The works of the new Masia of FC Barcelona began in December 2009 and were completed in July
2011. The original center, La Masia was created in 1979, and this new site has been added to the
name of Centre Formaci Oriol Tort, (Oriol Tort Training Centre) in honor of one of the fathers of the
idea of creating its own quarry, three decades before the inauguration.

The company MCM Renting, took over the surface of the facade, with a cost of 9 million euros. The
new building, for which a structure made previously took advantage, designed by architect Josep
Llobet Bach and PB2 Projecte Study Team has a floor area of 5883.20 m2 distributed over five
floors, with capacity for 123, 83 for residents and 40 for concentrations of professional teams.

In this study Barca residence residents and play, dreaming of reaching the goal of many other
football stars formed in the old farmhouse, like Piqu, Puyol, Busquets, Xavi, Iniesta, Pedrito, Messi
and Thiago.

Situation
In 2011 the transfer of the training center of FC Barcelona to a new facility located in a huge sports
complex, Ciudad Deportiva Joan Gamper belonging to the club, located in San Juan Despi, 4.5
miles from Camp Nou was announced, Barcelona, Catalunya, Spain. The new space was called La
Masia-Oriol Tort Training Centre.

The sports city with easy access to Camp Nou through the main roads linking Sant Joan Despi to
Barcelona.
Ciudad Deportiva Joan Gamper

With an area of 136,839 m2 Deportiva Joan Gamper City hosts training and competitions base
teams Catalans club football as well as the activity of much of the training sport sections. With the
coming into operation of this full installation, much of the sport equipment base is concentrated,
previously developed around the Camp Nou in the accompanying fields Miniestadi and the Palau
Blaugrana 2, popularly known as the Stables.

Its facilities, until 2011, consist of 9 golf 5 with natural grass and artificial turf 4 1 sports hall 1
grandstand building in the field 1, 1 service building, 1 building for locker rooms, different areas of
training specifically for goalkeepers and technical and New Masia, opened the same year. In addition
to soccer practice, are also performed on artificial turf practice rugby and hockey of Barcelona.

Sports City is organized into two main platforms at different heights, which differentiate a training
camp designed to professional football and soccer fields for the base and the other sections.

Concept
Distribution

The functionality and rationality are two basic concepts to define the new Masia. With minimalist
decor, new construction is characterized by comfort for its residents and for being a building with
capacity for growth depending on the needs of the Club.
One example is the storage room for boots and suitcases players, so do not take space in the
rooms, or the installation of an ice machine in order to be used to calm the beatings.

The training concept not only sports, but also education, is well defined in the new facility which has
wi-fi anywhere in the building and reinforcing classrooms equipped with the most modern
technologies in education, electronic whiteboards and projectors plus two study rooms on the
second floor. Leisure time residents were also listed, with playgrounds

Spaces
The building has a floor area of nearly 6,000 square meters on five floors, three of which are used on
campus and two are reserved for future use.

In the garden was installed a barbecue that can be used by players and their families visiting days.
The center has its own medical services, dining room, study and entertainment. Each floor has a
common area for computers.

Basement

On this floor, with entrance from training camp classrooms are concentrated study, is also the water
area and warehouses. At this level of 1,305 square meters almost all goods management building
blocks and are cold rooms and technical services.

Ground floor

An example of the concept developed in the project functionality is present on the ground floor of the
new residence, 1216.55 m2, where the kitchen is integrated, the self-service dining room, offices for
administration, classrooms reinforcement and space for recreation and leisure for residents, against
which left a green area so that they can be accessed directly from the training camps, while it is a
green lung for the new center. Thus, not only athletes conditions are improved, but also working
conditions responsible for caring for residents. Chefs, administrative staff and the heads of the
farmhouse will enjoy better facilities to perform their tasks, without losing the family spirit.

On this floor a television screen placed in the common area to live team parties also foosball,
billiards and spaces for interactive games.

First and second floor

Rooms

In the first and second floor of the new building, which are virtually identical, the 78 rooms are
located, for 2 or 4 residents. Each has a fully equipped bathroom and all the amenities necessary for
the proper performance of its occupants, beds, wardrobes, study tables.
Some rooms have been adapted for physical rehabilitation of the players who need and other
reserved for individual use.
In these plants are also massage rooms and a lounge area.

Infographic

Contacts

Opening date: October 20, 2011


Living Area: 5883.20 m2

Floors: 5

Capacity: 83 athletes

Total rooms: 78

Single rooms: 39

Double rooms: 36

Quadruple rooms: 3

Ground Floor: 1305.85 m2

Ground floor: 1216.55 m2

First floor: 1149.80 m2

Second floor: 1073.25 m2

Third floor: 1137.75 m2

Construction details
Active Facade
On the second skin of the facade on the training grounds of the New Masia, 350,500 LEDs offer an
area of 1460 m2 for use as a screen, a technology deployment that will allow club sponsors image
link entity and values, innovation and profitability.

The entire building is covered by this double skin of glass on the first floor, leaving a space
between facades that enables energy saving thermal level, comfort noise level and improves safety,
especially for a possible evacuation. The type of facade and the fact that all rooms leading outside
cause light has a major role

Access

In one corner of the building squarely cut that goes from the floor to the last level, rectangular plates
coated with shiny maroon tone, the center houses the main entrance. A carport, covered with dark
glass, complete the bucket up to the first floor and ceiling serves on whose side you can read the
name of the institution.
The facade looks at training camps U-shaped from the first level, its walls are covered with the same
bright maroon plates used in the angle of the main entrance. A skylight in the soil lets in natural light
on the ground floor. Since spring training is accessed via a wide staircase leading down to the
basement of the building

Materials
The structure is reinforced concrete. The first skin of the facades is formed by a coating of large
hanging pieces of 14030 cm, a material reminiscent terracotta cooked and does not require
maintenance. With his dark brown Unlike industrial buildings, while providing elements of
sustainability by not allowing the actual walls directly absorb heat from the sun, with a considerable
reduction in energy consumption for air conditioning.

The interior is airy, using durable materials and easy to maintain

The building is also surrounded by a second glass skin. In one of the facades of the New Masia
have placed 350,500 leds that make it a vector image, an active faade that will be used for various
reasons, advertising, press releases, etc. The technology will allow a diversified or sponsors
unilateral projection.

Facing the playground has developed a green area where grass and different trees planted, has also
installed a barbecue.

Architect:
Estudio PB2 Projecte, Llobet Bach, Josep
Technical Architect:
Llus Garcia
Construction Company:
MCM Renting
Developer:
Ftbol Club Barcelona
Built in:
2009-2011
Floors:
5
Facade:
Media
Location:
Sant Joan Despi, Barcelona, Catalunya, Spain