JOB CARD MPD-TASK:

IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A


46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text

CARD: ZONE: 210 INTERVAL:


SKILL: ACCESS:

MECH. INSP.

** ON A/C 101-199, 201-300, 901-999

TASK 46-21-00-710-002-A
VHF 3 Link Test of the ATSU

1. Reason for the Job


Self explanatory
2
Job Set-up Information
A. Work Zones and Access Panels

ZONE/ACCESS ZONE DESCRIPTION


210 CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD

B. Referenced Information

REFERENCE DESIGNATION
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External Power
(Ref. 24-41-00-861-002-A-01). Energize the Aircraft Electrical Circuits from the APU
(Ref. 24-41-00-861-002-A-02). Energize the Aircraft Electrical Circuits from Engine 1(2)
De-energize the Aircraft Electrical Circuits Supplied from the
(Ref. 24-41-00-862-002-A). External Power
(Ref. 24-41-00-862-002-A-01). De-energize the Aircraft Electrical Circuits Supplied from the APU
De-energize the Aircraft Electrical Circuits Supplied from the
(Ref. 24-41-00-862-002-A-02). Engine 1(2)
(Ref. 31-60-00-860-001-A). EIS Start Procedure
(Ref. 31-60-00-860-002-A). EIS Stop Procedure
MCDU Access to COMM MENU page SHEET 1
VHF3 DATA MODE and VHF3 VOICE DIRECTORY pages SHEET 1
COMM STATUS page SHEET 1
VHF3 LINK TEST page SHEET 1

3. Job Set-up
Subtask 46-21-00-861-050-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .
Subtask 46-21-00-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

PANEL DESIGNATION FIN LOCATION


49VU AUTO FLT/MCDU/1 11CA1 B01
49VU SDAC/1/SPLY 3WV F04
49VU FWS/FWC1/SPLY 3WW F01
121VU CFDS/CFDIU/SPLY 2TW J18
121VU ATSU 1 3TX1 L16
121VU ATSU 1/SWTG 5TX1 L15
121VU COM NAV/VHF/3 2RC3 L05
121VU EIS/FWC2/SPLY 2WW Q07
Subtask 46-21-00-860-052-A
C. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (upper ECAM DU, lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001) .
(2) On the center pedestal, on the MCDU 1, adjust the brightness of the MCDU screen.
4. Procedure
Subtask 46-21-00-710-050-C
A. VHF 3 Link Test of the ATSU

ACTION RESULT
1.On the RMP1 (2, 3):
push the VHF3 pushbutton switch.
On the MCDU 1:
the MCDU MENU page comes into view.
2.On the MCDU 1: MCDU Access to COMM MENU
push the MCDU MENU mode key page SHEET 1
3.On the MCDU MENU page:
push the line key adjacent to the ATSU On the MCDU 1:
indication. the ATSU DATALINK page comes into view.
4.On the ATSU DATALINK page:
push the line key adjacent to the COMM On the MCDU 1:
indication. the COMM MENU page comes into view.
5.On the COMM MENU page:
push the line key adjacent to the VHF 3 DATA
MODE indication.
VHF3 DATA MODE and VHF3 VOICE On the MCDU 1:
DIRECTORY pages SHEET 1 the VHF 3 DATA MODE page comes into view.
On the VHF 3 DATA MODE page:
the SCAN indication, the name of the
applicable Service Provider and the related
frequency indication come into view in the top
section of the page.
6.On the VHF 3 DATA MODE page:
push the line key adjacent to the applicable If you set the Service Provider manually
Service Provider (SP) indication. NOTE: (as shown in this procedure), the SCAN

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

ACTION RESULT
indication becomes MANUAL after
frequency scanning.
If scanning of the Service Provider
frequency is automatic, the indication
becomes AUTO.

7.On the VHF 3 DATA MODE page:


push the line key adjacent to the RETURN On the MCDU 1:
indication. the COMM MENU page comes into view.
On the MCDU 1:
the COMM STATUS page comes into view
the DATA/DLK AVAIL indications are shown
adjacent to the VHF 3 indication.

The VHF3 changes to COMM status


8.On the COMM MENU page: when the DATA frequency becomes
push the line key adjacent to the COMM available.
STATUS indication. NOTE: Some minutes can be necessary for this.
COMM STATUS page SHEET 1
9.On the COMM STATUS page:
push the line key adjacent to the RETURN On the MCDU 1:
indication. the COMM MENU page comes into view.
10.On the COMM MENU page:
push the line key adjacent to the
MAINTENANCE indication. On the MCDU 1:
VHF3 LINK TEST page SHEET 1 the MAINTENANCE page comes into view.
11.On the MAINTENANCE page:
push the line key adjacent to the TEST On the MCDU 1:
indication. the TEST page comes into view.
On the TEST page:
the REQUEST indication goes out of view
12.On the TEST page: the IN PROGRESS indication comes into view
push the line key adjacent to the REQUEST at the end of the test, the OK indication comes
VHF3 LINK indication. into view.
13.On the MCDU 1:
push the line key adjacent to the RETURN
indication until the ATSU DATALINK page
comes into view.
14.On the MCDU 1: On the MCDU1:
push the MCDU MENU key. the MCDU MENU page comes into view.

5. Close-up
Subtask 46-21-00-860-053-A
A. Put the aircraft back to its initial configuration.
(1) On the MCDU 1, fully decrease the brightness of the MCDU screen (display off).
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002) .

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

Subtask 46-21-00-862-050-A
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

MCDU
MENU
MCDU MODE-KEY

MCDU MENU

FMGC

AIDS

CFDS

ATSU

ATSU DATALINK

AOC MENU

COMM

COMM MENU
VHF3 COMM
DATA MODE CONFIG
VHF3 VOICE
DIRECTORY
COMM
STATUS

MAINTENANCE

AUDIT PRINT
RETURN SET OFF

N_MM_462100_5_AAN0_01_00

Figure 46-21-00-991-00300-C / SHEET 1/1 - MCDU Access to COMM MENU page


** ON A/C 101-199, 201-300, 901-999

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

< >

<

>

>

< *

* *

*
< *

< *

N_MM_462100_5_BDN0_01_00

Figure 46-21-00-991-00400-D / SHEET 1/1 - VHF3 DATA MODE and VHF3 VOICE DIRECTORY pages
** ON A/C 101-199, 201-300, 901-999

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

< >

<

>

>

< *

< *

< *

N_MM_462100_5_AHN0_01_00

Figure 46-21-00-991-00500-C / SHEET 1/1 - COMM STATUS page


** ON A/C 101-199, 201-300, 901-999

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 7 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
IAC - A318/A319/A320/A321 AMM TASK : 46-21-00-710-002-A
46-21-00 PB 501

TITLE:
A/C Reg.:
46-21-00-710-002-A - VHF 3 Link Test of the ATSU
applicability_text
MECH. INSP.

< >

<

>

>

< *

<

<

<

<

<

<

<

< *

* * * *

< * < *

N_MM_462100_5_AJP0_01_00

Figure 46-21-00-991-00600-C / SHEET 1/1 - VHF3 LINK TEST page


** ON A/C 101-199, 201-300, 901-999
*** END OF CARD ***

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 8 of 8
JCP Ref: reference DATABASE REV DATE: Aug 01/2015
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Jan 15/2016 13:03
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE