineering. Over the years, through its subsidiaries, The Company
has constructed about 90% of PLNs coal-fired and gas-fired
power plants, or roughly 15,000 MegaWatt capacity, including the
construction of some of the largest power plants in Indonesia for
the state-owned company PLN, such as:
- 2 x 660 MW CFPP (coal-fired power plant) Paiton, East Java
- 3 x 600 MW CFPP Suralaya, West Java
- 2 x 660 MW CCFP Tanjung Jati B, Central Java
- 740 MW GTCC (gas-turbine combined cycle) Cilegon, West Java
- 1500 MW GTCC Gresik, East Java

Truba Manunggal is also engaged in industrial projects in and outside of Indonesia, including: Installation of gas turbine for
Arabian Bemco, Tank works for Qatar Petroleum, Gantry Cranes for Laem Chabang and Structural works for Siemens. Trubas
industrial projects in Indonesia includes: NSO phase A field for Exxon Mobil, Nickel smelter plant for INCO, Aromatic plant for
Pertamina and Urea fertilizer storage for PT Pupuk Kaltim.

Power Generation
Domestic demand for electricity in Indonesia is still considered
largely unmet; particularly in areas outside Java. In addition, the
presence of adequate infrastructures and utilities such as electricity,
is one of the factors that induces favorable environment for
investments. In response to this need, the Government opened
up the power generating sector to private sector participation in a
bid to overcome the power supply shortage. Truba Manunggal has
responded positively to the Governments call, and is well on its
way in constructing several power plants which it will subsequently
operate and maintain.

Coal
Indonesia holds significant amounts of coal reserves that could
meet the demand for energy fuel in Indonesia for many years to
come. This offers the opportunity for coal to serve as a much more
affordable source of energy. Truba Manunggal recognizes this
opportunity and set its sight on securing concessionaires with
proven coal reserves as well as obtaining the rights for exploratory
works.

TRUBA ALAM MANUNGGAL ENGINEERING 1


Message from The President Director

2 TRUBA ALAM MANUNGGAL ENGINEERING


Truba Manunggals strength lies within our high quality We have decades of expertise in the engineering,
and experienced workforce, as well as our vertically procurement and construction of power plants, which
integrated line of business. will soon provide a steady and sustainable stream
of revenues from our long-term Independent Power
We believe that, despite todays challenging conditions Producer contracts.
on the global economic front, Truba Manunggal has
excellent long-term growth prospects on the strength of Competitive Strength
our strategic integration of the EPC, IPP and Coal Mining Needless to say, our competitive strength lies in
businesses. such unique integration, enabling us to make highly
competitive bidding for prime power generating
As an integrated EPC, IPP and Coal Mining operations, projects, while ensuring our partners and shareholders
our three core businesses complement and support one the prospects of a sustainable long-term growth.
another.

Sidarta Sidik
President Director

TRUBA ALAM MANUNGGAL ENGINEERING 3


Corporate Structure

PT Truba Alam Manunggal Engineering Tbk.

PT Maxima Infrastruktur Manunggal Beijing TAME Investments PT Manunggal Power


(Coal Mining & Trading) International Trade Co. Ltd. Pte. Ltd. (Power Plant)

PT Manunggal Infrasolusi
TAME T.C. Pte. Ltd.
(Power Plant/Industrial)

PT Truba Jaya Engineering


TAME Turnkey
(Construction)
(Labuan) Pte. Ltd.

PT Manunggal Engineering
Grenzone Pte. Ltd. (Engineering & Procurement)

PT Suar Alam Engineering


(Engineering & Procurement)

PT Manunggal Multi Energi


(Coal Mining)

