Abstract: In order to study the most economical configuration of bunkers to store a given volume of a material, one
hundred and forty five bunkers have been designed by changing the ratio of height to lateral dimensions for storing a
given material, namely, bituminous coal. In this investigation, for each volume, i.e., for 100m 3 the length to breadth
ratio is taken constant as 1, 1.2, 1.4, 1.6, 1.8 and 2 and, for each length by breadth ratio, four bunkers having different
breadth by depth ratio have been designed and finally, the most economical size is found out. This method is carried
out for volumes of 120m3, 140m3, 160m3, 180m3, and 200m3also. A program has been developed using C-language
for the design of bunkers, columns and footings and all the bunkers have been designed using this program. All the
designs have been based on the recommendations of I.S 4995 -1974 and I.S 456 2000 codes. Based on these designs,
those dimensions of bunkers which will lead to least amount of concrete, steel and total cost to store a given amount of
material have been found out. These findings will be useful for the designers of bunkers.
Keywords: Bunkers, length to breadth ratio, lateral dimensions, bituminous coal, total cost, most economical.
I. INTRODUCTION
Bins are used by a wide range of industries to store bulk solids in quantities ranging from a few tonnes to over one
hundred thousand tones. A bin is an upright container for the storage of bulk granular materials. Shallow bins are usually
called as bunkers and deep bins are usually called as silos. If the depth and breadth of a bin are such that the plane of
rupture meets the surface of the material, before it strikes the opposite side of the bin, it is called a shallow bin or a
bunker. Hopper of bins is four sloping slabs. Bunkers are made from many different structural materials. They can be
constructed of steel or reinforced concrete and may discharge by gravity flow or by mechanical means. Steel bins range
from heavily stiffened flat plate structures to efficient unstiffened shell structures. They can be supported on columns,
load bearing skirts, or they may be hung from floors. Bins with flat bottom are usually supported directly on foundations.
Reinforced concrete is an ideal structural material for the building of permanent bulk-storage facilities for dry
granular like fillings. Initially concrete storage units are economical in design and reasonable in cost. Concrete can offer
the protection to the stored materials, requires little maintenance, is aesthetically pleasing, and is relatively free of certain
structural hazards (such as buckling or denting).
GENERAL CHARACTERISTICS:
Concrete storage units can be designed and built in any shape and size to fit the site or the process for which
they are required. They can be poured monolithically by the use of sliding forms when the walls are high, in single lifts
when they are low, and in rapidly following lifts of fixed forms when they are of moderate height.
ETHODOLOGY:
A program has been developed using C-language for the design of bunkers, columns and footings and all the bunkers
have been designed using this program. All the designs have been based on the recommendations of I.S 4995 -1974 and
I.S 456 2000 codes. Estimation of cost of bunkers and its supporting structures are done by using Microsoft excel.
2014, IJARCSSE All Rights Reserved Page | 417
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
II. DESIGN CONSIDERATION:
The design process for bunkers is of two types functional and structural, functional design must provide for adequate
volume, proper protection of the stored materials, and satisfactory methods for filling and discharge. Structural
considerations are stability, strength and control (minimizing) of crack width and deflection. Loads to be considered
include the following:
1. Dead load of the structure itself and items supported by the structure.
2. Live Load forces are taken based on the type of material stored.
Before the structural design can be carried out, the loads on the bin must be evaluated. Loads from the stored material are
dependent, amongst other things, on the flow pattern, the properties of the stored material and the bin geometry while the
methods of structural analysis and design depend upon the bin geometry and the flow pattern. The importance of Stages i
and ii of the design should not be underestimated. Simplified rules for the functional design of bins and for estimating
wall loads are given in IS 4995-1974.
Design Example:
Volume of bunker =100m3
Dimension of bunker:
Adopt a bunker size 5.35x5.35x2.5m with the depth of 1.2m hopper bottom.
Height of surcharge = =
=1.87m.
Check for volume:
Volume of surcharge =
V 1= =17.5m3.
Volume of cylindrical portion = a*b*h.
V2=5.35*5.35*2.5=71.42 m3.
Volume of hopper bottom portion, V3
V3 =
=
V3=11.35 m3.
V=100.27 m3. 100 m3.
As per IS 4995(part 1)-1974, table 1, the density of bituminous coal is 8kN/m3 and angle of repose is 35.
Design of Side walls:
Horizontal working pressure p= whcos2
p= 8*5.35 cos235=28.71 kN/m2
Assume the thickness of side wall =230mm.
