You are on page 1of 1

ELEMENTOS UNIDADES N DE VECES N DE VECES ALTO (M) LONGITUD (M) SUBTOTAL TOTAL

CIMENTACION EXCAVACION DE ZANJA

EJE A-A,B-B,C-C ENTRE 1-1,4-4 M3 3 0.4 1.1 10.25 13.53


EJE 1-1,2-2,3-3,4-4 ENTRE A-A,C-C M3 8 0.4 1.1 3.40 11.97
EJE B'-B' ENTRE 2-2,3-3 M3 1 0.4 1.1 1.85 0.81
ZAPATA DE ESCALERA M3 1 0.4 1.1 1.00 0.44
26.75
RELLENO DEBAJO DEL TERRENO NATURAL

EJE A-A,B-B,C-C ENTRE EJES 1-1,2-2;3-3,4-4 M3 6 0.15 0.3 3.78 1.02


EJE A-A,B-B,C-C ENTRE EJES 2-2,3-3 M3 3 0.15 0.3 2.10 0.28
EJE 1-1,2-2,3-3,4-4 ENTRE A-A,C-C M3 8 0.25 0.3 3.40 2.04
EJE B'-B' ENTRE 2-2,3-3 M3 1 0.25 0.3 1.85 0.14
MENOS M3 2 0.15 0.3 0.13 0.01
3.47
VOLUMEN DE RELLENO ENTRE EL N.T.N Y N.R.

EJE A-A,C-C ENTRE EJES 1-1,2-2 M3 2 3.625 0.15 3.78 4.11


EJE A-A,B-B,C-C ENTRE EJES 3-3,4-4 M3 2 3.625 0.15 3.78 4.11
EJE A-A,C-C ENTRE 2-2,3-3 M3 2 3.625 0.15 2.10 2.28
EJE B'-B' ENTRE EJES 2-2, 3-3 MENOS M3 1 0.15 0.15 2.10 0.05
10.45