PT Truba Segihan Utama PT Equator Manunggal


(Stock Piling) Power

PT Bangka Manunggal
Power

PT Ranyza Energi

PT Central Daya Energi

PT Menamas Mitra Energi

4 TRUBA ALAM MANUNGGAL ENGINEERING


Some of Truba Manunggals Subsidiaries

Engineering Procurement PT Manunggal Engineering


l

Construction (EPC) PT Truba Jaya Engineering


l
PT MANUNGGAL INFRASOLUSI
PT Suar Alam Engineering
l

Independent Power Producer (IPP) PT Menamas Mitra Energi (MME)


l
PT MANUNGGAL POWER
PT Central Daya Energi (CDE)
l

PT Ranyza Energi
l

PT Banyuasing Power Energi


l

PT Bangka Manunggal Power


l

PT Equator Manunggal Power


l

Coal Mining and Trading PT Manunggal Multi Energi


l
PT MAXIMA INFRASTRUKTUR
PT Truba Segihan Utama
l

Maxima Coal Pte Ltd


l

TRUBA ALAM MANUNGGAL ENGINEERING 5


Integrated
EPC Services

1
6 TRUBA ALAM MANUNGGAL ENGINEERING
Truba Manunggal views its EPC services as an integral
part of a one-stop solution for the development and
commissioning of electricity power plants, transmission
and other industrial works.

To achieve this, the Company has established wholly-


owned subsidiaries, namely PT Manunggal Infrasolusi.
EPC (Manunggal Infrasolusi) which is engaged in power
plant and industrial EPC.

The three subsidiaries of Manunggal Infrasolusi are


PT Truba Jaya Engineering (TJE), which is engaged
The Company is an integrated Engineering, Procurement, and
primarily in construction activities, and PT Manunggal Construction (EPC) services include the construction of power plants
Engineering and PT Suar Alam Engineering, both of and industrial plants.
which are engaged in engineering and procurement
activities. Overseas Project Truba Arabia
Truba Arabia is a Joint Venture between PT Truba
TJE has implemented a number of installations that Jaya Engineering (TJE), a wholly owned subsidiary of
include power plants, machinery for industrial as well Truba Manunggal, and Arabian Bemco Contracting
as the oil and gas sector. Whereas ME and SUE provide Co. (BEMCO) a leading EPC contractor in Saudi Arabia.
technical assistance for power plant construction Truba Arabia started operation in 2002 to serve Electrical
projects, through feasibility study, detail engineering, as and Mechanical installation of the power generation
well as procurement of machinery and equipment. All industry, oil & gas and industrial plants projects in
three companies crucially support the Company in its Saudi Arabia and the Middle East region. Truba Arabia
venture to operate in an integrated manner. has a dedicated team of professional and highly skilled
workforce of over 1,000 personnel. The company has
With over 30 years experience in EPC, we are one of already been contracted to install more than 40 gas &
Indonesias leading EPC contractors for a wide variety of steam turbines in Saudi Arabia
power and industrial plants. We estimate that, through with a combined generating capacity of 4,000 MW.
TJE, we have built more than 90% of the coal-fired Truba Arabias Quality and Safety is built upon TJEs
and gas-fired power plants in Indonesia, with unit system that is internationally certified - ISO 9000:2000,
capacities ranging from 25 MW to 660 MW and a total OHSAS and ASME. TJE provides support to Truba Arabia
installed capacity of more than 15,000 MW. We have by mobilizing experienced key project supervision
also successfully completed a large number of industrial personnel and provides technical assistance in all
plant EPC projects, including cement plants, fertilizer aspects of the management of projects.
plants, chemical and petro-chemical plants, oil and
gas processing facilities and pulp and paper plants. In Certification
addition to our existing EPC capabilities, we are also Truba Manunggal, through TJE, is accredited by the
currently expanding into the construction of renewable American Society of Mechanical Engineering (ASME) for
energy power plants. the design and assembly of power boilers. TJE has also
The Companys procurement services includes access obtained the International certifications in the form of
to raw materials and construction equipment, building ISO 9001 (Quality Management System) from Llyods, ISO
materials, and imported goods needed for construction, 14001 (Environmental Management System) and AHSAS
mechanical or electrical works. 18001 (Occupational Management) from Sucofindo
International. These certifications testify the Companys
strength in human resources; the skills and experiences
of the Companys personnel and ability to meet vigorous
standards of quality control.