Effective span =5.35+0.23=5.58m.
L=B
Maximum bending moment at corners is
M=p (L2+B2-LB)/12 =p (L2)/12 =(28.71*5.352)/12=68.47kNm.
Ultimate design moment, Mu=1.5*68.47
=102.72kNm.
Direct tension in wall,
T=pB/2 (for longer wall)
T=pL/2 (for shorter wall)
T=28.71*(5.35/2)=76.79kN.
Ultimate direct tension in wall, T u
Tu=1.5*76.79=115.18kN.
Providing a cover of 30mm,
Providing effecting depth=230-30=200mm.
Distance between reinforcement of slap, x=85mm.
Net design moment = Mu-Tu*x
=102.72-(115.18*0.085)=92.93kNm.
D= =
=183.5mm <200mm.
Since the depth provided is more. The section is under reinforced. Hence the area of steel required is,
Mu=0.87fyAstd {1-Astfy/bdfck}
92.93*106=0.87*415*Ast*183.5{1-Ast*415/1000*183.5*20}
Ast=1748.18mm2.
Provide 12mm bars,
Ast= mm2.
Spacing S= =
Spacing S= = 0
Spacing S= =
Spacing S= = 0
Spacing S= = 0
TABLE 2
volume h a/b ratio h/b ratio a b
100 2.3 1.2 0.5 6.00 4.90
100 4.0 1.2 1.0 4.90 4.10
100 5.4 1.2 1.5 4.30 3.70
100 6.6 1.2 2.0 4.00 3.30
TABLE 3
volume h a/b ratio h/b ratio a b
100 2.4 1.4 0.5 6.20 4.50
100 4.0 1.4 1.0 5.20 3.80
100 5.1 1.4 1.5 4.80 3.40
100 6.30 1.4 2.0 4.35 3.12
TABLE 4
volume h a/b ratio h/b ratio a b
100 2.2 1.6 0.5 6.80 4.20
100 3.5 1.6 1 5.80 3.70
100 4.9 1.6 1.5 5.20 3.20
100 5.90 1.6 2.0 4.75 3.00
TABLE 5
volume h a/b ratio h/b ratio a b
100 1.89 1.8 0.5 7.45 4.10
100 3.5 1.8 1.0 6.20 3.40
100 4.6 1.8 1.5 5.60 3.10
100 5.8 1.8 2.0 5.00 2.85
TABLE 6
volume h a/b ratio h/b ratio a b
100 2.05 2.0 0.5 7.60 3.80
100 3.3 2.0 1.0 6.60 3.30
100 4.4 2.0 1.5 5.90 3.00
100 5.5 2.0 2.0 5.50 2.70
2014, IJARCSSE All Rights Reserved Page | 421
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
TABLE 7
volume h a/b ratio h/b ratio a b
120 2.9 1.0 0.5 5.50 5.50
120 4.4 1.0 1.0 4.40 4.40
120 6.1 1.0 1.5 4.15 4.15
120 7.42 1.0 2.0 3.80 3.80
TABLE 8
volume h a/b ratio h/b ratio a b
120 2.75 1.2 0.5 6.00 5.20
120 4.4 1.2 1.0 5.20 4.25
120 5.7 1.2 1.5 4.72 3.80
120 7.0 1.2 2.0 4.20 3.58
TABLE 9
volume h a/b ratio h/b ratio a b
120 2.5 1.4 0.5 6.70 4.80
120 3.9 1.4 1.0 5.80 4.10
120 5.4 1.4 1.5 5.10 3.60
120 6.5 1.4 2.0 4.76 3.30
TABLE 10
volume h a/b ratio h/b ratio a b
120 2.4 1.6 0.5 7.20 4.50
120 3.8 1.6 1.0 6.20 3.90
120 5.1 1.6 1.5 5.60 3.40
120 6.3 1.6 2.0 5.05 3.20
TABLE 11
volume h a/b ratio h/b ratio a b
120 2.3 1.8 0.5 7.60 4.30
120 3.8 1.8 1.0 6.50 3.66
120 4.9 1.8 1.5 6.00 3.25
120 6.1 1.8 2.0 5.50 3.00
TABLE 12
volume h a/b ratio h/b ratio a b
120 2.1 2.0 0.5 8.20 4.10
120 3.6 2.0 1.0 6.90 3.50
120 4.7 2.0 1.5 6.32 3.20
120 5.9 2.0 2.0 5.75 2.90
2014, IJARCSSE All Rights Reserved Page | 422
