Professional Documents
Culture Documents
Up&wbimt .f W&t,ouxe
SHEETMETAL EQUIP. SETTING
-
Date: 7/20/2015
Dear Sir:
Fountain Construction Company Inc. has been awarded a contract to construct a
(Translational Research Center) at the University of Mississippi Medical Center. This
project is part ofa larger common plan of development. referred to as the Master Plan which has
coverage under Large Construction General Permit Number MSRIOI976. This project will
disturb approximately 3 acres.
Enclosures:
Cc: Mr. Coleman Bond. UiavIC