Completed EPC Projects


Project Name Location Client Commencement Date

Power Plants
PLTU Unit 1 & 2 (2x65MW) Banjarmasin Mitsui 1998
Co-Generation 300MW Duri Utara Stone & Webster 1999
GTPP 2x50MW Pemaron Wasamitra 2003
Turbin Gas 6x143MW Muara Tawar Samsung 2003
Cilegon CC 740MW Cilegon Mitsubishi 2004
PLTU 2x300MW Cilacap Cengda 2004
PLTU Unit 3 & 4 (2x100MW) Tarahan JEL 2005
PLTU Tanjung Jati B (2x660MW) Jepara JEL 1997
(Jurong Engineering Ltd.)
PLTU Unit 3 & 4 (2x100MW) Tarahan JEL 2005

TRUBA ALAM MANUNGGAL ENGINEERING 7


Completed EPC Projects
Project Name Location Client Commencement Date

Paper Factories
Musi Pulp Mill Tanjung Enim Klockner 1998
Mechanical and Construction Work PM 2 Pekanbaru Pectech Sep 07
Tank Foundation work, piping, Aerial pool Pekanbaru Pectech Sep 07
Area Maintenance IKPP/RAPP Pekanbaru IKPP/ RAPP Apr 07
Power installation in Kiln Evaporator Pekanbaru Pectech Aug 07

Oil and Gas


Area-10 Pipe Line Duri Caltex 1999
Oil Tank Rehabilitation Mesaid Qatar Qatar-Petro 2001
Oil Production Area OSEIL Seram Daewoo 2001
Area-10 Hook-Up & POP Duri Caltex 2002
Suban Gas Suban Hyundai 2002
Booster Compression Lhouksukon Tri Patra 2002
Depot Terminal BBM Cikampek Pertamina 2002
DSF-11 Duri Caltex 2003
Oil Area maintenance Minas Caltex 2003
FPM Duri Tri Patra 2005
FPM Minas Tri Patra 2005
LNG Tangguh Tanah Merah Japan Gas 2006
Corporation (JGC) Track
Kellogg Brown & Root (KBR)
FPMMaintenance and Construction work Duri TripatraFlour Dec 07
Civil Work and Ground Work Kulin TripatraFlour Dec 07
Fertilizers Factories
UBS-3 and conveyor system Bontang Chengda 2000
UBS-5 and conveyor system Bontang Kalimantan Industrial 2005
Estate (KIE)

Chemical Factories
Styrene Monomer (SM-2 exp) Merak Mitsubishi 1998
RFCC Taoyuan Taiwan Lucky Gold (LG) 2000
Engineering

Cement Plant
Kerteh Olefin Plant Malaysia JEL 2000
Cement Factories

Steel
Cibinong Cibinong Semen Cibinong 2003
Steel Processing and Mining
Indominco Coal Bontang Mitsubishi 1998
Inco-Dryer Unit 2 (Gas Cleaning) Soroako Beca 1998
Up-grade Coal Port Kertapatih PT Bukit Asam (Persero) 2001
(PTBA)
Construction work and Soroako Inco Dec 07
Gas Cleaner Installation

Pipe and Tank Construction


Minas Tank GS-6 Riau Siemens 1998
Tank Renovation TK-220 Dumai Elnusa 2000
Oil Tank OSEIL Bula Daewoo 2001
Depot Tank BBM Cikampek Pertamina 2002
Civil and Architectural Work
Bridge Expansion Lukut-Ukui Perawang IKPP 2002
Heavy Equipment Work
Container Crane Tg.Mas Semarang IHI 1998
Container Crane ESCO Thailand JEL 1998
Container Crane P.Panamac Jakarta Barata 1999
Container Crane Makasar Makasar Noell Indonesia 2000
RTG Crane 35 ton Panjang Pelindo II 2001
Transmission and Substation Work
Transmission and Power Tower Cilegon Mitsubishi 2004
Spilicing Fiber Optic Line 4 Soroako Inco 2004