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
TABLE 13
volume h a/b ratio h/b ratio a b
140 2.8 1.0 0.5 6.00 6.00
140 4.9 1.0 1.0 4.90 4.90
140 6.6 1.0 1.5 4.30 4.30
140 7.8 1.0 2.0 4.00 4.00
TABLE 14
volume h a/b ratio h/b ratio a b
140 2.8 1.2 0.5 6.50 5.40
140 4.6 1.2 1.0 5.50 4.50
140 6.0 1.2 1.5 4.99 4.00
140 7.4 1.2 2.0 4.40 3.80
TABLE 15
volume h a/b ratio h/b ratio a b
140 2.8 1.4 0.5 6.90 5.10
140 4.4 1.4 1.0 6.00 4.20
140 5.6 1.4 1.5 5.50 3.80
140 7.0 1.4 2.00 4.94 3.50
TABLE 16
volume h a/b ratio h/b ratio a b
140 2.4 1.6 0.5 7.80 4.80
140 4.2 1.6 1.0 6.50 4.00
140 5.5 1.6 1.5 5.80 3.60
140 6.9 1.6 2 5.35 3.25
TABLE 17
volume h a/b ratio h/b ratio a b
140 2.4 1.8 0.5 8.18 4.43
140 4.0 1.8 1.0 6.84 3.85
140 5.2 1.8 1.5 6.20 3.50
140 6.4 1.8 2.0 5.75 3.20
TABLE 18
volume h a/b ratio h/b ratio a b
140 2.3 2.0 0.5 8.60 4.25
140 3.6 2.0 1.0 7.50 3.70
140 5.0 2.0 1.5 6.70 3.30
140 6.1 2.0 2.0 6.10 3.10
2014, IJARCSSE All Rights Reserved Page | 423
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
TABLE 19
volume h a/b ratio h/b ratio a b
160 3.2 1.0 0.5 6.10 6.10
160 5.2 1.0 1.0 5.10 5.10
160 7.0 1.0 1.5 4.50 4.50
160 8.2 1.0 2.0 4.19 4.19
TABLE 20
volume h a/b ratio h/b ratio a b
160 3.0 1.2 0.5 6.70 5.80
160 4.8 1.2 1.0 5.60 4.86
160 6.3 1.2 1.5 5.20 4.20
160 7.8 1.2 2.0 4.60 4.00
TABLE 21
volume h a/b ratio h/b ratio a b
160 2.9 1.4 0.5 7.28 5.30
160 4.4 1.4 1.0 6.45 4.45
160 5.8 1.4 1.5 5.75 4.00
160 7.3 1.4 2.0 5.15 3.70
TABLE 22
volume h a/b ratio h/b ratio a b
160 2.5 1.6 0.5 7.90 5.20
160 4.4 1.6 1.0 6.75 4.20
160 5.8 1.6 1.5 6.00 3.80
160 6.8 1.6 2.0 5.75 3.49
TABLE 23
volume h a/b ratio h/b ratio a b
160 2.5 1.8 0.5 8.60 4.70
160 4.1 1.8 1.0 7.20 4.10
160 5.4 1.8 1.5 6.50 3.70
160 6.7 1.8 2.0 5.95 3.40
TABLE 24
volume h a/b ratio h/b ratio a b
160 2.3 2.0 0.5 9.00 4.60
160 4.0 2.0 1.0 7.78 3.80
160 5.2 2.0 1.5 7.00 3.50
160 6.3 2.0 2.0 6.55 3.20
2014, IJARCSSE All Rights Reserved Page | 424
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
TABLE 25
volume h a/b ratio h/b ratio a b
180 3.3 1.0 0.5 6.40 6.40
180 5.4 1.0 1.0 5.30 5.30
180 7.0 1.0 1.5 4.75 4.75
180 8.8 1.0 2.0 4.30 4.30
TABLE 26
volume h a/b ratio h/b ratio a b
180 3.1 1.2 0.5 7.00 6.00
180 5.0 1.2 1.0 5.90 5.02
180 6.5 1.2 1.5 5.40 4.40
180 8.2 1.2 2.0 4.90 4.00
TABLE 27
volume h a/b ratio h/b ratio a b
180 2.8 1.4 0.5 7.70 5.70
180 4.8 1.4 1.0 6.45 4.70
180 6.1 1.4 1.5 5.90 4.20
180 7.8 1.4 2.0 5.35 3.80
TABLE 28
volume h a/b ratio h/b ratio a b
180 2.8 1.6 0.5 8.20 5.20
180 4.4 1.6 1.0 7.20 4.40
180 6.0 1.6 1.5 6.25 4.00
180 7.2 1.6 2 5.80 3.70
TABLE 29
