MEZCLA:
-2K ARENA
-1K DE CEMENTO
-AGUA
TABLA DE RESISTENCIA DE CONCRETOS / PROPORCIN POR CADA BULTO DE CEMENTO
CANTIDA CANTIDA
RESISTEN CANTIDA CANTIDA
D DE D DE
CIA Y D DE D DE VOLUMEN
APLICACI ARENA GRAVA
TIPO DE CEMENTO AGUA P/C RESULTANTE EN
N P/C BOTE P/C BOTE
CONCRET BULTO DE BOTE DE LITROS
DE 19 DE 19
O 50 KGS 19 LTS.
LTS. LTS.
FIRMES,
IF'C 100
KGS/CM2
PLANTILL 1.0 6.0 8.0 2.0 180 LTS
AS
DALAS Y
F'C 150
KGS/CM2
CASTILLO 1.0 5-1/4 7-1/2 1-3/4 165 LTS
S
LOSAS
F'C 200 DE
KGS/CM2 ENTREPIS 1.0 4-1/2 6.0 1-1/2 145 LTS
O
COLUMN
F'C 250
KGS/CM2
AS Y 1.0 3-3/4 5-1/2 1-1/4 130 LTS
TRABES
F'C 300 PREESFO
KGS/CM2 RZADOS 1.0 3 4-3/4 1.0 112 LTS
CANTIDA CANTIDA
RESISTEN CANTIDA CANTIDA
D DE D DE VOLUMEN
CIA Y TIPO D DE D DE
APLICACI ARENA GRAVA RESULTA
DE CEMENTO AGUA P/C
N P/C BOTE P/C BOTE NTE EN
CONCRET BULTO DE BOTE DE
DE 19 DE 19 LITROS
O 50 KGS 19 LTS.
LTS. LTS.
FIRMES,
IF'C 100 1000
KGS/CM2
PLANTILL 5 30.00 35 13.50
AS LTS
DALAS Y
F'C 150 1000
KGS/CM2
CASTILLO 6 29.00 34.50 13.50
S LTS
LOSAS
F'C 200 DE 1000
KGS/CM2 ENTREPIS 7 28.50 34.50 12.70
LTS
O
COLUMN
F'C 250 1000
KGS/CM2
AS Y 8 28.50 34.00 12.50
TRABES LTS
F'C 300 PREESFO 1000
KGS/CM2 RZADOS 8.50 27.30 33.00 10.50
LTS