EPC projects under construction


Power
PLTU 2 (2x300 MW) Coal Fired Steam Power Plant Banten, West Java Chengda Engineering Corp. Mar 07
PLTU Pelabuhan Ratu 3x300 MW West Java Shanghai Electric Corporation Nov 07
PT Maxima Infrastruktur
Muara Karang Gas Power Plant Project West Java Mitsubishi Corporation Sep 07
(Repowering) 720 MW
PLTU Indramayu 3x330 MW West Java China National Electric Nov 07
Equipment Corporation (CNEEC)
PLTU 1 Banten Suralaya Unit 8, 1x600 - 700 MW West Java China National Technical Jan 08
Import & Export Corporation
CFSPP Paiton 1x660 MW, Central Java East Java Beijing Electric Power May 08
Constructio Company (BEPCC)
CP - Bharai Power Plant (2x30 MW) CFSPP Sumatra Manunggal Engineering Jul 08
PLTU Tanjung Jati - B (3&4), CFPP 2x660 MW Central Java
Balance of Plant Sumitomo Corp. Erection Div. Jan 10
Mechanical Erection PT Jurong Engineering Lestari Feb 10
Installation of CW Pipe Sumitomo Corp. Erection Div. Feb 09
Mechanical Erecrion of Boiler & Auxillary Equipment PT Jurong Engineering Lestari Oct 09
Steel Structure Erection & Field Painting of MES-TSW Jont Operation Jun 09
Turbine & Control Building
(Mitsui Eng. & Shipbuilding Co. Ltd.)
PLTU Paiton Unit 3 Expansion Project, Paiton East Java Taehei Dengyo Kaisha Ltd. Nov 09

Oil and Gas and other Industries


LNG Tangguh - Mechanical work Papua JGC/KBRI Jul 06
TEL MUSI - Maintenance work Sumatra PT Tanjung Enim Lestari Apr 08
RAPP - Maintenance work Sumatra PT RAPP/PT IKPP Oct 08
Oil and Gas EPC - Duri Sumatra Chevron Pacific Indonesia Feb 08
Oil and Gas EPC - Duri Sumatra Chevron Pacific Indonesia Mar 08
GIIC Pellet Plant Mechanical & Bahrain Kobe Steel Ltd. Nov 07
Erection Work Plus Steel Structure Supply and Works

8 TRUBA ALAM MANUNGGAL ENGINEERING


Power Generation

2
TRUBA ALAM MANUNGGAL ENGINEERING 9
Electricity power in Indonesia is currently in short supply.
The problem is more acute in areas outside Java where
infrastructure development has lagged behind those in
Java.

The enactment of regional autonomy laws has meant


that Indonesian provinces have to generate their own
revenues by stimulating local industries and businesses.
But with the prevailing power shortage, neither business
nor investments can be expected to take roots, much
less grow.

The Government is fully aware of the power crisis More than three decades of hands-on expertise in the engineering,
procurement and construction of major power plants in Indonesia have
situation. Hence, the Government of Indonesia has
made Truba Manunggal a front-runner in the unfolding market for the
embarked on an accelerated program to construct new so-called Independent Power Producer.
power plant that will produce about 10,000 MW of
electricity from coal-fired power plants. The program is
The Companys key competitive advantages are:
termed the 10,000 MW Fastrack program that is slated
1. Long and extensive experience and role as EPC
to be completed within 3 years, beginning construction
contractor for power, will allow effective control over
in 2007. The move by the government to utilize coal
quality standards and construction management.
as fuel for power generation is due to the abundant
2. Construction of the IPP are mainly undertaken by the
coal reserves that Indonesia has, which would provide
Company itself, minimizing execution and
a cheap solution for power generation to an emerging
construction risk.
country like Indonesia. This program is open for private
3. Access to semi-captive coal supply.
sector participation.
4. IPP sites located in areas that will ensure access to
water catchments as well as ease of logistics.
Responding to this opportunity, the Company positions
itself to undertake not only the EPC for power plants,
At present, the Company is operating 3 power plants
but to build, own and operate these power plants as the
with total capacity of 170 MW, which consist of:
so-called Independent Power Producer (IPP).
1. 130 MW CDE Diesel in Lampung
2. 20 MW Tanjung Batu, East Kalimantan
As an IPP, the Company will supply electricity to PT PLN
3. 20 MW Karang Joang, East Kalimantan
(Persero) as well as to private industries, regulated by
terms and conditions agreed upon by the Company and
Truba Manunggal currently has 4 Power Purchase
the purchaser through a Power Purchase Agreement
Agreement (PPA) with PLN and 1PPA with a private
(PPA).
company, with total generating capacity of 414 MW:
1. 2x12MW Bangka, Bangka Island
Truba Manunggal IPP projects will focus outside of Java
2. 2x30MW Pontianak, West Kalimantan
Island. Allowing the Company to step in to provide
3. 2x30MW CP Bahari, Lampung
the unmet needs coming from more than 20 millions
4. 2x135MW Kuala Tanjung, North Sumatera
consumers.

