Analiza jedinine cene pozicije rada

Betonski radovi
RADNA SNAGA MATERIJAL MEHANIZACIJA
r.b. OPERACIJA
II III IV V VI VII VIII IX SVEGA Cement Pesak Voda El. En. Gorivo Mazivo F. Bet. Autom. P.za bet. Perv.
SVEGA SVEGA
BETONSKI RADOVI h h h h h h h h kg m3 m3 kw/h l l h h h h
1 Spravljanje bet. u c.f.b. 0.085 0.08 0.04 435 1.25 0.2 1.11 0 0.11 0.04
2 Spolj. transport 0.47 3.6 0.36 0.47
3 Unut. transport 0.02 0.02 0.06 0.006 0.02
4 Ugraivanje betona 0.07 0.07 0.06 0.07

Svega resursa 0.085 0.07 0.02 0.07 0.57 0.04 435 1.25 0.2 1.17 3.66 0.476 0.04 0.47 0.02 0.07
Jed. cena resursa (din) 270 280 290 300 310 320 330 340 Ers 5.78 680 30 8 40 250 Em 34415 2082 2778 256 Emeh
Trokovi (din/m3) 22.95 19.6 5.8 21 176.7 0 0 13.6 259.65 2514.3 850 6 9.36 146.4 119 3645.06 1376.6 978.54 55.56 17.92 2428.6

Analiza jedinine cene pozicije rada


Iskop useka za prilazni put
RADNA SNAGA MATERIJAL MEHANIZACIJA
r.b. OPERACIJA
II III IV V VI VII VIII IX SVEGA Gorivo Mazivo Bager Kiper Buldoz. Grejder Vibroje
SVEGA SVEGA
ISKOP h h h h h h h h l l h h h h h
1 Iskop i utovar 0.026 0.2 0.02 0.026
2 Transport zemlje 0.6 4.83 0.483 0.6
3 Razastiranje 0.24 0.12 0.012 0.024
4 Fino planiranje 0.004 0.04 0.004 0.004
5 Zbijanje 0.016 0.17 0.017 0.016

Svega resursa 0.6 0.256 0.004 0.026 5.36 0.536 0.026 0.6 0.024 0.004 0.016
Jed. cena resursa (din) 270 280 290 300 310 320 330 340 Ers 40 250 Em 7555 1972 2376 3890 4247 Emeh
Trokovi (din/m3) 0 0 0 0 186 81.92 1.32 8.84 278.08 214.4 134 348.4 196.43 1183.2 57.02 15.56 67.95 1452.2

Cena 1 m3 betona C = (Ers+Em+Emeh)*(1+j)= 7600.00 din/m3


Cena 1 m3 iskopa C = (Ers+Em+Emeh)*(1+j)= 2494.433 din/m3
PRORAUN TRAJANJA RADOVA
ISKOP ZEMLJE ZA PRILAZNI PUT

Kat. Radnika Ut. Rada po j.m. Ukupno rad. sati Uveanje za 20% Br. radnika-dana Sast. Rad. Brig.
Poz. Opis pozicije rada J.M. Koliina Vrsta i br. Maina Br. Rad. Dana Br. Smena
G M G M G M G M G M G M

1 Utovar IX Bager 1 kom. 0.026 130 156 21 1

2 Transport VI Kamion kiper 23k. 0.6 3000 3600 451 23

3 Razastiranje m3 5000 VII Buldozer 1 kom. 0.24 1200 1440 181 1 21 1

4 Fino planiranje VIII Grejder 1 kom. 0.004 20 24 4 1

5 Zbijanje VII Vibroje 1 kom. 0.016 80 96 13 1

BETONSKI RADOVI

Kat. Radnika Ut. Rada po j.m. Ukupno rad. sati Uveanje za 20% Br. radnika-dana Sast. Rad. Brig.
Poz. Opis pozicije rada J.M. Koliina Vrsta i br. Maina Br. Rad. Dana Br. Smena
G M G M G M G M G M G M

1 II IX 0.085 0.04 2774.4 130 3329.3 156 417 21 9 4


Spravljanje betona Fab. Betona 4 kom.
2 VI 0.08 0 2611.2 0 3133.4 1 393 8

3 Spolj. transport m 3 32640 VI Automealica 47 k. 0.047 0 1534.1 0 1840.9 1 231 47 6 1

4 Unut. transport IV VI Pumpa za bet. 2 k. 0.02 0.02 652.8 652.8 783.36 783.36 99 99 2 2

5 Ugra. betona III V Pervibrator 7 kom. 0.07 0.07 2284.8 2284.8 2741.8 2741.8 344 344 7 7

Armen Derbogosijan 53/99