NASHPA Gas Processing and LPG Recovery Plant

PROC-FC-CB/NASHPA/PROJ-1247/2015

PROJECT NO.: NASHPA 1247

DOCUMENT NO.:
MATERIAL TAKE-OFF PAGE 1 OF 3
NGP-000-TEL-15.04-0002-03

Telecom MTO for Existing Process unit area

REVISION DETAILS

00 15/07/2016 Approved for Design Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

C 07/07/2016 Issued for Approval Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

B 27/06/2016 Issued for Review Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

A 20/06/2016 Internal Discipline Check Shao Wanpeng Wang Hao Zhang Zhaomeng Wang Xinggang

REV DATE DESCRIPTION PRPD CHKD REVD APPD

Doc Size: A4
NASHPA Gas Processing and LPG Recovery Plant
PROC-FC-CB/NASHPA/PROJ-1247/2015
DOC. NO. NGP-000-TEL-15.04-0002-03
DESCRIPTION Telecom MTO for Existing Process unit area
REVISION 00
PAGE 2 OF 3

REVISION HISTORY

REV. DATE REVISION DESCRIPTION

A 20/06/2016 Internal Discipline Check

B 27/06/2016 Issued for Review

C 07/07/2016 Issued for Approval

00 15/07/2016 Approved for Design


CLINET: Oil & Gas Development Company Ltd.(OGDCL) Date: 15/07/2016
CONTRACTOR:Hong Kong Huihua Global Technology Limited Wholly owned subsidiary of China OIL HBP Science and Technology Corporation Ltd.HBP/HH Revision: 00
Document Number:NGP-000-TEL-15.04-0002-03 Document name:Telecom MTO for Existing Process unit area Discipline Approved for Design
Package Number: 03 Area Definition: Existing Process unit area Page: 3 of 3

Sr.No. Definition Specification Quantity Unit Remarks

1 PBX HOST trunck line E1, 16 analog trunk lines ,128 Subscriber lines set 1

2 CABINET (600(W)x800(D)x2100(H)) set 1


TELEPHONE
DISTRIBUTION
3 FRAME 100 pairs, with Surge protective device set 2

4 LAPTOP Latitude 14 3470 set 1

5 POWER CABLE 0.6/1kV CU/XPLE/PVC 3X2.5 m 20


METALLIC CABLE
6 TRAY 100x100mm m 20
GALVANIZED STEEL
7 PIPE DN80 m 18
L40x40x5 20
8 Steel Angle m