JOB HAZARD ANALYSIS WORKSHEET

PROJECT B11LQ
MAJOR WORK INSTALLATION OF PIPE SPOOLS
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT INSTALLATION OF PIPE SPOOLS (SMALL SIZES 100 mm & BELOW)
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
1 Increased ignition Modify existing lines by oxy- 3B 3B 3B 3B Brightness and UV ray (Eye Wear welding shield / goggles 1B 1B 0 0 Proper job planning and HUC team / Rigger,
sources cutting & grinding injury or arc eye) supervision and good Pipe Fitter & Welder
coordination
Spatters of molten metal Wear leather handgloves
(Burn)

Hot surfaces of welded work Wear leather handgloves


pieces (Burn)

2. Unignited HC N/A
release
Toxic/Asphyxiating
Release

3. High Pressure Cutting of pipe spools 3B 2B 2B 3B Gas Leak Check any gas leak in the hoses 1B 0 0 0 Proper job planning and HUC team / Rigger,
Liquid / Gas and fitting using soapy water supervision and good Pipe Fitter & Welder
Release coordination

4. High / Low Hot work activity Fire extinguisher to be placed & 1B 1B 0 0 Proper job planning and HUC team / Rigger,
Temperature shall be inspected peroidically. supervision and good Pipe Fitter & Welder
Liquid / Gas All combustible material shall be coordination
segregated.

5. Dropped Loose material 3B 3B 2B 3B Personnel Injury, Property Ensure all tools are secure and 1B 1B 0 0 Proper job planning and HUC team / Rigger,
Objects/Swinging Damage use of proper tool bag/box. supervision Pipe Fitter & Welder
loads Barricade the work area below.

Crane operation Personnel Injury, Property Competent Banksman appointed


Damage for the lifitng operations.
Rig-in pipe spools & Slip and fall from height Wear safety harness and secure
allignment.Congested & aloft lanyard properly
worksite
caught in/ between pipes & Hand / finger injury Good rigging practices use ropes
supports for pulling
Box-up flange connection of Hand / finger injury Use safety line to secure handtool
the pipe spools,Miss- handle instead hold direct by and
hand tools / Spanner

Erect screen welding habitat to Shoulder injury Carry a comportable weight


contain oxy-cutting/ grinding &
welding spatters

1 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK INSTALLATION OF PIPE SPOOLS
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT INSTALLATION OF PIPE SPOOLS (SMALL SIZES 100 mm & BELOW)
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
6. Ship Impact Engine Failure, Ship 3B 3B 2B 2B Personnel Injury, Property Personnel competency, 1B 1B 1B 1B Proper job planning and HUC team / Rigger,
Maneuvering Damage PPE,PTW,JSA,TBM and Safety supervision Pipe Fitter & Welder
sign

7. Structural Failure / corroded structure 3B 3B 2B 3C Damage property Inspect the work area/structure 1B 1B 0 0 Proper Inspection HUC team / Rigger,
Buoyancy Loss before work commences. Pipe Fitter & Welder

Use of weak structure to 3B 2C 1C 2C Personnel Injury Scaffolders and inspectors should 1B 1B 0 0 Proper Inspection
support scafffolding inspect the work area before
errecting of scaffolding.

8. Manual Handling Moving materials in congested 3B 2C 2B 2B Tri and Fall Keep work area clean and tidy 1B 1B 0 0 Proper job planning and HUC team / Rigger,
area supervision Pipe Fitter & Welder

Over exertion to get pipe Twist / back injury No over stress or twisting back
aligned during manual handling

9. Chemical Handling N/A

10 Access / Engress Working at height 3B 2C 2B 2B Personnel Injury Use certified access / scaffold at 1B 1B 0 0 Proper Inspection and HUC team / Rigger,
all times comply wit scaff. Tag housekeeping Pipe Fitter & Welder
system.

11. Escape/Evacuation Unfamiliar to escape route 2B 2B 1C 1C Personnel Injury,Trap Limit the personnel working in the 1B 1B 0 0 Proper Inspection and HUC team / Rigger,
area housekeeping Pipe Fitter & Welder

12. Location / H2S area, weather 3B 0 3B 3B Personnel Injury Proper H2S detection & escape 1B 0 0 0 Proper training and provision of HUC team / Rigger,
Escalation equipment equipment Pipe Fitter & Welder

13. Electricity In contact with live cable/circuit 2B 2B 2B 2B Personnel Injury, Death and Ensure proper isolation is done 1B 0 0 0 Proper training and provision of HUC team / Rigger,
Electrical Shock and tested before work equipment Pipe Fitter & Welder
commences.

Riggers assisted pulling Twist / back injury No over stress or twisting back
welding cables. Over exertion during manual handling
in cable pulling

2 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK INSTALLATION OF PIPE SPOOLS
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT INSTALLATION OF PIPE SPOOLS (SMALL SIZES 100 mm & BELOW)
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
14. Working Heat from live equipment 1B 1C 1C 1C Brightness and UV ray Check the vicinity is safe to 1B 0 0 0 Proper job planning and HUC team / Rigger,
Conditions, e.g. proceed with cutting job and supervision and good Pipe Fitter & Welder
heat, noise, bad adhere to PTW system required coordination
Working beside high noise 1C 1C 1C 1C Brightness and UV ray Check the vicinity is safe to 1B 0 0 0
weather etc
equipment proceed with cutting job and
adhere to PTW system required
Raining/windy condition. 1C 3C 1C 1B Brightness and UV ray Check the vicinity is safe to 1B 0 0 0
proceed with cutting job and
adhere to PTW system required

15. Others House Keeping Moving parts Ensure walkway is kept clear at all 1B 0 0 0 Proper job planning and HUC team / Rigger,
times, Maintain good supervision Pipe Fitter & Welder
housekeeping at all times & watch
your steps

Concurrent Activities Not Permitted/Restricted:


1) Restrict rigging and lifting activities when divers are in water.
2) Hot works will be restricted during operation activities which results in hydrocarbon release to atmosphere.