10 TRUBA ALAM MANUNGGAL ENGINEERING


Coal

3
TRUBA ALAM MANUNGGAL ENGINEERING 11
The Company is also in the business of operating coal
mines and the trading of coal. These activities are carried
out in line with efforts to provide fuels needed to power
coal-fired power plants that are currently being build in
Indonesia as well as potential foreign market.

Positive business prospects


To address the power crisis that Indonesia is in, the
Government of Indonesia put into plan of building
10,000 MW of coal-fired power plants. The decision
to use coal as fuel for power is mainly due to the fact
that coal is presently the cheapest form of fossil fuel. In
With potentially strong businesses in both EPC and IPP, it makes
addition to that Indonesia is blessed with the abundant strategic sense for Truba Manunggal to secure its own supply of coal.
coal reserves, which would be of strategic importance Securing this, will shape us into a fully integrated, coal-fired power plant
for the Government of Indonesia. developer, operator and maintenance company.

The fact that Indonesia is also considered as an


The Company projects that the domestic consumption
emerging market, the demand of power would kept on
of coal is expected to increase to as much as 30 to 40
increasing, because it not only need to meet the pent up
million tons per year with the 10,000 MW coal-fired
demand, but to add more affordable power capacity to
power plants coming on-stream. The Company intends
fuel the economic growth of the country.
to best utilize market opportunities in line with its
businesses in the ownership of power plants, and
This situation provides positive and ample growth
integrated supplier of energy required by power plants.
opportunities for the coal industry for the next decades
to come. In terms of the composition of energy sources
Securing Coal Sources and Supply
currently utilized by power plants in Indonesia (which
At present, Truba Manunggal owns 2 exploitation
includes coal, gas, geothermal, water, and oil) coal
licences which includes Manunggal Multi Energi (MME)
comprise as the largest type used and its composition is
at Muara Enim regency, South Sumatra, and Panimax Inti
expected to increase from 43% in 2006 to become 54%
Mining (PIM) at Tanah Bumbu, Kalimantan.
by 2015.

The Company plans to start producing from its coal


reserves, which at present estimate has about 140
million tons.

12 TRUBA ALAM MANUNGGAL ENGINEERING


The People of
TRUBA MANUNGGAL
Human resources are considered to be a vital element of the Company
for they are partners needed to achieve success for every business and
activity.

As a result, human resources counseling and In addition to this, the Company seeks to promote
development within the Company are both carefully positive core values to all of its employees such
planned and continuously implemented to ensure as integrity, transparency, cooperation, creativity,
that each employee contributes their best to determination, and providing the utmost in terms of
the Companys performance. In addition to this, service.
managements policy on human resources seek to,
among others, fulfill and move in accordance with Regular training and employee recruitment are
Government prescribed labor regulations and norms carefully planned and implemented in line with the
such as its participation in the Labor Social Guarantee current and future professional needs of the intended
(Jaminan Sosial Tenaga Kerja) or JAMSOSTEK scheme. trainee. The Companys recruitment program is based
on a Business Plan that was mutually agreed upon
In terms of improving work quality and productivity, by all operational managers and which takes into
the Company provides opportunities for its employees account, among others, the candidates qualifications.
access to education and training as a means of At the same time, the Company strives to instill a safe
refreshment from work as well as to enhance ones skill and healthy working environment, implement external
sets. In implementing this, a program is developed benchmarking to enhance employee creativity,
involving employees to identify skill sets that would ability and productivity, as well as improve work
be needed to enhance the effectiveness of Trubas efficiency and HR placements so as to ensure that
people in achieving Companys goal, which in the right people are in the right place. Subsequently,
return developed Trubas people into a high quality the Company intends to place its employees with
workforce. This program could include the typical its strategic partners in a number of joint venture
internal or external update seminars, workshop and projects, with particular emphasis on Engineering, in
courses, but also scholarship for advanced studies. order to enhance the Companys competitiveness.

Corporate Values
PT Truba Alam Manunggal Engineering Tbk. builds strong relationship with its stakeholders based on 10 (ten) core
values, divided into 2 (two) categories, namely external and internal values.

