Dairy Project Report Introduction of Murrah Buffalo :- Well, let us discuss about Murrah buffalo
project report. This report is about 50 Murrah buffaloes in dairy farming. This report includes about total
project cost of 50 Murrah buffaloes and subsidies, bank loans and profits in India.

The following dairy project report is based on following assumptions for Murrah buffalo dairy for
successful farming.

http://www.agrifarming.in/dairy-project-report/ 1/5
8/27/2017 Dairy Project Report With 50 Murrah Buffaloes | Agrifarming.in

Freshly calved Murrah female buffaloes in first or second lactation should be purchased in 2 batches of
25 animals.

And each batch at an interval of 5 to 6 months of time frame.

Make sure to have/own 9 to 10 acres of land for green fodder growing.

Buffalo dung is used as organic fertilizer manure for green fodder cultivation.

Cost of rearing or growing calves not considered as it will be repealed by their sale.

In case of death of adult animal, new buffalo will be purchased or replaced from insurance claim money
or buying.

Heifers can be used as replacement stocks.

Note: The actual amounts may change based on region, current market prices and other factors.

Type of animal (breed) Murrah Breed

Quantity of Murrah buffaloes 50

Menger per young stock in inches 15

Construction cost of o floor in q.ft


250

55,000 ( However, it may depends on age and


Price for Murrah buffalo including transportation
other factors)

Milk yield of Murrah per day 14 to 15 liters

Floor space for covered animal (adult) 30-35 sq.ft.

Open space adult Murrah 90-100 sq.ft.

Menger length/Murrah buffalo


25 inches

Covered Floor space/calf


15 sq.ft.

Open floor space for/calf 50 sq.ft

Menger/calf stock 15 inches

http://www.agrifarming.in/dairy-project-report/ 2/5
8/27/2017 Dairy Project Report With 50 Murrah Buffaloes | Agrifarming.in

Construction cost of office & floor 250 sq.ft

Construction cost 200 Rs/sq.ft

Milking machine and accessories cost 4,30,0000 Rs

Other equipment cost/buffalo 1,000 Rs

Green fodder cultivation cost/acre/season 5000 Rs

Veterinary expenses/buffalo/year 1000 Rs

Insurance premium 5% per/year

Dry fodder Cost 1 Rupee/kg

Concentrate feed cost 12 Rs/kg

Interest Rate 12%

Period of repayment 6 years

Milk selling price/liter 24 Rs

Gunny bags sale price 10 Rs

Lactation period 270 days

Dry period 150 days

Dairy Project Report : Feeding (Daily) & Cost Chart for each Murrah Buffalo:

Cost of Lactation Period Dry Period

Feed Item feed/kg Quantity in Quantity in


Cost in Rs. Cost in Rs.
Kgs Kgs

Concentrate feed 12 6.5 78 1 12

Grown at your Grown at


Green fodder 1 25 20
field your field

Dry fodder 2 6 12 5 10

Total 90 Rs 22 Rs

http://www.agrifarming.in/dairy-project-report/ 3/5
8/27/2017 Dairy Project Report With 50 Murrah Buffaloes | Agrifarming.in

Dairy Project Report: Project cost and Bank loan Information.

Project Cost. Amount in Rs.

Capital cost

Total covered area for 50 Buffaloes @


3,00,000
30sq.ft/buffalo @ 200/sq.ft.

Total covered area for 50 calves @ 15 sq.ft./calf @


1,50,000
200/sq.ft.

Construction cost of boundary and manger for


2,50,000
open space.

Store room construction cost for 200 sq.ft @ 250


50,000
per sq.ft.

Office and marketing room construction cost for


62,500
250 sq.ft. @ 250 per sq.ft.

Cost of 50 Murrah Buffaloes with minimum

average 15 liter milk yield /day @55000/buffaloes 27,50,000


including transport.

Generator set cost. 80,000

Milking machine, accessories and installation cost . 4,30,000

Dairy appliance cost /animal@ 1000 Rs 50,000

Bulk cooler of 500 liter capacity cost. 2,70,000

Bore well and pump set cost. 70,000

Electrical related cost. 30,000

Overhead tank and pipe line cost. 70,000

Chaff cutter for green fodder and dry fodder. 90,000

Total 46,52,500
http://www.agrifarming.in/dairy-project-report/ 4/5
8/27/2017 Dairy Project Report With 50 Murrah Buffaloes | Agrifarming.in

Dairy Project Report: Recurring cost details:

Item details. Amount in Rs.

Feed cost for first batch of 25 buffaloes for one


67,500
month as per feed chart above.

Insurance premium for 25 buffaloes @ 5% of


68,750
buffalo cost.

Green fodder cultivation cost 10 acres of land for


50,000
one session crop.

Cost of vaccination and medicines, electricity for


10,000
the first month.

Contingency (an incidental expense). 11,250

Total recurring expenditure: 2,07,500

Total Project Cost (Project cost + Total recurring


46,52,500 + 2,07,500 = 48,60,000
expenditure).

Margin money (no margin money up to one lakh


12,15,000
finance as per RBI instructions).

Bank loan: 100% of project cost: 36,45,000

Note: The above dairy project report is a sample model only.