DAYWORK SCHEDULE
1. Where work cannot be properly measured and valued the Contractor shall be allowed daywork rates at
the rates entered in Table 1, 2 and 3 of this Schedule.
2. The rates inserted by the Tenderer shall be realistic rates in conformity with those on which his tender has
been based, and shall be based on conditions prevailing at the time of tender but bearing in mind that
claims for escalation will not be entertained.
a. for jobbing or any other work carried out as a main or separate contract, or
b. daywork ordered by the Superintending Officer to be carried out after the date of commencement
of the Defects Liability Period, which may be the subject of a separate agreement, or
c. for work which can be valued in accordance with the provisions of the Conditions of
4. The rates for labour entered by the Contractor in Table 1 are to include for the following:-
a. The amount of wages actually paid to the employee when carrying out daywork.
b. The amount of bonuses, incentive payments and other emoluments actually paid to the employee
when carrying out daywork.
5. Notwithstanding the provisions of the Labour Enactments of Brunei, overtime working will be deemed to
be carrying out works outside the hours of 8:00 a.m. and 5:00 p.m. on Monday to Sunday inclusive.
a. Monday to Sunday inclusive between the hours of 5.00 p.m. and midnight at time and a half
(i.e. 1 times the amount entered in Table 1).
b. Monday to Sunday inclusive between the hours of midnight and 8.00 a.m. at double time (i.e.
2 times the amount entered in Table 1).
Section 2 - Materials
7. The rates for materials entered in Table 2 include for the following:-
Section 3 - Plant
8. The rates for plant entered in Table 3 include for the following:-
a. Use of mechanically operated plant for the time engaged upon daywork.
P10 C2
c. Fuel, grease and lubricating oil.
d. Maintenance.
e. Consumable stores.
f. Spare parts.
9. Costs for plant are to exclude the cost of wages in respect of drivers and operatives which are to be
included in Table 1.
10. Payment for mechanically operated plant will be made only for such time as the plant is engaged upon
daywork operations and shall exclude all standing time.
11. Overheads and profit are included in the rates entered in respect of labour, materials and plant in Table 1,
2 and 3 respectively.
g. Subsistence allowances.
k. Tool allowances.
m. All non-mechanically operated plant, erected scaffolding, staging and trestles, artificial lighting,
protective clothing, storage facilities and the like that may be in general use on the site.
Labourer hour
Concretor hour
Mason hour
Drainlayer hour
Carpenter hour
Steelworker hour
Welder hour
Electrician hour
Plumber hour
Painter hour
Driver hour
Mechanic hour
hour
hour
hour
hour
hour
hour
TABLE 2 MATERIALS
Rate
Description Unit
$ cts
Sand m3
20mm Aggregate m3
40mm Aggregate m3
Hardcore m3
Ditto - wrot m3
Ditto - wrot m3
TABLE 3 PLANT
Rate
Description Capacity Unit
$ cts
Rate
Description Capacity Unit
$ cts
Grader hour
Signature of Tenderer Signature of Witness
Address: Address:
Date:... Date:...