Internal Values External Values


1. Competence, continuously advance the quality 1. Dedication, passion in giving our best to provide
of skills, proficiencies, and mental attitude for effective solutions.
effectiveness of work. 2. Competitive pricing, delivering products and
2. Efficiency, the determination to always do the right services which have high quality standard with cost
thing, always seeks the chances of improvement and effective and always accomplished on the right time
efficiency, always creative and innovative in order as our promise.
to create added value for customers with a proper 3. Respect for Clients need, performing transparency,
and competitive price. accountability, and responsibility which related to
3. Integrity, firmness in holding the principle of truth the result.
and corporate value in business activity which is 4. Professionalism, Always striving to give high quality
presented in consistency of words and behavior. standard of products and services,
4. Teamwork, sharing capabilities and skill sets, based 5. Balance, live in harmony with related elements, such
on mutual respect, to achieve goals effectively. as: environment, people and community as well as
5. Responsibility, a fully integrated approach to Health, improving the living standards of local communities
Safety and Environmental (HSE) management in and protecting the global environment and strive to
offices, on site and at clients locations, in every gain the trust of our clients and society.
place we provide our expertise ensuring HSE is top
priority in all of our activities.

TRUBA ALAM MANUNGGAL ENGINEERING 13


14 TRUBA ALAM MANUNGGAL ENGINEERING
Environment, Health
and Safety
The Company seeks to prioritize occupational health and safety and
environmental conservation in every aspect of its activities. In addition
to this, the Company also aspires to be a socially responsible organiza-
tion by seeking to improve the welfare of the community where we
operate as well as implement environmental-friendly practices that
would contribute to the global community.

TRUBA ALAM MANUNGGAL ENGINEERING 15


Occupational Health and Safety
In its quest to ensure occupational health and safety,
the Company implements an onsite inspection of the
workplace of the work methods and impending issues as
well as job safety analysis. This process eventually results
in a Standard Operating Procedure (SOP) that is referred
to as the Work Safety Instruction (WSI). The instruction
incorporates work systems that must be implemented
by every employee to avoid work-related accidents.
In this respect, the Companys subsidiary, Truba Jaya
Engineering (TJE), has successfully been certified by the
National Council on Occupational Safety and Health
As power plants are known to have significant impact on environmental and
Administration (OSHA) of the US. The certification community well-being, Truba Manunggal takes its Corporate Social Responsibilities
internationally recognizes that the Companys business (CSR) seriously. The Company has developed a comprehensive policy guideline and
manual for the undertaking of CSR activities in the communities surrounding its
activities are deemed to be both occupationally healthy operations.
and safe. In addition to the OSHA certification, TJE also
secured the OHSAS 18001 (for Occupational Health and
In the past, Indonesia has, as we all know, experienced
Safety Management System-Requirements).
number of natural disasters that have taken its toll on
numerous lives. In response to these natural disasters,
Environmental Conservation
Truba Manunggal had proactively formed special teams
In addition to the OSHA and OHSAS, TJE was also
to directly provide vital assistance and support. The
internationally recognized for its effort in environmental
assistance extended by the Company are in the form of
conservation through the ISO 14001. The Company
cash, medicines, clothes, blankets, food and water, as
seriously seeks and implements efforts to conserve the
well as providing medical team to assist in the disaster
environment and protect the ecosystem that reside with
affected areas.
it, so as to ensure that the Environment is sustainably
and continuously perform its natural functions as well
Other forms of social-related assistance provided by
benefits to the inhabitants. To reduce its environmental
the Company include a blood donation program that is
footprint, Truba Manunggal put into service a very
routinely implemented once every three months. Blood
efficient waste recycling facility that is operated to
donation does not merely seek to extend vital medical
ensure that it is stringently in accordance with the waste
support to its recipients but it also has positive health
recycling system.
benefits for the donor as well.

