Tugas Akhir Perencanaan Embung Logung Kec. Dawe Kab.

Kudus

Tabel 4.11. Perhitungan Debit Andalan F.J Mock 1994

Parameter Terpakai :
1. m = 10 - 50 % 5. Faktor resesi aliran air tanah k = 0.940 ( Semakin kecil Q makin besar)
2. Kapasitas kelembaban tanah /SMC ( mm ) = 1000 mm 6. Penyimpanan awal (initial storage) IS = 647 mm
3. Daerah Aliran Sungai ( km2 ) = 48.310 km2 7. Faktor aliran hujan lebat PF = 10 %
4. Koefisien infiltrasi ( i ) = 0.40 ( Semakin besar Q makin kecil)

No. Uraian Simbol Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des
1 Curah Hujan P 440 246 497 190 54 20 0 0 0 1 114 334
2 Hari Hujan n 18 14 15 10 2 4 0 0 0 0 9 17
Limited Evapotranspirasi
3 Evapotranspirasi Ep 95.17 89.6 104.47 96.3 99.2 87.9 95.48 111.29 122.1 131.44 111.9 98.58
4 Exposed Surfaces m (%) 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
5 (m/20) (18 - n) % 0.000 0.001 0.000 0.001 0.002 0.002 0.003 0.003 0.003 0.003 0.00135 0.00015
6 E (5 x 3) 0.000 0.054 0.047 0.116 0.238 0.185 0.258 0.300 0.330 0.355 0.151065 0.014787
7 Et = Ep - E (3 - 6) 95.170 89.546 104.423 96.184 98.962 87.715 95.222 110.990 121.770 131.085 111.749 98.565
Water Balance
8 P - Et (1 - 7) 345.163 156.454 392.577 93.482 -44.629 -67.382 -95.222 -110.990 -121.770 -130.418 1.918 235.768
9 Soil Storage 0 0 0 0 -44.629 -67.382 -95.222 -110.990 -121.770 -130.418 0 0
10 Soil Moisture 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
11 Water Surplus (8 - 9) 345.163 156.454 392.577 93.482 0 0 0 0 0 0 1.918 235.768
Run and Ground Water Storage
12 Infiltrasi (11 x i) 138.065 62.582 157.031 37.393 0 0 0 0 0 0 0.767 94.307
13 0,5 x (1 + k) x (12) 133.923 60.704 152.320 36.271 0 0 0 0 0 0 0.744 91.478
14 k x V (n-1) (k x IS) 608.180 571.689 537.388 505.145 474.836 446.346 419.565 394.391 370.728 348.484 327.575 307.920
15 Storage Volume (Vn) (13 + 14) 742.103 632.393 689.708 541.416 474.836 446.346 419.565 394.391 370.728 348.484 328.319 399.398
16 dVn = Vn -V(n-1) 134 61 152 36 0 0 0 0 0 0 1 91
17 Base Flow (12 - 16) 4 2 5 1 0 0 0 0 0 0 0 3
18 Direct Run Off (11 - 12) 207.098 93.872 235.546 56.089 0 0 0 0 0 0 1.151 141.461
19 Run Off (17 + 18) 211 96 240 57 0 0 0 0 0 0 1 144
20 Luas Catchment Area 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310 48.310
21 Debit (m3/det) (19 x 20) 3.810 1.912 4.333 1.066 0 0 0 0 0 0 0.0219 2.6025
22 Debit (lt/det) 3810.111 1912.065 4333.491 1066.308 0 0 0 0 0 0 21.8747 2602.5441
Jumlah Hari 31 28 31 30 31 30 31 31 30 31 30 31
m3/bln (106) 10.205 4.626 11.607 2.764 0 0 0 0 0 0 0.057 6.971

Teknik Perencanaan Irigasi dan Rawa Dep. PU - UNDIP


Tugas Akhir Perencanaan Embung Logung Kec Dawe Kab. Kudus

Tabel 4.12. Rekap Debit Andalan Metode F.J MockEmbung Logung

Tahun Bulan
Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des
(m3/det)
1999 2.394 4.672 2.182 1.755 0.000 1.333 0.000 0.000 0.000 1.277 2.129 4.671
1998 1.236 0.961 2.280 2.134 0.001 0.087 0.750 0.000 0.000 1.114 2.117 1.249
1997 3.059 1.248 0.456 0.664 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.067
1996 4.054 6.739 1.026 0.367 0.000 0.000 0.000 0.000 0.000 0.564 2.888 4.067
1995 7.840 7.058 2.821 0.000 0.000 0.398 0.000 0.000 0.000 0.000 2.526 4.524
1994 3.810 1.912 4.333 1.066 0.000 0.000 0.000 0.000 0.000 0.000 0.022 2.603

Debit andalan yang digunakan adalah debit andalan 20 % kering


dari data di atas dapat disusun urutan debit sebagai berikut

No. Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des
(m /det)
3

1 1.236 0.961 0.456 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.249
2 2.394 1.248 1.026 0.367 0.000 0.000 0.000 0.000 0.000 0.000 0.022 2.603
3 3.059 1.912 2.182 0.664 0.000 0.000 0.000 0.000 0.000 0.000 2.129 4.671
4 3.810 4.672 2.280 1.755 0.000 0.087 0.000 0.000 0.000 1.277 2.117 3.067
5 3.810 6.739 2.821 1.066 0.000 0.398 0.000 0.000 0.000 0.564 2.526 4.067
6 7.840 7.058 4.333 2.134 0.001 1.333 0.750 0.000 0.000 1.114 2.888 4.524

Debit andalan yang digunakan adalah :


Bulan Jan Feb Mar Apr Mei Jun Jul Agt Sept Okt Nov Des
Q m /det
3
1.815 1.105 0.741 0.183 0.000 0.000 0.000 0.000 0.000 0.000 0.011 1.926