volume h a/b ratio h/b ratio a b
180 2.6 1.8 0.5 8.90 4.90
180 4.4 1.8 1.0 7.50 4.20
180 5.7 1.8 1.5 6.80 3.80
180 7.1 1.8 2.0 6.20 3.50
TABLE 30
volume h a/b ratio h/b ratio a b
180 2.5 1.9 0.5 9.20 4.80
180 4.1 2.0 1.0 8.10 4.00
180 5.5 2.0 1.5 7.20 3.62
180 6.7 2.0 2.0 6.75 3.30
2014, IJARCSSE All Rights Reserved Page | 425
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
TABLE 31
volume h a/b ratio h/b ratio a b
200 3.5 1.0 0.5 6.55 6.55
200 5.6 1.0 1.0 5.50 5.50
200 7.4 1.0 1.5 4.90 4.90
200 9.0 1.0 2.0 4.50 4.50
TABLE 32
volume h a/b ratio h/b ratio a b
200 3.3 1.2 0.5 7.40 6.00
200 5.0 1.2 1.0 6.40 5.20
200 7.1 1.2 1.5 5.40 4.60
200 8.5 1.2 2.0 5.00 4.20
TABLE 33
volume h a/b ratio h/b ratio a b
200 3.0 1.4 0.5 7.90 5.85
200 4.9 1.4 1.0 6.80 4.80
200 6.3 1.4 1.5 6.20 4.30
200 8.0 1.4 2.0 5.50 4.00
TABLE 34
volume h a/b ratio h/b ratio a b
200 2.9 1.6 0.5 8.50 5.40
200 4.7 1.6 1.0 7.40 4.50
200 6.2 1.6 1.5 6.57 4.10
200 7.5 1.6 2.0 6.10 3.79
TABLE 35
volume h a/b ratio h/b ratio a b
200 7.8 1.8 2.2 6.30 3.50
200 8.6 1.8 2.5 6.00 3.40
200 8.9 1.8 2.7 6.00 3.30
200 9.6 1.8 3.0 5.80 3.20
TABLE 36
volume h a/b ratio h/b ratio a b
200 7.4 2.0 2.2 6.72 3.40
200 7.9 2.0 2.4 6.60 3.30
200 8.5 2.0 2.6 6.40 3.20
200 9.1 2.0 2.9 6.20 3.10
2014, IJARCSSE All Rights Reserved Page | 426
Shenbagam et al., International Journal of Advanced Research in Computer Science and Software Engineering 4(9),
September - 2014, pp. 417-429
III. COST COMPARISON OF R.C.C BUNKERS WITH VARIOUS H/B RATIO
For the purpose of cost comparison, the rates are adopted as per the prevailing rates at Sathyamangalam during the period
of October 2011 and the rates are given below
Rate of concrete: Rs.5000 per m3.
Rate of Steel: RS.50 per kgf.
Rate of Formwork: Rs. 150 per m2.
275
8 nos of 32
mm dia @
125mm c/c
275
180
16 mm dia bars
@200 mm c/c
4000
16 mm dia bars
@100 mm c/c
16 mm dia bars
@150 mm c/c
16 mm dia bars
@200 mm c/c
300
275
425
500
ACKNOWLEDGEMENT
The authors thank the Management and the Principal, and the HOD of Bannari Amman Institute of Technology,
Sathyamangalam.
REFERENCES
[1] N.Krishna Raju, Advanced Reinforced Concrete Structures.
[2] Bhavikatti.V, Advanced Reinforced Concrete Structures.
[3] O.P Jain and Jai Krishna Plain and reinforced Concrete Volume-II.
[4] IS: 4995(Part1)-1974 (Criteria for design of Reinforced Concrete Bins for Storage of Granular and Powdery
Materials),
[5] IS: 4995(Part II)-1974 (Criteria for design of Reinforced Concrete Bins for Storage of Granular and Powdery
Materials).
[6] IS: 456-2000 (Code of Practice for Plain and Reinforced Concrete)