Social Responsibility
In terms of education and religion, the Company extends
As a responsible corporate citizen, the Company is
a scholarship program to children from less fortunate
committed to take active role in the effort to improve
families to ensure that their education continues and
the general welfare of communities where the Company
strive to achieve success. The Company also builds
is operating, as well as striving to be an environmentally
religious facilities, particularly within the vicinity of its
friendly in its activity, which in the long run would
projects. The construction of the religious facilities are to
benefit every one of us.
provide the local community as well as our employees to
ease access to conduct their prayers.
Presently the Company is revisiting its CSR program, to
enhance and focus the program to be as effective as
Going forward Truba Manunggal will focus its CSR
possible as well as in line with the Companys vision and
activities on education. The Company strongly believes
values.
in contributing to the enlightenment of the Nation.
Hence, presently the Company is developing programs
to achieve this goal.

16 TRUBA ALAM MANUNGGAL ENGINEERING


Management Team
Richard Harjani
President Commissioner
President Commisioner, received his Masters degree in 1994. Prior to his current position, he served as
Chief Executive Officer at PT Sulawesi Agro Utama, from February to December 2007. From 1994 to 2006,
Mr. Harjani also served as Chief Operating Officer at PT Rimo Catur Lestari.

Siswanto
Independent Commissioner
An independent Commisioner with a military background, he last held the rank of Brigadier General of
the Army. During his military career, Siswanto served in a number of important positions, including in
the UN Mission at Cambodia, lecturer at the Army Command Staff School in Bandung, and a staff at the
Planning Bureau, Army Head Quarters. Currently, he also serves as Comisioner or Director at several other
major corporations.

Board of Commissioner

Sidarta Sidik
President Director
President Director, hold a Master of Science from Stanford University, California, USA and a Bachelor of
Science from University of Washington, USA. Prior to 2001, Mr. Sidik had worked for several companies in
Indonesia such as PT NTT Indonesia, Artha Graha Group as well as in overseas NTT Group-Japan and AT
Kearney, Inc-USA. He currently also serves as President Commisioners in PT Truba Jaya Engineering

Shi Hong Chao


Director
Director, received a Bachelors Degree and a Masters Degree in Thermal Power Engineering from
Shanghai Jiaotong University and an MBA from China-Europe International Business School. Apart from
serving as a Director, Mr. Shi also serves as President Director of ME since November 2006. During the
period of June 1996 up to October 2006, he worked for CHEC and his latest position was Operation
Director in charge of business operations

Andre Purnawan
Board of Directors Director
Director, recieved his Master of Business in Administration (MBA), majoring in Finance and Marketing
in 1988, from Indiana University, Indiana USA. Since 2006, aside from being appointed as a Director at
PT Truba Alam Manunggal Engineering, he was also appointed as Commisioners both at PT Manunggal
Engineering and PT Truba Jaya Engineering. During his career days from 1995 to 2006, he also served as
Director for the Sinar Mas Group.

FX. Agus Edyono, S.Ip


Unaffiliated Director
Unaffiliated Director, has a military background and his last active post was Colonel. During his military
career he served in East Timor, the Middle East, Morocco, Cambodia and Australia. Before his military
career, Mr. Edyono was part of the operational staff of PT Brajamusti Citra Nusantara and operational staff
of PT Usaha Kita Makmur Bersama. Mr Edyono holds a Bachelors Degree in State Administration, from
Universitas Terbuka, Bandung, 1996

Julius Edi Wibowo


Director
Indonesian citizen Received his Master of Science in Electrical Engineering majoring in wireless
communication in 1995 from Delft University of Technology Delft, The Netherland. Upon his graduation,
Mr. Wibowo also served as researcher at Rheinisch-Westflische Technische Hochschule (RWTH) Aachen,
Germany. Currently serves as Director of Truba Manunggal. Previously worked for several companies
including Booz-Allen & Hamilton Inc. and Deputy Director of Business Strategic & Planning in Truba
Manunggal.
Corporate Data

Name of Company
PT TRUBA ALAM MANUNGGAL ENGINEERING Tbk.

Line of Bussines
Integrated Electricity Power, Engineering, Procurement
and Construction Provider.

Head Office
Wisma BRI II, 30th-31st Floor
Jl. Jend. Sudirman Kav. 44-46
Jakarta 10210, Indonesia
Phone : (62-21) 5793 2255
Fax : (62-21) 5793 2334
Website: www.truba-manunggal.com

Corporate Secretary
Gamala V. Katoppo
E-mail : gamala.katoppo@truba-manunggal.com

You might also like