For The Month of May

Date/ Time Activities Number of Hours


18-May-17 Assigned to the superior 8 hours
Understanding Rules and
Regulation as trainee specially
the importance of safety in
8:00 AM- 5:00 PM construction and Plan Reading
Listening to trainor discussing
19-May-17 about detailed plan. 7 hours
Write down important details to
8:00 AM- 4:00 PM followed in construction
Tour in the construction site
while trainor show us the plan
and how it is done in actual
20-May-17 work 13 hours
Write down important details to
8:00 AM- 10:00 PM followed in construction
Witness the actual pouring of
concrete columns
21-May-17 Site Observation 8 hours
8:00 AM- 5:00 PM Write Accomplishment Report
26-May-17 Checklist 7 hours
8:00 AM- 4:00 PM Plan Reading
Site observation ( Foundation,
Footing)
Engage manpower and be
familiar with their works
(Supervisors, engineers,
labours, carpenters, Steelman,
foreman etc) at different
27-May-17 locations. 7 hours
Inspecting checklist along with
8:00 AM- 4:00 PM trainor on site
Write Daily Accomplishment
Report

TOTAL 50 hours
For the Month of June

Activities
Date/ Time Number of Hours
03-June-17 Site Observation (Surveying) 7 hours
8:00 AM- 4:00 PM Update Progress Report
Write Daily Accomplishment
Report
Site Observation ( Tiring of Wire
04-June-17 at Column) 7 hours
8:00 AM- 4:00 PM Update Progress Report
Write Daily Accomplishment
Report
Learning about Quantity
09-Jun-17 Surveying 8 hours
8:00 AM- 5:00 PM Note materials needed on site
Update Progress Report
Continuation of learning about
10-Jun-17 Quantity Surveying 8 hours
8:00 AM- 5:00 PM Write Accomplishment Reports
Familiarizing with construction
17-Jun-17 bidding 8 hours
Cost estimate from blueprints
8:00 AM- 5:00 PM and materials take offs
Write accomplishment Report
Study and Understanding
23-Jun-17 Drawings 8 hours
Making possible changes of
8:00 AM- 5:00 PM drawings using AutoCAD
Continuation of Understanding
drawings and applying in
24-Jun-17 AutoCAD 7 hours
8:00 AM- 4:00 PM Write accomplishment Report
30-Jun-17 Update Progress Report 8 hours
8:00 AM- 5:00 PM Filing of Drawing
Write accomplishment Report
TOTAL 61 hours
For the Month of July

Date/ Time Activities Number of Hours


Learning how to convert
1-July-17 design into reality 7 hours
Understanding the drawings
properly while discussing with
the planning department and
8:00 AM- 4:00 PM project manager
Write Accomplishment Report
Learning how to make and
7-July-17 follow working schedule 8 hours
8:00 AM- 5:00 PM Site observation
Update Progress Report
Familiarizing with equipments
used in construction site such
as mobile crane, concrete
8-July-17 trowel etc. 8 hours
Determine the equipments
8:00 AM- 5:00 PM functionality
Write Accomplishment Report
14-July-17 Site Observation (slab) 7 hours
Oversee all testing methods in
8:00 AM- 4:00 PM construction site
Review quality of materials on
15-July-17 site 7 hours
8:00 AM- 4:00 PM Write Accomplishment Report
Gain knowledge from
engineers, foreman, Steelman
and collaborate with
21-July-17 contractors 10 hours
Witness the actual pouring of
8:00 AM- 7:00 PM slab
Write Daily Accomplishment
Report
Witness the use of ride-on-
trowels for the finishing of floor
22-July-17 slabs 10 hours
Oversee the preparation for
another pouring of slab
8:00 AM- 7:00 PM (scaffold, tire wiring etc)
Witness the actual pouring of
slab
Site Observation ( Finishing of
23-July-17 floorslab) 10 hours
8:00 AM- 7:00 PM Doing checklist and cutting list
Observe pouring of concrete
column
Learning how to monitor and
24-July-17 record all project activities 13 hours
Learning how to analyze all
processes to ensure all work
according to quality
8:00 AM- 10:00 PM requirements
Write Accomplishment Report
Learning how to monitor the
manpower and evaluate their
25-July-17 performance 13 hours
8:00 AM- 10:00 PM Update Progress Report
Site observation (installation of
26-July-17 trusses) 10 hours
Site observation ( Pouring of
8:00 AM- 7:00 PM concrete column at 2nd floor)
Write Daily Accomplishment
Site Observation (Installation
27-July-17 of trusses) 13 hours
Site Observation (Pouring of
8:00 AM- 10:00 PM Slab)
Write Accomplishment Report
Site Observation (Installation
28-July-17 of trusses) 13 hours
Site Observation( Finishing of
7:00 AM- 4:00 PM Floor Slab)
Update Progress Report
TOTAL 129 hours