You are on page 1of 7

FT/A1

APPENDIX FT/A

DAYWORK SCHEDULE

1. Where work cannot be properly measured and valued the Contractor shall be allowed daywork rates at
the rates entered in Table 1, 2 and 3 of this Schedule.

2. The rates inserted by the Tenderer shall be realistic rates in conformity with those on which his tender has
been based, and shall be based on conditions prevailing at the time of tender but bearing in mind that
claims for escalation will not be entertained.

3. Daywork rates will not apply in the following cases:-

a. for jobbing or any other work carried out as a main or separate contract, or

b. daywork ordered by the Superintending Officer to be carried out after the date of commencement
of the Defects Liability Period, which may be the subject of a separate agreement, or

c. for work which can be valued in accordance with the provisions of the Conditions of

Contract. Section 1 - Labour

4. The rates for labour entered by the Contractor in Table 1 are to include for the following:-

a. The amount of wages actually paid to the employee when carrying out daywork.

b. The amount of bonuses, incentive payments and other emoluments actually paid to the employee
when carrying out daywork.

c. Overheads and profit as defined in Section Four below.

5. Notwithstanding the provisions of the Labour Enactments of Brunei, overtime working will be deemed to
be carrying out works outside the hours of 8:00 a.m. and 5:00 p.m. on Monday to Sunday inclusive.

6. Payment for overtime working will be calculated on the following basis:-

a. Monday to Sunday inclusive between the hours of 5.00 p.m. and midnight at time and a half
(i.e. 1 times the amount entered in Table 1).

b. Monday to Sunday inclusive between the hours of midnight and 8.00 a.m. at double time (i.e.
2 times the amount entered in Table 1).

Section 2 - Materials

7. The rates for materials entered in Table 2 include for the following:-

a. The cost of materials including all costs relating thereto.

b. Overheads and profit as defined in Section 4 below.

Section 3 - Plant

8. The rates for plant entered in Table 3 include for the following:-

a. Use of mechanically operated plant for the time engaged upon daywork.

b. Hire charges where applicable.

P10 C2
c. Fuel, grease and lubricating oil.

d. Maintenance.

e. Consumable stores.

f. Spare parts.

g. Insurance and road taxes where applicable.

h. Overheads and profit as defined in Section 4 below.

9. Costs for plant are to exclude the cost of wages in respect of drivers and operatives which are to be
included in Table 1.

10. Payment for mechanically operated plant will be made only for such time as the plant is engaged upon
daywork operations and shall exclude all standing time.

Section 4 Overheads and Profit

11. Overheads and profit are included in the rates entered in respect of labour, materials and plant in Table 1,
2 and 3 respectively.

12. The term Overheads is defined below as including:-

a. Head office charges.

b. Site supervision and site staff.

c. All Government and statutory taxes and levies.

d. Overtime other than that allowed for in Section One.

e. Time lost due to inclement weather.

f. Travelling time and expenses.

g. Subsistence allowances.

h. Safety, health and welfare facilities.

i. Third party and Employers liability insurance.

j. Holiday and sick pay.

k. Tool allowances.

l. Use, repair and sharpening of small tools.

m. All non-mechanically operated plant, erected scaffolding, staging and trestles, artificial lighting,
protective clothing, storage facilities and the like that may be in general use on the site.

n. All other liabilities and obligations whatsoever.


TABLE 1 - LABOUR

Description Unit Rate


$ cts

Labourer hour

Concretor hour

Steel bender hour

Mason hour

Drainlayer hour

Carpenter hour

Steelworker hour

Welder hour

Electrician hour

Plumber hour

Painter hour

Driver hour

Mechanic hour

Plant Operator Mechanical Plant under 100 B.H.P. hour

Plant Operator Mechanical Plant 100 B.H.P. and over hour

(Any classification not included above)

hour
hour

hour

hour

hour

hour

TABLE 2 MATERIALS

Rate
Description Unit
$ cts

Cement (50 kg. bag) Bag

Sand m3

20mm Aggregate m3

40mm Aggregate m3

Hardcore m3

Mild steel rod reinforcement 10mm and below kg.

Ditto 12mm kg.

Ditto 16mm and above kg.

High tensile rod reinforcement 10mm and below kg.

Ditto 12mm kg.

Ditto 16mm and above kg,

Bricks ordinary first quality 1,000 pcs.

Kapur Bukit - sawn m3

Ditto - wrot m3

Dark Red Meranti - sawn m3

Ditto - wrot m3

Mild steel plates kg.

Mild steel sections kg.

Mild steel rolled hollow sections kg.

(any other items)

TABLE 3 PLANT

Enter the size or capacity of Plant where not stated.

Rate
Description Capacity Unit
$ cts

Compressors - Portable (incl. tools and hose) .... m3/m hour

- Mobile (incl. tools and hose) .... m3/m hour

Crane - Mobile ... tonnes hour

Dumpers (or Dump Trucks) ..... m3 hour

Excavators - Track Type . m3 hour

- Wheel Type . m3 hour

Tractor Shovel - Track Type ..... m3 hour

- Wheel Type ..... m3 hour

Generating Sets ....K.V.A. hour

Lorries - Van or similar utility ..... kg. hour

- Ordinary flat top ... tonnes hour

- Ordinary heavy haulage ... tonnes hour

Mixers - Concrete, open drum ... hour

- Ditto - ... hour

Mixers - with weight batchers ... hour

Paver ... hour

Pumps - Portable (incl. foot valves,


suction hose and all fittings)

- diesel or petrol driven .... mm hour

- ditto - .... mm hour

- electrically driven mm hour


TABLE 3 PLANT (Contd)

Rate
Description Capacity Unit
$ cts

Water truck (Type)


(including spraying equipment) .. litres hour

Welding and cutting set (Oxy-acetylene inclusive


of oxygen and acetylene) each hour

Ditto Electric Arc each hour

Roller Compactor 3 tonnes hour

Roller Compactor 7 tonnes hour

Roller Compactor 10 tonnes hour

Grader hour

(Any items not included above)


Signature of Tenderer Signature of Witness

Address: Address:


Date:... Date:...